Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Files3

Search terms highlighted
Eversource rate increase is on 6 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
5 pages match
Words on different pages
  1. Page 16 of 276

    14 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Introduction and Overview T Charting a new path on cost allocation is an important part of utility cost allocation for a wide range of practitioners, including utilities, intervenors, utility creating the fair, efficient and clean regulators and other policymakers. Cost allocation is electric system of the future. one of the major steps in the traditional regulatory he purpose of this manual is to provide a comprehensive reference on electric process for setting utility rates. In this step, the regulators are best practices that have been developed over the past several primarily determining how to equitably divide a set amount decades and points toward needed innovations. The authors of of costs, typically referred to as the revenue requirement, this manual believe strongly that charting a new path forward among several broadly defined classes of ratepayers. The on cost allocation is an important part of creating the fair, predominant impact of different cost allocation techniques efficient and clean electric system of the future. is which group of customers pays for which costs. In many cases, this is the share of costs paid by residential customers, commercial customers and industrial customers. Scope and Context of This Manual In addition, the data and analytical methods used to This manual focuses on cost allocation practices for inform cost allocation are often relevant to the final step of electric utilities in the United States and their implications. the traditional regulatory process, known as rate design. In Our goal is to serve as both a practical and theoretical this final step, the types of charges for each class of ratepayers guide to the analytical techniques involved in the equitable are determined — which can include a per-month charge; distribution of electricity costs. This includes background on charges per kilowatt-hour (kWh), which can vary by season regulatory processes, purposes of regulation, the development and time of day; and different charges based on measurements of the electricity system in the United States, current best of kilowatt (kW) demand — as well as the price for each type practices for cost allocation and the direction that cost of charge. As a result, cost allocation decisions and analytical allocation processes should move. Most of the elements of techniques can have additional efficiency implications. this manual will be applicable elsewhere in the Americas, as Cost allocation has been addressed in several important books and manuals on utility regulation over the past well as in Europe, Asia and other regions. The rate-making process for investor-owned utilities 60 years, but much has changed since the last comprehensive (IOUs) has three steps: (1) determining the annual revenue publication on the topic — the 1992 Electric Utility Cost requirement, (2) allocating the costs of the revenue require- Allocation Manual from the National Association of ment among the defined rate classes and (3) designing the Regulatory Utility Commissioners (NARUC). Although rates each customer ultimately will pay. Figure 1 on the next these works and historic best practices are foundational, the page presents a highly simplified version of these steps. legacy methods of cost allocation from the 20th century are In the cost allocation step, there are two major quantita- no more suited to the new realities of the 21st century than tive frameworks used around the United States: embedded the engineering of internal combustion engines is to the cost of service studies and marginal cost of service studies. design of new electric motors. New electric vehicles (EVs) may Embedded cost studies typically are based on a single year- look similar on the outside, but the design under the hood is long period, using the embedded cost revenue requirement completely different. This handbook both describes the current and customer usage patterns in that year to divide up costs.
  2. Page 17 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 15 Figure 1. Simplified rate-making process Determine revenue requirement Net rate base (Plant in service – depreciation reserve) x + Rate of return Depreciation expense (Plant in service x depreciation rate) + Operating expense (Fuel + purchased power + labor + labor overheads + supplies + services + income taxes) + = Other taxes $ millions Allocate costs among customer classes Design retail rates Residential Commercial Industrial Dollars Cents per Cents per kWh month per kWh off-peak peak Dollars Cents per Cents per kWh month per kWh off-peak peak Street lighting Dollars Dollars per Cents per kW Cents month per kWh per kWh monthly peak off-peak Dollars per light per month Marginal cost of service studies, in contrast, look at how costs The analysis for a marginal cost of service study starts are changing over time in response to changes in customer with a similar functionalization step, but that is followed by usage. estimation of marginal unit costs for each element of the Regardless of which framework will be used, an enor- system, calculation of a marginal cost revenue requirement mous amount of data is typically collected first, starting with (MCRR) for each class as well as for the system as a whole, the costs that make up the revenue requirement, energy and then reconciliation with the annual embedded cost usage by customer class and measurements of demand at revenue requirement. various times and often extending to data on generation This cost allocation manual is intended to build upon pre- patterns. Furthermore, when the quantitative cost of service vious works on the topic and to illuminate several areas where study is completed, regulators typically don’t take the results the authors of this manual disagree with the approaches of the as the final word, often making adjustments for a wide range previous publications. Important works include: of policy considerations after the fact. • Traditionally, the analysis for an embedded cost of service study is itself divided into three parts: functionalization, classification and allocation. Figure 2 on the next page shows the traditional flowchart for this process. Principles of Public Utility Rates by James C. Bonbright (first edition, 1961; second edition, 1988). • Public Utility Economics by Paul J. Garfield and Wallace F. Lovejoy (1964).
  3. Page 18 of 276

    16 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Figure 2. Traditional embedded cost of service study flowchart Revenue requirement Functionalization Generation Distribution Transmission Billing and customer service Classification Demand-related Energy-related Customer-related Allocation Residential • Commercial The Economics of Regulation: Principles and Institutions by Alfred E. Kahn (first edition Volume 1, 1970, and Volume 2, 1971; second edition, 1988). • The Regulation of Public Utilities by Charles F. Phillips (1984). • The 1992 NARUC Electric Utility Cost Allocation Manual. Of course, cost allocation has been touched upon in other works, including RAP’s publication Electricity Regulation in the United States: A Guide by Jim Lazar (second edition, 2016). However, since the 1990s, there has been neither a comprehensive treatment of cost allocation nor one that addresses the emerging issues of the 21st century. This manual incorporates the elements of these previous works that remain relevant, while adding new cost centers, new operating regimes and new technologies that today’s cost analysts must address. Industrial Street lighting Continuing Evolution of the Electric System Since the establishment of electric utility regulation in the United States in the early 20th century, the electric system has undergone periods of great change every several decades. Initial provision of electricity service in densely populated areas was followed by widespread rural electrification in the 1930s and 1940s. In the 1950s and 1960s, vertically integrated utilities, owning generation, transmission and distribution simultaneously, were the overwhelmingly dominant form of electricity service across the entire country. However, the oil crisis in the 1970s sparked a chain reaction in the electric industry. That included a new focus by utilities on baseload generation plants, typically using coal or nuclear power. At the same time, the federal government began to open up competition in the electric system with the passage of the Public Utilities Regulatory Policy Act (PURPA)
  4. Page 19 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® of 1978. PURPA dictated that each state utility commission consider a series of standards to reform rate-making prac- ELECTRIC COST ALLOCATION FOR A NEW ERA 400 the recommendation that rates should be based on the cost 350 of service, but neither PURPA nor state regulators were to calculate it and how to use it. PURPA also required that utilities pay for power from independent power producers Combined 300 Terawatt-hours legal and policy discussion about the cost of service, how 17 Figure 3. Increase in US wind and solar generation from 2008 to 2018 tices, including cost of service.1 Nearly every state adopted clear about what that should mean. This has led to a fertile | on set terms. 250 Wind 200 150 100 In the 1970s and early 1980s, major increases in oil prices, Solar 50 the completion of expensive capital investments in coal and 0 2008 nuclear generation facilities and general inflation all led to significantly higher electricity prices across the board. These 2010 2012 2014 2016 2018 Data source: U.S. Energy Information Administration. (2019, February). Electric Power Monthly. Table 1.1.A. Retrieved from https://www.eia.gov/ electricity/monthly/epm_table_grapher.php?t=epmt_1_01_a higher prices, in combination with PURPA’s requirement for set compensation to independent power producers, led to demands by major consumers to become wholesale that currently run directly on fossil fuels — for example, purchasers of electricity. This in turn led to the Energy Policy electric vehicles in place of vehicles with internal Act of 1992, which enabled the broader restructuring of the combustion engines. electric industry in much of the country around the turn of Many, if not all, of these changes have quantifiable ele- the 20th century. ments that can and should be incorporated directly into the The key texts and most of the analytical principles regulatory process, including cost allocation. The increased currently used for cost allocation were developed between development of renewable energy and the proliferation of the 1960s and early 1990s. Since that time, the electric system more sophisticated meters provide two examples. in the United States has been undergoing another period of Figure 3 illustrates the dramatic increase in wind and dramatic change. That includes a wide range of interrelated solar generation in the United States in the last decade, based advancements in technology, policy and economics: on data from the U.S. Energy Information Administration. • • • • Major advances in data collection and analytical Traditional cost allocation techniques classify all utility capabilities. costs as energy-related, demand-related or customer- Restructuring of the industry in many parts of the related. These categories were always simplifications, but country, including new wholesale electricity markets, they must be reevaluated given new developments. Some new retail markets and new market participants. legacy cost allocation methods would have treated wind and New consumer interests and technologies that can be solar generation entirely as a demand-related cost simply deployed behind the meter, including clean distributed because they are capital investments without any variable generation, energy efficiency, demand response, storage fuel costs. However, wind and solar generation does not and other energy management technologies. necessarily provide firm capacity at peak times as envisioned Dramatic shifts in the relative cost of technologies and by the legacy frameworks, and it displaces the need for fuel fuels, including massive declines in the price of variable supply, so it doesn’t fit as a demand-related cost. renewable resources like wind and solar and sharp declines in the cost of energy storage technologies. • The potential for beneficial electrification of end uses 1 The PURPA rate-making standards are set forth in 16 U.S.C. § 2621. Congress in 2005 adopted a specific requirement that cost of service studies take time of usage into account; this is set forth in 16 U.S.C. § 2625.
  5. Page 20 of 276

    18 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Table 1. Types of meters and percentage of customers with each in 2017 Residential Commercial Industrial Advanced metering infrastructure 52.2% 50.0% 44.5% Automated meter reading 29.5% 26.5% 28.0% Older systems 18.3% 23.5% 27.5% Principles and Best Practices There is general agreement that the overarching goal of cost allocation is equitable division of costs among customers. Unfortunately, that is where the agreement ends and the arguments begin. Two primary conceptual principles Data source: U.S. Energy Information Administration. Annual Electric Power Industry Report, Form EIA-861: 2017 [Data file]. Retrieved from https://www.eia.gov/electricity/data/eia861/ help guide the way to the right answers: 1. Cost causation: Why were the costs incurred? 2. Costs follow benefits: Who benefits? In some cases these two frameworks point to the same answer, but in other cases they conflict. The authors of this manual believe that “costs follow benefits” is usually, but In addition, many utilities now collect much more not always, the superior principle. Other helpful questions granular data than was possible in the past, due to the can be asked to illuminate the details of particularly difficult widespread installation of advanced metering infrastructure questions, such as: (AMI) in many parts of the country and other advancements • If certain resources were not available, which services in the monitoring of the electric system. As a result, utility would not be provided, and what different resources analysts often have access to historical hourly usage data would be needed to provide those services at least cost? for the entire utility system, each distribution circuit, each • If we did not serve this need in this way, how would costs customer class and, increasingly, each customer. Some change? automated meter reading (AMR) systems also allow the In the end, cost allocation may be more of an art than a collection of hourly data, typically read once per billing cycle. science, since fairness and equity are often in the eye of the Table 1 shows the recent distribution of meter types across beholder. In most situations, cost allocation is a zero-sum the country, based on data from the U.S. Energy Information process where lower costs for any one group of customers Administration. Improved data collection allows for a wide lead to higher costs for another group. However, the tech- range of new cost allocation techniques. niques used in cost allocation have been designed to mediate In addition, meters have been primarily treated as a these disputes between competing sets of interests. Similarly, customer-related cost in older methods because their main the data and analysis produced for the cost allocation process purpose was customer billing. However, advanced meters can also provide meaningful information to assist in rate serve a broader range of functions, including demand design, such as the seasons and hours when costs are highest management, which in turn provides system capacity and lowest, categorized by system component as well as by benefits, and line loss reduction, which provides a system customer class. In that spirit, we would like to highlight the following energy benefit. This means the benefits of these meters flow beyond individual customers, and logically so should current best practices discussed at more length in the later responsibility for the costs. chapters of this manual. To begin, there are best practices These are just two examples of how recent technological that apply to both embedded and marginal cost of service advances affect appropriate cost allocation. In subsequent studies: chapters, this manual will address each major cost area for • Treat as customer-related only those costs that actually electric utilities, the changes that have occurred in how costs vary with the number of customers, generally known as are incurred and how assets are used, and the best methods the basic customer method. for cost allocation. • Apportion all shared generation, transmission and distribution assets and the associated operating expenses
  6. Page 21 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA on measures of usage, both energy- and demand-based. • • of service studies: administrative and general (A&G) costs, based on usage • lower greenhouse gas emissions than the present system, Eliminate any distinction between “fixed” costs and and recognize the costs of emissions that do occur as “variable” costs, as capital investments (including new marginal costs during those periods. • capacity purchases are cheaper than a traditional peaking Where future costs are expected to vary significantly combustion turbine as the foundation of marginal from current costs, make the cost trajectory an important generation capacity cost. • and other investments in avoiding capacity or increasing Classify and allocate generation capacity costs using a reliability, and consider including replacement costs over time-differentiated method, such as the probability-of- the relevant timeframe. dispatch or base-intermediate-peak (BIP) methods, or • Recognize marginal line losses in each period. classify capacity costs between energy and demand using • Functionalize marginal costs in revenue reconciliation; the equivalent peaker method. use the equal percentage of marginal cost technique by Allocate demand-related costs for generation using a function, not in total. broad peak measure, such as the highest 100 hours or the loss-of-energy expectation. Classify and allocate the costs of transmission based on its purpose, with any demand-related costs allocated • Path Forward and Need for Reform Our power system is changing, and cost allocation based on broad peak periods for regional networks and methods must also change to reflect what we are narrower ones for local networks. experiencing. Key changes in the power system that have Classify distribution costs using the basic customer consequences for how we allocate costs include: method, and divide the vast majority of costs between • demand-related and energy-related using an energyweighted method, such as the average-and-peak method • • Peaking resources are increasingly located near load that many natural gas utilities use. centers, eliminating the need for transmission line Allocate demand-related distribution costs using investment to meet peak demand. Long transmission appropriately broad peak measures that capture the hours lines are often needed to bring baseload coal and nuclear with high usage for the relevant system elements while resources, and to bring wind and other renewable resources, even if they may have limited peaking value Ensure that customer connection and service costs appropriately reflect differences between customer • Renewable resources are replacing fossil generation, substituting invested capital in place of variable fuel costs. appropriately accounting for diversity in customer usage. • Use an expansive definition of marginal costs for transmission and distribution, including automation, controls embedded cost of service studies: • Analyze whether demand response, storage or market tutes for fuel and other short-run variable operating costs. Second, there are current best practices specific to • Use long-run marginal costs for generation that reflect metrics. consideration in the apportionment of costs. • 19 Lastly, there are current best practices for marginal cost Ensure broad sharing of overhead investments and technology and data acquisition) are increasingly substi• | relative to their total value to the power system. • Storage is a new form of peaking resource — one that classes by using either specific cost studies for each can be located almost anywhere and has low variable element or a weighted customer approach. costs. Storage can help avoid generation, transmission Functionalize and classify AMI and billing systems and distribution capacity-related costs. The total costs of according to their multiple benefits across different storage need to be assigned to the proper time period for elements and aspects of the electric system. equitable treatment of customer classes.
  7. Page 22 of 276

    20 | ELECTRIC COST ALLOCATION FOR A NEW ERA • REGULATORY ASSISTANCE PROJECT (RAP)® Consumer-sited resources, including solar and storage, outside of public utilities commissions. are becoming essential components of the modern grid. For all cost of service studies, these innovations could The distribution system may also begin to serve as include: a gathering system for power flowing from locations • of local generation to other parts of the utility service territory, the opposite of the historical top-down electric • Clear distinction between shared assets and customerspecific assets in the accounting for distribution costs. • Clearer tracking of distinctions between system costs and delivery model. overhead investments and expenses at all stages of the Smart grid systems make it possible to provide better rate-making process. service at lower cost by including targeted energy • More accurate definitions of rate classes based on emerg- efficiency and demand response measures to meet loads ing economic and service characteristic distinctions at targeted times and places and other measures to take between customers. advantage of improved data and operational capabilities. • Unfortunately, older techniques, even those resulting Distinction between loads that can be controlled to draw power primarily at low-cost periods and those that are from detailed inquiries by cutting-edge regulators in recent inflexible. decades, may not be sufficiently sophisticated to incorporate For embedded cost of service studies, innovative hourly new technologies, more granular data and advancements in allocation techniques could incorporate a number of analytical capabilities. As a result, innovations are needed advances, including: in the regulatory process to mirror the changes taking place • Hourly methods for generation: Most generation costs Figure 4. Modern embedded cost of service study flowchart Revenue requirement Functionalization Generation Distribution Transmission Billing, customer service, and A&G costs Time assignment Peak hours Intermediate hours All hours, including off-peak Site infrastructure, billing and collection Allocation Residential Commercial Industrial Street lighting
  8. Page 23 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® • • 21 apportioning utility costs among functions, customer classes facilities are actually used and to all hours across the year, and types of service and that they join us in finding the best not solely based on measurements in a subset of these path forward. Hourly methods for transmission: Transmission costs must be examined to determine the purpose and usage • | should be assigned to the hours in which the relevant hours. • ELECTRIC COST ALLOCATION FOR A NEW ERA Guide to This Manual After this introduction and summary, this manual is patterns, and costs must be assigned to the hours when divided into five parts: the transmission services are utilized to serve customer • Part 1: Chapters 1 through 4 lay out principles of needs. economic regulation of electric utilities, background on All shared distribution costs should be apportioned the rate-making process, and definitions and descriptions based on the time periods when customers utilize of the electric system in the United States. Readers who these facilities. The system is needed to provide service are new to rate-making and utility regulation should start in every hour, and in most cases a significant portion here for the basics.2 Much of this material likely will be of the distribution system cost should be assigned familiar to an experienced practitioner but emphasizes volumetrically to all hours across the year. key issues relevant to the remainder of the manual. Billing, customer service and A&G costs that do not • Part II: Chapters 5 through 8 cover the important vary based on consumption should be functionalized definitions, basic techniques and overarching issues in separately. cost allocation. Some of this material may be familiar to Site infrastructure to connect customers, billing and an experienced practitioner but also lays out the issues collection should be a separate classification category. facing cost allocation. Figure 4 shows an example of a modern time-based • allocation method in a reformed flowchart. subject of embedded cost of service studies, including Innovation in marginal cost of service studies could take discussion of historic techniques, current best practices the form of more granular hourly marginal cost analysis for the generation, transmission and shared distribution elements of Part III: Chapters 9 through 17 delve deeply into the and key reforms. • Part IV: Chapters 18 through 26 cover the field of mar- the system. Alternatively, a more conceptual shift to the total ginal cost of service studies, including historical develop- service long-run incremental cost method developed for the ment, current best practices and key needed reforms. restructuring of the telecommunications industry should be • Part V: Chapters 27 and 28 cover what happens after considered. This method estimates the cost of building a new the completion of the quantitative studies, including optimally sized system using current technologies and costs. presentation of study results and adjustments, and This avoids a number of significant issues with traditional the relationship between cost allocation and rate marginal cost of service studies, particularly the problem design. of significant swings in estimates based on the presence or The conclusion wraps up with final thoughts. absence of excess capacity, but it comes with additional data Each part of this manual ends with a list of works requirements and new uncertainties. These proposed innovations, regardless of whether they cited. Terms defined in the glossary are set off in boldface type where they first appear in the text. are adopted widely, shed new light into the foundations of cost allocation and may help the reader gain insight into the underlying questions. More generally, we hope that readers find this manual useful as they undertake the complex task of 2 For a more detailed handbook on the structure and operation of the industry, see Lazar, J. (2016). Electricity Regulation in the United States: A Guide (2nd ed.). Montpelier, VT: Regulatory Assistance Project. Retrieved from https://www.raponline.org/knowledge-center/electricity-regulationin-the-us-a-guide-2/
  9. Page 24 of 276

    22 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Visual display of cost allocation results Like much of utility regulation, visual display of information in be possible to convey cost allocation results in a meaningful cost allocation tends to be dry and difficult to understand. Much way that a wider audience can understand. One possibility is of the analytical information for cost allocation tends to be to convert the traditional flowcharts into Sankey diagrams, displayed in large tables that only experts can interpret. Simple where the width of the flows is proportional to the magnitude of flowcharts, such as Figure 2 on Page 16, are also quite common the costs. Figure 5 shows this type of diagram for a traditional and convey little substantive information. Nevertheless, it should embedded cost of service study. Figure 5. Sankey diagram for traditional embedded cost of service study Revenue requirement: 1,500 Generation: 650 Transmission: 250 Demand-related: 625 Residential: 530 Distribution: 450 150 Customerrelated: 200 Energy-related: 675 Commercial: 460 Billing & customer service: Industrial: 415 Street lighting: 95
  10. Page 25 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 23 A Sankey diagram can display a tremendous amount of infor- a more complex reformed embedded cost of service study. Like mation in a way that is reasonably understandable. At the top, Figure 5, it shows illustrative results that are feasible with certain it begins with the overall revenue requirement, then splits into allocation techniques. In contrast, the flowcharts in figures 2 three functions. Next, each function splits into the different and 4 show all the different allocation possibilities with arrows classifications, which are then allocated by customer class. At linking different categories. each step, the overall costs stay constant, but the relative sizes for each function, classification and customer class are readily apparent. Additionally, the colors in the diagram can be used to indicate additional distinctions. Figure 6 is a Sankey diagram for As the Sankey diagram becomes more complex, it can be less intuitive. Yet it is likely a much more understandable visual representation of the key elements of a cost of service study. Figure 6. Sankey diagram for modern embedded cost of service study Revenue requirement: 1,500 Generation: 600 Peak hours: 250 Transmission: 200 Intermediate hours: 375 Residential: 500 Distribution: 400 300 Site infrastructure, billing and collection: All hours: 635 Commercial: 460 Customer service, billing and A&G: 240 Industrial: 400 Street lighting: 140
1 page match

As listed on the current system

Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Melissa Whited [26-05-10]

This filing on the current system (opens in a new tab)