  1. Page 220 of 276

    218 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® 25. Cutting-Edge Marginal Cost Approaches T he NERA method for calculating marginal costs, particularly for generation, becomes less sustainable as the utility systems move toward major technological change and reductions in carbon. While the It is important to sketch out a new paradigm for marginal costs, even though many of the calculations on which it could be constructed have not been developed. effect may be different in different regions of the country, the short-term avoided energy cost will reflect current system in a number of ways. The theory is that it will diminishing variable costs to the extent that natural gas is be optimally sized with optimal technology, which should in replaced with renewables and storage. Capacity costs may be most cases reduce costs (or at least societal costs reflecting moving toward batteries given that renewable integration can environmental constraints) relative to current technology — be achieved better with storage resources that can both use although that may not always be true. However, the system overgeneration and provide ramping and integration more would also be built at current construction costs, so it could effectively than fossil-fueled plants that do nothing about be more expensive in that regard. Since TSLRIC represents overgeneration. Thus, it is important to at least sketch out a an optimal system, it removes one of the key problems of new paradigm for marginal costs, even though many of the the NERA method, which can disproportionately assign calculations on which it could be constructed have not been excess capacity to specific customer classes if not undertaken developed yet or integrated into a whole. carefully to remove the excess capacity. 25.1 Total Service Long-Run Incremental Cost Although the theory is relatively easy to state, it has not been implemented for an electric utility, and the data to implement it will need to be collected and analyzed. The basic theory presented here is the total system To make this calculation, one needs to start with the cost of long-run incremental cost method that was developed in the existing system. This is then adjusted for inflation since the telecommunications industry during its period of rapid the time when it was built, yielding what is usually referred technological change before deregulation. Under this method, to as “replacement cost new.” But a TSLRIC study goes all costs are variable but may be very different from historical beyond simply a study of the replacement cost of the system costs. This is important when examining the generation as it exists today. Other sources of data should be acquired system in particular, because the optimal system going for resources whose costs are declining due to technological forward is likely to have very few traditional variable costs. change and data availability. From that point, one examines The TSLRIC is theoretically defined as the total cost the changes in the generation resource mix to move it of building and operating an optimal new system to serve toward optimality. Substitution of storage or other DERs for the current load with changes that can be reasonably upstream generation and transmission may reduce TSLRIC foreseen and changes to reflect environmental priorities costs. A complex engineering analysis would also be required (e.g., additional efficiency and demand response, changes to to review the magnitude of the cost-decreasing and cost- electrification for purposes of decarbonizing existing fossil increasing drivers for transmission and distribution costs, fuel end uses and development of more loads with storage which are likely to be different by utility. The discussion or other controls). The system will be different from the below outlines qualitative issues relating to the cost
  2. Page 221 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | changes that would result from using a system constructed programs (such as interruptible industrials and air under TSLRIC. conditioner cycling) likely would become cost-effective as 219 part of an optimal system. Examples include smart appliances 25.1.1 Generation Without full quantification, an optimal system 15 to 20 that would run discretionary loads such as washing, drying or dishwashing at times when the loads match system years out will contain considerably more wind generation, needs, and variable-speed drives for heating, ventilation and solar generation, possibly some other renewable generation air conditioning systems that could both save energy and and more storage than the current system. The mix of solar respond automatically to peak or ramp conditions. These also and wind generation is likely to be region-specific, depending may be part of TSLRIC, functionalized among generation, on available resources that can be economically brought to transmission and distribution as joint products. market. Some storage could be centralized, providing gener- Most existing conventional hydro and pumped storage ation for peaking, ramping and renewable integration. At the resources probably would remain part of an optimal system, grid level, storage could be related to batteries, compressed although the timing of their usage may change from the air and pumped hydro, as well as the load-related operations current system. In part, even under TSLRIC, it is not of large water projects (e.g., hydroelectric capacity and flexible reasonable to ignore high decommissioning costs that can pumping loads and storage associated with large water supply be avoided by keeping them in operation. More importantly, projects). The question of black start capability of storage hydro resources with storage also provide energy at zero resources may need to be addressed because, if storage can incremental costs, as well as ancillary services and significant provide this capability, it may supplant the need for certain amounts of flexibility to the grid. These resources may be gas-fired resources. devalued rather than being included at full replacement Storage could be decentralized, also serving to reduce cost to recognize that their continued operation depends the need to build distribution capacity while serving the in part on avoiding the costs of removing them — which is distribution system with greater reliability in addition to G&T generally not considered in a TSLRIC environment. However, displacement. At the decentralized level, batteries would be some smaller resources would be closed, particularly an option, but so would end-user storage such as controllable run-of-river plants and those in areas where there are water heaters (which would have significant benefits for significant environmental impacts. At current and projected dealing with ramp), thermal energy storage to supplant peak costs (considering those related to capital, operations and air conditioning, and use of existing or new water storage emissions), coal and traditional nuclear units237 likely would to control timing of pumping and delivery by local water not be part of the new optimal system under TSLRIC. agencies and irrigators. This storage is a joint product that The role of natural gas-fired generation for reliability and must be functionalized among generation, distribution and bulk energy generation in an optimal system that recognizes possibly transmission. carbon constraints is a large question. In all likelihood, some Controls on electric vehicle charging — to keep them out of the most efficient gas generating units would remain for of peak periods, avoid distribution overloads, preferentially a significant period, although the amount of energy they charge to mitigate ramp and possibly reverse flows (vehicle to produce could be considerably less than at present. Gas plants grid) — could also create flexibility, since there would be little could include: or no resource costs except controls (incremental changes in • CHP, which has very high efficiency and uses thermal costs of charging and discharging only). These controls are energy to produce steam for industrial processes or installed at the end user level but may be critical to reduce chilled water to displace air conditioning loads. generation and distribution costs in an optimal system and as such would be part of TSLRIC. Other demand response programs beyond traditional 237 Consider the abandonment of South Carolina Electric and Gas Co.’s Summer Nuclear Station and the cost overruns at Georgia Power’s Vogtle units 2 and 3, which cost $23 billion — or more than $10,000 per kW (Ondieki, 2017).
  3. Page 222 of 276

    220 | ELECTRIC COST ALLOCATION FOR A NEW ERA • • REGULATORY ASSISTANCE PROJECT (RAP)® Combined cycle generation designed for flexible use that located storage devices if cheaper than both transmission could also make up for any shortages in bulk energy if lines and conventional RMR gas-fired generation. PG&E’s adverse weather conditions reduce output from hydro use of batteries to displace an RMR contract in an area south and renewables. of San Jose (discussed in Section 18.3) suggests the potential Potentially, gas turbine peakers. The modern gas turbine of this outcome. It is also possible that a further analysis of supplanted less-efficient older gas-fired steam units. But a more optimal network of transmission lines may reveal storage and demand response are likely to make even significant portions of those lines are, in fact, related to off- modern gas turbines less economic, particularly for peak use or contingencies that could occur at nonpeak times reserves, needle peak use and ramping.238 Nevertheless, and should thus be spread over more than peak hours. in some places, particularly where gas turbines are considerably cheaper than combined cycle units and where other flexible resources (such as hydro) are not 25.1.3 Shared Distribution The whole distribution system would become part of widely available, there may be a dispatch range TSLRIC, instead of just the narrowly defined portions where (for example, a 10% to 20% capacity factor) where gas the NERA method suggests investments are needed to serve turbines might be economic in an optimal system. increases in demand. The optimal distribution system is likely For any fossil generation, to the extent not otherwise to need less capacity and to serve load more reliably and with internalized, a carbon adder based on residual damage or fewer losses than the current system, because of technologies mitigation costs would be included under TSLRIC, but much such as automatic switching and integrated volt/VAR controls of the TSLRIC system is being rebuilt to optimize for the — which would reduce costs — and because energy efficiency need to reduce carbon emissions as well as for financial costs. (particularly related to space conditioning), decentralized storage, demand response and controls on electric vehicles 25.1.2 Transmission could reduce distribution peaks. Assuming no major technological advances (e.g., super- There are likely to be customers for whom usage is so conductors), some changes in transmission from the current low that they are better served by DERs than by a grid. They system would arise from changing generation patterns. will include many rural customers (particularly in areas Long-distance transmission from existing coal and nuclear with high potential fire danger) but also small loads in an stations may no longer be part of an optimal system, but urban area. Solar-powered school crossing signals are being long-distance transmission from distant wind regions may installed today, simply because the cost of connecting to the replace it as a significant factor, either because of new con- grid exceeds the cost of the distributed energy system. Other struction or wheeling costs.239 Interties would likely remain, applications using low-wattage LED lights (e.g., traffic signals although there may be more bidirectional power, and their and remote streetlights) may ultimately also find a distributed role may be clearing renewable surpluses across wide regions. alternative to be cheaper than grid service. Factoring this into These transmission facilities for delivery of bulk energy, a TSLRIC study will ensure that low-use customers are not explicitly excluded from the NERA method, probably would assigned costs that will not benefit them economically. be allocated over hours of use — making them energy-related, since they are not constructed for peak loads. Distribution is also likely to be bidirectional at least in some places, particularly if whole neighborhoods are served There may be other efficiencies associated with both with distributed solar (or solar plus storage) resources. This better controls and with the possible use of strategically change may require more expensive control systems in some 238 In 2018, NV Energy executed contracts for four-hour battery storage at a cost of $73 per kW-year, less than the carrying cost plus nondispatch O&M for a peaker (Bade, 2018). 239 For example, capacity freed up on transmission lines bringing coal-fired electricity from Four Corners to Southern California Edison is now being used to deliver wind energy from New Mexico. (Southern California Edison, 2015, p. 4).
  4. Page 223 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 221 places but is also likely to have a net effect of economizing on to individual customers who use solar and storage to serve system sizing. Some primary distribution feeders (along with their loads and establish small microgrids. They may possibly service lines and transformers) may need to be reconstructed be some of the last customers with fossil fuels (propane or if neighborhoods are converted from gas to electric space compressed natural gas) as a source for meeting relatively heating or if electric vehicles become ubiquitous, but those large energy loads such as space and water heating in a mainly costs would be spread over more kWhs of load. Beneficial decarbonized system. electrification of heating and transportation could increase total distribution costs, but because these technologies add energy loads, the costs per kWh may be stable or decline, and the amount of winter peaking load is likely to increase. However, costs can increase from other aspects of the 25.1.4 Customer Connection, Billing and Service Costs The design of customer connection equipment may not change greatly, except for replacement of urban overhead lines optimal distribution system. More of the optimal system is with underground equipment and possibly some advances likely to be underground in urban areas, increasing system in controls that can optimize transformer capacity for small capital costs. Although overhead wires are cheaper, they also customers. As noted earlier, some service lines and transform- have nonmonetary costs related to worse aesthetics, poorer ers may need to be resized if neighborhoods are converted reliability (particularly in areas subject to ice storms and from gas to electric space heating or electric vehicles become tropical storms) and to some extent worse safety (fires, downed ubiquitous. As with the current system, costs of advanced wires). There would be some cost offset because the oldest metering would need to be divided between the pure connec- and least reliable underground technologies that are currently tion and billing function and the costs of other services that being replaced at significant cost would have been supplanted, AMI provides (to reduce grid costs and to provide platforms thereby reducing TSLRIC maintenance and replacement costs for demand response and storage behind the meter). compared with current costs. Urban vegetation management Customer accounting and service O&M will be reduced costs would also be reduced in a system with more due to the continuation of greater productivity from internet undergrounding. The overall costs of increased underground and interactive voice response systems and the prevalence of service (even after netting out the relevant costs avoided, such cheaper methods of receiving and paying bills that were as maintenance, replacement of aging lines and vegetation discussed in Section 21.4. These items have been increasing management) likely would still be higher than current costs. productivity for the last decade and are likely to continue to The optimal distribution grid is likely to have other cost-increasing features. It will need more resilience against natural disasters such as hurricanes, more patrols and maintenance to prevent fires, and costlier and more extensive do so. 25.2 Hourly Marginal Cost Methods vegetation management. It will also incur costs for protection Although the hourly marginal cost method has not been against stronger winds, dealing with safety hazards from pole explicitly used (a variant is used in Nevada), the Energy and overloading by both electric utilities and communications Environmental Economics long-run marginal cost study companies, and possibly undergrounding in some remote points to how such a method could be used. Rather than areas to prevent outages and fires. dividing costs into demand and energy costs and allocating by One potential outcome in the Western U.S. may kWs, E3 assigns its various types of avoided costs to individual even be that significant parts of the grid routinely begin hours so that specific energy efficiency, demand response to receive interruptible service to prevent wildfires. Even and distributed generation costs could be measured against more remote portions of the grid serving few customers in the hourly costs given their operational patterns. When areas with high fire danger may be completely abandoned. costs are assigned to hours, the allocation to classes can be In essence, those parts of the system could be turned back based on customer loads in those hours without calling the
  5. Page 224 of 276

    222 | ELECTRIC COST ALLOCATION FOR A NEW ERA costs “demand” or “energy” costs. As with hourly allocation embedded cost methods, this may be an approach that will serve the cost analyst as the utility system evolves to include widespread renewable and distributed resources. REGULATORY ASSISTANCE PROJECT (RAP)® 25.2.2 Transmission and Shared Distribution For transmission and distribution costs (except possibly for distribution costs for new business, including primary To convert the marginal costs calculated using a variant lines installed to connect new customers and transformers), a of the NERA method into hourly costs, and after considering method that skips the dollars-per-kW step and goes directly to the E3 hourly cost calculation, the following method could be total dollars per hour has advantages. It avoids the significant used. This method still has some of the potential drawbacks problems associated with mismatches of kWs of capacity of the NERA method discussed in detail above (possible (calculated based on extreme weather peak loads or size of mismatches in short-run and long-run analysis, failure equipment that is added) and kWs of load (calculated based on to consider certain plant such as transmission interties, a smaller number of kWs such as PCAF or a peak or diversified ambiguous treatment of replacement equipment, etc.). demand); see Appendix C. This also provides a clearer path The NERA approach is also a fundamentally peak-oriented toward design of TOU pricing. If a figure in cents per kWh is method, as opposed to the methods based on hours of use needed in an hour or time period, total dollars can be divided of capacity suggested in Chapter 17. Nevertheless, with some by the loads in each hour. Such an allocation method would modification, it can be amenable to hourly calculations. need to be disaggregated by voltage (transmission if not 25.2.1 Energy and Generation Energy costs can be calculated on a time period basis, FERC jurisdictional, possibly subtransmission, distribution). Additionally, a disaggregation at each voltage between substations and circuits would improve an hourly calculation as in Oregon or California. Otherwise, energy costs can be because substations and circuits may have different time calculated on an hourly basis, as in Nevada, and aggregated patterns of usage and cost causation. into time periods based on hourly loads (including losses) For each component (excluding the transmission by each class in each time period. Generation capacity components for utilities with fully FERC jurisdictional costs need to be originally calculated in dollars per kW of transmission), the total investment in capacity-related capacity and divided between peaking capacity and other equipment including automation and controls — unlike capacity needs (e.g., ramp) in ways described in Section 19.3. the NERA method, which excludes them — would be The peaking costs would be assigned to a subset of hours calculated in real dollars and averaged over a period such as using methodologies such as loss-of-energy expectation, 10 years. This should perhaps include both forward-looking PCAF, loads or load differentials in largest ramp periods, or and historical data as with the NERA method. The costs other multihour methods. Costs in each hour would then should then be annualized using an RECC and with O&M be calculated in cents per kWh and multiplied by the loads and possibly replacements added (in real dollars per year). in each hour (including losses). The hourly costs can be The O&M and replacement costs would be based on either aggregated into time periods. Consideration should be given averaged costs or forward-looking costs if changes from the to the establishment of a super-peak period for hourly cost average have been observed or are expected. allocation containing the highest peak-related costs based on Substation capacity needs are generally oriented to the loss-of-energy expectation or PCAF allocations to encourage peak loads of the equipment, although they are also related the use of short-term resources such as demand response. to the duration of heavy energy use, suggesting a broader If ramp costs are calculated, they could largely be based on allocation than a single coincident peak. An allocation of total storage operations and could have negative capacity costs in dollar costs to time periods consistent with the NERA meth- hours when storage is charging immediately before a ramp od’s emphasis on capacity could be based on some hybrid of and positive capacity costs from the beginning of the ramp the percentage of kVA of substation peaks in each season and through the daily peak and shortly afterward. time period and a PCAF, which has an energy component
  6. Page 225 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 223 because all loads in excess of 80% of the peak are assigned different hours. If large customers are directly assigned costs, some capacity value. The PCAF could be set differently for they would not be allocated any of the hourly costs. summer and winter peaking kVA if applicable. For rate design New business distribution lines could be part of purposes, a super-peak period could also be carved out that distribution circuits or could be segregated into a separate recognizes stress on components and high marginal line cost item for allocation. If new business lines and line losses during extreme loads. transformers are separated from other distribution costs, the Transmission and subtransmission line marginal capacity costs could be calculated in dollars per kW using a method under the NERA method involves a highly networked system, with a demand measure such as changes in the demand at where at least some of the installed capacity is needed to the final line transformer240 (which reflects diversity for meet contingencies that may occur at times other than those customers sharing transformers). These costs can during peak hours. The hourly causation and allocation of then be allocated to hours within each class based partly costs is likely to require further analysis that has not yet been on class peak load characteristics (e.g., assigning more costs conducted. But it could be some mix of peak loads (i.e., PCAF) to residential customers in summer evening hours or to and hourly loads (weighted into time periods when contin- commercial customers during summer afternoons) and partly gencies are most likely to occur to the extent possible). to additional hours to reflect that transformer performance is Distribution substations are generally oriented to diver- degraded if more energy is used in high-load (nonpeak) hours, sified peak loads on the equipment while also being related to as discussed in Section 5.1. A class allocation based on loads the duration of energy use and should be allocated to hours at the transformer would reflect that these very localized in a manner like the allocation of transmission substations. costs have some relationship to the customer’s own demand Distribution lines are more radial in nature, although switch- (diversified to the transformer). Some utilities may have a ing among feeders has been installed in some places, and small secondary distribution marginal capacity component more automation and volt/VAR controls are likely to cause reflecting that capacity may need to be added to networked distribution systems to become more networked. The cost secondary systems. This cost, if applicable, could be treated causation for distribution line capacity has a peak-oriented similarly to new business and line transformer costs, component — which is likely to increase as the system assigned in dollars per kW based on demand at the final line networking and switching increases — and a component transformer and assigned to classes on the secondary system related to individual feeder peak loads, which is likely to in the same way as line transformers. decline. To allocate these costs to hours, one could start with O&M costs for substations and circuits generally should a cost component for specific lines that would be directly be allocated in the same way as the plant, except that costs assigned based on the individual peak of customers who are of vegetation management and various periodic patrols and very large in relation to feeder sizes (i.e., customers over a inspections should be assigned to all hours because they are particular MW size or a high percentage of the feeder’s peak not caused by peak loads. load). Remaining costs could be allocated to hours based on a If T&D replacement costs are included as recommended mix of PCAF or top hours, a component based on the timing in Chapter 20, the costs should be allocated to hours either in of individual feeder peaks (taking into account differences in a manner like the underlying allocation for plant of each type residential and commercial load patterns) and a base load to or based on all hours, reflecting that replacements are not all hours. For cost allocation, the hourly loads for feeder peaks based on peak demand. Some mix of the two methods may could segregate the residential and commercial loads into also be used. 240 With an allocation to primary voltage customers based on maximum demand but excluding transformer costs.
  7. Page 226 of 276

    224 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® 26. Summary of Recommendations for Marginal Cost of Service Studies T his chapter provides recommendations on two sets 4. If the NERA-style short-run energy and generation of issues: how to make incremental improvements capacity cost methods are used in the relevant jurisdic- to the predominantly used NERA method and how tion, use a longer period of time for analyzing marginal to work toward developing an hourly TSLRIC method, which energy costs than one to six years to deal with the mix of has not yet been implemented. short-run and long-run costs currently used. Also ensure that carbon costs are included and a renewable portfolio 26.1 Improving Marginal Cost Methods standard adder is used if relevant to the jurisdiction. And examine whether pure capacity purchased from the market is cheaper than either a combustion turbine or Nine key items are distilled from Part IV as to how to battery for near-term application. improve marginal cost methods from the NERA method. 1. 2. Analyze whether demand response can provide relief 5. for the highest 20 to 50 hours of system load more for transmission and distribution to include automation, cost-effectively than supply options, and substitute controls and other investments in avoiding capacity or these costs for peak-hour costing if they are available increasing reliability, and consider including replacement and cost-effective. costs. Analyze whether grid-sized batteries are the least-cost 6. Use the NCO method of calculating marginal customer capacity resource in the near term, instead of combustion costs. If replacement is included for any assets, a replace- turbine peakers, to meet the highest few hundred hours ment rate should be based on actual experience, which of system load — recognizing that they may take on a would typically be less often than the accounting lifetime different role in the long term as systems become more suggests. heavily reliant on variable renewable generation. This is 7. or ramping function as well as a peaking function in the Functionalize marginal costs in revenue reconciliation; use EPMC by function, not in total. particularly important if reliability has a grid integration 8. If demand costs are used, make sure that kWs used to relevant jurisdiction, because a battery can reduce ramp calculate marginal costs and kWs used to allocate them approximately twice as much as a generator of the same are harmonized. size and can smooth intermittent resource output better 3. Make the definition of marginal costs more expansive 9. To the extent feasible, use an hourly method, such as the than a fossil-fueled plant. one E3 developed, to assign costs to hours and then to Move toward long-run incremental costs for generation customer class loads. This avoids the need to separate containing less carbon as a first step toward the TSLRIC costs into the demand and energy classification. method. Oregon uses 75% combined cycle and 25% solar in its long-run incremental cost. To the extent that it can be reasonably justified, a decarbonized long-run incremental cost would have storage for capacity, more renewables and less gas. 26.2 Moving Toward Broader Reform TSLRIC will require both vision and research to be implemented for all utility functions. How a TSLRIC approach might look different from simply using replacement cost new
  8. Page 227 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® for existing facilities was sketched out in Section 25.1. ELECTRIC COST ALLOCATION FOR A NEW ERA | 225 there is only a limited amount of resources with fossil fuel The first place where a TSLRIC approach could be that may not be dispatched in all hours. This means that price used is for generation, where it could be built up from a shapes based on short-run marginal cost may no longer make lower-carbon long-run incremental cost. Other resources sense. This method would end up giving batteries and storage may also be available to assist in constructing the TSLRIC negative energy costs when they are charging and positive of generation. They include the low-carbon grid study for costs when discharging. Distributed generation would require the Western grid and similar studies that build out potential functionalization. future resource plans (Brinkman, Jorgenson, Ehlen and Developing TSLRIC for transmission and distribution Caldwell, 2016, and Marcus, 2016). This is a data-intensive would require considerable amounts of engineering analysis approach that will require envisioning and costing out future to determine how the various cost drivers would work when systems and determining the resilience of the cost estimates developing a more optimal system and would likely involve a to various assumptions. TSLRIC for generation probably longer process. suggests starting with a “cost by hours of use” approach, since
  9. Page 228 of 276

    226 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Works Cited in Part IV Bade, G. (2018, June 13). NV Energy 2.3-cent solar contract could set new price record. Utility Dive. Retrieved from https://www.utilitydive.com/news/nv-energy-23-cent-solar-contract-could-set-new-price-record/525610/ Barker, D. (2014, January 31). Testimony on behalf of San Diego Gas & Electric. California Public Utilities Commission Application No. 14-01-027. Retrieved from https://www.sdge.com/sites/default/files/RDW_Barker_SDGE_ Testimony_0.pdf Bohrman, J. (2013, June 3). Testimony on behalf of NV Energy. Public Utilities Commission of Nevada Docket No. 13-06-002. Retrieved from http://pucweb1.state.nv.us/PDF/AxImages/DOCKETS_2010_THRU_ PRESENT/2013-6/26978.pdf Brinkman, G., Jorgenson, J., Ehlen, A., and Caldwell, J. (2016). Low carbon grid study: Analysis of a 50% emission reduction in California (NREL/TP-6A20-64884). Golden, CO: National Renewable Energy Laboratory. Retrieved from https://www.nrel.gov/docs/fy16osti/64884.pdf California Public Utilities Commission. (1983). Decision No. 83-12-068 in Pacific Gas & Electric general rate case, 14 CPUC 2d 15. California Public Utilities Commission. (1986, August 20). Decision No. 86-08-083 in 1986 energy cost adjustment charge case, 21 CPUC 2d 613. California Public Utilities Commission. (1989, December). Decision No. 89-12-057 in Pacific Gas & Electric general rate case. California Public Utilities Commission. (1995, December). Decision No. 95-12-053 in Pacific Gas & Electric biennial gas cost allocation proceeding. California Public Utilities Commission. (2018, November 8). Resolution E-4949 approving Pacific Gas & Electric battery procurements with modifications. Retrieved from http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M240/ K050/240050937.PDF Chaudhury, S. (2015, November 19). Testimony on behalf of Southern California Gas Co. and San Diego Gas & Electric. California Public Utilities Commission Application No. 15-07-014. Retrieved from https://www.socalgas.com/ regulatory/documents/a-15-07-014/TCAP%20Phs%202%20-%20Chaudhury%20Revised%20(clean).pdf Chow, L., and Brant, S. (2018). The 2017 resource adequacy report. California Public Utilities Commission, Energy Division. Retrieved from http://www.cpuc.ca.gov/RA/ Goodman, I., and Marcus, W. (1990, July 23). Joint testimony on behalf of Concerned Citizens of Manitoba, Sierra Club of Western Canada, Manitoba Branch, and Conservation Strategy Association of Manitoba. Manitoba Public Utilities Board proceeding regarding Manitoba Hydro submission in respect to major capital projects. Horii, B., Price, S., Cutter, E., Ming, Z., and Chawla, K. (2016). Avoided costs 2016 interim update. Energy and Environmental Economics Inc. Retrieved from https://www.ethree.com/wp-content/uploads/2017/01/20160801_ E3_-Avoided_Cost-2016-Interim_Update.pdf Jones, G., and Marcus, W. (2015, March 13). Testimony on behalf of The Utility Reform Network. California Public Utilities Commission Application No. 14-06-014.
  10. Page 229 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA Jones, G., and Marcus, W. (2016, July 5). Testimony on behalf of Utility Consumers’ Action Network. California Public Utilities Commission Application No. 15-04-012. Lazar, J. (2016). Teaching the “duck” to fly (2nd ed.). Montpelier, VT: Regulatory Assistance Project. Retrieved from https://www.raponline.org/knowledge-center/teaching-the-duck-to-fly-second-edition/ Maloney, P. (2018, July 3). PG&E to replace 3 gas plants with world’s biggest battery projects. Utility Dive. Retrieved from https://www.utilitydive.com/news/pge-to-replace-3-gas-plants-with-worlds-biggest-battery-projects/526991/ Marcus, W. (1984, September 21). Testimony on behalf of Cogentrix. North Carolina Utilities Commission Docket No. E-100, Sub 41A. Retrieved from https://starw1.ncuc.net/NCUC/ViewFile.aspx?Id=d91cce39-c161-4dfb-b1d456677499106f Marcus, W. (1988, September). Electric utility planning for the 1990s [Presentation for the Ontario Legislature Select Committee on Energy]. Marcus, W. (2010a, February 26). Testimony and exhibits on behalf of the Arkansas attorney general. Arkansas Public Service Commission Docket No. 09-084-U. Retrieved from http://www.apscservices.info/pdf/09/09-084-u_151_1.pdf and http://www.apscservices.info/pdf/09/09-084-u_152_1.pdf Marcus, W. (2010b, October 6). Testimony on behalf of The Utility Reform Network. California Public Utilities Commission Application No. 10-03-014. Marcus, W. (2010c, October 12). Testimony on behalf of the Bureau of Consumer Protection. Public Utility Commission of Nevada Docket No. 10-06-001/-002. Retrieved from http://pucweb1.state.nv.us/PDF/AxImages/DOCKETS_2010_ THRU_PRESENT/2010-6/4649.pdf Marcus, W. (2016). Low carbon grid study: Comparison of 2030 fixed costs of renewables, efficiency, and integration with production cost savings. JBS Energy. National Economic Research Associates. (1977a). A framework for marginal cost-based time-differentiated pricing in the United States. Palo Alto, CA: Electric Power Research Institute. National Economic Research Associates. (1977b). How to quantify marginal costs. Palo Alto, CA: Electric Power Research Institute. Palo Alto, CA: Electric Power Research Institute. New York Independent System Operator. (n.d.). Installed capacity market (ICAP) [Webpage]. Retrieved from https://www.nyiso.com/installed-capacity-market Ondieki, A. (2017, December 21). Georgia PSC votes to continue construction at Plant Vogtle. The Atlanta JournalConstitution. Retrieved from https://www.ajc.com/news/local-govt--politics/georgia-psc-votes-continue-constructionplant-vogtle/Tu0ja76KWtR3YGlhaFLTeM/ Pacific Gas & Electric. (2016, December 2). 2017 generation rate case Phase II updated and amended prepared testimony. California Public Utilities Commission Application No. 16-06-013. Retrieved from https://drpwg.org/wpcontent/uploads/2017/07/PGE-09-v1_GRC-2017-PhII_Test_PGE_20161202_396470.pdf Paice, C. (2013, March 1). Testimony on behalf of PacifiCorp. Public Utility Commission of Oregon Docket No. UE 263. Retrieved from https://edocs.puc.state.or.us/efdocs/UAA/ue263uaa11547.pdf Phillips, N. (2018, March 23). Testimony on behalf of Energy Producers and Users Coalition. California Public Utilities Commission Docket No. 17-06-030. | 227