    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | the New York Power Authority provides the power and that Nova Scotia Power Load Retention and Economic Development Rates all customers share the cost of incremental resources needed In 2011, falling global demand for paper resulted in the resources are equitably allocated to the customers for whom to serve demand in excess of incremental usage.201 177 bankruptcy and shutdown of two paper mills that were Nova Scotia Power’s largest customers, which accounted for about Northwest Power Act — New Large Single Loads 20% of its sales and 12% of its revenues. The mills had been The Pacific Northwest Electric Power Planning and major employers, both directly and as purchasers of wood Conservation Act of 1980 provided, among other things, for harvested from forests in the province. A buyer emerged for division of the economic benefits of the federal Columbia the larger of those facilities, contingent on a variety of sup- River power system among various customer groups and rate portive policies from the provincial and federal governments, pools (Pub. L. No. 96-501; 16 U.S.C. § 839 et seq.). The act set including favorable tax treatment and rates. forth a specific mechanism for the Bonneville Power Admin- Nova Scotia Power proposed and the Nova Scotia Utility istration to charge a price based on new resources to “new and Review Board approved (with modifications) a load reten- large single loads” (discrete load increments of 10 average tion rate that would charge the mill hourly marginal fuel and MWs or 87,600 MWhs per year, such as might be experienced purchased power costs (including opportunity costs from lost if a new oil refinery were built). This provision was intended exports), plus administrative charges and mill rates to cover to protect existing consumers from rate increases that could variable O&M, variable capital expenditures and a contribu- result from new very large loads attracted by the low average tion to capital investments and long-term O&M. The load generation costs in the region, in a period in which new would be entirely interruptible, and the utility committed to resources were very expensive. Table 38 shows average rates excluding the mill’s load from its planning and commitment for Bonneville Power Administration by category for recent decisions (Nova Scotia Utility and Review Board, 2012). years, including a higher rate for new resources (Bonneville The determination of Nova Scotia Power’s hourly Power Administration, n.d.).202 marginal costs proved to be more difficult than expected.203 Nonetheless, the rate design succeeded in attracting the Table 38. Bonneville Power Administration rate summary, October 2017 to September 2019 Rate category Average rates per MWh Priority firm public utility average $36.96 Priority firm public utility Tier 1 $35.57 Priority firm – IOU residential load $61.86 Industrial power $43.51 New resources $78.95 Source: Bonneville Power Administration. Current Power Rates 201 This same concept has been the foundation of inclining block rates in Washington state and Indonesia. 202 The average rates subsume a variety of fixed and variable charges. 203 Nova Scotia Power was not part of an energy market and had limited connections to its only neighboring utility (NB Power, which is also not part of an energy market), and its marginal generation resources are coal investment necessary to restart and retain the mill as an employer while producing some contribution to Nova Scotia Power’s embedded costs. The load retention tariff expires in 2020, at which time the mill may switch to a firm rate or negotiate a new load retention tariff.204 Chelan County Public Utility District Bitcoin Rate The creation of bitcoin cryptocurrency units requires energy-intensive mathematical computations called mining. To limit the cost of their operations, bitcoin “miners” have sought locations with low-priced electricity. Those operations plants with long commitment horizons (Rudkevich, Hornby and Luckow, 2014). 204 The Nova Scotia Power system will operate differently after 2020, when it is expected to have access to large amounts of Newfoundland hydro energy and operate under stricter carbon emissions standards. Any new load retention tariff would need to reflect those changes.
  2. Page 180 of 276

    178 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® typically require very large amounts of power but have few declared a moratorium on new connections and developed on-site employees and little local economic benefit. One of a tariff designed to ensure that any growth of this type of these locations is Chelan County in Washington state, where load would not adversely affect other consumers or the local the local public utility district owns two very large dams on economy (Chelan County Public Utility District, 2018). This the Columbia River and has industrial rates about one-fourth tariff is geographically differentiated, to recognize areas of the national average.205 where transmission and distribution capacity are available, Chelan County Public Utility District’s existing low-cost resource is fully obligated to a combination of local retail use and includes: • and long-term contract sales. The contract sales prices are above the average retail rates, bringing significant revenue to Payment in a one-time charge of transmission and distribution system costs to serve large new loads. • A price for electricity, tied to (generally higher) regional fund public infrastructure in the county, including a world- wholesale market prices, not Chelan County Public class parks network. When the district received applications Utility District system costs. for service from bitcoin miners, it decided that this high- • Severe penalties for excess usage that could threaten density load growth would not be in the public interest, system reliability. 205 The Chelan County Public Utility District rate for primary industrial customers up to 5 MWs with an 80% load factor is 1.91 cents per kWh (Chelan County Public Utility District, n.d.). The average U.S. industrial price was 6.88 cents per kWh in 2017 (U.S. Energy Information Administration, 2018, Table 5.c).
  3. Page 181 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 179 17. Future of Embedded Cost Allocation C hange is inevitable as the electric industry adapts customer loads than they had a few decades ago. As the costs to new technology. Part III of this manual, on of electronics decline, more data will become available to embedded cost of service studies, has attempted to more utilities. Thus, methods that were the best available in address many common situations the cost analyst will face in the 1980s can now (or soon) be superseded by more accurate determining an equitable allocation of costs among customer and realistic allocations. Computations that would have been classes. But new technologies and changing loads will dictate unwieldy on the computers of the 1980s are trivial today. new issues and perhaps new methods. For example, as utilities acquire data on the hourly load Historically, power has flowed from central generators, of each class, many costs can be allocated on an hourly basis, through transmission, to primary distribution and then rather than on such summary values as annual energy use and secondary distribution. Customers served at the transmis- contribution to a few peak load hours. The costs of baseload sion level have not paid for distribution, and those served generation resources (nuclear, biomass, geothermal) may be at primary have not paid for line transformers or secondary assigned to all hours; costs of wind and solar resources to the lines. This situation is beginning to change. In some places, hours they provide service; storage to the hours in which it the development of distributed solar capacity already causes exports energy and provides other benefits;206 and demand power to flow from secondary to primary and even onto the response costs to the hours these resources are deployed or transmission system. At some point, all customers may receive the hours in which they reduce costs by supplying operating service through all levels of the delivery system, requiring a reserves. In a sense, this is an evolution and refinement of substantial rethinking of the allocation of distribution costs. the base-intermediate-peak traditional method, described in Section 9.1. In addition to the increased complexity of system oper- To illustrate this approach, Figure 45 provides a day’s ations, utilities have more data about system operations and Figure 45. Daily dispatch for illustrative hourly allocation example 2,500 2,000 Peaker Storage Solar Charging of storage Base Megawatts 1,500 1,000 500 0 -500 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Hour of day 206 Among other things, charging storage in hours with low net loads will raise minimum load levels and reduce ramp rates, benefiting the hours in which net load rises rapidly.
  4. Page 182 of 276

    180 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Figure 46. Class loads for illustrative hourly allocation example 2,500 Street lighting Industrial Commercial Megawatts 2,000 Residential 1,500 1,000 500 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Hour of day worth of hourly dispatch of four resources: a baseload The generation cost allocation for a class would be: resource (perhaps nuclear), solar, a peaker (perhaps a Lh combustion turbine) and storage (both as charging load below the axis and generation above the line). In this example, the storage charges from excess base capacity in the early morning and then from solar, and discharges in the evening to replace the waning solar. The actual application of hourly allocation would include 8,760 hours from an actual or typical year, with a wide range of load levels, availability of the base resource and solar output patterns. Figure 46 provides hourly energy requirements by class (including losses) for the same day as in Figure 45. Table 39 on the next page provides two types of data from Figure 45 and Figure 46: each class’s share of the load in each hour, and the portion of each resource’s daily generation that occurs in the hour. r,h r r,h Where Lh = class share of load in hour h Sr,h = share of resource r output that occurred in hour h Cr = cost of resource (in this example, for the day) Table 40 shows the result of this computation for the data in Table 39. The lighting class, for example, would pay for 1.8% of the base resource, 2.2% of the peakers and just 0.6% of the solar. Table 40 also shows each class’s share of total load, for reference.
  5. Page 183 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA Table 39. Hourly class load share and resource output Class share of load Resource output: Percentage occurring by hour Hour Residential Commercial Industrial Street lighting 1 39.0% 35.3% 22.5% 3.2% 4% 0% 0% 0% 2 37.0% 36.2% 23.5% 3.3% 4% 0% 0% 0% 3 36.4% 36.7% 23.5% 3.4% 4% 0% 0% 0% 4 36.7% 37.0% 23.1% 3.3% 4% 0% 0% 0% 5 37.5% 36.6% 22.7% 3.2% 4% 0% 0% 0% 6 38.4% 37.2% 21.4% 3.0% 4% 0% 3% 0% 7 39.7% 37.1% 20.6% 2.6% 4% 0% 8% 0% 8 39.8% 39.2% 19.5% 1.6% 4% 0% 9% 0% 9 38.8% 42.6% 18.4% 0.2% 4% 0% 9% 0% 10 36.7% 44.8% 18.2% 0.2% 4% 0% 8% 0% 11 36.6% 45.1% 18.1% 0.2% 4% 0% 11% 0% 12 35.9% 45.8% 18.1% 0.2% 4% 0% 10% 0% 13 36.7% 44.8% 18.3% 0.2% 4% 0% 7% 1% 14 37.5% 44.0% 18.2% 0.2% 4% 0% 13% 0% 15 36.3% 44.7% 18.8% 0.2% 4% 0% 12% 0% 16 37.4% 43.5% 18.8% 0.2% 4% 0% 7% 0% 17 41.5% 40.6% 17.4% 0.4% 4% 5% 1% 25% 18 44.7% 37.3% 16.1% 2.0% 4% 13% 0% 25% 19 45.2% 35.8% 16.8% 2.2% 4% 13% 0% 18% 20 44.2% 36.1% 17.4% 2.3% 4% 15% 0% 12% 21 44.4% 35.4% 17.8% 2.3% 4% 15% 0% 10% 22 45.9% 33.8% 17.9% 2.4% 4% 19% 0% 5% 23 42.8% 35.1% 19.4% 2.6% 4% 12% 0% 1% 24 41.6% 35.5% 20.1% 2.8% 4% 6% 0% 3% All hours 39.7% 39.6% 19.1% 1.6% 100% 100% 100% 100% Note: Percentages may not add up to 100 because of rounding. Table 40. Class shares of resource cost responsibilities and load Residential Secondary commercial Primary industrial Street lighting Resource type Base 39.6% 39.2% 19.4% 1.8% Peaker 44.3% 35.8% 17.7% 2.2% Solar 37.5% 43.1% 18.7% 0.6% Storage 43.8% 37.4% 17.2% 1.7% Class share of total load 39.7% 39.6% 19.1% 1.6% Base Peaking Solar Storage | 181
  6. Page 184 of 276

    182 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Works Cited in Part III Arkansas Public Service Commission. (2013, December 30). Docket No. 13-028-U, Order No. 21 in general rate case for Entergy Arkansas. Retrieved from http://www.apscservices.info/pdf/13/13-028-U_431_1.pdf Barrett, L. (2012, March 29). Nova Scotia-located coal plants next to go. Australia’s Mining Monthly. Retrieved from https://www.miningmonthly.com/archive/news/1300953/nova-scotia-located-coal-plants BC Hydro. (2014, June 19). 2015 rate design application (RDA): Cost of service (COS) methodology review [Presentation]. Retrieved from http://www.bchydro.com/content/dam/BCHydro/customer-portal/documents/corporate/regulatoryplanning-documents/regulatory-matters/cos-methodology-review-workshop-presentation.PDF Behnke, M., Erdman, W., Horgan, S., Dawson, D., Feero, W., Soudi, F., et al. (2005). Secondary network distribution systems background and issues related to the interconnection of distributed resources (NREL/TP-560-38079). Golden, CO: National Renewable Energy Laboratory. Retrieved from https://www.nrel.gov/docs/fy05osti/38079.pdf Bonbright, J. (1961). Principles of public utility rates. New York, NY: Columbia University Press. Bonneville Power Administration. (n.d.). Current power rates [Webpage]. Retrieved from https://www.bpa.gov/ Finance/RateInformation/Pages/Current-Power-Rates.aspx Burbank Water and Power. (n.d.). BWP free WiFi [Webpage]. Retrieved from https://www.burbankwaterandpower.com/bwp-free-wifi Burlington Electric Department. (2019, February 1). Rates & fees [Webpage]. Retrieved from https://www.burlingtonelectric.com/rates-fees California Energy Commission. (2014, May 21). California transmission lines – substations enlargement maps. Retrieved from https://ww2.energy.ca.gov/maps/infrastructure/3part_enlargements.html California Public Utilities Commission. (2007, July 12). Opinion addressing electric and gas residential line extension allowance calculation methodology. Application No. 05-09-019 et al., Decision No. 07-07-019. Retrieved from http://docs.cpuc.ca.gov/PublishedDocs/WORD_PDF/FINAL_DECISION/70109.PDF California Public Utilities Commission. (2014, December 18). Decision regarding smartmeter opt-out provisions. Application No. 11-03-014 et al., Decision No. 14-12-078. Retrieved from http://docs.cpuc.ca.gov/PublishedDocs/ Published/G000/M143/K904/143904205.PDF Chelan County Public Utility District. (n.d.). Rates and policies [Webpage]. Retrieved from https://www.chelanpud.org/my-pud-services/rates-and-policies Chelan County Public Utility District. (2018, November 5). Cryptocurrency rate: Board preview of Nov. 7 public information meeting [Presentation]. Retrieved from https://www.chelanpud.org/docs/default-source/defaultdocument-library/nov-5-board-preview-of-nov-7-info-meeting.pdf Chernick, P. (2010, August 20). Rebuttal testimony on behalf of the Office of the People’s Counsel. Maryland Public Service Commission Case No. 9230. Chernick, P., and Meyer, M. (1982). Capacity/energy classifications and allocations for generation and transmission plant. Award Papers in Public Utility Economics and Regulation. East Lansing, MI: Michigan State University, Institute for Public Utilities.
  7. Page 185 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA Colorado Public Utilities Commission. (2018, June 15). Proceeding No. 17AL-0477E, Decision No. C18-0445 in rate case for Black Hills/Colorado Electric Utility Co. Retrieved from https://www.dora.state.co.us/pls/efi/EFI_Search_UI.Show_ Decision?p_session_id=&p_dec=25270 Coyle, E. (1982, June 24). Average and excess demand once again. Public Utilities Fortnightly. Delmarva Power & Light. (2016, August 15). Response to the Office of the People’s Counsel data request 5-11, Attachment D. Maryland Public Service Commission Case No. 9424. Drazen, M. and Mikkelsen, R. (2013, December 2). Rebuttal evidence on behalf of the Industrial Group. Nova Scotia Utility and Review Board NSPI-P-892/Matter No. M05473, Exhibit N-28. Retrieved from https://uarb.novascotia.ca/fmi/webd/UARB15 Electric Reliability Council of Texas. (2018). 2017 ERCOT hourly load data [Data set]. Retrieved from http://www.ercot.com/gridinfo/load/load_hist/ El Paso Electric Co. (2015, October 29). El Paso Electric Company’s response to Office of Public Utility Counsel’s fifth request for information. Public Utility Commission of Texas Docket No. 44941. Retrieved from http://interchange.puc. texas.gov/Search/Documents?controlNumber=44941&itemNumber=215 Energy and Environmental Economics. (2014). California transportation electrification assessment — Phase 2: Grid impacts. San Francisco, CA: Author. Retrieved from http://www.caletc.com/wp-content/uploads/2016/08/CalETC_ TEA_Phase_2_Final_10-23-14.pdf ENGIE Resources (n.d.). Historical data reports [Webpage]. Retrieved from https://www.engieresources.com/historical-data Entergy Corp. (n.d.). How we trim trees [Webpage]. Retrieved from https://www.entergy.com/tree_trimming_how/ Fang, C. (2017, January 20). Direct testimony on behalf of San Diego Gas & Electric. California Public Utilities Commission Application No. 17-01-020. Retrieved from https://www.sdge.com/regulatory-filing/20491/applicationsdge-authority-implement-priority-review-and-standard-review Federal Energy Regulatory Commission. (n.d.). Form 1 — electric utility annual report [Database]. Retrieved from https://www.ferc.gov/docs-filing/forms/form-1/data.asp Federal Energy Regulatory Commission. (2008, April 21). Opinion and order on initial decision. 123 FERC ¶ 61,047. Docket No. EL05-19-002, Opinion No. 501. Retrieved from https://www.ferc.gov/whats-new/commmeet/2008/041708/E-7.pdf Federal Energy Regulatory Commission. (2011, July 21). Transmission planning and cost allocation by transmission owning and operating public utilities. 136 FERC ¶ 61,051. Docket No. RM10-23-000, Order No. 1000. Retrieved from https://www.ferc.gov/whats-new/comm-meet/2011/072111/E-6.pdf Gorman, H. (2018, November 15). Testimony on behalf of National Grid. Massachusetts Department of Public Utilities Docket No. 18-150. Retrieved from https://fileservice.eea.comacloud.net/FileService.Api/file/FileRoom/10043215 Green Mountain Power. (2016, April 1). Electric service extensions and relocations. Retrieved from http://greenmountainpower.com/wp-content/uploads/2017/01/Line-Extension-Rules-Regulations-4.1.16.pdf Hammer, N. (2018, May 30). Direct testimony on behalf of MidAmerican Energy Co. Iowa Utilities Board Docket No. RPU2018-0003. Retrieved from https://efs.iowa.gov/efs/ShowDocketSummary.do?docketNumber=RPU-2018-0003 | 183
  8. Page 186 of 276

    184 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Henry, T. (2012, October 31). Luminant coal units get permission to mothball this winter. National Public Radio. Retrieved from https://stateimpact.npr.org/texas/2012/10/31/luminant-coal-units-get-go-ahead-to-mothball-thiswinter/ Illinois Commerce Commission. (2008, September 10). Docket No. 07-0566, order in rate case for Commonwealth Edison Co. Retrieved from https://www.icc.illinois.gov/docket/files.aspx?no=07-0566&docId=128596 Institute for Energy Economics and Financial Analysis. (2019, March 4). Owners say Gibbons Creek coal plant in Texas will remain in mothball status. Retrieved from http://ieefa.org/owners-say-gibbons-creek-coal-plant-in-texas-willremain-in-mothball-status/ Johnson, B. (1980, December 4). Cost allocations: Limits, problems and alternatives. Public Utilities Fortnightly. Kahn, E. (1988). Electric utility planning and regulation. Washington, DC: American Council for an Energy-Efficient Economy. La Capra, R. (1992). Direct testimony on behalf of Boston Edison. Massachusetts Department of Public Utilities Docket No. 92-92. Lazar, J., and Baldwin, X. (2011). Valuing the contribution of energy efficiency to avoided marginal line losses and reserve requirements. Montpelier, VT: Regulatory Assistance Project. Retrieved from https://www.raponline.org/knowledgecenter/valuing-the-contribution-of-energy-efficiency-to-avoided-marginal-line-losses-and-reserve-requirements/ Lazard. (2018). Lazard’s levelized cost of energy analysis — Version 12.0. Retrieved from https://www.lazard.com/ media/450784/lazards-levelized-cost-of-energy-version-120-vfinal.pdf Levin, A. (2017, June 30). Prefiled response testimony on behalf of NW Energy Coalition, Renewable Northwest and Natural Resources Defense Council in rate case for Puget Sound Energy. Washington Utilities and Transportation Commission Docket No. UE-170033. Retrieved from https://www.utc.wa.gov/_layouts/15/CasesPublicWebsite/ GetDocument.ashx?docID=2309&year=2017&docketNumber=170033 Manitoba Hydro. (2015). Cost of service methodology review. Retrieved from https://www.hydro.mb.ca/regulatory_ affairs/pdf/electric/cost_of_service_study_submission/appendix_3_1_pcoss14.pdf Manitoba Public Utility Board (2016, December 20). Order in respect of a review of Manitoba Hydro’s cost of service study methodology. Order No. 164/16. Retrieved from http://www.pubmanitoba.ca/v1/pdf/16hydro/164-16.pdf Marcus, W. (1987). Testimony on behalf of Alberta Federation of Rural Electrification Associations and Alberta Association of Municipal Districts and Counties. Alberta Public Utilities Board 1987 Electric Energy Marketing Agency adjustment. Massachusetts Department of Public Utilities. (1989). Docket No. 88-250, order in rate case for Western Massachusetts Electric Co. Meyer, M. (1981, December 17). Clarifying NARUC demand allocation methods. Public Utilities Fortnightly. Michigan Public Service Commission. (2017, July 31). Case No. U-18124, order in natural gas rate case for Consumers Energy Co. Retrieved from https://mi-psc.force.com/sfc/servlet.shepherd/version/ download/068t0000001UUAgAAO Midcontinent Independent System Operator. (2018). Planning year 2019-2020 loss of load expectation study report. Carmel, IN: Author. Retrieved from https://cdn.misoenergy.org/2019%20LOLE%20Study%20Report285051.pdf
  9. Page 187 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA Minnesota Power. (2013, May 28). Minnesota Power construction guide: Home edition. Retrieved from https://mnpower. com/Content/Documents/CustomerService/ConstructionCenter/residential-construction-guide-with-toc.pdf Minnesota Public Utilities Commission. (2016, June 3). Docket No. G-008/GR-15-424, order in natural gas rate case for CenterPoint Energy. Retrieved from https://www.edockets.state.mn.us/EFiling/edockets/searchDocuments.do?metho d=showPoup&documentId={92AB0946-4F77-4A70-BF38-7D36F88AC979}&documentTitle=20166-121975-01 Monitoring Analytics. (2014). 2013 state of the market report for PJM. Eagleville, PA: Author. Retrieved from http://www.monitoringanalytics.com/reports/PJM_State_of_the_Market/2013.shtml Monitoring Analytics. (2019). 2018 state of the market report for PJM. Eagleville, PA: Author. Retrieved from http://www.monitoringanalytics.com/reports/PJM_State_of_the_Market/2018.shtml National Association of Regulatory Utility Commissioners. (1989). Gas distribution rate design manual. Washington, DC: Author. Retrieved from http://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B04381803-1D3A4CD7-BBE3-64EDB16835C0%7D National Association of Regulatory Utility Commissioners. (1992). Electric utility cost allocation manual. Washington, DC: Author. Retrieved from https://pubs.naruc.org/pub/53A3986F-2354-D714-51BD-23412BCFEDFD Newfoundland and Labrador Hydro (2018). 2018 cost of service methodology review report. Retrieved from http:// www.pub.nf.ca/applications/NLH2018CostofService/application/Application%20-%20Cost%20of%20Service%20 Methodology%20-%202018-11-15.PDF Northern Indiana Public Service Co. (2018). 2018 integrated resource plan executive summary. Retrieved from https://www.nipsco.com/docs/librariesprovider11/rates-and-tariffs/irp/irp-executive-summary.pdf Northern States Power Co.-Minnesota. (2010, November 3). General rules and regulations. Retrieved from https://www.xcelenergy.com/staticfiles/xe/PDF/Regulatory/Me_Section_6.pdf Nova Scotia Power. (2013a, June 28). 2013 Nova Scotia Power cost of service study. Nova Scotia Utility and Review Board Matter No. M05473, Exhibit N-1. Retrieved from https://uarb.novascotia.ca/fmi/webd/UARB15 Nova Scotia Power. (2013b, September 12). 2013 Nova Scotia Power cost of service study: Attachment 1 in response to IR-15. Nova Scotia Utility and Review Board Matter No. M05473, Exhibit N-3(i). Retrieved from https://uarb.novascotia. ca/fmi/webd/UARB15 Nova Scotia Utility and Review Board. (1995, September 22). Docket No. NSPI864, order in generic hearing respecting cost of service and rate design for Nova Scotia Power. Nova Scotia Utility and Review Board. (2012, August 20). Matter No. M04862, decision approving with conditions a load retention rate mechanism. Retrieved from https://uarb.novascotia.ca/fmi/webd/UARB15 Nova Scotia Utility and Review Board. (2014, March 11). Matter No. M05473, decision approving amended 2013 Nova Scotia Power cost of service study. Retrieved from https://uarb.novascotia.ca/fmi/webd/UARB15 NV Energy. (n.d.). IS-2 interruptible irrigation service [Webpage]. Retrieved from https://www.nvenergy.com/account-services/energy-pricing-plans/is-2 Otter Tail Power Co. (2017, July 21). Tariff schedules applicable to electric service of Otter Tail Power Company. Retrieved from https://www.otpco.com/media/1300/mn_indexandgeneralrulesandregulations.pdf | 185
  10. Page 188 of 276

    186 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Parmesano, H., Rankin, W., Nieto, A., and Irastorza, V. (2004). Classification and allocation methods for generation and transmission in cost-of-service studies. Los Angeles, CA: National Economic Research Associates. Retrieved from https://www.nera.com/content/dam/nera/publications/archive1/final%20report%20to%20PUBMH-NERA-20040401-1.pdf Patton, D., LeeVanSchaick, P., and Chen, J. (2017). 2016 assessment of the ISO New England electricity markets. Fairfax, VA: Potomac Economics. Retrieved from https://www.iso-ne.com/static-assets/documents/2017/08/isone-2016-som-report-full-report-final.pdf Patton, D., LeeVanSchaick, P., Chen, J., and Palavadi Naga, R. (2018). 2017 state of the market report for the New York ISO markets. Fairfax, VA: Potomac Economics. Retrieved from https://www.potomaceconomics.com/wp-content/ uploads/2018/06/NYISO-2017-SOM-Report-5-07-2018_final.pdf Peppin, M. (2013, November 4). Direct testimony on behalf of Northern States Power Co.-Minnesota. Minnesota Public Utilities Commission Docket No. E002/GR-13-868, Document No. 20311-93284-02. Retrieved from https:// www.edockets.state.mn.us/EFiling/edockets/searchDocuments.do?method=showPoup&documentId={21D30B7CA614-4649-AEE7-CDA29BD1192B}&documentTitle=201311-93284-02 Public Service Company of Colorado. (2018, December 3). Rules and regulations: Electric service distribution extension policy. Retrieved from https://www.xcelenergy.com/staticfiles/xe-responsive/Company/Rates%20&%20 Regulations/18AL-0852E-AL-1785-E-Distribution-Extension-Policy-Tariffs-FINAL.pdf Public Utility Commission of Texas. (2000, November 22). Interim order establishing generic customer classification and rate design. Docket No. 22344, Order No. 40. Retrieved from http://interchange.puc.texas.gov/Search/ Documents?controlNumber=22344&itemNumber=655 Public Utility Commission of Texas. (2015, December 18). Docket No. 43695, order in rate case for Southwestern Public Service Co. Retrieved from http://interchange.puc.texas.gov/Documents/43695_1018_876737.PDF Public Utility Commission of Texas. (2018, March 19). Docket No. 46449, order on rehearing in rate case for Southwestern Electric Power Co. Retrieved from http://interchange.puc.texas.gov/ Documents/46449_825_973078.PDF Rea, C. (2013, May 17). Testimony on behalf of MidAmerican Energy Co. Iowa Utilities Board Docket No. RPU-20130004. Retrieved from https://efs.iowa.gov/cs/groups/external/documents/docket/mdaw/mtgy/~edisp/182629.pdf Rudkevich, A., Hornby, R., and Luckow, P. (2014, February 28). Audit of Port Hawkesbury paper load retention tariff. Synapse Energy Economics and Newton Energy Group. Nova Scotia Utility and Review Board Matter No. M05803, Exhibit N-4. Retrieved from https://uarb.novascotia.ca/fmi/webd/UARB15 Seattle Municipal Archives. (1977, September 27). Utilities Committee meeting (Record Series 4601-03, Event ID 6544) [Audio recording]. Retrieved from https://www.seattle.gov/cityarchives/exhibits-and-education/seattlevoices/energy-conservation Seelye, W. (2016, November 23). Direct testimony on behalf of Kentucky Utilities Co. Kentucky Public Service Commission Case No. 2016-00370. Retrieved from https://psc.ky.gov/pscecf/2016-00370/derek.rahn%40lge-ku. com/11232016073202/10_-_KU_Testimony_and_Exhibits_-_Malloy_to_Spanos_-_FINAL.pdf Sterzinger, G. (1981, July 2). The customer charge and problems of double allocation of costs. Public Utilities Fortnightly.
1 page match

As listed on the current system

Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Melissa Whited [26-05-10]

This filing on the current system (opens in a new tab)