Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Files3

Search terms highlighted
Eversource rate increase is on 6 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
5 pages match
Words on different pages
  1. Page 198 of 276

    196 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® 19. Generation in Marginal Cost of Service Studies T he theory of marginal generation costs starts from (usually a combustion turbine) was determined to be the peak the position that electric generation is a joint cost, and the remaining costs were energy-related.214 In the product, producing energy as well as capacity or past, the baseload generation cost was often a coal plant. This reliability. When marginal cost methods were introduced method has recently been modified in Oregon to use a com- in the 1970s, they constituted a significant advance over the bustion turbine for peak generation and a mix of combined previously used embedded cost theory that assumed that cycle gas generation and wind generation for the nonpeak generation capital investment and nondispatch O&M costs alternative (Paice, 2013, pp. 7-8). are all demand-related and only short-term variable costs are The second long-run marginal cost option has been used energy-related. The marginal cost paradigm recognizes in by the California Public Utilities Commission for purposes some way, albeit imperfectly, that with a variety of generating other than cost allocation and rate design. Energy and plant technologies, capital can be substituted for energy Environmental Economics Inc. (E3) developed a relatively and that all capital is not related to the need to serve peak sophisticated hourly long-run incremental cost model.215 The demand. California commission has used the E3 model to evaluate 19.1 Long-Run Marginal Cost of Generation The first key question regarding marginal generation energy efficiency, demand response and distributed generation for a number of years, although it has not yet used it for rate design. The generation components of this method have an evaluation period of up to 30 years. The model is designed costs is the balance between short-run and long-run marginal to assume the short-run avoided cost until the year when costs. There are two options for explicitly calculating long- capacity is projected to be needed and the full cost of a com- run marginal costs. Both are based on the cost of building and bined cycle generator if the long-run base total fossil-fueled operating new resources. generation cost is in equilibrium. The effect of this, in the The first option is the use of long-run marginal costs past three decades, would have been to understate generation (referred to as long-run incremental costs by the entities marginal costs compared with those that would exist under that developed these methods) to allocate generation costs an equilibrium market. However, if the year of capacity need based on plant types. This method was developed in the is set to the current year, which has been done in some recent Pacific Northwest, where large portions of the systems were analyses, the model becomes a full long-run marginal cost energy-constrained. Hydro systems have very flexible capacity model, alleviating this problem. but depend on water for energy generation, and the supply E3 divides the costs into energy and capacity, with the of water is both limited under adverse conditions and not costs of a simple-cycle combustion turbine (net of profits controllable. Under this method, the cost of new baseload received for energy and ancillary services) treated as capacity- generation in a resource plan was calculated as the total related and all remaining combined cycle costs as energy- marginal generation cost. The cost of peaking generation related. The E3 model then shapes the energy costs into an 214 This method is similar to the equivalent peaker method (discussed in Section 9.1), except that it includes both capacity and energy. 215 The description of this method is taken from Horii, Price, Cutter, Ming and Chawla, 2016.
  2. Page 199 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 197 hourly load shape using information on load shapes over cost analyses, tend to overstate the balance of costs for time (including changes resulting from renewable resource customer classes with lower load factors and understate them additions) and adds a projection of line losses, carbon dioxide for customer classes with higher load factors. The cost of a costs and ancillary services to obtain a market price. To combustion turbine, which is allocated heavily based on peak obtain the full marginal or avoided energy cost — to the conditions, becomes a larger portion of marginal generation extent that renewable resources (net of their resource-specific costs if short-run energy costs are lower than if higher capacity credits) cost more than the energy-related cost of a longer-run costs are used. combined cycle unit — the resulting extra costs of meeting It is of key importance that reasonable natural gas price the renewable portfolio standard over the 20-year period are forecasts are used, particularly if looking out beyond a very added to the market-based costs. short time horizon. In much of the country, the modeling 19.2 Short-Run Marginal Energy Costs Short-run marginal energy costs normally are calculated outputs are very sensitive to this input factor, and key results can vary greatly depending on the natural gas forecast. The E3 long-run incremental cost forecast uses short-term forecasts from futures and a longer-term mix of forecasts from the from a production cost or similar model on a time- U.S. Energy Information Administration and the California differentiated (or even hourly) basis. These calculations are Energy Commission’s Integrated Electric Policy Report (Horii made over a relatively short period (typically one to six years et al., 2016, pp. 5-8). Utilities tend to use their own forecasts, out, depending on the utility). Marginal energy costs in the but in California those forecasts are updated after intervenor West — whether simulated directly or simulated through a testimony is filed. market pricing version of a production cost model — typically Greenhouse gas emissions are an important marginal have been dependent on the cost of gas and the overall cost, but there is not a consensus method to address it. efficiency of the system (i.e., the percentage of time gas was Carbon cost is, in theory, internalized by California’s cap- the incremental fuel, the type of gas plants used and the and-trade system, although it becomes difficult to properly amount of baseload or intermittent generation available). This model the dispatch in the Western United States when only changes in very wet months, when hydro may be the marginal California resources and California imports carry carbon resource, or increasingly at midday on light-load days, when values. The Regional Greenhouse Gas Initiative market solar becomes a market driver. In Texas and the Plains states, performs a similar function in the Northeastern United wind is increasingly a market-driving resource. For utilities in States. In all jurisdictions where carbon prices are included, the Midwest, South and East, the incremental fuel is typically carbon prices must be forecast if longer-term marginal a mix of gas-fired generation during peak and midpeak periods cost methods are used. Prices need to be forecast over the with coal-fired generation off-peak in some locations. Some full study duration where markets do not exist for these utilities face much higher marginal costs or market prices in products. Even in California and the Regional Greenhouse extreme winter weather because of gas price spikes, limits on Gas Initiative states, market-determined allowance prices gas availability, high peak loads and unreliability of service due extend out for only a three-year period. However, in places to freezing of coal piles and some mechanical parts of power where carbon is not explicitly valued, a marginal cost method plants and gas wells. should include current or future carbon values associated In California and Nevada, utilities typically have modeled with fossil-fueled generation to provide forward-looking and averaged marginal energy costs over one or three years, price signals. In jurisdictions covered by electric sector corresponding to the length of time between rate cases, but cap-and-trade programs, there are still questions about PG&E uses six years. These very short-run energy analyses, whether the marginal cost from the program is sufficient or particularly when coupled with long-run generation capacity whether another measure, such as the social cost of carbon
  3. Page 200 of 276

    198 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® or marginal cost of long-term greenhouse gas reductions, is variation in loads is a flexible resource, not necessarily the more accurate. least-cost resource, and the dispatch of hydro can change The addition of renewable resources to utility portfolios, with changes in load. In California, the utilities commission especially if added in advance of the need for capacity, adopted a method that computed marginal costs as the depresses marginal energy costs by adding energy with zero change in total costs for a large utility between a symmetrical fuel costs (or even negative costs in the case of wind energy increment of several hundred MWs above and several hun- with the production tax credit). The result is to reduce dred MWs below current loads in each hour. This resulted in marginal costs in two ways. It reduces the heat rates of gas- a more expansive definition of short-run marginal costs that fired generators on the margin. It also decreases the number included not just the incremental costs of a plant running in of hours when a gas-fired resource is on the margin in some a given hour but the differences in how many power plants places where cheaper coal or surplus hydro (the Pacific were committed if the load were different — thus causing Northwest or Canada) can be a marginal source of energy or changes in costs of startups and plants running at minimum when renewables are curtailed. In other words, the short-run load to be available the next day. These unit commitment model reduces energy costs relative to capacity costs when costs generally increase the marginal costs experienced new renewable resources are constructed. during peak hours above hourly marginal costs. In current It can be argued that costs of compliance with an RPS are wholesale markets, unit commitment costs tend to be reflect- short-run marginal costs, in the sense that if load changes on ed in day-ahead prices because bidders who need to commit a a permanent basis, a portion of that load must be met with resource must include that cost in their bids. renewable resources. The capital and operating costs of those Several ancillary services defined by FERC and ISOs/ resources (possibly net of the fixed costs of an equivalent RTOs are purchased on an hourly basis. These include spin- amount of peaking capacity) would replace the market prices ning reserves, nonspinning reserves available in a time frame and fuel costs from existing generation used to calculate mar- of about 10 minutes, in some cases replacement reserves ginal costs.216 The Nevada utilities first developed calculations (plants that could fill another reserve type on a contingency using the RPS as an adder to conventional resources in Sierra basis if that reserve was used in real time) and frequency reg- Pacific Power Co.’s 2010 rate case (Pollard, 2010).217 The RPS ulation (both upward and downward) on a minute-to-minute adder was then adopted by California consumer groups basis. Additionally, there are services that are not officially (Marcus, 2010b, p. 45) and by Southern California Edison (2014, called ancillary services but that are related. These include the pp. 31-32). It is also included in the E3 long-run marginal cost need to assure that enough generation is committed to meet model (Horii et al., pp. 36-38). Note that, mathematically, energy requirements (residual unit commitment, acquired in the Western states that use marginal cost analysis, the daily) and energy that can be dispatched to ramp upward or RPS adder increases if short-run market energy prices decline downward within a bid period to meet changes in demand (e.g., due to an update that reduces gas prices). and changes in variable (typically renewable) resource output Before deregulation, there was a debate over whether that can be forecast hourly or subhourly (e.g., solar). Finally, short-run marginal energy costs should be the instantaneous there are out-of-market real-time costs necessary to maintain cost in the given hour as envisioned in the original NERA system reliability if generation is not available or if transmis- method or should reflect other factors such as unit com- sion contingencies occur. These costs are “uplift” (charged mitment. Often the actual unit that varies with short-term to system loads) by ISOs/RTOs. That said, uplift costs can be 216 As an analogy, in most jurisdictions with retail choice, RPS requirements typically are implemented in a way that is a short-run cost. As a percentage requirement based on load served or retail kWh sales, it automatically varies based on kWhs in a predictable way. Therefore, treating RPS requirements similarly in jurisdictions where generation is regulated is appropriate. 217 Those calculations established the principle, even though they were flawed because they included energy efficiency resources that were cheaper than market prices that could meet Nevada RPS requirements and because the energy efficiency costs did not consider a time value of money (Marcus, 2010c, pp. 7-8).
  4. Page 201 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA incurred unnecessarily if ISOs/RTOs fail to optimize existing | 199 A number of technologies could be the least-cost markets to provide necessary reserves and other ancillary generating capacity option, including: services to provide necessary grid support. • Although some utilities and industrial customers suggest Conventional peaking generation, demand response or economic curtailment. these costs are really capacity costs and thus should be • Midrange generation net of fuel or market price savings. subsumed in the marginal cost of capacity, they are paid for in • Short-term or intermediate-term power purchases. each hour along with market energy costs, so that, regardless • Results of RTO capacity market auctions or market of the semantics, they should be allocated on an hourly basis. prices for capacity procured for resource adequacy The costs are not large in normally functioning markets. (if applicable). For purposes of evaluation of energy efficiency in California, • Centralized or distributed storage net of fuel or market E3 uses a figure of 0.7% of marginal energy costs for ancillary price savings. services (Horii et al., pp. 25-26),218 a decrease from 1% several In equilibrium, without cheaper short-term options, years ago. A more detailed study of California ISO ancillary the cost of a peaker would theoretically equal the shortage services costs for the 12 months ending April 2010 ended up value customers experience from generation outages. That with 0.8% of marginal energy cost, with amounts ranging from is the reason marginal generation costs have typically used 1.17% summer on-peak to 0.61% winter midpeak (Marcus, a peaker, because they effectively assume equilibrium exists. 2010b, p. 45). Although not large, the costs are real and should The California and Nevada utilities other than PG&E use the be included in a short-run energy costing methodology. full cost of a combustion turbine as the basis for marginal Costs paid on an hourly basis for intrahour ramping may capacity costs. PG&E, the California Public Utilities Commis- also be incurred. This is particularly an issue in the Western sion advocacy staff and other consumer intervenors recognize U.S. The drop-off of solar energy as the sun sets plus increas- that the short-run marginal cost can be less than a peaker. ing of loads toward an evening peak can cause a doubling of Lower costs should occur if capacity is either unneeded or so loads served by other resources (i.e., net loads, excluding wind economic that energy savings from construction of baseload and solar generation) on some low-load days in the spring generation exceeds the cost of the plant, or if cheaper options and fall. This causes the need to rapidly ramp up convention- than a combustion turbine peaker are available. Theoretically, al generation, such as natural gas and hydro, and opens up the marginal generation capacity cost can also be higher for an important new role for storage. Any energy costs of ramp short periods when there are shortages of capacity within the should be assigned as a marginal cost to those hours. lead time of building generation, but those conditions have 19.3 Short-Run Marginal Generation Capacity Costs Under the short-run marginal cost method, the theory, not occurred since the early 1980s (California Public Utilities Commission, 1983, pp. 220-222). In 2017-2018, Southern California Edison claimed that some of the need for system reliability was not caused by as originally developed in the late 1970s, is that the value of peak loads but instead by the requirement to have adequate generation capacity is capped at the least cost of acquiring capacity available to ramp generation from midafternoon generation for reliability. If all that was needed was capacity, to the evening peak in periods of the year with relatively a cheap resource to provide capacity (such as a peaking low loads (and relatively high output from conventional plant) could be built. Any more expensive generation would hydro plants that reduced their flexibility for use in peaking). have been built specifically to reduce total system costs (fuel Although many options are available to reduce the size and plus capacity). Under this method, the cost of the peaker is scope of the ramp, particularly storage and use of flexible multiplied by the real economic carrying charge, and O&M and A&G costs are added to it. 218 These costs do not include ramp, residual unit commitment or out-ofmarket costs.
  5. Page 202 of 276

    200 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® loads in areas such as water supply and delivery (see Marcus, a market). Combustion turbines installed in the 1970s, 2010b, and Lazar, 2016), one of the options the California ISO when the NERA method was developed, had heat rates in identified was gas-fired generation. New storage options may the range of 15,000 Btu per kWh and burned expensive be especially well suited for dealing with problems of ramping diesel oil. They were machines that provided essentially because of the timing of both charging and discharging bat- pure capacity — reserves that were turned on to keep the teries or taking other actions like storing hot or chilled water. lights from going out. Much of the gas-fired load at that Equating a marginal capacity cost based on a peaker time came from less flexible steam plants with heat rates with very short-run energy costs creates a mismatch that is from 9,000 to 12,000 Btu per kWh. Modern peakers detrimental to customers with peakier load shapes. Several have a heat rate in the range of 10,000 Btu per kWh points must be considered here. (or lower) and burn gas. They actually have better heat 1. Costs of peakers vary. Smaller combustion turbines and rates than many of the older intermediate steam plants, aero-derivative turbines are more expensive than larger as well as greater flexibility. As a result, when modern combustion turbines. Some of these smaller turbines peakers are used, they generally earn at least some money have costs that approach or even exceed the cost of in the market or save fuel and purchased power costs.221 a larger combined cycle plant.219 When conducting They also can earn revenue from selling dispatch rights marginal cost studies, some utilities and industrial in the 10-minute (nonspinning) reserve ancillary service customers have requested approval for expensive peakers market. This revenue should be netted against the cost of as marginal capacity costs.220 However, that point ignores the combustion turbine, because it pays a portion of the the key finding of the NERA method: that the marginal cost of capacity. cost of capacity is the least costly source of capacity, so 2. 4. Peaking generation may not be the least-cost capacity that by definition the more expensive peaker installed for resource. It is possible for an intermediate resource such other reasons is not the marginal cost of capacity under as a combined cycle generator to have a lower net cost that framework. than a combustion turbine. In particular, the capital and Financing costs for peakers vary. In California, a num- long-term O&M cost of the combined cycle generator ber of parties (including E3) have used merchant plant minus the revenue that it would earn in the market or financing, which is more expensive than utility financing, the fuel it would save can be less than the cost of a com- to develop the marginal cost of capacity. Again, the issue bustion turbine. Even with excess capacity, this outcome is that a merchant plant is not the least costly source of can sometimes occur, particularly if a relatively expensive capacity because merchant plants have higher required turbine is erroneously considered as the peaking unit returns. Furthermore, merchant plants often have (as discussed earlier in this list). off-take contracts that are shorter than the physical life 5. Storage costs may be cheaper than combustion turbines. of the plant. Using the shorter contract life for capital Under current conditions, it is possible that storage recovery also inappropriately increases the marginal cost costs net of energy savings relative to market prices can of generating capacity. be cheaper than conventional peaking generation. In Even a peaking power plant would make money in the particular, PG&E is installing and contracting for about market (or save fuel and purchased power costs in a ver- 550 MWs of batteries with four-hour storage to meet tically integrated utility that is not closely affiliated with system needs and replace 570 MWs of RMR peaking and 219 A utility might have installed some of these smaller turbines for reasons such as alleviating transmission constraints, meeting time constraints (if the smaller turbines had less stringent siting requirements) or responding to specialized system needs such as black start capability. 220 See, for example, Phillips (2018, pp. 5-11), where the testimony argues for the usage of a 50-MW turbine costing $1,600 per kW instead of a cheaper 100-MW turbine. 3. 221 See Section 1.1 for more discussion and quantitative examples of this phenomenon.
  6. Page 203 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® 6. ELECTRIC COST ALLOCATION FOR A NEW ERA | 201 combined cycle generation (Maloney, 2018; California To the extent there is a marginal capacity cost for ramp- Public Utilities Commission, 2018). RMR generation ing capability, it can best be understood as an hourly capacity receives payments on a cost of service basis including cost that is negative in the hour or two before the ramp capital and operating costs, although the specific plants begins, a positive hourly cost in the steepest several hours of being replaced are partly depreciated. the ramp and lower but still positive hourly cost as the ramp Additionally, pure capacity can be available at becomes flatter, continuing through and just beyond the considerably lower costs than a combustion turbine. evening peak. Systemwide actual and projected prices in the California But, for allocation purposes, the cost needs to be first resource adequacy markets are $30 to $40 per kW-year divided between ramp caused by customer loads and ramp over the period of 2017-2021 (Chow and Brant, 2018, caused by generation characteristics, which should be p. 21) with even the peak monthly prices from July to feasible. This is another example of how the emerging wind- September rising no higher than $4.50 per kW-month and solar-dominated grid challenges traditional methods of (Chow and Brant, p. 32). Capacity market prices are cost allocation. To the extent that the need for capacity for generally similar in the PJM region, with higher prices ramping, and hence part of its cost, is caused by generation in transmission-constrained pockets of New Jersey characteristics, it should not be a load-related marginal cost and occasionally other areas; new demand resources, for allocation to the classes that contribute to the ramp.223 renewables and gas-fired combined cycle generation have The generation-related ramp effectively becomes part of the been added at those low prices (PJM, n.d.).222 Resource cost of the generation resources causing the ramp under adequacy capacity does not come with the physical hedge a short-run marginal cost theory, such as the one NERA against high market prices provided by the combustion defined. To the extent that generation-related ramping costs turbine’s known heat rate, but it is much less costly. It is are recovered as incurred periodically in energy costs or arguably the newest version of “pure capacity” as NERA ancillary service or other charges from the RTO, they should originally defined it. PG&E estimates the capacity cost be part of marginal energy costs. Although these concepts during a period of surplus as the long-term O&M cost of are relatively clear, their implementation is not clear at all, a combined cycle generating plant, because a combined with disagreements among parties on both the generation- cycle plant that could not earn its long-term O&M would related portion of ramp costs, the definition of ramp hours go out of service, reducing any available surplus (Pacific (for example, whether more than one large ramp should be Gas & Electric, 2016, Chapter 2). counted on a single day) and the method of allocating costs In sum, the combustion turbine peaker that is the typical to both hours and classes. Storage units are more effective for choice for marginal capacity costs under the NERA method, ramping than thermal peakers because they can both charge as well as under long-run incremental costs, is likely to in the preramp hours and discharge to clip the peak, reducing significantly overstate capacity costs given the economics the total amount of ramp more than a thermal plant, whether of new large-scale storage facilities and significant capacity the storage is installed as a bulk power resource or for other surpluses. purposes. 222 Similar capacity prices have prevailed in New York, outside the New York City load pocket (New York Independent System Operator, n.d.). Capacity prices in MISO are even lower due to a continuing surplus and renewable additions, while prices in New England were higher for a few years after 2016 and have recently fallen to the California range. 223 Although the generation-related cost should not be part of the class allocation, it may be appropriate to include some of that cost in rate design to provide a greater discouragement to ramping loads.
  7. Page 204 of 276

    202 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® 20. Transmission and Shared Distribution in Marginal Cost of Service Studies 20.1 Marginal Transmission Costs M arginal transmission costs have not received the attention that marginal generation and distribution costs have received, because in large parts of the country transmission is partly if not wholly under FERC jurisdiction. Thus, California utilities only calculate marginal transmission costs as an input to the process of calculating the contribution to margin of economic development rates, rather than for cost allocation and rate design. Nevada calculates marginal transmission costs using the NERA method. But since there is no joint product (such as generation energy and capacity, or distribution lines and customer connections) and Nevada allocates costs by functions (see Chapter 24), there is little controversy. Southern California Edison breaks its transmission costs into transmission (115 kV and above) and subtransmission (69 kV and below) because specific factors relating to the physical layout of its system left its subtransmission system under Public Utilities Commission regulation, where it is treated as part of the company’s distribution marginal costs.224 The NERA method for marginal transmission costs in- volves some analysis of the relationship between transmission system design and peak loads. Although the original method involves regression analysis between cumulative investment in load-related transmission (calculated in real, inflation-adjusted dollars) and cumulative increases to peak load, two other methods have been developed. The first, the total investment method, examines total investment divided by the change in investments occurring earlier. The specific choice among these three methods can create relatively small differences (unless miscalculated). The investment cost is annualized by multiplying by the RECC. Investment costs are defined narrowly. As an example typical of most utilities, Southern California Edison stated in its most recent rate design case: Projects discretely identified as load growth are only considered in the analysis. All projects not related to load growth (i.e., grid reliability, infrastructure replacement projects, grid modernization, automation, etc.) are excluded from this analysis (2017b, p. 37). The NERA method can be applied to the transmission system as a whole or to transmission and subtransmission voltage levels and to lines and substations separately. O&M costs are added to the annualized capital costs. There are two conceptual methods for doing this. The original NERA method averages O&M costs (in real terms) divided by kWs of load (i.e., calculated in dollars per kW) over a period containing both historical and forecast years. An alternative method used by PG&E calculates O&M costs as a percentage of plant and adds it only to the new plant. Using this method, O&M costs are lower because the assumption is made that O&M is tied to new plant rather than maintaining the system in order to retain all loads. The NERA method essentially ignores large parts of the transmission system and therefore generally ends up with marginal transmission costs well below embedded costs. It also fails to recognize that peaking resources and storage are peak load. The second, the discounted total investment method, uses discounted total investment divided by the discounted change in peak load. This assigns lower weights to investments occurring later in a projected analysis period relative to 224 California utilities calculate a marginal cost of transmission as an element of cost when determining how much contribution to margin is provided by loads such as economic development rates, but it is not used for allocation of costs to customer classes (which is done by FERC) and is therefore not reviewed carefully in rate cases.
  8. Page 205 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 203 often strategically located near loads where transmission is various load conditions throughout the year with one or constrained to reduce the need for transmission. For example, two elements of the system out of service. This networking the city of Burbank, California, incurred additional costs to essentially means that even though the NERA method relates locate the Lake generating unit in the heart of the urban area; investment to peak, the cost causation of that relationship an offsetting benefit was avoidance of transmission costs. is unclear, and a significant portion of costs may be related First, interties to connect utilities, or to connect remote to lower-load hours than the peak. The hourly allocation generation plants for purposes of obtaining cheaper sources methods discussed in Section 25.2 may provide guidance in of generation and increasing imports of generation capacity, treating some transmission costs in marginal cost studies, are often simply ignored. They are treated as “inframarginal” by assigning these costs to all hours in which the assets are sources of generation (built because they were theoretically deployed. cost-effective relative to the existing system without those lines). As a result, the cost of interties ends up neither in the marginal generation costs (where the only effect is to depress short-run marginal energy costs) nor in the marginal trans- 20.2 Marginal Shared Distribution Costs The most controversial issue for the calculation of mission costs (because the NERA method assumes them to marginal distribution costs is the same issue raised in the be a source of cheap generation). Nor do the net revenues the embedded cost section. Is a portion of the shared distribution utility receives for off-system energy sales (to the extent that system, particularly the poles, conductors and transformers the concept still exists in competitive wholesale markets) end in FERC accounts 364 through 368, customer-related? The au- up as an offset to transmission costs, even though such sales thors of this manual believe strongly that these costs are not could be one reason for constructing intertie capacity. customer-related; Section 11.2 on embedded costs addresses The second set of costs that methods like the NERA this question in detail. This section will comment only on method ignore is the cost of system replacement. The argu- some specific issues of the customer/demand classification ment is that once the utility commits to build one system of as they apply specifically to marginal costs for the shared transmission, the RECC method has the effect of deferring all elements of the distribution system. replacements. The end result is that, as pieces of the system The NERA method for marginal distribution capacity that were built 30 to 60 years ago are replaced, they are part costs unrelated to customer connections is similar to that of the embedded costs but not part of the marginal costs. for marginal transmission costs, involving an analysis of the System replacements can be a significant portion of the cost relationship between distribution system design and peak of new rate base. This issue is discussed further in the next loads. Again, the three methods used are regression analysis, section. the total investment method and discounted total investment Third, any transmission and distribution costs related to improving reliability on the existing system (instead of method, all discussed in Section 20.1. The investment cost is annualized by multiplying by the RECC. specifically adding new capacity) or automating the system The marginal cost of distribution capacity can be (to improve reliability or reduce capacity needs) are excluded developed for the distribution system as a whole, as well as under the pure version of this method. This exclusion is at separately for lines and substations. A number of utilities variance to the theory of marginal generation costs, where in (including Southern California Edison, San Diego Gas & equilibrium the value of avoided shortages equals the value of Electric and the Nevada utilities) have separate calculations the least-cost resource able to meet the need. Here, avoided for distribution substations and lines. PG&E uses regional shortages are assigned no value. costs. It calculates costs individually for more than 200 Fourth, the transmission and subtransmission systems distribution planning areas for purposes of economic are heavily networked and are built to avoid outages under development rates and aggregates them up to 17 utility
  9. Page 206 of 276

    204 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® divisions for purposes of marginal cost calculation for cost increased, more costs are allocated to residential customers allocation and rate design (Pacific Gas & Electric, 2016, because land developers pay fewer of them. Unlike most chapters 5 and 6). Using all of the distribution planning areas utilities, the Nevada utilities have separate rates for single- (as was proposed in the 199os) is so granular that it would family and multifamily customers. The result of this split of be difficult to examine and audit the relationship of costs to the residential class is that multifamily customers, with less cost drivers. This is true in part because costs are dependent expensive hookups on a dollars-per-customer basis, do not on the amount of excess capacity in local areas. In addition, subsidize single-family customers, in contrast to the case customers who are large relative to the distribution system across most of North America when distribution circuit costs may never pay for capacity needed to serve them in some are partly assigned on a per-customer basis. We discuss the cases. And customers in slow-growing areas are charged class definition issue in Section 5.2. less than those where load is growing faster, even if those Central Maine Power, which uses marginal costs to customers are using a significant portion of the distribution allocate distribution costs, also divides the distribution system. system between line extension and other distribution O&M costs are added to the annualized capital costs. facilities and uses a different allocation among classes for As with transmission, there are two conceptual methods for line extension costs that allocates the costs more heavily to doing this. The original NERA method averages O&M costs residential customers (Strunk, 2018, pp. 14-18). (in real terms) divided by kWs of load over a period containing Pacific Power’s Oregon rate cases have a “commit- both historical and forecast years. The alternative would ment-related” component to primary distribution costs calculate O&M costs as a percentage of plant and include it as that is similar to the minimum system methods used by an adder only to new plant.225 utilities conducting embedded cost studies and has similar Southern California Edison and San Diego Gas & Electric issues (Paice, 2013, pp. 6, 9-11). Although the Oregon utility aggregate all primary distribution circuit costs, including commission has accepted this for interclass cost allocation those that are part of line extensions, and treat them as purposes, it does not include these as customer-related in the demand costs. PG&E treats all primary distribution costs rate design phase of rate-making (B. Jenks, Oregon Citizens’ associated with line extensions as demand costs, again calcu- Utility Board, personal communication, June 4, 2019). lated regionally, but uses a different, less diverse measure of The NERA method again ignores replacement costs, demand — demand at the final line transformer, rather than which constitute the majority of new distribution plant demand at the substation, to allocate these costs (Pacific Gas for many utilities’ systems, in addition to ignoring costs of & Electric, 2016, Chapter 6). improving reliability. A good argument can be made that The Nevada utilities make a distinction between costs replacement costs are truly marginal costs and that the utility covered by the line extension allowance (which they call needs to make replacements to serve its existing load safely facilities costs) and other distribution substation and circuit and reliably. First, regardless of the workings of the RECC costs. Facilities costs are allocated to customer classes based method, assuming that replacement costs are automatically on the cost of facilities built for each class that are recovered committed when a new piece of distribution equipment is from customers because they are less than the line extension built is a monopoly-based argument and does not work in a allowance. Costs are higher in dollars per customer in truly competitive market. The marginal cost relates to both nonresidential classes than in the residential class. These incremental and decremental demand. A replacement is costs are annualized by the RECC and have O&M added to needed to assure that demand does not decline but is instead them (Walsh, 2013, p. 9). This treatment is identical to the rental method for customer connection costs discussed in Section 21.1. Thus, as the line extension allowance is 225 This is PG&E’s method because the company claims that O&M costs are not marginal once the plant is installed (Pacific Gas & Electric, 2016, Chapter 5, p. 11).
  10. Page 207 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 205 served reliably. The fact that replacements are a marginal determinants on which revenue allocation is conducted. Not cost can be analogized to other industries, such as trucking. all kWs are equal. This issue is referenced here as a concern A more detailed theoretical exposition is given in Appendix D. regarding marginal distribution costs but is addressed in Adding in replacement costs (calculated in dollars per more detail in Chapter 24 on reconciling marginal costs to kW like O&M costs, but with an adder for the present value of revenue requirements) has been estimated in the past to embedded costs. The transformer is an intermediate piece of equipment. increase marginal costs for Southern California Edison by In the larger C&I classes, a transformer will often serve a 40% for distribution and 31% for subtransmission (Jones and single secondary voltage customer, while for residential Marcus, 2015, p. 30) and for PG&E by 46% for primary distri- customers it may serve a single rural customer, a group of bution and 27% for new business (Marcus, 2010b, pp. 36-37). six to 10 suburban customers or 50 apartments or more. In Replacement costs were included as marginal costs in the the small and medium commercial classes, several customers 1996 PG&E gas cost adjustment proceeding (California Public are served by a single transformer in some cases, while some Utilities Commission, 1995) but have not been included in any customers (particularly larger or three-phase customers) are electric marginal costs because all California cases have been served with single transformers. There are also differences settled for almost 25 years. in cost between single-phase and three-phase transformers. Some distribution costs that are similar to replacement Single-phase equipment is adequate for serving nearly all costs are actually policy-related and may not be marginal residential customers and many small commercial customers. costs as a result (e.g., urban undergrounding of overhead Some utilities have allocated these costs to classes as lines; other changes related to safety and environmental marginal costs based on the average cost of a transformer protection). As with embedded costs and for the same serving the class. If this treatment is used for class allocation, reasons, costs in FERC accounts 364 through 367 should be transformer costs should not be fixed customer costs for considered as common system costs rather than as costs purposes of rate design because of the wide variety of assigned to individual customers. Even though they are customer sizes and transformer configurations. In older included in Account 368, as with embedded costs, capacitors urban areas, secondary line is often networked across several and regulators need to at least be functionalized as primary transformers, with some service drops connected directly distribution costs when calculating marginal costs, unless to the transformer and some connected to the networked the dual function of the capacitor as a generation resource secondary line. In these cases, the use of secondary lines is recognized,226 just as with embedded costs. They reduce to connect the transformer to the customer is more of a losses and increase distribution capacity by supporting common cost than a connection cost, unlike in more modern voltage and reducing amounts of reactive power. design configurations, where secondary distribution might be Many smart grid investments such as automated switching and integrated volt/VAR controls (as well as an economic alternative for customer connection. If a transformer cost is considered part of the customer potential investments in storage and targeted demand connection function, a portion of transformer costs is response programs) increase overcapacity and reduce likely not marginal costs, and only the cost of the smallest distribution marginal costs calculated using the NERA transformer should be included. Transformers typically method by reducing the need to build new lines. Under this are purchased using an algorithm to minimize the present method, this overcapacity will cause customer costs to be value of capital costs and load-related and nonload-related emphasized relative to other distribution costs. (core) losses. The extra costs of the transformers above the Distribution marginal costs end up with tricky calculation issues because of differences in the determinants on which marginal cost calculations are made and the costing 226 If a capacitor is deemed to have a generation function, it is not a marginal cost at all under the NERA method.
1 page match

As listed on the current system

Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Melissa Whited [26-05-10]

This filing on the current system (opens in a new tab)