Prefiled testimony
Witness: Melissa Whited
Files3
Synapse - Eversource COS and Rate Design Testimony Final.pdf
PDF · 829 KB · 48 pagesText searchable
Download Synapse - Eversource COS and Rate Design Testimony Final.pdfRead the text of Synapse - Eversource COS and Rate Design Testimony Final.pdf
MW-2- Synapse Attachment.pdf
PDF · 4.6 MB · 276 pagesText searchable
Download MW-2- Synapse Attachment.pdfRead the text of MW-2- Synapse Attachment.pdf
MW-1 - Synapse Attachment.pdf
PDF · 734 KB · 13 pagesText searchable
Download MW-1 - Synapse Attachment.pdfRead the text of MW-1 - Synapse Attachment.pdf
Page 192 of 276
190 | ELECTRIC COST ALLOCATION FOR A NEW ERA determinants for each class. This produces a class marginal cost revenue requirement and, when combined with other classes, a system MCRR. This is then reconciled with the allowed revenue requirement to determine revenue allocation by class. This part of this manual provides some examples of marginal cost studies and the revenue allocation resulting from them. A second important concept related to marginal cost pricing comes from the theory of general equilibrium: If costs are in equilibrium, short-run marginal costs equal long-run marginal costs. That is, to get one more unit from existing resources would require operating resources with high variable costs, at a cost equal to the cost of both building and operating newer, cheaper resources. However, it is hard to apply this theory in practice because developing and quantifying a system in equilibrium is extremely difficult. Until recently, assets tended to be developed in large sizes relative to the utility’s overall system needs, rendering equilibrium conditions unlikely. Equilibrium is also impossible in the real world, for three main reasons. First, loads and fuel prices can never be forecast exactly (and often cannot be forecast even closely). Technology also changes, and the use of specific resources ends up changing. Finally, long lead times to construct various resources (particularly large power plants and transmission lines) can exacerbate the consequences of forecasting errors. As a result, the marginal cost methods used today, such REGULATORY ASSISTANCE PROJECT (RAP)® 18.1 Development of Marginal Cost of Service Studies The most common method used in jurisdictions relying on marginal costs for allocation purposes was developed by Alfred Kahn and colleagues at NERA in the late 1970s.207 The Kahn/NERA method (referred to as the NERA method in this manual because that is the term most analysts and practitioners use) is the predominant method that current marginal cost analysts use. Some entities, such as Oregon, use a long-run marginal cost method for generation, and other states and analysts have proposed changes to specific components of the NERA method. Nevertheless, the NERA method, whatever its benefits and detriments, is the starting point for most current marginal cost of service study analysis, and marginal cost of service study analysts have identified fewer alternative methods than have embedded cost of service study analysts. Another practical consideration in analyzing marginal cost methods is that very few states are marginal cost jurisdictions. In particular, California, Nevada and Oregon calculate marginal costs for generation and other functions; Maine and New York have deregulated generation but use marginal costs for distribution. Thus, many examples in the remaining discussion come from a relatively small number of jurisdictions. The NERA methodology uses: • new customer connection equipment using the current as those developed by National Economic Research Associates (now NERA Economic Consulting) — discussed in considerably more detail throughout Part IV — do not reflect technology. • capacity but not to increase reliability or replace existing ration of the electric system and changes over time, the trend capacity to continue to serve load, measured over 10 to has been toward overbuilding, so generation marginal cost for class allocation. In addition, as previously implemented in many jurisdictions, the definitions of marginal cost have mixed short-term and long-term elements in ways that are theoretically inconsistent. 207 National Economic Research Associates developed a series of papers on the topic. The most critical for this manual are A Framework for Marginal Cost-Based Time-Differentiated Pricing in the United States (1977a) and How to Quantify Marginal Costs (1977b). Intermediate-term transmission and shared distribution costs based on an analysis of additions made to serve new equilibrium conditions. Moreover, with the current configu- ends up systematically below average cost, with ramifications Long-term customer costs based on the cost of renting 15 years. • Generation capacity costs that tend toward a longer term based on new construction.208 • Usually relatively short-term marginal energy costs (one to six years). 208 Some utilities and consumer advocates have used shorter-term generation capacity costs. Consumer advocates often chose shorter-term generation costs when revenue allocation was done by function rather than in total. See Section 19.3.Page 193 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA One of the key concepts developed through this work • was the real economic carrying charge. A RECC takes the | Using long-run incremental costs, including full costs of new construction of generation. revenue requirements or costs of a resource and reshapes • Applying the new paradigm of long-run incremental them to reflect a stream of costs that increases with inflation cost analysis, at least for generation, explicitly to and has the same present value as the revenue requirements. include the energy transition to renewables for Inputs to a RECC are the same as those used for utility generation and storage and demand response for revenue requirements. They include the capital structure and capacity. cost of capital, a discount rate, income tax parameters (rates, • Using short-run customer costs based on the direct costs depreciation and whether specific tax differences are normal- of hooking up new customers as a better match with ized or flowed through), book depreciable life and costs of short-run energy costs (see Chapter 21). property taxes and insurance. The RECC is not unique to this • Ignoring joint and common costs, reducing long-run method but can be used in conjunction with other methods, A&G costs that are assigned to functions other than such as long-run incremental cost of generation (see Section energy (see Chapter 22). 19.1) or total service long-run incremental cost (Section 25.1). 191 • Reconciling on a functionalized basis (generation, Analytically, the RECC also reflects the value associated transmission and distribution by the marginal costs with deferring a project from one year to the next and can be of those functions) instead of on a total cost basis used to place projects with different useful lives on a common (see Chapter 24). footing. The RECC is lower than the utility’s nominal level- Another important issue NERA addressed was the meth- ized cost of capital for a given type of plant and lower than od used to reconcile marginal costs to the system revenue the early year revenue requirements calculated traditionally requirement. The calculated marginal costs may be greater or for such a plant. A further discussion of the RECC, with a less than the allowed revenue requirement, which is nor- specific example, is in Appendix B. mally computed on an accounting or embedded cost basis. The mismatch of long-run and short-run marginal costs Thus, methods such as the equal percent of marginal cost among cost components is particularly problematic in the approach are sometimes used for reconciliation, but some NERA method. If system costs are allocated using the total analysts prefer to use the inverse elasticity rule, where elastic measurement of generation costs based on relatively low components of usage are priced at the measured marginal shorter-run costs for energy and generation (that do not con- cost, while inelastic components of usage are priced higher sider the value of capital substituting for energy over time) or lower than marginal cost to absorb the difference between and much longer-term costs for the distribution and custom- embedded and marginal costs. This issue is discussed further er functions, the study will mathematically give too much in Chapter 24. weight to distribution costs in a marginal cost study, to the In the NERA method, the functionalization and then detriment of small customers. Analysts have used a number classification of system costs as energy-related, demand-related of methods to ameliorate or counteract this mismatch. These and customer-related is performed, just as in a traditional methods are briefly identified here but discussed in more embedded cost of service study. The marginal cost of each detail in the sections noted. of these elements is then estimated using a wide variety of • Developing a longer time horizon for generation costs techniques. These marginal costs are then multiplied by the (see Chapter 19 and Section 25.1). Various methods billing determinants for each class to obtain the marginal cost include: by class, commonly referred to as the marginal cost revenue • Extending the time horizon for marginal energy costs requirement. The MCRR is then reconciled to embedded and including carbon dioxide reductions and renewable costs and allocated across the classes. Each set of billing costs as adders to short-run marginal energy costs. determinants used in the calculation is developed on a classPage 194 of 276
192 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Table 41. Illustrative example of allocating marginal distribution demand costs by two methods Residential Small commercial Medium commercial Large commercial and industrial Class coincident peak-based allocation Marginal cost per kW $100 $100 $100 $98* Probability of circuit peak (MWs) 5,900 1,000 3,800 1,500 $590,000,000 $100,000,000 $380,000,000 $147,000,000 48% 8% 31% 12% $100 $100 $100 $98* 23,878 3,131 7,482 3,561 Effective demand factor 36% 37% 65% 76% Noncoincident peak demand multiplied by effective demand (MWs, rounded) 8,600 1,150 4,850 2,700 $860,000,000 $115,000,000 $485,000,000 $264,600,000 50% 7% 28% 16% Marginal cost revenue requirement for distribution demand Share of costs Customer noncoincident peak demand allocation with diversity Marginal cost per kW Noncoincident peak demand (MWs) Marginal cost revenue requirement for distribution demand Share of costs *Lower marginal cost of large commercial/industrial reflects lower line losses on primary distribution loads. Note: Percentages may not add up to 100 because of rounding. Sources: Southern California Edison. (2017). Errata to Phase 2 of 2018 General Rate Case: Marginal Cost and Sales Forecast Proposals; 2018 General Rate Case Phase 2 Workpapers; additional calculations by the authors basis and, except for the customer-related costs, is divided into (2) an allocation factor spread equally over the top few hours time periods and provided for the year as a whole. (100 to 300)209 or (3) peak capacity allocation factors, For the energy-related costs, the allocation is relatively straightforward, multiplying energy use in each time period effectively a hybrid between the two other methods.210 For transmission and distribution costs, the methodology by the energy cost in each time period. For the generation is not as settled, even among marginal cost jurisdictions. capacity costs related to reliability at peak, the allocation Allocation has been either coincident peak-based (related to typically has not been done using the coincident peak the probability of peaks on distribution elements) or noncoin- methods most commonly used in embedded cost analysis cident demand-based, with adjustments for diversity between (and discussed in Section 9.3). Instead, marginal costs are the load at the customer and load at the circuit or substation typically allocated over a larger number of hours. This transformer (which can be developed through statistical anal- allocation has been done using (1) loss-of-energy expectation, ysis). Table 41 illustrates how the two methods can produce 209 This method was developed in California after restructuring in the late 1990s for use in allocating certain transition costs, because generation was expected to be competitive and loss-of-load probability was expected not to exist in a competitive market. San Diego Gas & Electric used the top 100 hours method for allocation of generation costs until 2012 (Saxe, 2012, Chapter 3, pp. 4-5). The company ultimately switched to loss-ofload expectation in 2014 (Barker, 2014). The top 100 hours are still used for allocation of the remaining transition costs of all the major California utilities. 210 Pacific Gas & Electric uses these. Every hour in excess of 80% of the peak is assigned a contribution to peak based on the load minus 80% of the peak. The mathematics mean that the peak hour has an allocation that is 20 times the allocation of an hour that is 81% of the peak and twice the allocation of an hour that is 90% of the peak. In past cases, the company used the gross load curve for both generation and distribution; in 2016, it switched for generation to the load curve net of wind and solar generation while using gross load for distribution. See Pacific Gas & Electric (2016), chapters 9 and 10.Page 195 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 193 substantially different outcomes (Southern California Edison, result from high utility rates of return and strong financial 2017a, 2017b, pp. 59-61 and Appendix B, with additional incentives for rate base growth, as noted in almost every calculations by the authors).211 Data from Southern California utility presentation and analyst report, because intermediate- Edison were used because the company currently employs a term marginal cost methods usually have not included system hybrid of both methods. replacements, as discussed in Chapter 20 and Appendix D. Similar to its use of PCAF for generation allocation, System replacements and incremental investments to Pacific Gas & Electric (PG&E) uses a PCAF method at the local improve safety and reliability (but not to serve new demand) level (each of its 17 divisions) for distribution costs (Pacific are a large component of new T&D construction by utilities. Gas & Electric, 2016, Chapter 10). Nevada uses an hourly Generation is even more complex. Not only was it un- allocation method based on probability of peak using the economic in the past to build generation in small increments, system peak demand from which its costs were calculated but there were significant benefits of capital substitution (Bohrman, 2013, pp. 3-8). (spending money on capital to reduce the use of expensive Analysts must be extremely careful when calculating the fuel) that created excess expensive capacity. In the past, when MCRR, particularly associated with T&D demand. The reason vertically integrated utilities built coal and nuclear plants, is that not all kWs are the same. Many utilities use one type they would conduct planning exercises that provided a of kW when developing a marginal cost per kW of demand justification for those projects based on extremely long-term or capacity (e.g., a kW of substation capacity, where there are estimates of future fuel costs and future dispatch. As a result, 25,000 MWs of such capacity on a utility system) and then large portions of the investment-related costs of these plants multiply the marginal costs by a kW that measures a different were justified based on savings of costly fuel and purchased type of demand (for example, system peak demand where power relative to building peaking generation. The forecast there are only 15,000 kWs of demand). In particular, when the relatively high loads and high fuel prices did not always mate- marginal cost is measured based on a larger number of kWs rialize, and long lead times of large projects meant they could than the kWs on which the cost is allocated, the result is to not be economically changed or canceled in cases where the assign too few costs as demand-related; this overweights the forecasts turned out to be wrong. The disconnect between customer costs in a distribution cost calculation. Additionally, generation construction and short-run marginal costs also controversy can arrive in measuring the kWs of demand for resulted in stranded costs when restructuring took place. cost allocation. Although there is no hard and fast rule, two A similar phenomenon occurred more recently as examples in Appendix C illustrate the concerns. 18.2 Marginal Costs in an Oversized System T&D systems have tended to be oversized because investments were made in expensive environmental retrofits of coal plants instead of retiring the units. Some of these investments ended up being uneconomic given lower than expected prices for natural gas and renewables, not to mention the prospect of greenhouse gas regulation. equipment (transformers, wires, etc.) comes in fixed sizes. For a number of utilities, a short-run marginal cost Moreover, oversizing could theoretically be cheaper in the — assuming the existence of these future plants with high long run than having to return to the same site to change out capital cost and low-cost fuel — was used to evaluate energy equipment, particularly when underground lines have been efficiency, renewables and CHP and to design rates. This installed. Although it may be economically preferable in some methodology effectively gives preference to utility resources circumstances, this oversizing tends to reduce intermediate- while depressing the avoided cost paid to independent power term marginal T&D costs below full long-run marginal costs producers, finding less energy efficiency to be cost-effective, or embedded costs. Increased marginal costs for T&D do not necessarily 211 Loads are rounded off to the nearest 50 MWs in the table, leaving out small classes and granular detail for ease of exposition.Page 196 of 276
194 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® and lowering incentives for customer-side response through next peak period and the renewable energy tax credits that rate design. Examples include Duke Power and Carolina make operating some resources profitable even if they need to Power and Light Co. from 1982 to 1985, which assumed that pay for the market to absorb their energy output. future coal and nuclear plants would be built when evaluating The renewable transition makes the traditional marginal PURPA projects (Marcus, 1984, pp. 10-23). Another example cost methodology less relevant. Capacity costs and short- is the calculations by Ontario Hydro for evaluation of energy run marginal energy costs are low, while embedded costs efficiency and private power prior to and during the 1990- remain high. Essentially a short-run marginal cost method 1993 demand/supply plan hearings at the Environmental sends price signals that energy is cheap because the fossil- Assessment Board (Marcus, 1988, pp. 14-16). A third, from fueled component of energy is being used less frequently 1990-1991 hearings, is Manitoba Hydro’s analysis of energy and is becoming less costly when it is used, while generation efficiency using differential revenue requirement analyses capacity costs are also low unless artificially increased. assuming that the Conawapa hydro project would be However, while short-run marginal costs are constructed (Goodman and Marcus, 1990, pp. 132-133, F34-F45). decreasing, embedded system generation costs are remaining Appendix E provides a mathematical discussion of this issue.212 at current levels or increasing because additional capacity Then, when excess capacity appeared, short-run marginal is being brought on in advance of need. Other effects on energy costs declined. The need for generation capacity also utility generation revenue requirements arise because: declined, although the extent to which that decline was (1) some renewables acquired relatively early may be relatively recognized in short-run marginal cost methods varied across expensive compared with newer renewables in the face of jurisdictions (see Section 19.3). declining cost curves; (2) the growth of renewables may 18.3 Impact of New Technology on Marginal Cost Analysis Excess capacity can be the result of other cost transitions made for a combination of economic and environmental reasons — in particular, the transition to renewables and other related technologies (storage) that are not fuel-intensive. be dampening growth in natural gas prices, which makes renewable energy look less cost-effective than it really is; and (3) in some cases, accelerated recovery of costs reflecting the early retirement of fossil-fueled and nuclear generation may raise embedded costs. 18.3.2 Other New Technologies Smart grid resources can also reduce the marginal cost of 18.3.1 Renewable Energy distribution capacity by extending the ability to optimize the Low-cost wind and solar resources are being installed to use of existing capacity. This may increase excess capacity in provide economic and environmental benefits and reduce fuel the short term while reducing long-run costs by substituting use even where capacity is not needed and in some cases are controls for wires and fuel. Sections 7.1 and 11.5 discuss in causing the retirements of older plants.213 In some instances, detail the technological characteristics of smart grid func- the total cost of new renewable generation can be less than tions — including integrated volt/VAR (volt-ampere reactive) the fuel and O&M costs of generation that it displaces. controls, automated switching and balancing of loads across These resources have already been reducing short-term market prices in virtually all ISOs/RTOs. Short-run energy circuits and enablement of demand response programs — and of storage and demand response resources. market prices are even sometimes negative in off-peak hours, In the near term, large-scale battery storage on the utility due to generation that cannot shut down and restart for the grid can be an economic substitute for peaking and relatively 212 Although not strictly a marginal cost issue, divergence between short-run and long-run marginal cost can be one reason for stranded costs (which tend to have been measured against an estimate of short-run cost over time). 213 An explicit example is Xcel Energy’s program of substituting “steel for fuel” by replacing coal and gas with wind and solar generation (Xcel Energy, 2018).Page 197 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® inefficient intermediate gas-fired generation — including generation now receiving reliability-must-run (RMR) contracts in transmission rates — while reducing the cost of ramping to meet daily peak loads (Maloney, 2018; see also ELECTRIC COST ALLOCATION FOR A NEW ERA | 195 The technology-based economic transition to a smarter grid and a greater role for intermittent and storage resources will change the marginal cost paradigm. California Public Utilities Commission, 2018). This could reduce both marginal energy costs and have been designed for fossil-fueled systems, using marginal capacity costs if it proves ultimately to be cheaper economic dispatch. Renewable resources, storage and than a combustion turbine. In the longer term of a decarbon- other resources tend to depress the short-run prices of ized system with large amounts of intermittent resources, fossil-fueled energy and existing fossil-fueled capacity. batteries are likely to need to operate for more hours. • If installed elsewhere on the system, particularly on the Treatment of renewables. With the substitution of renewables (relatively high capital costs but almost zero variable distribution system, storage batteries can not only provide costs) for fossil fuel, short-run marginal energy costs support for generation and transmission but remedy distri- are significantly below the cost of new generation, with bution overloads or mitigate outages on less reliable radial significant implications for cost allocation. As an example, distribution lines, especially where other smart grid functions a wind plant that runs at 40% to 50% capacity factor are not feasible. The effect would be to reduce marginal (in the Southern Plains) depresses short-run marginal capacity costs — although some portion of the cost of the energy cost and may have no impact on capacity costs. storage should be included as a distribution capacity resource. • Availability of storage. Storage is likely to have a lower Behind the meter, storage can provide demand response for cost of capacity than fossil-fueled capacity for at least the utility as well as significant benefits to customers. some applications. It also provides more services than Demand response (e.g., air conditioner cycling, inter- conventional peaking capacity depending on where it ruptible customers) typically has been used as an emergency is sited — for example, it can provide some ancillary capacity resource to avoid bulk generation outages. But it services (e.g., fast ramping service) and help with variable could also be used (when coupled with smart appliances) to renewable energy integration. However, it may have mitigate transmission and distribution overloads when the the counterintuitive impact of depressing short-run customer is at an appropriate voltage level, reducing future marginal costs. marginal costs. In essence, the technology-based economic transition to 18.4 Summary The key issues associated with marginal cost analysis on a a smarter grid and a greater role for intermittent and storage resources will ultimately change the marginal cost paradigm from that used for the last four decades while blurring the generic basis are: traditional distinctions among generation, transmission and • Mixed time horizons. Marginal cost methods often mix distribution costs. The short-run marginal cost paradigm short-run, intermediate-term and long-run marginal based primarily on variable costs of fossil-fueled generation costs in an inconsistent manner that has tended to have is becoming less central to the fundamental economics of inequitable results over the last 30 years. electricity service for which regulation must account. That Obsolete technique given changing resource options. change has not been fully analyzed within the structure of Whether short-run or long-run, marginal energy and marginal cost rate-making, but a pathway for such analysis generation capacity cost allocation methods essentially will be discussed in Chapter 25. •Page 198 of 276
196 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® 19. Generation in Marginal Cost of Service Studies T he theory of marginal generation costs starts from (usually a combustion turbine) was determined to be the peak the position that electric generation is a joint cost, and the remaining costs were energy-related.214 In the product, producing energy as well as capacity or past, the baseload generation cost was often a coal plant. This reliability. When marginal cost methods were introduced method has recently been modified in Oregon to use a com- in the 1970s, they constituted a significant advance over the bustion turbine for peak generation and a mix of combined previously used embedded cost theory that assumed that cycle gas generation and wind generation for the nonpeak generation capital investment and nondispatch O&M costs alternative (Paice, 2013, pp. 7-8). are all demand-related and only short-term variable costs are The second long-run marginal cost option has been used energy-related. The marginal cost paradigm recognizes in by the California Public Utilities Commission for purposes some way, albeit imperfectly, that with a variety of generating other than cost allocation and rate design. Energy and plant technologies, capital can be substituted for energy Environmental Economics Inc. (E3) developed a relatively and that all capital is not related to the need to serve peak sophisticated hourly long-run incremental cost model.215 The demand. California commission has used the E3 model to evaluate 19.1 Long-Run Marginal Cost of Generation The first key question regarding marginal generation energy efficiency, demand response and distributed generation for a number of years, although it has not yet used it for rate design. The generation components of this method have an evaluation period of up to 30 years. The model is designed costs is the balance between short-run and long-run marginal to assume the short-run avoided cost until the year when costs. There are two options for explicitly calculating long- capacity is projected to be needed and the full cost of a com- run marginal costs. Both are based on the cost of building and bined cycle generator if the long-run base total fossil-fueled operating new resources. generation cost is in equilibrium. The effect of this, in the The first option is the use of long-run marginal costs past three decades, would have been to understate generation (referred to as long-run incremental costs by the entities marginal costs compared with those that would exist under that developed these methods) to allocate generation costs an equilibrium market. However, if the year of capacity need based on plant types. This method was developed in the is set to the current year, which has been done in some recent Pacific Northwest, where large portions of the systems were analyses, the model becomes a full long-run marginal cost energy-constrained. Hydro systems have very flexible capacity model, alleviating this problem. but depend on water for energy generation, and the supply E3 divides the costs into energy and capacity, with the of water is both limited under adverse conditions and not costs of a simple-cycle combustion turbine (net of profits controllable. Under this method, the cost of new baseload received for energy and ancillary services) treated as capacity- generation in a resource plan was calculated as the total related and all remaining combined cycle costs as energy- marginal generation cost. The cost of peaking generation related. The E3 model then shapes the energy costs into an 214 This method is similar to the equivalent peaker method (discussed in Section 9.1), except that it includes both capacity and energy. 215 The description of this method is taken from Horii, Price, Cutter, Ming and Chawla, 2016.Page 199 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 197 hourly load shape using information on load shapes over cost analyses, tend to overstate the balance of costs for time (including changes resulting from renewable resource customer classes with lower load factors and understate them additions) and adds a projection of line losses, carbon dioxide for customer classes with higher load factors. The cost of a costs and ancillary services to obtain a market price. To combustion turbine, which is allocated heavily based on peak obtain the full marginal or avoided energy cost — to the conditions, becomes a larger portion of marginal generation extent that renewable resources (net of their resource-specific costs if short-run energy costs are lower than if higher capacity credits) cost more than the energy-related cost of a longer-run costs are used. combined cycle unit — the resulting extra costs of meeting It is of key importance that reasonable natural gas price the renewable portfolio standard over the 20-year period are forecasts are used, particularly if looking out beyond a very added to the market-based costs. short time horizon. In much of the country, the modeling 19.2 Short-Run Marginal Energy Costs Short-run marginal energy costs normally are calculated outputs are very sensitive to this input factor, and key results can vary greatly depending on the natural gas forecast. The E3 long-run incremental cost forecast uses short-term forecasts from futures and a longer-term mix of forecasts from the from a production cost or similar model on a time- U.S. Energy Information Administration and the California differentiated (or even hourly) basis. These calculations are Energy Commission’s Integrated Electric Policy Report (Horii made over a relatively short period (typically one to six years et al., 2016, pp. 5-8). Utilities tend to use their own forecasts, out, depending on the utility). Marginal energy costs in the but in California those forecasts are updated after intervenor West — whether simulated directly or simulated through a testimony is filed. market pricing version of a production cost model — typically Greenhouse gas emissions are an important marginal have been dependent on the cost of gas and the overall cost, but there is not a consensus method to address it. efficiency of the system (i.e., the percentage of time gas was Carbon cost is, in theory, internalized by California’s cap- the incremental fuel, the type of gas plants used and the and-trade system, although it becomes difficult to properly amount of baseload or intermittent generation available). This model the dispatch in the Western United States when only changes in very wet months, when hydro may be the marginal California resources and California imports carry carbon resource, or increasingly at midday on light-load days, when values. The Regional Greenhouse Gas Initiative market solar becomes a market driver. In Texas and the Plains states, performs a similar function in the Northeastern United wind is increasingly a market-driving resource. For utilities in States. In all jurisdictions where carbon prices are included, the Midwest, South and East, the incremental fuel is typically carbon prices must be forecast if longer-term marginal a mix of gas-fired generation during peak and midpeak periods cost methods are used. Prices need to be forecast over the with coal-fired generation off-peak in some locations. Some full study duration where markets do not exist for these utilities face much higher marginal costs or market prices in products. Even in California and the Regional Greenhouse extreme winter weather because of gas price spikes, limits on Gas Initiative states, market-determined allowance prices gas availability, high peak loads and unreliability of service due extend out for only a three-year period. However, in places to freezing of coal piles and some mechanical parts of power where carbon is not explicitly valued, a marginal cost method plants and gas wells. should include current or future carbon values associated In California and Nevada, utilities typically have modeled with fossil-fueled generation to provide forward-looking and averaged marginal energy costs over one or three years, price signals. In jurisdictions covered by electric sector corresponding to the length of time between rate cases, but cap-and-trade programs, there are still questions about PG&E uses six years. These very short-run energy analyses, whether the marginal cost from the program is sufficient or particularly when coupled with long-run generation capacity whether another measure, such as the social cost of carbonPage 200 of 276
198 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® or marginal cost of long-term greenhouse gas reductions, is variation in loads is a flexible resource, not necessarily the more accurate. least-cost resource, and the dispatch of hydro can change The addition of renewable resources to utility portfolios, with changes in load. In California, the utilities commission especially if added in advance of the need for capacity, adopted a method that computed marginal costs as the depresses marginal energy costs by adding energy with zero change in total costs for a large utility between a symmetrical fuel costs (or even negative costs in the case of wind energy increment of several hundred MWs above and several hun- with the production tax credit). The result is to reduce dred MWs below current loads in each hour. This resulted in marginal costs in two ways. It reduces the heat rates of gas- a more expansive definition of short-run marginal costs that fired generators on the margin. It also decreases the number included not just the incremental costs of a plant running in of hours when a gas-fired resource is on the margin in some a given hour but the differences in how many power plants places where cheaper coal or surplus hydro (the Pacific were committed if the load were different — thus causing Northwest or Canada) can be a marginal source of energy or changes in costs of startups and plants running at minimum when renewables are curtailed. In other words, the short-run load to be available the next day. These unit commitment model reduces energy costs relative to capacity costs when costs generally increase the marginal costs experienced new renewable resources are constructed. during peak hours above hourly marginal costs. In current It can be argued that costs of compliance with an RPS are wholesale markets, unit commitment costs tend to be reflect- short-run marginal costs, in the sense that if load changes on ed in day-ahead prices because bidders who need to commit a a permanent basis, a portion of that load must be met with resource must include that cost in their bids. renewable resources. The capital and operating costs of those Several ancillary services defined by FERC and ISOs/ resources (possibly net of the fixed costs of an equivalent RTOs are purchased on an hourly basis. These include spin- amount of peaking capacity) would replace the market prices ning reserves, nonspinning reserves available in a time frame and fuel costs from existing generation used to calculate mar- of about 10 minutes, in some cases replacement reserves ginal costs.216 The Nevada utilities first developed calculations (plants that could fill another reserve type on a contingency using the RPS as an adder to conventional resources in Sierra basis if that reserve was used in real time) and frequency reg- Pacific Power Co.’s 2010 rate case (Pollard, 2010).217 The RPS ulation (both upward and downward) on a minute-to-minute adder was then adopted by California consumer groups basis. Additionally, there are services that are not officially (Marcus, 2010b, p. 45) and by Southern California Edison (2014, called ancillary services but that are related. These include the pp. 31-32). It is also included in the E3 long-run marginal cost need to assure that enough generation is committed to meet model (Horii et al., pp. 36-38). Note that, mathematically, energy requirements (residual unit commitment, acquired in the Western states that use marginal cost analysis, the daily) and energy that can be dispatched to ramp upward or RPS adder increases if short-run market energy prices decline downward within a bid period to meet changes in demand (e.g., due to an update that reduces gas prices). and changes in variable (typically renewable) resource output Before deregulation, there was a debate over whether that can be forecast hourly or subhourly (e.g., solar). Finally, short-run marginal energy costs should be the instantaneous there are out-of-market real-time costs necessary to maintain cost in the given hour as envisioned in the original NERA system reliability if generation is not available or if transmis- method or should reflect other factors such as unit com- sion contingencies occur. These costs are “uplift” (charged mitment. Often the actual unit that varies with short-term to system loads) by ISOs/RTOs. That said, uplift costs can be 216 As an analogy, in most jurisdictions with retail choice, RPS requirements typically are implemented in a way that is a short-run cost. As a percentage requirement based on load served or retail kWh sales, it automatically varies based on kWhs in a predictable way. Therefore, treating RPS requirements similarly in jurisdictions where generation is regulated is appropriate. 217 Those calculations established the principle, even though they were flawed because they included energy efficiency resources that were cheaper than market prices that could meet Nevada RPS requirements and because the energy efficiency costs did not consider a time value of money (Marcus, 2010c, pp. 7-8).Page 201 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA incurred unnecessarily if ISOs/RTOs fail to optimize existing | 199 A number of technologies could be the least-cost markets to provide necessary reserves and other ancillary generating capacity option, including: services to provide necessary grid support. • Although some utilities and industrial customers suggest Conventional peaking generation, demand response or economic curtailment. these costs are really capacity costs and thus should be • Midrange generation net of fuel or market price savings. subsumed in the marginal cost of capacity, they are paid for in • Short-term or intermediate-term power purchases. each hour along with market energy costs, so that, regardless • Results of RTO capacity market auctions or market of the semantics, they should be allocated on an hourly basis. prices for capacity procured for resource adequacy The costs are not large in normally functioning markets. (if applicable). For purposes of evaluation of energy efficiency in California, • Centralized or distributed storage net of fuel or market E3 uses a figure of 0.7% of marginal energy costs for ancillary price savings. services (Horii et al., pp. 25-26),218 a decrease from 1% several In equilibrium, without cheaper short-term options, years ago. A more detailed study of California ISO ancillary the cost of a peaker would theoretically equal the shortage services costs for the 12 months ending April 2010 ended up value customers experience from generation outages. That with 0.8% of marginal energy cost, with amounts ranging from is the reason marginal generation costs have typically used 1.17% summer on-peak to 0.61% winter midpeak (Marcus, a peaker, because they effectively assume equilibrium exists. 2010b, p. 45). Although not large, the costs are real and should The California and Nevada utilities other than PG&E use the be included in a short-run energy costing methodology. full cost of a combustion turbine as the basis for marginal Costs paid on an hourly basis for intrahour ramping may capacity costs. PG&E, the California Public Utilities Commis- also be incurred. This is particularly an issue in the Western sion advocacy staff and other consumer intervenors recognize U.S. The drop-off of solar energy as the sun sets plus increas- that the short-run marginal cost can be less than a peaker. ing of loads toward an evening peak can cause a doubling of Lower costs should occur if capacity is either unneeded or so loads served by other resources (i.e., net loads, excluding wind economic that energy savings from construction of baseload and solar generation) on some low-load days in the spring generation exceeds the cost of the plant, or if cheaper options and fall. This causes the need to rapidly ramp up convention- than a combustion turbine peaker are available. Theoretically, al generation, such as natural gas and hydro, and opens up the marginal generation capacity cost can also be higher for an important new role for storage. Any energy costs of ramp short periods when there are shortages of capacity within the should be assigned as a marginal cost to those hours. lead time of building generation, but those conditions have 19.3 Short-Run Marginal Generation Capacity Costs Under the short-run marginal cost method, the theory, not occurred since the early 1980s (California Public Utilities Commission, 1983, pp. 220-222). In 2017-2018, Southern California Edison claimed that some of the need for system reliability was not caused by as originally developed in the late 1970s, is that the value of peak loads but instead by the requirement to have adequate generation capacity is capped at the least cost of acquiring capacity available to ramp generation from midafternoon generation for reliability. If all that was needed was capacity, to the evening peak in periods of the year with relatively a cheap resource to provide capacity (such as a peaking low loads (and relatively high output from conventional plant) could be built. Any more expensive generation would hydro plants that reduced their flexibility for use in peaking). have been built specifically to reduce total system costs (fuel Although many options are available to reduce the size and plus capacity). Under this method, the cost of the peaker is scope of the ramp, particularly storage and use of flexible multiplied by the real economic carrying charge, and O&M and A&G costs are added to it. 218 These costs do not include ramp, residual unit commitment or out-ofmarket costs.
As listed on the current system
Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Melissa Whited [26-05-10]