    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 205 served reliably. The fact that replacements are a marginal determinants on which revenue allocation is conducted. Not cost can be analogized to other industries, such as trucking. all kWs are equal. This issue is referenced here as a concern A more detailed theoretical exposition is given in Appendix D. regarding marginal distribution costs but is addressed in Adding in replacement costs (calculated in dollars per more detail in Chapter 24 on reconciling marginal costs to kW like O&M costs, but with an adder for the present value of revenue requirements) has been estimated in the past to embedded costs. The transformer is an intermediate piece of equipment. increase marginal costs for Southern California Edison by In the larger C&I classes, a transformer will often serve a 40% for distribution and 31% for subtransmission (Jones and single secondary voltage customer, while for residential Marcus, 2015, p. 30) and for PG&E by 46% for primary distri- customers it may serve a single rural customer, a group of bution and 27% for new business (Marcus, 2010b, pp. 36-37). six to 10 suburban customers or 50 apartments or more. In Replacement costs were included as marginal costs in the the small and medium commercial classes, several customers 1996 PG&E gas cost adjustment proceeding (California Public are served by a single transformer in some cases, while some Utilities Commission, 1995) but have not been included in any customers (particularly larger or three-phase customers) are electric marginal costs because all California cases have been served with single transformers. There are also differences settled for almost 25 years. in cost between single-phase and three-phase transformers. Some distribution costs that are similar to replacement Single-phase equipment is adequate for serving nearly all costs are actually policy-related and may not be marginal residential customers and many small commercial customers. costs as a result (e.g., urban undergrounding of overhead Some utilities have allocated these costs to classes as lines; other changes related to safety and environmental marginal costs based on the average cost of a transformer protection). As with embedded costs and for the same serving the class. If this treatment is used for class allocation, reasons, costs in FERC accounts 364 through 367 should be transformer costs should not be fixed customer costs for considered as common system costs rather than as costs purposes of rate design because of the wide variety of assigned to individual customers. Even though they are customer sizes and transformer configurations. In older included in Account 368, as with embedded costs, capacitors urban areas, secondary line is often networked across several and regulators need to at least be functionalized as primary transformers, with some service drops connected directly distribution costs when calculating marginal costs, unless to the transformer and some connected to the networked the dual function of the capacitor as a generation resource secondary line. In these cases, the use of secondary lines is recognized,226 just as with embedded costs. They reduce to connect the transformer to the customer is more of a losses and increase distribution capacity by supporting common cost than a connection cost, unlike in more modern voltage and reducing amounts of reactive power. design configurations, where secondary distribution might be Many smart grid investments such as automated switching and integrated volt/VAR controls (as well as an economic alternative for customer connection. If a transformer cost is considered part of the customer potential investments in storage and targeted demand connection function, a portion of transformer costs is response programs) increase overcapacity and reduce likely not marginal costs, and only the cost of the smallest distribution marginal costs calculated using the NERA transformer should be included. Transformers typically method by reducing the need to build new lines. Under this are purchased using an algorithm to minimize the present method, this overcapacity will cause customer costs to be value of capital costs and load-related and nonload-related emphasized relative to other distribution costs. (core) losses. The extra costs of the transformers above the Distribution marginal costs end up with tricky calculation issues because of differences in the determinants on which marginal cost calculations are made and the costing 226 If a capacitor is deemed to have a generation function, it is not a marginal cost at all under the NERA method.
  2. Page 208 of 276

    206 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® minimum costs would be inframarginal costs of providing need to meet but not exceed the federal standard. Capacitors energy and capacity rather than customer connection costs. and voltage regulators are also not part of transformer costs However, these extra costs have been difficult to measure for either customer connection or secondary distribution in past cases. Also, many utilities claim that the new energy demand but instead should be quantified together with other standards for line transformers mean they no longer need primary distribution costs. to optimize transformer costs against losses and they only
  3. Page 209 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 207 21. Customer Connection and Service in Marginal Cost of Service Studies T he customer connection costs, also known as point of revenue requirements multiplier to reflect the costs of of delivery costs, include the service drop and meter income taxes and property taxes under utility ownership. and may include the final line transformer and any Elements of the method were introduced by consumer secondary distribution lines that are not networked with advocates who recognized that the incremental and other transformers.227 Primary lines are typically not point decremental costs of hooking up new customers were of delivery costs, although several utilities include either line different (unlike most marginal cost elements) in the mid- to extension costs or some type of minimum system as custom- late 1980s. The specific NCO method was first presented by er costs. The basic customer method primarily includes the PG&E (in 1993; it has since disavowed the NCO method) and service and meter, although some states include a transform- was adopted by consumer advocates with modifications after er. As a matter of calculation, it is necessary to determine a that time. Again, O&M costs are added. meter cost for each customer class. Additionally, customers The rental method has the longest time horizon of all cause the utility to incur costs of billing, collections and the marginal cost methods in the entire panoply of marginal similar items. costs developed by NERA and used by regulators. All custom- 21.1 Traditional Computation Methods ers are assumed to rent equipment based on today’s costs and configurations of customer connection equipment, which is largely underground in most newly constructed urban and There are two longstanding methods for computing suburban distribution systems. The method as utilities now marginal customer connection costs. The first is the rental implement it generally does not consider the standing stock method, where the cost of new customer connection equip- of equipment. As a result, the rental method assumes that ment is multiplied by the RECC to obtain a value at which a customers with overhead service in urban areas are charged customer could be presumed to rent the equipment from the in marginal costs as if they had underground service. So these utility. O&M costs are added to these annualized capital costs. customers not only have to look at wires and poles, but they This method is a direct continuation of the NERA method. face a revenue allocation that assumes they have the ameni- The second method is the new-customer-only ties of modern suburbs. By failing to use the standing stock, (NCO) method. It calculates a marginal cost based on the the rental method also assumes that the percentage of new number of new hookups (and possibly replacements) of housing stock built as apartments is the same as the percent- customer connection equipment in the same time frame as used to measure other marginal costs for generation and transmission. This cost is adjusted by a present value 227 A secondary distribution line that is not networked is installed to reduce costs (including line losses) relative to running all services directly off a single transformer. It is thus an economic substitute for longer service lines. 228 The exception to this concern is Nevada, where separate marginal customer costs are calculated for single-family and multifamily homes based on new costs but are applied to the existing stock of each type of age of existing housing units that are apartments.228 Besides these computational issues, there are significant theoretical issues that caused the development of the NCO housing. This practice has been in place since at least 1999 when the utilities presented the division of the residential class in Public Utilities Commission of Nevada dockets 99-04001 and 99-04005. San Diego Gas & Electric calculates customer connection costs based on the noncoincident demand of the customers and uses demand estimates of existing customers, which also ameliorates this problem to some degree (Saxe, 2016, pp. 6-10).
  4. Page 210 of 276

    208 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® method. Aside from computational inaccuracies from protecting the profits of the landlord — or the utility, in this not using the standing stock, the rental method is not the case — from the vagaries of competition. outcome of a true competitive market. The NCO method There is one additional computational issue in the NCO reflects as marginal only those costs that are avoidable — method, where the replacement rate may or may not be incurred at the time when the choice to spend or not spend considered. In California, the utility commission advocacy money on new hookups is made — when the customer office has omitted replacements from the NCO method as chooses to connect to the utility system or when a hookup is well as from calculations of marginal distribution costs. The replaced. It is thus a shorter-run marginal cost method than Utility Reform Network tends to include them for both, the rental method, making the NCO method more consistent yielding higher costs for both demand distribution and with the other short- and intermediate-term means of customer-related costs. If a replacement cost is needed for the calculating costs included in the rest of the NERA method. NCO method, utilities often use the highest possible number The cost analyst must carefully examine the consistency — the inverse of the depreciable life of the equipment. between the NCO method, which considers the full costs Although data for service drops may be limited, utilities often of system replacement, and the methods used for G&T. have actual rates of replacement of meters and transformers, If replacement costs are used for one category, they should as well as information that could allow the replacement be used for all categories, moving the study toward a total rates for service drops to be inferred from capital budgeting service long-run incremental cost study (see Section 25.1). documents.230 The NCO method also comports better with competitive markets and consumer behavior. Consumers typically have the choice to either own or rent any equipment affixed to their 21.2 Smart Meter Issues For utilities installing smart meters, a joint product issue homes that costs several hundred to a few thousand dollars. arises. A smart meter with the associated data collection In many cases, consumers nearly always own the equipment, network hardware and software serves multiple functions. It as in the case of curtains or chandeliers. In other cases, there provides customer connection and billing while reducing the is consumer choice as to ownership or rental, as with propane labor costs of meter reading and other functions. It can also tanks, solar energy systems,229 internet routers and (in some provide a number of other peak load, energy and reliability parts of North America) water heaters. Even where the rental functions, including enabling TOU pricing and measuring option is present, the consumer can choose to purchase the demand response; load research; distribution smart grid equipment. In contrast, the rental method does not simulate functions such as outage detection and (if tied to utility GPS the outcome of a competitive market. It is equivalent to as- and mapping functions) identification of potential trans- suming there are enough landlords that there is a competitive former overloads; and even, in some cases, internet access for rental market, who own all the property in a given communi- utility customers. ty. Anyone who wants to live in that community has to rent The NERA method provides a theoretical underpinning from one of these owners; no one is allowed to buy property. that customer connections (analogous to generation capacity) Rather, this is a market with barriers to entry that prevent true should be provided by the least-cost method. In evaluating competition. Thus, the analogy of the current rental method past smart meter cases, about 70% of the cost of the AMI sys- to the housing market places an anti-competitive constraint tem was covered by meter reading benefits; the remainder of on consumers that would limit their economic choices while the cost was justified by other benefits. Therefore, California 229 Solar systems may be a special case. Renting the equipment generates some tax benefits that can be passed to the consumer in lower rent, while ownership would not have the same tax advantages. This will change if the solar investment tax credit is allowed to expire after 2020 as would occur under current law. 230 There is an accounting issue for meter replacement, because the cost of the meter is capitalized but the cost of meter replacement O&M is often expensed (see Section 21.3). It is important not to count the same cost twice.
  5. Page 211 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 209 ratepayer advocates typically have argued that only 70% of citing San Diego Gas & Electric testimony). Effectively, the the cost was a customer connection and billing cost and the cost of replacing meters for customers needing replacement remainder was not a marginal customer cost. Alternatively, is included in both the O&M costs and the capital costs in other studies, more than 100% of the smart meter and (because the lessor has the responsibility of replacement in data collection installation cost is justified by other savings the rental method and the replacement is included in the in power supply and line losses, rendering the metering and NCO method). Therefore, replacement meter costs should meter reading function as a cost-free byproduct. be removed from Account 586 in the rental method because The division of the smart meter into connection and they would otherwise be double-counted as part of the rental billing and other benefits can be analyzed in a different way cost. In the NCO method with replacement, the costs of — by netting out all benefits from the smart meter aside meter installation should be removed from the capital costs from those associated with meter reading and customer for replaced units and left in Account 586 to reflect recurring accounts, leaving the remainder as connection-related. replacements. This is analogous to calculating a marginal capacity cost Second, there are issues relating to the real costs of based on a combined cycle power plant net of savings of operating and maintaining service drops, some of which also fuel and purchased power if it is cheaper than a combustion must be dealt with in embedded cost analysis. Utilities may turbine. assign costs to service drops based on investment or line 21.3 Operations and Maintenance Expenses for Customer Connection Most utilities that use marginal costs assign the costs of FERC accounts 586 and 597 (meter operations and maintenance) and possibly portions of accounts 583, 584, 593 and 594 (operations and maintenance of underground and overhead lines) related to services and transformers as customer-related. If a transformer is customer connection equipment, Account 595 (transformer maintenance) is also customer-related. Utilities also assign portions of overhead accounts 580 (supervision and engineering), 588 (miscellaneous operating expenses), 590 (maintenance supervision) and 598 (miscellaneous maintenance expenses) to the customer costs. The treatment of these expenses is often an issue, as the specific costs in many of these areas may be more related to shared distribution system costs than to customer connections. These costs typically are developed using an average of several years of historical data and several years of future data. There are several computational issues. First, at least some utilities include the labor cost of replacing a meter in Account 586 (Jones and Marcus, 2016, miles. But as a practical matter, utilities spend very little on service drops as compared with primary distribution lines. In particular, many utilities have vegetation management standards almost entirely tied to primary lines. They rarely trim trees around secondary wires, except incidentally when primary line trimming is needed, and even more rarely trim trees around service drops, except under emergency conditions. Aside from tree trimming, patrols and inspections are driven by primary lines, not service drops. Therefore, it is necessary to conduct utility-specific analysis on service drop maintenance. A third issue is that some of the costs in Account 588 are not marginal costs at all. For example, PG&E in a previous case included costs of obtaining additional revenue from nontraditional sources and costs of performing work reimbursed by others. Other costs do not apply to customer connection equipment (environmental costs and mapping expenses that generally do not apply to services and meters). In addition, if smart metering is in the process of being installed or has just been installed, O&M costs of smart meter installation may be part of accounts 586 and 587 in some historical years. In that case, it will be necessary to identify and remove those costs or use a historical period of time entirely after smart meter installation.
  6. Page 212 of 276

    210 | ELECTRIC COST ALLOCATION FOR A NEW ERA 21.4 Billing and Customer Service Expenses A marginal cost analysis of billing and customer service expenses is usually done in one of two ways. The most common way, following the NERA method, is to average costs over a number of historical and projected years. These costs are calculated per weighted customer, recognizing that certain activities are more heavily related to some customers than others. The second method is to use the costs of revenue cycle services, which are short-run incremental costs used to pay competitive service providers, plus similar short-run calculations for call centers and other activities. These costs are less than embedded costs of the same functions used in the NERA method. PG&E chose this method in Phase 2 of its 1999 general rate case to be consistent with the lower marginal costs it calculated for paying competitors; it has kept this design ever since. A method based on revenue cycle services is more consistent with a short-run marginal cost theory, but many utilities may not have the ability to implement it. Many of the issues related to the appropriate calculation of marginal costs of billing and customer service are similar to the embedded cost issues raised in this manual. As with the discussion of this issue in Section 12.1, the frequency of billing and collection is driven by usage; if customers used minuscule amounts of power, it would not be cost-effective to read meters (without smart meters) or even bill on a monthly basis. For utilities without AMI, costs in excess of bimonthly meter reading and billing could be considered revenue-related rather than related to customer accounting. Relatedly, if smart meters are being implemented or have recently been implemented, meter reading costs from periods before smart meter implementation (as well as other costs such as call center costs associated with the implementation process) must be removed to prevent double counting of the capital cost of the smart meter and the operating cost of the mechanical meter that the smart meter replaces. As with embedded costs (see Section 12.3), the costs associated with major account representatives assigned to serve large customers (regardless of the FERC accounts in which they are found) should be considered part of the marginal costs of serving those customers and should be assigned to them. REGULATORY ASSISTANCE PROJECT (RAP)® As with customer-related distribution costs, in jurisdictions using long averages with both present and future costs, the future cost forecast must be reasonable. In the specific case of customer accounting costs, a trend toward declining costs and increasing productivity has persisted for almost a decade. More customers are receiving and paying bills online or through automatic bank transactions, both of which are less expensive to the utility than mailing bills and payment envelopes to the customer and then opening and processing return envelopes with payments from customers. Phone calls to the utility are being replaced with internet transactions (even for items such as changing service or making payment arrangements) and the use of interactive voice response units. Even though utilities may claim that the remaining calls may be more complex, customer service representatives are logging fewer total hours. As a result, it is important to examine any set of averaged costs carefully. If costs are declining, as they should be, then an average would include costs from a period of worse productivity than the present and should not be used. Similarly, if the future is projected to be more expensive than recent history, that assumption should be probed for reasonableness. Some customer accounting and customer-related metering and distribution O&M expenses are paid by fees, not rates (see Chapter 15). As a result, they are not marginal costs associated with the general body of ratepayers. Costs of activities such as establishing service; disconnection and reconnection after customer nonpayment; field collections; meter testing; and returned checks are offset by fees received from individual customers (largely residential customers). If the costs paid by the fees are allocated heavily to residential customers, but the fees are not included in the revenue to be allocated, this would effectively cause residential customers to pay twice: once in the rate and a second time when assessed the fee. This problem can be dealt with in either of two ways. Nevada includes the fees in the revenue to be allocated and directly assigns the fees as revenues received from the classes that pay them. California generally removes an amount equal to the fees from the marginal customer accounting cost. The methods are not identical, but both will address the double counting. Costs (and uncollectible
  7. Page 213 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 211 accounts if necessary) related to billing and collecting money Lastly, a number of cost elements that are sometimes from non-energy activities such as line extension advances mistakenly classified as customer service do not fit a marginal and other products and services besides the utility’s energy cost analysis well, particularly if the programs are undertaken bills may be in accounts 901 through 905, but they are not for public policy reasons. A cost undertaken for public policy marginal costs of serving electric customers and should be reasons is not a marginal cost, even if it might theoretically excluded from marginal customer costs. This is similar to the vary with the number of customers. An energy efficiency approach in Section 15.2 for embedded costs. program or demand response program is established by the In some cases, the difference between marginal and state or regulators for policy reasons, theoretically to provide embedded cost analysis is that costs are excluded from a cost-effective or environmentally preferred substitute marginal costs while being allocated differently from for other investments and expenses. Subsidy programs for other costs as embedded costs. Examples are economic low-income customers are also established for policy reasons. development rates and uncollectible accounts expenses. Certain other programs are also policy-related, such as Economic development rates, as well as any costs for promoting solar energy, battery storage and electric vehicles; marketing and load retention, are not marginal costs. allowing customers to opt out of smart meters; and research These programs are not needed for customer service and and development programs. These are not marginal costs, theoretically should pay for themselves by attracting or and their allocation to customers outside of a marginal cost retaining loads or improving economic conditions in the framework will be discussed in Chapter 23. area. Uncollectible accounts expenses are not marginal costs associated with current bill-paying customers and conceptually should not be included in marginal costs. This is a similar issue to the embedded cost issue, discussed 21.5 Illustrative Marginal Customer Costs Tables 42 and 43 on the next pages illustrate a calcula- in Section 12.2, regarding whether uncollectible accounts tion of marginal customer costs using the NCO and rental expenses are costs associated with present customers (direct methods, with a set of assumptions that are generally realistic assigned) or former customers (allocated by usage or revenue). but not tied to any specific utility. California regulators removed uncollectible accounts Table 44 on Page 213 shows the impact of the choice expenses from marginal costs in 1989 (California Public of marginal customer cost methods on the MCRR of Utilities Commission, 1989); the Nevada commission includes distribution and thus on the overall allocation of distribution them (Public Utilities Commission of Nevada, 2002, p. 109). costs. To illustrate this impact, there is also an assumption as If uncollectible accounts are included, then late payment to demand distribution costs. Costs for primary customers revenues must be treated consistently, by adding them to the are assumed to be lower than for other classes largely because distribution revenues to be allocated and subtracting them they do not need line transformers. In this example, the from the classes that pay them. residential class has 41% of the MCRR for distribution costs with the rental method but 38.8% with the NCO method.
  8. Page 214 of 276

    212 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Table 42. Illustrative example of new-customer-only method for marginal customer costs Residential Small commercial Secondary large commercial Primary industrial Service $800 $1,200 $3,000 N/A Meter $200 $300 $3,000 $9,000 Total $1,000 $1,500 $6,000 $9,000 Present value of revenue requirements (PVRR) factor Service 1.3 1.3 1.3 1.3 Initial investment Meter Investment with PVRR Service Meter Total New customers (% of system) Replacements (% of system) Service 1.25 1.25 1.25 $1,040 $1,560 $3,900 N/A $250 1.25 $375 $3,750 $11,250 $1,290 $1,935 $7,650 1% 1% 0.5% $11,250 0.5% 0.5% 0.5% 2% 0.5% 2% 2% Marginal cost for new customers (investment with PVRR x new customer %) Service $10.40 $15.60 $19.50 N/A Meter 2% 0% Meter $2.50 $3.75 $18.75 N/A Total $12.90 $19.35 $38.25 N/A Marginal cost for replacement (investment with PVRR x replacement %) Service $5.20 $7.80 $19.50 N/A Meter $5.00 $7.50 $75.00 $225 Total $10.20 $15.30 $94.50 $225 Total investment marginal cost for new and replacement customers Service $15.60 $23.40 $39.00 N/A Meter $7.50 $11.25 $93.75 $225 Total $23.10 $34.65 $132.75 $225 $30 $50 $500 $53.10 $84.65 $632.75 1,000,000 100,000 10,000 $700 Customer operations and maintenance cost Total marginal customer cost Number of customers Marginal cost revenue requirement for customer costs $53,100,000 $8,465,000 $6,327,500 $925 1,000 $925,000
  9. Page 215 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 213 Table 43. Illustrative example of rental method for marginal customer costs Small commercial Residential Secondary large commercial Primary industrial Initial investment Service $800 $1,200 $3,000 N/A Meter $200 $300 $3,000 $9,000 Total $1,000 $1,500 $6,000 $9,000 7% 7% 7% 7% Real economic carrying charge rate Service 10% Meter Annualized investment cost Service Annual customer operations and maintenance cost Total customer cost Number of customers Marginal cost revenue requirement for customer costs 10% 10% $56 $84 $210 $20 $30 N/A $300 $900 $76 $114 $510 $30 $50 $500 $900 Meter Total 10% $700 $106 $164 $1,010 1,000,000 100,000 10,000 $106,000,000 $16,400,000 $1,600 1,000 $10,100,000 $1,600,000 Table 44. Illustrative comparison of rental versus new-customer-only method for overall distribution costs Small commercial Secondary large commercial Primary industrial $16,400,000 $10,100,000 $1,600,000 $53,100,000 $8,465,000 $6,327,500 $100 $110 $110 $925,000 Residential Marginal cost revenue requirement for customer costs Rental method New-customer-only method Marginal distribution demand cost per kW Demand per customer (kWs) Number of customers Marginal cost revenue requirement for distribution demand costs Results: Rental method Total distribution marginal cost revenue requirement Share of distribution costs Results: New-customer-only method Total distribution marginal cost revenue requirement Share of distribution costs $106,000,000 $75 4 25 250 2,000 1,000,000 100,000 10,000 1,000 $400,000,000 $275,000,000 $275,000,000 $150,000,000 $506,000,000 $291,400,000 $285,100,000 $151,600,000 41.0% 23.6% 23.1% 12.3% $453,100,000 $283,465,000 $281,327,500 $150,925,000 24.1% 12.9% 38.8% 24.3% Note: Based generally on California examples, except transformer part of demand cost. Marginal demand cost is higher in commercial classes than residential because residential has more customers per transformer. Demand is lower in industrial class because no transformers or secondary lines are included. Percentages may not add up to 100 because of rounding.
  10. Page 216 of 276

    214 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® 22. Administrative and General Costs in Marginal Cost of Service Studies B oth A&G expenses and general plant costs are typi- the size of the utility in the intermediate term are benefits cally considered “loaders” to marginal costs, applied administration, accounts payable, payroll processing and to the generation, transmission and distribution capital accounting. Over a longer period, portions of an functions. Fundamentally, at least some A&G expenses and even broader set of costs are variable. For example, executive general plant costs are marginal costs, though over varying salaries are related (though possibly not proportional) to time horizons and in varying amounts because of economies the size of the company, as a larger company will have more of scale in running a large corporation. executives and pay them more (Marcus, 2010a, pp. 90-93 and The NERA method in the 1970s used an extremely long- Exhibit WBM-18). Other examples relate to buildings and run marginal cost method for A&G costs. It developed loading other general plant items. A utility with fewer workers will factors based on what appears to be a fairly arbitrary mix of own, rent and maintain less building space and have fewer labor, O&M expenses and total plant for A&G expenses, and vehicles and tools. it allocated general plant based on other plant (other capital Recently a number of utilities, following the FERC investments). As with other elements of the NERA method, method of unbundling transmission, have allocated both the mismatch in time frames is a serious theoretical concern. A&G expenses and general plant costs (using a long-run One method of addressing this is to eliminate consideration marginal cost basis) based on labor with the exception of joint and common A&G costs from the marginal cost of (1) property insurance, which is based on plant, and analysis. This leaves only short-run marginal A&G costs as a (2) franchise fees based on revenue. The labor allocation better match with short-run generation marginal costs. method for A&G expenses tends to be less favorable to small Short-run marginal costs include at least workers’ com- customers than the plant-based method, but it has analytical pensation and pensions and benefits associated with other merit. Key issues here are (1) ensuring that specific elements marginal costs that are labor-related. Similarly, incentive of A&G expenses are truly recurring marginal costs and pay, to the extent recorded to A&G accounts, is a short-run (2) whether a given cost should be functionalized differently marginal cost assigned to labor. Property insurance is a among generation, transmission and distribution. This can be plant-related marginal cost to the extent that the amount of as simple as, for example, removing a large one-time fire claim insured property affects the premiums. (which has no relationship to any cost drivers) from a utility’s If longer-term A&G costs are included, one can either recorded A&G expenses and removing nuclear insurance include all of them as variable in the long run with the size of from liability insurance allocated by company labor when the the utility or recognize potential economies of scale, which company had no labor costs at a jointly owned nuclear plant would mean that only a portion of costs is marginal. The (Jones and Marcus, 2016, pp. 20-21). Or it can involve a more best example of an intermediate-term marginal cost is the complex analysis of which specific A&G costs are marginal, human resources department, which varies with the size of an exercise Southern California Gas Co. undertook in its gas the workforce. Other examples of costs that will vary with marginal cost studies (Chaudhury, 2015, pp. 21-22).