Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Files3

Search terms highlighted
Eversource rate increase is on 6 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
5 pages match
Words on different pages
  1. Page 228 of 276

    226 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Works Cited in Part IV Bade, G. (2018, June 13). NV Energy 2.3-cent solar contract could set new price record. Utility Dive. Retrieved from https://www.utilitydive.com/news/nv-energy-23-cent-solar-contract-could-set-new-price-record/525610/ Barker, D. (2014, January 31). Testimony on behalf of San Diego Gas & Electric. California Public Utilities Commission Application No. 14-01-027. Retrieved from https://www.sdge.com/sites/default/files/RDW_Barker_SDGE_ Testimony_0.pdf Bohrman, J. (2013, June 3). Testimony on behalf of NV Energy. Public Utilities Commission of Nevada Docket No. 13-06-002. Retrieved from http://pucweb1.state.nv.us/PDF/AxImages/DOCKETS_2010_THRU_ PRESENT/2013-6/26978.pdf Brinkman, G., Jorgenson, J., Ehlen, A., and Caldwell, J. (2016). Low carbon grid study: Analysis of a 50% emission reduction in California (NREL/TP-6A20-64884). Golden, CO: National Renewable Energy Laboratory. Retrieved from https://www.nrel.gov/docs/fy16osti/64884.pdf California Public Utilities Commission. (1983). Decision No. 83-12-068 in Pacific Gas & Electric general rate case, 14 CPUC 2d 15. California Public Utilities Commission. (1986, August 20). Decision No. 86-08-083 in 1986 energy cost adjustment charge case, 21 CPUC 2d 613. California Public Utilities Commission. (1989, December). Decision No. 89-12-057 in Pacific Gas & Electric general rate case. California Public Utilities Commission. (1995, December). Decision No. 95-12-053 in Pacific Gas & Electric biennial gas cost allocation proceeding. California Public Utilities Commission. (2018, November 8). Resolution E-4949 approving Pacific Gas & Electric battery procurements with modifications. Retrieved from http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M240/ K050/240050937.PDF Chaudhury, S. (2015, November 19). Testimony on behalf of Southern California Gas Co. and San Diego Gas & Electric. California Public Utilities Commission Application No. 15-07-014. Retrieved from https://www.socalgas.com/ regulatory/documents/a-15-07-014/TCAP%20Phs%202%20-%20Chaudhury%20Revised%20(clean).pdf Chow, L., and Brant, S. (2018). The 2017 resource adequacy report. California Public Utilities Commission, Energy Division. Retrieved from http://www.cpuc.ca.gov/RA/ Goodman, I., and Marcus, W. (1990, July 23). Joint testimony on behalf of Concerned Citizens of Manitoba, Sierra Club of Western Canada, Manitoba Branch, and Conservation Strategy Association of Manitoba. Manitoba Public Utilities Board proceeding regarding Manitoba Hydro submission in respect to major capital projects. Horii, B., Price, S., Cutter, E., Ming, Z., and Chawla, K. (2016). Avoided costs 2016 interim update. Energy and Environmental Economics Inc. Retrieved from https://www.ethree.com/wp-content/uploads/2017/01/20160801_ E3_-Avoided_Cost-2016-Interim_Update.pdf Jones, G., and Marcus, W. (2015, March 13). Testimony on behalf of The Utility Reform Network. California Public Utilities Commission Application No. 14-06-014.
  2. Page 229 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA Jones, G., and Marcus, W. (2016, July 5). Testimony on behalf of Utility Consumers’ Action Network. California Public Utilities Commission Application No. 15-04-012. Lazar, J. (2016). Teaching the “duck” to fly (2nd ed.). Montpelier, VT: Regulatory Assistance Project. Retrieved from https://www.raponline.org/knowledge-center/teaching-the-duck-to-fly-second-edition/ Maloney, P. (2018, July 3). PG&E to replace 3 gas plants with world’s biggest battery projects. Utility Dive. Retrieved from https://www.utilitydive.com/news/pge-to-replace-3-gas-plants-with-worlds-biggest-battery-projects/526991/ Marcus, W. (1984, September 21). Testimony on behalf of Cogentrix. North Carolina Utilities Commission Docket No. E-100, Sub 41A. Retrieved from https://starw1.ncuc.net/NCUC/ViewFile.aspx?Id=d91cce39-c161-4dfb-b1d456677499106f Marcus, W. (1988, September). Electric utility planning for the 1990s [Presentation for the Ontario Legislature Select Committee on Energy]. Marcus, W. (2010a, February 26). Testimony and exhibits on behalf of the Arkansas attorney general. Arkansas Public Service Commission Docket No. 09-084-U. Retrieved from http://www.apscservices.info/pdf/09/09-084-u_151_1.pdf and http://www.apscservices.info/pdf/09/09-084-u_152_1.pdf Marcus, W. (2010b, October 6). Testimony on behalf of The Utility Reform Network. California Public Utilities Commission Application No. 10-03-014. Marcus, W. (2010c, October 12). Testimony on behalf of the Bureau of Consumer Protection. Public Utility Commission of Nevada Docket No. 10-06-001/-002. Retrieved from http://pucweb1.state.nv.us/PDF/AxImages/DOCKETS_2010_ THRU_PRESENT/2010-6/4649.pdf Marcus, W. (2016). Low carbon grid study: Comparison of 2030 fixed costs of renewables, efficiency, and integration with production cost savings. JBS Energy. National Economic Research Associates. (1977a). A framework for marginal cost-based time-differentiated pricing in the United States. Palo Alto, CA: Electric Power Research Institute. National Economic Research Associates. (1977b). How to quantify marginal costs. Palo Alto, CA: Electric Power Research Institute. Palo Alto, CA: Electric Power Research Institute. New York Independent System Operator. (n.d.). Installed capacity market (ICAP) [Webpage]. Retrieved from https://www.nyiso.com/installed-capacity-market Ondieki, A. (2017, December 21). Georgia PSC votes to continue construction at Plant Vogtle. The Atlanta JournalConstitution. Retrieved from https://www.ajc.com/news/local-govt--politics/georgia-psc-votes-continue-constructionplant-vogtle/Tu0ja76KWtR3YGlhaFLTeM/ Pacific Gas & Electric. (2016, December 2). 2017 generation rate case Phase II updated and amended prepared testimony. California Public Utilities Commission Application No. 16-06-013. Retrieved from https://drpwg.org/wpcontent/uploads/2017/07/PGE-09-v1_GRC-2017-PhII_Test_PGE_20161202_396470.pdf Paice, C. (2013, March 1). Testimony on behalf of PacifiCorp. Public Utility Commission of Oregon Docket No. UE 263. Retrieved from https://edocs.puc.state.or.us/efdocs/UAA/ue263uaa11547.pdf Phillips, N. (2018, March 23). Testimony on behalf of Energy Producers and Users Coalition. California Public Utilities Commission Docket No. 17-06-030. | 227
  3. Page 230 of 276

    228 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® PJM. (n.d.). Capacity market (RPM) [Webpage]. Retrieved from https://www.pjm.com/markets-and-operations/rpm.aspx Pollard, T. (2010, June 1). Testimony on behalf of NV Energy. Public Utility Commission of Nevada Docket No. 10-06-001. Retrieved from http://pucweb1.state.nv.us/PDF/AxImages/DOCKETS_2010_THRU_PRESENT/2010-6/1869.pdf Public Utilities Commission of Nevada. (2002, March 29). Dockets No. 01-10001 and 01-10002, order in Nevada Power Co. general rate case. Retrieved from http://pucweb1.state.nv.us/PDF/AxImages/DOCKETS_2001_THRU_2004/200110/7107.pdf Public Utilities Commission of Nevada. (2007, July 17). Dockets No. 06-11022 and 06-11023, modified final order in Nevada Power Co. general rate case. Retrieved from http://pucweb1.state.nv.us/PDF/AxImages/DOCKETS_2005_THRU_ PRESENT/2006-11/12604.pdf Saxe, W. (2012, March 30). Testimony on behalf of San Diego Gas & Electric. California Public Utilities Commission Application No. 11-10-00. Retrieved from https://www.sdge.com/sites/default/files/Saxe_Revised_Testimony_Ch_3_ FINAL%2520_Second%2520Revised__0.pdf Saxe, W. (2016, February 9). Testimony on behalf of San Diego Gas & Electric. California Public Utilities Commission Application No. 15-04-012. Retrieved from https://www.sdge.com/sites/default/files/Saxe%2520Clean%2520w_ Attachments.pdf Schichtl, J. (2002, October). Revenue allocation testimony on behalf of Southern California Edison. California Public Utilities Commission Application No. 02-05-004. Southern California Edison. (2014, June 20). Phase 2 of 2015 general rate case: Marginal cost and sales forecast proposals. California Public Utilities Commission Application No. 14-06-014. Retrieved from http://www3.sce.com/sscc/law/dis/ dbattach5e.nsf/0/CA145802C8F9719A88257CFD0073857B/$FILE/A.14-06-XXX_2015%20GRC%20Phase%202%20 -%20SCE-02%20Marginal%20Cost%20and%20Sales%20Forecast.pdf Southern California Edison. (2015, October 27). Advice Letter No. 3299-E. Retrieved from https://cpucadviceletters.org/ search/?source=&q=3299-E&submit= Southern California Edison. (2017a, July 7). 2018 general rate case Phase 2 workpapers. California Public Utilities Commission Application No. 17-06-030. Retrieved from http://www3.sce.com/law/cpucproceedings.nsf/ frmMainPage?ReadForm Southern California Edison. (2017b, November 1). Errata to Phase 2 of 2018 general rate case: Marginal cost and sales forecast proposals. California Public Utilities Commission Application No. 17-06-030. Retrieved from http://www3. sce.com/sscc/law/dis/dbattach5e.nsf/0/F40D6AEFD8622526882581CB007FC097/$FILE/A1706030-%20SCE02A-2018%20GRC%20Ph2-Various-Errata%20Marginal%20Cost%20and%20Sales%20Forecast.pdf Strunk, K. (2018, October 15). Marginal cost of distribution service: Prepared for Central Maine Power Company (Exhibit Strunk-2). Maine Public Utility Commission Docket No. 2018-00194. Retrieved from https://mpuc-cms.maine. gov/CQM.Public.WebUI/Common/CaseMaster.aspx?CaseNumber=2018-00194 Walsh, L. (2013, June 3). Testimony on behalf of NV Energy. Public Utilities Commission of Nevada Docket No. 13-06-002. Retrieved from http://pucweb1.state.nv.us/PDF/AxImages/DOCKETS_2010_THRU_PRESENT/2013-6/26978.pdf Xcel Energy. (2018, October 2-4). Leading the energy future [Presentation at the Wolfe Research Conference]. Retrieved from investors.xcelenergy.com/file/4025308/Index?KeyFile=1500113448
  4. Page 231 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA Part V: After the Cost of Service Study | 229
  5. Page 232 of 276

    230 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® 27. Using Study Results to Allocate the Revenue Requirement U ltimately, the purpose of a cost of service study is to inform utility regulators about the relative contribution to costs by the various customer classes as one element in the decision on how to apportion the revenue requirement among classes. In most states, regulators have a great deal of discretion about how they use the results of cost allocation studies. Therefore, the way the results are presented is important because the regulators will want to see important impacts clearly to use their time efficiently. Embedded cost of service studies and marginal cost 27.2 Presenting Embedded Cost of Service Study Results Embedded cost of service studies typically include conclusions regarding the relative margin to the utility from each customer class. Relative margin is a measure of profitability, based on the revenues, expenses and rate base allocated to each class.241 Class profitability is often presented in the following forms: 1. by class and for the total utility): of service studies approach this very differently, and we rate of return = discuss each separately in this chapter. After that, we discuss approaches regulators use to implement, or diverge from, the allocated annual operating income allocated rate base Where allocated annual operating income = results of these studies. 27.1 Role of the Regulator Versus Role of the Analyst Calculated rate of return on rate base (expressed both annual revenues – annual allocated expenses 2. Calculated utility profit margin (expressed both by class and for the total utility): The role of the regulator is different from that of the profit margin = analyst. Regulators typically are appointed or elected into the annual revenues annual allocated expenses –1 position based upon their broad perspectives of what “fair, just and reasonable” means in the context of utility regulation 3. Ratio of class revenue to total class-allocated costs: and pricing. These perspectives are necessarily subjective. revenue ratio = The analyst, on the other hand, may be tempted to work revenues allocated expenses + allocated return on a strictly scientific and mathematical basis. This may not Where allocated return = allocated rate base x allowed adequately serve the needs of the regulator, who may need rate of return the analysis to take note of public policy goals, economic conditions in the service territory and other factors. 4. In the simplest terms, the regulator may need a range shortfall = (allocated return + allocated expenses) – of reasonable options for cost allocation and for rate design, based on a range of reasonable analytical options, not a single recommendation based on a single framework or approach. The analyst must be prepared to develop more than one cost Revenue shortfall: current revenues 5. Percentage increase required for equal rate of return: increase for equal rate of return = shortfall revenues allocation study, based on more than one analytical approach, and let the regulator consider the principles guiding each study. The analyst must be prepared to develop multiple ap- Table 45 on the next page shows an illustrative example of the computation of these measures. proaches to rate design, all sharing the same goals of overall revenue recovery and efficient forward-looking pricing. 241 These computations may use historical revenues and costs or projected revenues and costs.
  6. Page 233 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 231 Table 45. Computing class rate of return in an embedded cost study Medium (20 to 250 kWs) Large (more than 250 kWs) Large primary Other Total Residential Small (up to 20 kWs) Revenues $117,760,688 $28,116,419 $8,342,138 $26,156,458 $38,730,796 $15,134,759 $1,280,117 Allocated expenses $112,438,805 $28,297,246 $8,997,362 $23,807,377 $35,927,265 $14,280,041 $1,129,515 Operating income $5,321,883 -$180,827 -$655,223 $2,349,081 $2,803,532 $854,718 $150,603 Allocated rate base $87,878,094 $24,935,855 $8,339,503 $18,481,728 $26,069,711 $9,399,629 $651,667 Allocated return $5,321,883 $1,510,111 $505,039 $1,119,251 $1,578,778 $569,240 $39,465 Rate of return 6.06% -0.73% -7.86% 12.71% 10.75% 9.09% 23.11% Profit margin 4.52% -0.65% -7.82% 8.94% 7.21% 5.62% 13.33% Revenue-cost ratio 100.00% 94.33% 87.79% 104.93% 103.27% 101.92% 109.51% Revenue shortfall (or surplus) $1,690,938 $1,160,262 ($1,229,831) ($1,224,754) ($285,478) ($111,138) 13.91% -4.70% -3.16% -1.89% -8.68% Percentage increase for equal rate of return 6.01% Note: Independent rounding may affect results of calculations. To the extent that the results of the cost of service study regulator considered reasonable the range of revenue-cost are reliable, the class rates of return indicate which classes are ratio from 93% to 107%, it is possible a regulator might find paying more or less than the average return. In the example that the residential class is producing a reasonable level of in Table 45, the rate of return results show that the utility is revenue but that small general service customers should be earning less than the average return from the residential class paying a somewhat higher share of system costs than 87.79% and the small general service class and more than average and the “other” class (which might be mostly street lighting) from the other classes. These class rate of return results do should be paying somewhat less than 109.51%. not provide much information about the size of the reve- The cost allocation process usually assumes that all class- nue shift that would produce equal rates of return (or any es and all assets impose the same cost of capital. The results class-specific differential return requirement), or whether a in Table 45 reflect that assumption, effectively stating that negative rate of return represents a very serious situation. an equal return is the goal. In some cases, the regulator may The profit margin, while commonly used in many indus- determine that different customer classes impose different tries, ignores the return on capital. The revenue-cost ratio financing costs in percentage terms — for example, to reflect provides a more intuitive metric. The most useful results may the higher undiversifiable risks of serving industrial loads be the revenue shortfall and the increase required to produce through the economic cycle. In addition, some assets are class return equal to the system average return. riskier than others; generation is generally riskier than T&D, These metrics show a very different picture of interclass while nuclear and coal generation are often regarded as being equity. The residential class may be providing a negative riskier than other generation. In this situation, the cost of rate of return, -0.73% in Table 45, but its revenues are equal service study could be modified to reflect the differential risks to 94.33% of the system revenue requirement. Because of (different required rates of return can be applied to different uncertainties in sampled load data, variation in load patterns classes of customers or different categories of utility plant). among years and the difficulty of defining the causation of Or the cost of service study results could be presented in a many costs, regulators define a “range of reasonableness” of manner that allows the user to compare the achieved return one or more of the profitability metrics. For example, if the to the class target return.
  7. Page 234 of 276

    232 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® To summarize, presenting embedded cost of service study results in multiple ways is often helpful to regulators. The Table 46. Illustrative marginal cost results by element Cost Units per unit revenue-cost ratio is probably the easiest way for regulators to understand and use the results of cost of service studies in Customer connection Dollars per year $80 costs. It is important to note that the result of this allocation Secondary distribution Dollars per kW $40 process is to determine a level of revenue that the regulator Primary distribution Dollars per kW $80 deems cost-related. The regulator will often apply other Transmission Dollars per kW $50 non-cost criteria to establish the level of revenue that each Generation capacity Dollars per kW $100 On-peak Dollars per kWh $0.10 Midpeak Dollars per kWh $0.07 Off-peak Dollars per kWh $0.05 determining the fair, just and reasonable apportionment of customer class will pay. Energy by time period 27.3 Presenting Marginal Cost of Service Study Results Marginal cost of service studies reach a very different set of conclusions than embedded cost of service studies. While customer usage to generate a marginal cost revenue require- an embedded cost of service study divides up the allowed ment for each class. Table 46 shows an illustrative marginal revenue requirement among classes, a marginal cost of unit cost result. service study measures (over a short-, intermediate- or Table 47 shows load research data for an illustrative long-run time frame) the costs that would change as utility system with three classes with identical kWh customer count and usage change. consumption but different per-customer usage and very A marginal cost of service study produces a cost for different load shapes. The residential class and secondary each increment of service: the cost of connecting additional commercial class both take power at secondary voltages, but customers, peak capacity at different levels of the system the secondary commercial class has a more peak-oriented and energy costs by time period. These can be multiplied by usage and 10 times the average consumption per customer. Table 47. Illustrative load research data for marginal cost of service study Units Customer connection Secondary distribution Primary distribution Transmission Generation capacity Energy by time period On-peak Residential # of customers 100,000 kWs 300,000 kWs 303,000 kWs 305,000 kWs 307,000 kWhs 245,600,000 Secondary commercial 10,000 Primary industrial 1,000 320,000 N/A 325,000 250,000 325,000 255,000 330,000 258,000 396,000,000 206,400,000 Midpeak kWhs 614,000,000 825,000,000 825,000,000 Off-peak kWhs 614,000,000 252,600,000 442,200,000 1,473,600,000 1,473,600,000 51% 65% All periods Class load factor kWhs 1,473,600,000 55%
  8. Page 235 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 233 Table 48. Illustrative marginal cost revenue requirement Residential Customer connection Secondary distribution Primary distribution Transmission Generation capacity Energy by time period On-peak Total Primary industrial $8,000,000 $800,000 $80,000 $12,000,000 $12,800,000 N/A $24,240,000 $26,000,000 $20,000,000 $15,250,000 $16,250,000 $12,750,000 $30,700,000 $33,000,000 $25,800,000 $24,560,000 $39,600,000 $20,640,000 Midpeak Off-peak Secondary commercial $42,980,000 $8,880,000 $24,800,000 $70,240,000 $44,250,000 $89,500,000 $84,800,000 $57,750,000 $158,480,000 $30,700,000 $12,630,000 $22,110,000 $188,430,000 $198,830,000 $159,130,000 $65,440,000 Average marginal cost per kWh $57,750,000 Total $0.128 $0.135 $546,390,000 $0.108 $0.124 The primary industrial class has a less peak-oriented usage the class marginal cost responsibility, as determined by a and 100 times the average consumption per customer of the marginal cost of service study, to the utility embedded cost residential class. revenue requirement determined in the rate proceeding. Table 48 combines the marginal costs by element with The first method is equal percentage of marginal cost, which the load research data to compute a marginal cost revenue itself has two variants. The second is the inverse elasticity requirement for each class, as well as the combined total. rule derived from Ramsey pricing. The approaches are very As shown in Table 48, the illustrative MCRR for all classes different. combined is $546,390,000. It would be pure happenstance In the EPMC approach, the embedded cost revenue if this equaled the embedded cost revenue requirement requirement is compared with the total of the class marginal determined in the rate case. More likely, the revenue cost revenue requirements, also known as the system MCRR. requirement will be significantly more or less. The next step For example, we offer two possible situations in tables 49 in a marginal cost of service study is reconciliation between and 50 — one where the marginal cost is less than the the MCRR results and the establishment of class-by-class revenue requirement, the other where it is more — and show responsibility for the embedded cost revenue requirement. the result of adjusting the revenue for each class by a uniform There are two commonly used methods to reconcile percentage. The class marginal cost revenue requirements Table 49. EPMC adjustment where revenue requirement less than marginal cost Residential Secondary commercial Primary industrial Total Marginal cost revenue requirement $188,430,000 $198,830,000 $159,130,000 $546,390,000 Embedded cost revenue requirement $500,000,000 Ratio of embedded cost to marginal cost Reconciled revenue requirement $172,431,779 $181,948,791 $145,619,429 92% $500,000,000
  9. Page 236 of 276

    234 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Table 50. EPMC adjustment where revenue requirement more than marginal cost Residential Secondary commercial Primary industrial Total Marginal cost revenue requirement $188,430,000 $198,830,000 $159,130,000 $546,390,000 Embedded cost revenue requirement $600,000,000 Ratio of embedded cost to marginal cost Reconciled revenue requirement $206,918,135 $218,338,549 $174,743,315 110% $600,000,000 are adjusted by the ratio of the embedded cost revenue jurisdictions where power supply is a competitive non-utility requirement to the system MCRR, resulting in the amount service. Assume for purposes of the illustration in Table 50 of the embedded cost revenue requirement that each class is that the total embedded cost revenue requirement of responsible for. In Table 49, the cost responsibility for each $600 million comprises $400 million of generation costs, class is reduced 8% below the marginal cost of service. $60 million of transmission costs and $140 million of It is important to note that the result of this allocation distribution costs. Table 51 shows how to reconcile costs for process is to determine a level of revenue that the regulator each function separately, which are then used to calculate deems cost-reflective. The regulator often will apply other the overall responsibility of each class for the embedded cost non-cost criteria to establish the level of revenue that each revenue requirement. customer class will pay. The illustrative functionalized EPMC results in Table 51 The EPMC is often functionalized, particularly in are close to the total EPMC results but slightly higher for Table 51. Illustrative functionalized equal percentage of marginal cost results Residential Secondary commercial Primary industrial Total Distribution Customer connection $8,000,000 $800,000 $80,000 $8,880,000 Secondary distribution $12,000,000 $12,800,000 N/A $24,800,000 Primary distribution $24,240,000 $26,000,000 $20,000,000 $70,240,000 Marginal cost revenue requirement $44,240,000 $39,600,000 $20,080,000 $103,920,000 $140,000,000 Embedded cost revenue requirement Reconciled distribution revenue requirement Transmission Marginal cost revenue requirement Embedded cost revenue requirement Reconciled transmission revenue requirement Generation Capacity $59,599,692 $53,348,730 $27,051,578 $15,250,000 $12,750,000 $44,250,000 $60,000,000 $20,677,966 $16,250,000 $22,033,898 $17,288,136 $30,700,000 $33,000,000 $25,800,000 Total energy $98,240,000 $109,980,000 $100,500,000 $308,720,000 Marginal cost revenue requirement $128,940,000 $142,980,000 $126,300,000 $398,220,000 $400,000,000 Embedded cost revenue requirement Reconciled generation revenue requirement Total reconciled revenue requirement $129,516,348 $143,619,105 $126,864,547 $209,794,006 $219,001,733 $171,204,261 $89,500,000 $600,000,000
  10. Page 237 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 235 Table 52. Total EPMC results with lower marginal generation costs Residential Secondary commercial Primary industrial $133,170,000 $137,240,000 $103,720,000 $374,130,000 Embedded cost revenue requirement $600,000,000 Ratio of embedded cost to marginal cost Reconciled revenue requirement $213,567,476.55 Marginal cost revenue requirement $220,094,619.52 Total $166,337,903.94 160% $600,000,000 residential and slightly lower for primary industrial the residential class actually has a lower share of the customers. embedded cost revenue requirement under functionalization with lower marginal generation costs. Table 54 on the next However, if the marginal generation costs are considerably lower, functionalization can have a different page compares the results for the residential class from impact. Assume that marginal energy costs are half of the tables 50, 51, 52 and 53. estimates in Table 48 and marginal generation capacity costs Comparing the two functionalization scenarios, the are 80% of those in Table 48 (e.g., because of low gas prices, a residential share of embedded costs ends up very slightly shorter time horizon for cost estimation and excess capacity). higher in the lower marginal generation scenario, but the These results are shown in tables 52 and 53. difference is less than 1%. As shown in Table 53, functionalization blunts the impact The second general approach used for marginal cost of lower marginal generation costs. Compared with Table 52, of service study application is the inverse elasticity rule. Table 53. Functionalized EPMC example with lower marginal generation costs Residential Secondary commercial $8,000,000 $800,000 Primary industrial Total Distribution Customer connection $80,000 $8,880,000 Secondary distribution $12,000,000 $12,800,000 N/A $24,800,000 Primary distribution $24,240,000 $26,000,000 $20,000,000 $70,240,000 $44,240,000 $39,600,000 $20,080,000 $103,920,000 $140,000,000 Marginal cost revenue requirement Embedded cost revenue requirement Reconciled distribution revenue requirement $59,599,692 $53,348,730 $27,051,578 $15,250,000 $16,250,000 $12,750,000 $44,250,000 $60,000,000 Transmission Marginal cost revenue requirement Embedded cost revenue requirement Reconciled transmission revenue requirement $20,677,966 $22,033,898 $17,288,136 Generation Capacity $24,560,000 $26,400,000 $20,640,000 $71,600,000 Total energy $49,120,000 $54,990,000 $50,250,000 $154,360,000 $73,680,000 $81,390,000 $70,890,000 $225,960,000 $400,000,000 Marginal cost revenue requirement Embedded cost revenue requirement Reconciled generation revenue requirement Total reconciled revenue requirement $130,430,165 $144,078,598 $125,491,237 $400,000,000 $210,707,823 $219,461,226 $169,830,951 $600,000,000
1 page match

As listed on the current system

Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Melissa Whited [26-05-10]

This filing on the current system (opens in a new tab)