Prefiled testimony
Witness: Melissa Whited
Files3
Synapse - Eversource COS and Rate Design Testimony Final.pdf
PDF · 829 KB · 48 pagesText searchable
Download Synapse - Eversource COS and Rate Design Testimony Final.pdfRead the text of Synapse - Eversource COS and Rate Design Testimony Final.pdf
MW-2- Synapse Attachment.pdf
PDF · 4.6 MB · 276 pagesText searchable
Download MW-2- Synapse Attachment.pdfRead the text of MW-2- Synapse Attachment.pdf
MW-1 - Synapse Attachment.pdf
PDF · 734 KB · 13 pagesText searchable
Download MW-1 - Synapse Attachment.pdfRead the text of MW-1 - Synapse Attachment.pdf
Page 202 of 276
200 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® loads in areas such as water supply and delivery (see Marcus, a market). Combustion turbines installed in the 1970s, 2010b, and Lazar, 2016), one of the options the California ISO when the NERA method was developed, had heat rates in identified was gas-fired generation. New storage options may the range of 15,000 Btu per kWh and burned expensive be especially well suited for dealing with problems of ramping diesel oil. They were machines that provided essentially because of the timing of both charging and discharging bat- pure capacity — reserves that were turned on to keep the teries or taking other actions like storing hot or chilled water. lights from going out. Much of the gas-fired load at that Equating a marginal capacity cost based on a peaker time came from less flexible steam plants with heat rates with very short-run energy costs creates a mismatch that is from 9,000 to 12,000 Btu per kWh. Modern peakers detrimental to customers with peakier load shapes. Several have a heat rate in the range of 10,000 Btu per kWh points must be considered here. (or lower) and burn gas. They actually have better heat 1. Costs of peakers vary. Smaller combustion turbines and rates than many of the older intermediate steam plants, aero-derivative turbines are more expensive than larger as well as greater flexibility. As a result, when modern combustion turbines. Some of these smaller turbines peakers are used, they generally earn at least some money have costs that approach or even exceed the cost of in the market or save fuel and purchased power costs.221 a larger combined cycle plant.219 When conducting They also can earn revenue from selling dispatch rights marginal cost studies, some utilities and industrial in the 10-minute (nonspinning) reserve ancillary service customers have requested approval for expensive peakers market. This revenue should be netted against the cost of as marginal capacity costs.220 However, that point ignores the combustion turbine, because it pays a portion of the the key finding of the NERA method: that the marginal cost of capacity. cost of capacity is the least costly source of capacity, so 2. 4. Peaking generation may not be the least-cost capacity that by definition the more expensive peaker installed for resource. It is possible for an intermediate resource such other reasons is not the marginal cost of capacity under as a combined cycle generator to have a lower net cost that framework. than a combustion turbine. In particular, the capital and Financing costs for peakers vary. In California, a num- long-term O&M cost of the combined cycle generator ber of parties (including E3) have used merchant plant minus the revenue that it would earn in the market or financing, which is more expensive than utility financing, the fuel it would save can be less than the cost of a com- to develop the marginal cost of capacity. Again, the issue bustion turbine. Even with excess capacity, this outcome is that a merchant plant is not the least costly source of can sometimes occur, particularly if a relatively expensive capacity because merchant plants have higher required turbine is erroneously considered as the peaking unit returns. Furthermore, merchant plants often have (as discussed earlier in this list). off-take contracts that are shorter than the physical life 5. Storage costs may be cheaper than combustion turbines. of the plant. Using the shorter contract life for capital Under current conditions, it is possible that storage recovery also inappropriately increases the marginal cost costs net of energy savings relative to market prices can of generating capacity. be cheaper than conventional peaking generation. In Even a peaking power plant would make money in the particular, PG&E is installing and contracting for about market (or save fuel and purchased power costs in a ver- 550 MWs of batteries with four-hour storage to meet tically integrated utility that is not closely affiliated with system needs and replace 570 MWs of RMR peaking and 219 A utility might have installed some of these smaller turbines for reasons such as alleviating transmission constraints, meeting time constraints (if the smaller turbines had less stringent siting requirements) or responding to specialized system needs such as black start capability. 220 See, for example, Phillips (2018, pp. 5-11), where the testimony argues for the usage of a 50-MW turbine costing $1,600 per kW instead of a cheaper 100-MW turbine. 3. 221 See Section 1.1 for more discussion and quantitative examples of this phenomenon.Page 203 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® 6. ELECTRIC COST ALLOCATION FOR A NEW ERA | 201 combined cycle generation (Maloney, 2018; California To the extent there is a marginal capacity cost for ramp- Public Utilities Commission, 2018). RMR generation ing capability, it can best be understood as an hourly capacity receives payments on a cost of service basis including cost that is negative in the hour or two before the ramp capital and operating costs, although the specific plants begins, a positive hourly cost in the steepest several hours of being replaced are partly depreciated. the ramp and lower but still positive hourly cost as the ramp Additionally, pure capacity can be available at becomes flatter, continuing through and just beyond the considerably lower costs than a combustion turbine. evening peak. Systemwide actual and projected prices in the California But, for allocation purposes, the cost needs to be first resource adequacy markets are $30 to $40 per kW-year divided between ramp caused by customer loads and ramp over the period of 2017-2021 (Chow and Brant, 2018, caused by generation characteristics, which should be p. 21) with even the peak monthly prices from July to feasible. This is another example of how the emerging wind- September rising no higher than $4.50 per kW-month and solar-dominated grid challenges traditional methods of (Chow and Brant, p. 32). Capacity market prices are cost allocation. To the extent that the need for capacity for generally similar in the PJM region, with higher prices ramping, and hence part of its cost, is caused by generation in transmission-constrained pockets of New Jersey characteristics, it should not be a load-related marginal cost and occasionally other areas; new demand resources, for allocation to the classes that contribute to the ramp.223 renewables and gas-fired combined cycle generation have The generation-related ramp effectively becomes part of the been added at those low prices (PJM, n.d.).222 Resource cost of the generation resources causing the ramp under adequacy capacity does not come with the physical hedge a short-run marginal cost theory, such as the one NERA against high market prices provided by the combustion defined. To the extent that generation-related ramping costs turbine’s known heat rate, but it is much less costly. It is are recovered as incurred periodically in energy costs or arguably the newest version of “pure capacity” as NERA ancillary service or other charges from the RTO, they should originally defined it. PG&E estimates the capacity cost be part of marginal energy costs. Although these concepts during a period of surplus as the long-term O&M cost of are relatively clear, their implementation is not clear at all, a combined cycle generating plant, because a combined with disagreements among parties on both the generation- cycle plant that could not earn its long-term O&M would related portion of ramp costs, the definition of ramp hours go out of service, reducing any available surplus (Pacific (for example, whether more than one large ramp should be Gas & Electric, 2016, Chapter 2). counted on a single day) and the method of allocating costs In sum, the combustion turbine peaker that is the typical to both hours and classes. Storage units are more effective for choice for marginal capacity costs under the NERA method, ramping than thermal peakers because they can both charge as well as under long-run incremental costs, is likely to in the preramp hours and discharge to clip the peak, reducing significantly overstate capacity costs given the economics the total amount of ramp more than a thermal plant, whether of new large-scale storage facilities and significant capacity the storage is installed as a bulk power resource or for other surpluses. purposes. 222 Similar capacity prices have prevailed in New York, outside the New York City load pocket (New York Independent System Operator, n.d.). Capacity prices in MISO are even lower due to a continuing surplus and renewable additions, while prices in New England were higher for a few years after 2016 and have recently fallen to the California range. 223 Although the generation-related cost should not be part of the class allocation, it may be appropriate to include some of that cost in rate design to provide a greater discouragement to ramping loads.Page 204 of 276
202 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® 20. Transmission and Shared Distribution in Marginal Cost of Service Studies 20.1 Marginal Transmission Costs M arginal transmission costs have not received the attention that marginal generation and distribution costs have received, because in large parts of the country transmission is partly if not wholly under FERC jurisdiction. Thus, California utilities only calculate marginal transmission costs as an input to the process of calculating the contribution to margin of economic development rates, rather than for cost allocation and rate design. Nevada calculates marginal transmission costs using the NERA method. But since there is no joint product (such as generation energy and capacity, or distribution lines and customer connections) and Nevada allocates costs by functions (see Chapter 24), there is little controversy. Southern California Edison breaks its transmission costs into transmission (115 kV and above) and subtransmission (69 kV and below) because specific factors relating to the physical layout of its system left its subtransmission system under Public Utilities Commission regulation, where it is treated as part of the company’s distribution marginal costs.224 The NERA method for marginal transmission costs in- volves some analysis of the relationship between transmission system design and peak loads. Although the original method involves regression analysis between cumulative investment in load-related transmission (calculated in real, inflation-adjusted dollars) and cumulative increases to peak load, two other methods have been developed. The first, the total investment method, examines total investment divided by the change in investments occurring earlier. The specific choice among these three methods can create relatively small differences (unless miscalculated). The investment cost is annualized by multiplying by the RECC. Investment costs are defined narrowly. As an example typical of most utilities, Southern California Edison stated in its most recent rate design case: Projects discretely identified as load growth are only considered in the analysis. All projects not related to load growth (i.e., grid reliability, infrastructure replacement projects, grid modernization, automation, etc.) are excluded from this analysis (2017b, p. 37). The NERA method can be applied to the transmission system as a whole or to transmission and subtransmission voltage levels and to lines and substations separately. O&M costs are added to the annualized capital costs. There are two conceptual methods for doing this. The original NERA method averages O&M costs (in real terms) divided by kWs of load (i.e., calculated in dollars per kW) over a period containing both historical and forecast years. An alternative method used by PG&E calculates O&M costs as a percentage of plant and adds it only to the new plant. Using this method, O&M costs are lower because the assumption is made that O&M is tied to new plant rather than maintaining the system in order to retain all loads. The NERA method essentially ignores large parts of the transmission system and therefore generally ends up with marginal transmission costs well below embedded costs. It also fails to recognize that peaking resources and storage are peak load. The second, the discounted total investment method, uses discounted total investment divided by the discounted change in peak load. This assigns lower weights to investments occurring later in a projected analysis period relative to 224 California utilities calculate a marginal cost of transmission as an element of cost when determining how much contribution to margin is provided by loads such as economic development rates, but it is not used for allocation of costs to customer classes (which is done by FERC) and is therefore not reviewed carefully in rate cases.Page 205 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 203 often strategically located near loads where transmission is various load conditions throughout the year with one or constrained to reduce the need for transmission. For example, two elements of the system out of service. This networking the city of Burbank, California, incurred additional costs to essentially means that even though the NERA method relates locate the Lake generating unit in the heart of the urban area; investment to peak, the cost causation of that relationship an offsetting benefit was avoidance of transmission costs. is unclear, and a significant portion of costs may be related First, interties to connect utilities, or to connect remote to lower-load hours than the peak. The hourly allocation generation plants for purposes of obtaining cheaper sources methods discussed in Section 25.2 may provide guidance in of generation and increasing imports of generation capacity, treating some transmission costs in marginal cost studies, are often simply ignored. They are treated as “inframarginal” by assigning these costs to all hours in which the assets are sources of generation (built because they were theoretically deployed. cost-effective relative to the existing system without those lines). As a result, the cost of interties ends up neither in the marginal generation costs (where the only effect is to depress short-run marginal energy costs) nor in the marginal trans- 20.2 Marginal Shared Distribution Costs The most controversial issue for the calculation of mission costs (because the NERA method assumes them to marginal distribution costs is the same issue raised in the be a source of cheap generation). Nor do the net revenues the embedded cost section. Is a portion of the shared distribution utility receives for off-system energy sales (to the extent that system, particularly the poles, conductors and transformers the concept still exists in competitive wholesale markets) end in FERC accounts 364 through 368, customer-related? The au- up as an offset to transmission costs, even though such sales thors of this manual believe strongly that these costs are not could be one reason for constructing intertie capacity. customer-related; Section 11.2 on embedded costs addresses The second set of costs that methods like the NERA this question in detail. This section will comment only on method ignore is the cost of system replacement. The argu- some specific issues of the customer/demand classification ment is that once the utility commits to build one system of as they apply specifically to marginal costs for the shared transmission, the RECC method has the effect of deferring all elements of the distribution system. replacements. The end result is that, as pieces of the system The NERA method for marginal distribution capacity that were built 30 to 60 years ago are replaced, they are part costs unrelated to customer connections is similar to that of the embedded costs but not part of the marginal costs. for marginal transmission costs, involving an analysis of the System replacements can be a significant portion of the cost relationship between distribution system design and peak of new rate base. This issue is discussed further in the next loads. Again, the three methods used are regression analysis, section. the total investment method and discounted total investment Third, any transmission and distribution costs related to improving reliability on the existing system (instead of method, all discussed in Section 20.1. The investment cost is annualized by multiplying by the RECC. specifically adding new capacity) or automating the system The marginal cost of distribution capacity can be (to improve reliability or reduce capacity needs) are excluded developed for the distribution system as a whole, as well as under the pure version of this method. This exclusion is at separately for lines and substations. A number of utilities variance to the theory of marginal generation costs, where in (including Southern California Edison, San Diego Gas & equilibrium the value of avoided shortages equals the value of Electric and the Nevada utilities) have separate calculations the least-cost resource able to meet the need. Here, avoided for distribution substations and lines. PG&E uses regional shortages are assigned no value. costs. It calculates costs individually for more than 200 Fourth, the transmission and subtransmission systems distribution planning areas for purposes of economic are heavily networked and are built to avoid outages under development rates and aggregates them up to 17 utilityPage 206 of 276
204 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® divisions for purposes of marginal cost calculation for cost increased, more costs are allocated to residential customers allocation and rate design (Pacific Gas & Electric, 2016, because land developers pay fewer of them. Unlike most chapters 5 and 6). Using all of the distribution planning areas utilities, the Nevada utilities have separate rates for single- (as was proposed in the 199os) is so granular that it would family and multifamily customers. The result of this split of be difficult to examine and audit the relationship of costs to the residential class is that multifamily customers, with less cost drivers. This is true in part because costs are dependent expensive hookups on a dollars-per-customer basis, do not on the amount of excess capacity in local areas. In addition, subsidize single-family customers, in contrast to the case customers who are large relative to the distribution system across most of North America when distribution circuit costs may never pay for capacity needed to serve them in some are partly assigned on a per-customer basis. We discuss the cases. And customers in slow-growing areas are charged class definition issue in Section 5.2. less than those where load is growing faster, even if those Central Maine Power, which uses marginal costs to customers are using a significant portion of the distribution allocate distribution costs, also divides the distribution system. system between line extension and other distribution O&M costs are added to the annualized capital costs. facilities and uses a different allocation among classes for As with transmission, there are two conceptual methods for line extension costs that allocates the costs more heavily to doing this. The original NERA method averages O&M costs residential customers (Strunk, 2018, pp. 14-18). (in real terms) divided by kWs of load over a period containing Pacific Power’s Oregon rate cases have a “commit- both historical and forecast years. The alternative would ment-related” component to primary distribution costs calculate O&M costs as a percentage of plant and include it as that is similar to the minimum system methods used by an adder only to new plant.225 utilities conducting embedded cost studies and has similar Southern California Edison and San Diego Gas & Electric issues (Paice, 2013, pp. 6, 9-11). Although the Oregon utility aggregate all primary distribution circuit costs, including commission has accepted this for interclass cost allocation those that are part of line extensions, and treat them as purposes, it does not include these as customer-related in the demand costs. PG&E treats all primary distribution costs rate design phase of rate-making (B. Jenks, Oregon Citizens’ associated with line extensions as demand costs, again calcu- Utility Board, personal communication, June 4, 2019). lated regionally, but uses a different, less diverse measure of The NERA method again ignores replacement costs, demand — demand at the final line transformer, rather than which constitute the majority of new distribution plant demand at the substation, to allocate these costs (Pacific Gas for many utilities’ systems, in addition to ignoring costs of & Electric, 2016, Chapter 6). improving reliability. A good argument can be made that The Nevada utilities make a distinction between costs replacement costs are truly marginal costs and that the utility covered by the line extension allowance (which they call needs to make replacements to serve its existing load safely facilities costs) and other distribution substation and circuit and reliably. First, regardless of the workings of the RECC costs. Facilities costs are allocated to customer classes based method, assuming that replacement costs are automatically on the cost of facilities built for each class that are recovered committed when a new piece of distribution equipment is from customers because they are less than the line extension built is a monopoly-based argument and does not work in a allowance. Costs are higher in dollars per customer in truly competitive market. The marginal cost relates to both nonresidential classes than in the residential class. These incremental and decremental demand. A replacement is costs are annualized by the RECC and have O&M added to needed to assure that demand does not decline but is instead them (Walsh, 2013, p. 9). This treatment is identical to the rental method for customer connection costs discussed in Section 21.1. Thus, as the line extension allowance is 225 This is PG&E’s method because the company claims that O&M costs are not marginal once the plant is installed (Pacific Gas & Electric, 2016, Chapter 5, p. 11).Page 207 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 205 served reliably. The fact that replacements are a marginal determinants on which revenue allocation is conducted. Not cost can be analogized to other industries, such as trucking. all kWs are equal. This issue is referenced here as a concern A more detailed theoretical exposition is given in Appendix D. regarding marginal distribution costs but is addressed in Adding in replacement costs (calculated in dollars per more detail in Chapter 24 on reconciling marginal costs to kW like O&M costs, but with an adder for the present value of revenue requirements) has been estimated in the past to embedded costs. The transformer is an intermediate piece of equipment. increase marginal costs for Southern California Edison by In the larger C&I classes, a transformer will often serve a 40% for distribution and 31% for subtransmission (Jones and single secondary voltage customer, while for residential Marcus, 2015, p. 30) and for PG&E by 46% for primary distri- customers it may serve a single rural customer, a group of bution and 27% for new business (Marcus, 2010b, pp. 36-37). six to 10 suburban customers or 50 apartments or more. In Replacement costs were included as marginal costs in the the small and medium commercial classes, several customers 1996 PG&E gas cost adjustment proceeding (California Public are served by a single transformer in some cases, while some Utilities Commission, 1995) but have not been included in any customers (particularly larger or three-phase customers) are electric marginal costs because all California cases have been served with single transformers. There are also differences settled for almost 25 years. in cost between single-phase and three-phase transformers. Some distribution costs that are similar to replacement Single-phase equipment is adequate for serving nearly all costs are actually policy-related and may not be marginal residential customers and many small commercial customers. costs as a result (e.g., urban undergrounding of overhead Some utilities have allocated these costs to classes as lines; other changes related to safety and environmental marginal costs based on the average cost of a transformer protection). As with embedded costs and for the same serving the class. If this treatment is used for class allocation, reasons, costs in FERC accounts 364 through 367 should be transformer costs should not be fixed customer costs for considered as common system costs rather than as costs purposes of rate design because of the wide variety of assigned to individual customers. Even though they are customer sizes and transformer configurations. In older included in Account 368, as with embedded costs, capacitors urban areas, secondary line is often networked across several and regulators need to at least be functionalized as primary transformers, with some service drops connected directly distribution costs when calculating marginal costs, unless to the transformer and some connected to the networked the dual function of the capacitor as a generation resource secondary line. In these cases, the use of secondary lines is recognized,226 just as with embedded costs. They reduce to connect the transformer to the customer is more of a losses and increase distribution capacity by supporting common cost than a connection cost, unlike in more modern voltage and reducing amounts of reactive power. design configurations, where secondary distribution might be Many smart grid investments such as automated switching and integrated volt/VAR controls (as well as an economic alternative for customer connection. If a transformer cost is considered part of the customer potential investments in storage and targeted demand connection function, a portion of transformer costs is response programs) increase overcapacity and reduce likely not marginal costs, and only the cost of the smallest distribution marginal costs calculated using the NERA transformer should be included. Transformers typically method by reducing the need to build new lines. Under this are purchased using an algorithm to minimize the present method, this overcapacity will cause customer costs to be value of capital costs and load-related and nonload-related emphasized relative to other distribution costs. (core) losses. The extra costs of the transformers above the Distribution marginal costs end up with tricky calculation issues because of differences in the determinants on which marginal cost calculations are made and the costing 226 If a capacitor is deemed to have a generation function, it is not a marginal cost at all under the NERA method.Page 208 of 276
206 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® minimum costs would be inframarginal costs of providing need to meet but not exceed the federal standard. Capacitors energy and capacity rather than customer connection costs. and voltage regulators are also not part of transformer costs However, these extra costs have been difficult to measure for either customer connection or secondary distribution in past cases. Also, many utilities claim that the new energy demand but instead should be quantified together with other standards for line transformers mean they no longer need primary distribution costs. to optimize transformer costs against losses and they onlyPage 209 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 207 21. Customer Connection and Service in Marginal Cost of Service Studies T he customer connection costs, also known as point of revenue requirements multiplier to reflect the costs of of delivery costs, include the service drop and meter income taxes and property taxes under utility ownership. and may include the final line transformer and any Elements of the method were introduced by consumer secondary distribution lines that are not networked with advocates who recognized that the incremental and other transformers.227 Primary lines are typically not point decremental costs of hooking up new customers were of delivery costs, although several utilities include either line different (unlike most marginal cost elements) in the mid- to extension costs or some type of minimum system as custom- late 1980s. The specific NCO method was first presented by er costs. The basic customer method primarily includes the PG&E (in 1993; it has since disavowed the NCO method) and service and meter, although some states include a transform- was adopted by consumer advocates with modifications after er. As a matter of calculation, it is necessary to determine a that time. Again, O&M costs are added. meter cost for each customer class. Additionally, customers The rental method has the longest time horizon of all cause the utility to incur costs of billing, collections and the marginal cost methods in the entire panoply of marginal similar items. costs developed by NERA and used by regulators. All custom- 21.1 Traditional Computation Methods ers are assumed to rent equipment based on today’s costs and configurations of customer connection equipment, which is largely underground in most newly constructed urban and There are two longstanding methods for computing suburban distribution systems. The method as utilities now marginal customer connection costs. The first is the rental implement it generally does not consider the standing stock method, where the cost of new customer connection equip- of equipment. As a result, the rental method assumes that ment is multiplied by the RECC to obtain a value at which a customers with overhead service in urban areas are charged customer could be presumed to rent the equipment from the in marginal costs as if they had underground service. So these utility. O&M costs are added to these annualized capital costs. customers not only have to look at wires and poles, but they This method is a direct continuation of the NERA method. face a revenue allocation that assumes they have the ameni- The second method is the new-customer-only ties of modern suburbs. By failing to use the standing stock, (NCO) method. It calculates a marginal cost based on the the rental method also assumes that the percentage of new number of new hookups (and possibly replacements) of housing stock built as apartments is the same as the percent- customer connection equipment in the same time frame as used to measure other marginal costs for generation and transmission. This cost is adjusted by a present value 227 A secondary distribution line that is not networked is installed to reduce costs (including line losses) relative to running all services directly off a single transformer. It is thus an economic substitute for longer service lines. 228 The exception to this concern is Nevada, where separate marginal customer costs are calculated for single-family and multifamily homes based on new costs but are applied to the existing stock of each type of age of existing housing units that are apartments.228 Besides these computational issues, there are significant theoretical issues that caused the development of the NCO housing. This practice has been in place since at least 1999 when the utilities presented the division of the residential class in Public Utilities Commission of Nevada dockets 99-04001 and 99-04005. San Diego Gas & Electric calculates customer connection costs based on the noncoincident demand of the customers and uses demand estimates of existing customers, which also ameliorates this problem to some degree (Saxe, 2016, pp. 6-10).Page 210 of 276
208 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® method. Aside from computational inaccuracies from protecting the profits of the landlord — or the utility, in this not using the standing stock, the rental method is not the case — from the vagaries of competition. outcome of a true competitive market. The NCO method There is one additional computational issue in the NCO reflects as marginal only those costs that are avoidable — method, where the replacement rate may or may not be incurred at the time when the choice to spend or not spend considered. In California, the utility commission advocacy money on new hookups is made — when the customer office has omitted replacements from the NCO method as chooses to connect to the utility system or when a hookup is well as from calculations of marginal distribution costs. The replaced. It is thus a shorter-run marginal cost method than Utility Reform Network tends to include them for both, the rental method, making the NCO method more consistent yielding higher costs for both demand distribution and with the other short- and intermediate-term means of customer-related costs. If a replacement cost is needed for the calculating costs included in the rest of the NERA method. NCO method, utilities often use the highest possible number The cost analyst must carefully examine the consistency — the inverse of the depreciable life of the equipment. between the NCO method, which considers the full costs Although data for service drops may be limited, utilities often of system replacement, and the methods used for G&T. have actual rates of replacement of meters and transformers, If replacement costs are used for one category, they should as well as information that could allow the replacement be used for all categories, moving the study toward a total rates for service drops to be inferred from capital budgeting service long-run incremental cost study (see Section 25.1). documents.230 The NCO method also comports better with competitive markets and consumer behavior. Consumers typically have the choice to either own or rent any equipment affixed to their 21.2 Smart Meter Issues For utilities installing smart meters, a joint product issue homes that costs several hundred to a few thousand dollars. arises. A smart meter with the associated data collection In many cases, consumers nearly always own the equipment, network hardware and software serves multiple functions. It as in the case of curtains or chandeliers. In other cases, there provides customer connection and billing while reducing the is consumer choice as to ownership or rental, as with propane labor costs of meter reading and other functions. It can also tanks, solar energy systems,229 internet routers and (in some provide a number of other peak load, energy and reliability parts of North America) water heaters. Even where the rental functions, including enabling TOU pricing and measuring option is present, the consumer can choose to purchase the demand response; load research; distribution smart grid equipment. In contrast, the rental method does not simulate functions such as outage detection and (if tied to utility GPS the outcome of a competitive market. It is equivalent to as- and mapping functions) identification of potential trans- suming there are enough landlords that there is a competitive former overloads; and even, in some cases, internet access for rental market, who own all the property in a given communi- utility customers. ty. Anyone who wants to live in that community has to rent The NERA method provides a theoretical underpinning from one of these owners; no one is allowed to buy property. that customer connections (analogous to generation capacity) Rather, this is a market with barriers to entry that prevent true should be provided by the least-cost method. In evaluating competition. Thus, the analogy of the current rental method past smart meter cases, about 70% of the cost of the AMI sys- to the housing market places an anti-competitive constraint tem was covered by meter reading benefits; the remainder of on consumers that would limit their economic choices while the cost was justified by other benefits. Therefore, California 229 Solar systems may be a special case. Renting the equipment generates some tax benefits that can be passed to the consumer in lower rent, while ownership would not have the same tax advantages. This will change if the solar investment tax credit is allowed to expire after 2020 as would occur under current law. 230 There is an accounting issue for meter replacement, because the cost of the meter is capitalized but the cost of meter replacement O&M is often expensed (see Section 21.3). It is important not to count the same cost twice.Page 211 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 209 ratepayer advocates typically have argued that only 70% of citing San Diego Gas & Electric testimony). Effectively, the the cost was a customer connection and billing cost and the cost of replacing meters for customers needing replacement remainder was not a marginal customer cost. Alternatively, is included in both the O&M costs and the capital costs in other studies, more than 100% of the smart meter and (because the lessor has the responsibility of replacement in data collection installation cost is justified by other savings the rental method and the replacement is included in the in power supply and line losses, rendering the metering and NCO method). Therefore, replacement meter costs should meter reading function as a cost-free byproduct. be removed from Account 586 in the rental method because The division of the smart meter into connection and they would otherwise be double-counted as part of the rental billing and other benefits can be analyzed in a different way cost. In the NCO method with replacement, the costs of — by netting out all benefits from the smart meter aside meter installation should be removed from the capital costs from those associated with meter reading and customer for replaced units and left in Account 586 to reflect recurring accounts, leaving the remainder as connection-related. replacements. This is analogous to calculating a marginal capacity cost Second, there are issues relating to the real costs of based on a combined cycle power plant net of savings of operating and maintaining service drops, some of which also fuel and purchased power if it is cheaper than a combustion must be dealt with in embedded cost analysis. Utilities may turbine. assign costs to service drops based on investment or line 21.3 Operations and Maintenance Expenses for Customer Connection Most utilities that use marginal costs assign the costs of FERC accounts 586 and 597 (meter operations and maintenance) and possibly portions of accounts 583, 584, 593 and 594 (operations and maintenance of underground and overhead lines) related to services and transformers as customer-related. If a transformer is customer connection equipment, Account 595 (transformer maintenance) is also customer-related. Utilities also assign portions of overhead accounts 580 (supervision and engineering), 588 (miscellaneous operating expenses), 590 (maintenance supervision) and 598 (miscellaneous maintenance expenses) to the customer costs. The treatment of these expenses is often an issue, as the specific costs in many of these areas may be more related to shared distribution system costs than to customer connections. These costs typically are developed using an average of several years of historical data and several years of future data. There are several computational issues. First, at least some utilities include the labor cost of replacing a meter in Account 586 (Jones and Marcus, 2016, miles. But as a practical matter, utilities spend very little on service drops as compared with primary distribution lines. In particular, many utilities have vegetation management standards almost entirely tied to primary lines. They rarely trim trees around secondary wires, except incidentally when primary line trimming is needed, and even more rarely trim trees around service drops, except under emergency conditions. Aside from tree trimming, patrols and inspections are driven by primary lines, not service drops. Therefore, it is necessary to conduct utility-specific analysis on service drop maintenance. A third issue is that some of the costs in Account 588 are not marginal costs at all. For example, PG&E in a previous case included costs of obtaining additional revenue from nontraditional sources and costs of performing work reimbursed by others. Other costs do not apply to customer connection equipment (environmental costs and mapping expenses that generally do not apply to services and meters). In addition, if smart metering is in the process of being installed or has just been installed, O&M costs of smart meter installation may be part of accounts 586 and 587 in some historical years. In that case, it will be necessary to identify and remove those costs or use a historical period of time entirely after smart meter installation.
As listed on the current system