Prefiled testimony
Witness: Melissa Whited
Files3
Synapse - Eversource COS and Rate Design Testimony Final.pdf
PDF · 829 KB · 48 pagesText searchable
Download Synapse - Eversource COS and Rate Design Testimony Final.pdfRead the text of Synapse - Eversource COS and Rate Design Testimony Final.pdf
MW-2- Synapse Attachment.pdf
PDF · 4.6 MB · 276 pagesText searchable
Download MW-2- Synapse Attachment.pdfRead the text of MW-2- Synapse Attachment.pdf
MW-1 - Synapse Attachment.pdf
PDF · 734 KB · 13 pagesText searchable
Download MW-1 - Synapse Attachment.pdfRead the text of MW-1 - Synapse Attachment.pdf
Page 160 of 276
158 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Table 32. Summary of distribution allocation approaches Element Method Comments Hourly allocation Substations Functionalization: Entirely primary Classification: Demand and energy Allocator: Loads on substations in hours at or near peaks Reflect effect of energy near peak and preceding peak on sizing and aging Allocate by substation cost or capacity, then to hours that stress that substation with peak and heating Poles Functionalization: Entirely primary Classification: Demand and energy* Energy allocator: Energy or revenue Demand allocator: Loads in hours at or near peaks Pole costs driven by revenue expectation As primary lines Primary conductors Functionalization: Entirely primary Classification: Demand and energy* Energy allocator: Energy or revenue Demand allocator: Loads in hours at or near peaks • • Line transformers Functionalization: Entirely secondary Classification: Demand and energy* Energy allocator: Secondary energy Demand allocator: Diversified secondary loads in peak and near-peak hours Reflect diversity Distribution of transformer peaks and high-load hours Secondary conductors Functionalization: Entirely secondary Classification: Demand and energy* Energy allocator: Energy or revenue Demand allocator: Loads in hours at or near peaks Energy is more important for underground than overhead Distribution of line peaks and highload hours Meters Functionalization: Advanced metering infrastructure to generation, transmission and distribution, as well as metering Allocator for customer-related costs: Weighted customer Allocation of generation, transmission and distribution components depends on use of advanced metering infrastructure N/A • Distribution network is installed due to revenue potential Sizing determined by loads in and near peak hours • Cost associated with revenuedriven line extension to all hours Cost associated with peak loads and overloads on distribution of line peaks and high-load hours * Except some to customer, where a significant portion of plant serves only one customer costs due to load shifting and line loss reduction. Legacy methods for allocating metering costs as primarily customerrelated would place the vast majority of these costs onto the residential rate class, but many of the benefits are typically shared across all rate classes. In other words, the legacy method would give commercial and industrial rate classes substantial benefits but none of the costs. Table 31 identifies some of the key elements of smart grid cost and how these would be appropriately treated in an embedded cost of service study. These approaches match smart grid cost savings to the enabling expenditures. 11.6 Summary of Distribution Classification and Allocation Methods and Illustrative Examples The preceding discussion identifies a variety of methods used to functionalize, classify and allocate distribution plant. Table 32 summarizes the application of some of those methods, including the hourly allocations that may be applicable for modern distribution systems with: • A mix of centralized and distributed resources, conventional and renewable, as well as storage. • The ability to measure hourly usage on the substations and feeders. • The ability to estimate hourly load patterns on transformers and secondary lines.Page 161 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 159 Table 33. Illustrative allocation of distribution substation costs by different methods Residential Secondary commercial Primary industrial Street lighting Total Class NCP: substation (legacy) $9,730,000 $9,730,000 $7,297,000 $3,243,000 $30,000,000 Average and peak $10,056,000 $10,056,000 $8,100,000 $1,788,000 $30,000,000 Hourly $9,939,000 $10,533,000 $9,009,000 $519,000 $30,000,000 Note: Numbers may not add up to total because of rounding. Where the available data or analytical resources will not support more sophisticated analyses of distribution Substations Table 33 shows three methods for allocating costs of cost causation, the following simple rules of thumb may be distribution substations. The first of these is a legacy method, helpful. relying solely on the class NCP at the substation level.169 The • The only costs that should be classified as customer- second is an average-and-peak method, a weighted average related are those specific to individual customers: between class NCP and energy usage. The third uses the • Basic metering costs, not including the additional hourly composite allocator, which includes higher costs for costs of advanced meters incurred for system hours in which substations are highly loaded. benefits. • Service lines, adjusting for shared services in buildings with multiple tenants. • • • Primary Circuits Distribution circuits are built where there is an expecta- For very rural systems, where most transformers and tion of significant electricity usage and must be sized to meet large stretches of primary line serve only a single peak demands, including the peak hour and other high-load customer (and those costs are not recovered from hours that contribute to heating of the relevant elements of contributions in aid of construction), a portion of the system. Table 34 on the next page illustrates the effect of transformer and primary costs. four alternative methods. The first, based on the class NCP at Other costs should be classified as a mix of energy and the circuit level, again produces unreasonable results for the demand, such as using the average-and-peak allocator. street lighting class. The second, the legacy minimum system The peak demand allocation factor should reflect the method, is not recommended, as discussed above. The third distribution of hours in which various portions of and fourth use a simple (average-and-peak) and more sophis- distribution system equipment experience peak or ticated (hourly) approach to assigning costs based on how heavy loads. If the utility has data only on the time of much each class uses the lines and how that usage correlates substation peaks, the load-weighted peaks can be used to with high-load hours. distribute the demand-related distribution costs to hours and hence to classes. 11.6.1 Illustrative Methods and Results Transformers Line transformers are needed to serve all secondary voltage customers, typically all residential, small general The following discussion and tables show illustrative methods and results for several of the key distribution accounts, focused only on the capital costs. The same principles should be applied to O&M costs and depreciation expense. These examples use inputs from tables 5, 6, 7 and 27. 169 The street lighting class NCP occurs in the night, and street lighting is a small portion of load on any substation, so the street lighting class NCP load rarely contributes to the sizing of summer-peaking substations. The NCP method treats off-peak class loads as being as important as those that are on-peak. This is particularly inequitable for street lighting, which is nearly always a load caused by the presence of other customers who collectively justify the construction of a circuit.Page 162 of 276
160 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Table 34. Illustrative allocation of primary distribution circuit costs by different methods Residential Secondary commercial Primary industrial Street lighting Total Class NCP: circuit (legacy) $69,565,000 $69,565,000 $43,478,000 $17,391,000 $200,000,000 Minimum system (legacy) $113,783,000 $51,783,000 $24,739,000 $9,696,000 $200,000,000 Average and peak $67,041,000 $67,041,000 $53,997,000 $11,921,000 $200,000,000 Hourly $66,258,000 $70,221,000 $60,059,000 $3,462,000 $200,000,000 Note: Numbers may not add up to total because of rounding. service and street lighting customers and often other by class at 20% and the class sum of customer NCP customer classes as well. We present four methods in (recognizing that the diversity is not perfect) at 80%. Table 35: two archaic and two more reflective of dynamic The last is an hourly energy method but excluding the systems and more granular data. All of these apportion primary voltage class of customers. no cost to the primary voltage class, which does not use Customer-Related Costs distribution transformers supplied by the utility. The final illustration shows two techniques for the The first method is to apportion transformers in proportion to the class sum of customer noncoincident apportionment of customer-related costs, based on a peaks. This method is not recommended because it fails to traditional customer count and a weighted customer count. recognize that there is great diversity between customers Even for simple meters used solely for billing purposes, at the transformer level; as noted in Subsection 11.3.3, each larger customers require different and more expensive transformer in an urban or suburban system may serve meters. There are fewer of them per customer class, but the anywhere from five to more than 50 customers. The second billing system programming costs do not vary by number of is the minimum system method, also not recommended customers. In addition, a weighted customer account is also because it fails to recognize the drivers of circuit relevant to customer service, discussed in the next chapter, construction, as discussed in Section 11.2. The third is the because the larger use customers typically have access to weighted transformers allocation factor we derive in superior customer service through “key accounts” specialists Section 5.3 (Table 7), weighting the number of transformers who are trained for their needs. Table 35. Illustrative allocation of distribution line transformer costs by different methods Residential Secondary commercial Primary industrial Street lighting Total Customer NCP (legacy) $32,258,000 $16,129,000 $0 $1,613,000 $50,000,000 Minimum system (legacy) $32,461,000 $14,773,000 $0 $2,766,000 $50,000,000 Weighted transformers factor $29,806,000 $14,903,000 $0 $5,290,000 $50,000,000 Hourly $23,810,000 $23,810,000 $0 $2,381,000 $50,000,000 Note: Numbers may not add up to total because of rounding.Page 163 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 161 Table 36. Illustrative allocation of customer-related costs by different methods Residential Secondary commercial Primary industrial Street lighting Customer count 100,000 20,000 2,000 50,000 172,000 Customer factor 58% 12% 1% 29% 100% Customer costs $58,140,000 $11,628,000 $1,163,000 $29,070,000 $100,000,000 Weighting factor 1 3 20 0.05 Customer count 100,000 60,000 40,000 2,500 202,500 Customer factor 49% 30% 20% 1% 100% Customer costs $49,383,000 $29,630,000 $19,753,000 $1,235,000 $100,000,000 Total Unweighted Weighted Note: Numbers may not add up to total because of rounding. Table 36 first shows a traditional calculation based on treated as a tiny fraction of one customer; although there the actual number of customers. Then it shows an illustrative are tens of thousands of individual lights, the bills typically customer weighting and a simple allocation of customer- include hundreds or thousands of individual lights, billed to a related costs based on that weighting. Each street light is city, homeowners association or other responsible party.170 170 In some locales, street lighting is treated as a franchise obligation of the utility and is not billed. In this situation, there are no customer service or billing and collection expenses.Page 164 of 276
162 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® 12. Billing and Customer Service in Embedded Cost of Service Studies M any utilities classify billing and customer service allocated according to appropriate measures of usage, rather costs, often termed retail service costs, as almost than customer count. entirely customer-related and allocate these Manual reading of the meters of large customers typically costs across classes based on the number of customers. This takes longer than for small customers, both because of chapter describes how these costs can be allocated in a more travel distance among larger customers and the complexity granular and detailed way. of metering typical of large customers (TOU or demand- 12.1 Billing and Meter Reading metered). In some cases, small customer meters are read manually but large customers are remotely metered; the Most utilities bill customers either monthly or additional costs of the equipment for that remote metering bimonthly. The reason for this is relatively simple: If should be assigned to the classes that use remote metering. billed less frequently, the bills would be very large and As noted in Section 11.5, unmetered customers such as unmanageable for some consumers; if billed more frequently, streetlights should not be allocated meter reading costs. the billing costs would be an unacceptable part of the total For utilities with AMI, any meter reading costs arising cost. As noted in Subsection 3.1.5, billing closer to the time of from customers opting out of AMI should be recovered either consumption provides customers with a better understanding from the opt-out customers or functionalized, classified and of their usage patterns from month to month, which may allocated in proportion to the AMI costs, because opt-outs are assist them in increasing efficiency. There are exceptions: part of the cost of obtaining the benefits of AMI. Many water, sewer and even electric utilities serving seasonal properties may render bills only once or twice a year.171 The costs of billing, payment processing and collections for special services (e.g., line extensions and relocations) can It is important to recognize these cost drivers in the clas- end up in Account 903 for some utilities. These are overhead sification of billing costs. From a cost causation perspective, costs, not customer costs, and should be either classified or the reason for frequent billing is that usage drives the size of allocated as an overhead expense.172 the bill. We receive annual bills for magazine subscriptions Some utilities provide on-bill financing for energy because the quantity we will use (one per week or month) efficiency, renewable energy or demand response investments is very small and predictable. In some states, rules of the that the utility (or a third party) makes at the customer prem- regulatory commission require billing on a specified interval. ises. Where this occurs, a portion of the billing cost should be For example, in Washington state, the rules require billing assigned to the nonservice cost element. not less than bimonthly (Washington Administrative Code Title 480, Chapter 100, § 178[1][a]). In this situation, billing frequency in excess of that required by law or regulation is driven by consumption. The portion of the costs of reading meters and billing more frequently should be classified and 171 This is also the case for California customers who opt out of AMI (California Public Utilities Commission, 2014). 172 The same is true for any uncollectible charges for special services. If there 12.2 Uncollectible Accounts Expenses Uncollectible accounts expenses are the expenses from customers who have not paid their bills, due to financial is direct assignment of uncollectibles, charges related to non-energy billings or claims should be segregated from the remainder of Account 904 and directly assigned as overhead expenses.Page 165 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 163 distress, bankruptcy or departure from the service territory.173 on the cost of service study, because direct-assigned late Some analyses erroneously allocate the costs of former payment revenues and deposits partly offset direct-assigned customers to the classes of current customers on a per- uncollectible accounts expenses. customer basis or by direct assignment. However, these costs The worst cost allocation outcome is inconsistency: are not caused by any current customer in any particular assigning uncollectible accounts expenses largely to class.174 Although certain accounts have unpaid electric bills, residential customers using direct assignment or a those accounts are former customers who are no longer per-customer allocation while using a broad allocation members of any class. method for late payment charges and customer deposits, Uncollectible accounts are related to class revenue in two ways. First, the higher the bills of a particular class, the more revenue is at risk of becoming uncollectible. Second, if the customer had shut down or left before rates were set, most of the costs reflected in the uncollectible bills would have been allocated to the remaining customers, in all classes. even though both of these items are also largely paid by residential customers. 12.3 Customer Service and Assistance Utilities frequently classify customer service and in- Hence, uncollectible revenues should be classified as revenue- formation expenses as customer-related and allocate them related and allocated in proportion to revenues, not customer in proportion to customer number. This approach is not number.175 reasonable, because these expenses are more likely to vary The treatment of four elements should be coordinated in the cost of service study: with class energy consumption and revenues. In general, larger customers have more complicated • Uncollectible accounts expenses. installations, metering and billing and warrant more time and • Late payment revenues if charged to all classes (some- attention from a utility. A utility customer service staff does times called forfeited discounts, often recorded in FERC not spend as much time and attention on each residential Account 450 in the Uniform System of Accounts). customer as on each large commercial or industrial customer, Customer deposits, which protect utilities against considering the fact that the larger customers may have bills uncollectibles and which offset rate base for most utilities 100 or 1,000 times that of the average residential customer. in North America. Indeed, most utilities have key accounts specialists — highly Interest paid to customers on customer deposits. trained customer service personnel who concentrate on the If uncollectible accounts expenses are assigned as an needs of the largest customers. Large customers may also • • overhead expense based on revenue, then all of these four have more complex billing arrangements, multiple delivery items should be allocated based on revenue. points, demand charges, campus billing, interruptible rates On the other hand, if uncollectible accounts expenses are and credits, transformer ownership credits and additional directly assigned to the originating class or using a customer complications that require more time from engineering, allocator, then late payment revenues and customer deposits legal and rate staff, supervisors and higher management, so should be assigned in the same manner. the billing costs should be weighted proportionately to the Although an allocation based on revenue is more appropriate, the consistent allocation of these four items by either customer classes with complex arrangements. The alternative to a simple customer allocator for revenue or direct assignment may not have a large effect customer service costs may be to use a weighted customer 173 For most utilities, the residential class produces most of the uncollectible accounts expenses, in part because large customers are more often required to post deposits or demonstrate good financial standing. However, when large customers’ bills are uncollectible, often due to bankruptcy, the amounts can be very large. 174 Texas has one of the strongest precedents on this issue for utilities not in ERCOT and therefore not subject to competition. See Public Utility Commission of Texas (2018, p. 47, findings of fact 303-305). 175 Texas and California have treated these costs as overhead costs, allocated by revenue to all customer classes.Page 166 of 276
164 | ELECTRIC COST ALLOCATION FOR A NEW ERA allocator — in which larger customers are assigned a multiple of the costs assigned to smaller customers — or a combination of customer number and class revenue. The retail allocators should be derived from the relative cost or effort required per customer for each class. Most utilities can segregate costs for key accounts and identify the customer classes for which these services are provided. Although these costs should be recorded in customer service costs (accounts 907 to 910), they can appear in other accounts. Wherever they appear, they should be assigned to the classes that use them. The costs should be assigned mostly to the largest commercial and industrial customers who receive the services, perhaps with a small amount allocated to classes with smaller nonresidential customers.176 Account 908, which FERC identifies as customer assistance expenses, contains general advice and education on electrical safety and energy conservation. Account 909 involves informational advertising. Those activities are generally not extensive (or expensive), and allocation is not REGULATORY ASSISTANCE PROJECT (RAP)® 12.4 Sales and Marketing Sales and marketing costs are often erroneously allocated by the number of customers rather than the purpose of sales and marketing expenses: to increase electric loads (e.g., by economic development or load retention). Since the purpose of these costs is to increase contributions to margin from new or existing customers, thereby reducing the need for future rate increases, the costs should be allocated by base rate revenue or another broad allocation factor such as rate base. Some sales and marketing funds are used to promote important public policy programs (such as energy efficiency or electric vehicles, discussed further in sections 14.1 and 7.1.3, respectively). Other sales and marketing efforts, however, may promote programs that ratepayers arguably should not fund at all (e.g., promotion of inefficient electric resistance heating by a utility that is almost entirely fossil fuel-based, through sponsorships and advertising) and should be examined closely in revenue requirements cases. usually controversial. But many utilities also book to this account energy efficiency expenditures, which can represent a few percent of consumer bills. If there are significant costs in this account, they are likely to be dominated by energy efficiency programs, which should be allocated as described in Section 14.1. 176 A few large customers billed on multiple small or medium commercial tariffs may receive key-customer services, such as franchisees, government agencies and small accounts attached to large ones.Page 167 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 165 13. Administrative and General Costs in Embedded Cost of Service Studies U tilities have very significant administrative over- power supply expenses) or allocated in proportion to those head costs, including general plant (office buildings, costs or on energy. Similarly, some utilities include all or vehicles, computer systems), labor costs (executive a portion of the major accounts expenses (discussed in compensation, employee benefits) and the cost of outside Section 12.3) in accounts 920 and 921. These should be services. Some cost of service studies functionalize a portion reclassified to customer service and assigned to the classes of each category of general plant and overhead costs to each with the large customers who receive these services. of the first four functions. Other cost of service studies treat overhead as a function and allocate those costs to classes in proportion to the costs allocated to other functions, or on such drivers as the labor cost incurred by each of the other functions.177 In this regard, the structure of the cost of service does not constrain or distort the allocation of overhead costs. Overheads are costs that cannot be directly assigned to particular functions. The overhead category includes the capital costs and depreciation expenses recorded as general plant in accounts 389 to 399 (which includes office buildings and warehouses), property taxes in Account 408, employment taxes in Account 408.2 and the O&M expenses recorded as administrative and general in accounts 920 to 935. 13.1 Operations and Maintenance Costs in Overhead Accounts Some costs included as A&G expenses may be more accurately treated as O&M for specific functions. Utilities do not all interpret the FERC Uniform System of Accounts in the same way. For example, a utility may include some or all of its expenses for procuring electricity and fuel in Account 920 13.2 Labor-Related Overhead Costs Some of the A&G accounts in the standard utility accounting systems serve a single function and are driven by a single factor. For example, employment taxes, pension expenses and other employee benefits vary with the number of employees and salaries and are generally functionalized in proportion to the labor in each function or are allocated using the special labor allocation factor calculated earlier in the process, based on how the labor costs in each function were previously allocated among the classes. If a labor allocator is not available, nonfuel O&M is often used as a reasonable proxy for labor.178 If the administrative overheads are available disaggregated by department or function, the human resources or personnel office should also be functionalized or allocated in proportion to labor. For administrative labor and other costs that cannot be directly functionalized, see Section 13.5. 13.3 Plant-Related Overhead Accounts 924 (property insurance) and 925 (injuries (administrative salaries) and Account 921 (office expenses). and damages) are clearly plant-related and are generally These costs should be treated as energy-related, either by functionalized or allocated in proportion to plant, with the being refunctionalized to fuel costs and Account 557 (other exception of workers’ compensation expenses in Account 925, 177 In setting wholesale transmission rates, FERC allocates A&G and general plant costs among jurisdictions by labor, with the exception of property insurance Account 924 (by plant) and regulatory commission expenses (directly assigned). As described in sections 5.2 and 5.3, this treatment is overgeneralized. 178 If nonfuel O&M is used instead of labor, transmission wheeling expenses, uncollectible accounts expenses and regulatory amortizations to operation and maintenance accounts should also be excluded, since these costs do not require supervision and administrative cost.Page 168 of 276
166 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® which are labor-related.179 The same is true for property taxes suppliers, customers, regulators and other parties. Outside that are based on the assessed value of each utility facility.180 purchased services may include consultants on new power Typically, an allocator based on net plant (or net plant less plants, fuel and equipment procurement, power transactions, deferred taxes) is used, but the allocation should reflect the environmental compliance, worker safety and many other method by which taxes are assessed in each state. activities. 13.4 Regulatory Commission Expenses These costs are driven by the utility’s entire operation, including labor, other O&M and plant investment. If these corporate overheads can be differentiated in sufficient detail The benefits to customers of the regulatory oversight (sections 13.1, 13.2 and 13.3), they can be functionalized or funded through FERC Account 928 will normally be distrib- allocated to specific cost categories. Otherwise, these costs uted more in proportion to the classes’ total bills, including can be allocated in proportion to class revenue (or the total of both investment-related costs and operating expenses, other cost allocations). rather than to the number of customers in the classes. In Utilities agree to franchise payments (in Account 927) to terms of cost causation, the regulatory assessment covers gain access to customers and the associated revenues; thus expenditures on many types of proceedings, including franchise payments should be allocated in proportion to total (depending on the jurisdiction) rate cases, resource planning, revenues or other allocated costs. project certification, review of investments, power purchase contracts and fuel expenses. Demand and energy use are the major contributors to the size of the assessment and the cost 13.6 Advertising and Donations Some utilities assign Account 930.1 (general advertising) of its regulatory efforts. Depending on the jurisdiction and or certain donations as customer-related. This treatment the distribution of the regulator’s efforts, the most equitable is erroneous. General advertising is not trying to inform allocator may be class revenues or energy consumption.181 customers of anything they need to know about their regulated utility service (the purpose of Account 909) or sell them 13.5 Administrative and Executive Overhead Many of the standard A&G accounts serve multiple functions. Administrative salaries pay employees in human resources, financing, public relations, regulatory affairs, the legal department, purchasing and senior management. Some of their work is driven by employee numbers (e.g., human resources), others by capital investment (finance) and most by a mix of labor, fuel procurement, nonfuel expenses and capital investments, including dealing with disputes with 179 As a refinement, a study could be done to determine workers’ compensation costs by functions. Customer service representatives (largely customer-related in Account 903) are likely to have lower workers’ compensation costs than power plant operators or power line workers. 180 For publicly owned utilities, the equivalent may be payments in lieu of taxes. anything (Account 913). Rather Account 930.1 includes “cost of advertising activities on a local or national basis of a good will or institutional nature, which is primarily designed to improve the image of the utility or the industry” (18 C.F.R. § 367.901[d]). If allowed in rates at all, these costs are clearly overheads, even if the expenditures are largely intended to affect the opinions of residential customers (or voters). To the extent that some donations are allowed in rates (as in Texas), they also are image-building and charitable overhead and, as such, should not be assigned by the number of customers. 181 Many utilities allocate these costs by base rate revenues; a more appropriate allocator would be total revenues given that fuel and other costs collected in riders are also regulated and planning and certification activities related to the rider costs constitute a significant portion of the burden on regulators.Page 169 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 167 14. Other Resources and Public Policy Programs in Embedded Cost of Service Studies 14.1 Energy Efficiency Programs E nergy efficiency costs have three effects on the revenue requirement that will be recovered through rates. First, energy efficiency shrinks the size of the pie of non-energy efficiency costs that have to be split up, because the utility will need less generation, transmission and distribution in the long run, and utilities that own generation may be able to earn some export revenues to offset other costs. Since utilities generally undertake energy efficiency only if it is less expensive than the avoided costs (sometimes measured as short run, sometimes as long run, and including or excluding environmental costs), energy efficiency tends to reduce total costs, at least in the long term. Energy efficiency programs typically reduce generation, transmission and distribution costs, and hence also some of the associated overheads, but not most retail service costs, such as metering and billing.182 In restructured utilities, energy efficiency load reductions tend to reduce the prices that all customers pay for generation services, as well as avoiding transmission and distribution investments. These benefits typically are dominated by energy savings, with a portion being demand-related. Some utilities collect energy efficiency costs from all customers, on an equal cents-perkWh basis or using an energy/demand allocator. Where this is done, the allocation of program costs should generally follow the framework for revenue collection. Second, a program that reduces the loads of one class shrinks its share of the cost pie, increasing other classes’ shares of the pie. For the participating class, the reduction in both the size of the pie and the class’s share of the pie reduces customers’ cost allocation. For each class participating in participating classes. But for some other class, the increase in its share of the costs may be either larger or smaller than the effect on the size of the total pie, so its cost allocation may either rise or fall due to the energy efficiency. Thus, cost-effective energy efficiency, with the costs allocated to classes based on the class share of the system benefits, can result in nonparticipating classes paying more than they would without energy efficiency. Conversely, assigning the costs directly to the participating class or classes can result in the participants paying more for energy efficiency programs than they benefit from the shrinking of the revenue requirements and of their share, leaving them worse off. These are extreme situations. With highly cost-effective programs and broad participation, all classes are very likely to benefit from energy efficiency, no matter how the costs are allocated. But the net benefits can be inequitably allocated. The cost effects of energy efficiency differ between the short term and the long term. The costs of energy efficiency investment are often incurred in the year of program implementation, while the benefits stretch on for many years. In 2018, the customers will be paying roughly the costs of the 2018 program, while nonparticipating customers in 2018 are primarily receiving the benefits of energy efficiency investment that occurred in the past. This could be another source of misalignment between cost recovery and benefits, particularly if there are changes over time in the cost recovery method or the relative benefits to each customer class. Energy efficiency costs are typically caused by the opportunity to reduce total costs to consumers. For most costs, revenue requirements would be lower if customers did less to require the utility to incur those costs. Customers each program, the program reduces the bills of participants and the costs allocated to the class. Thus, some utilities have assigned the costs of each energy efficiency program to the 182 Energy efficiency programs targeted to low-income customers can reduce collection costs, uncollectibles and other burdens on the utility and other customers.
As listed on the current system
Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Melissa Whited [26-05-10]