Prefiled testimony
Witness: Melissa Whited
Files3
Synapse - Eversource COS and Rate Design Testimony Final.pdf
PDF · 829 KB · 48 pagesText searchable
Download Synapse - Eversource COS and Rate Design Testimony Final.pdfRead the text of Synapse - Eversource COS and Rate Design Testimony Final.pdf
MW-2- Synapse Attachment.pdf
PDF · 4.6 MB · 276 pagesText searchable
Download MW-2- Synapse Attachment.pdfRead the text of MW-2- Synapse Attachment.pdf
MW-1 - Synapse Attachment.pdf
PDF · 734 KB · 13 pagesText searchable
Download MW-1 - Synapse Attachment.pdfRead the text of MW-1 - Synapse Attachment.pdf
Page 234 of 276
232 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® To summarize, presenting embedded cost of service study results in multiple ways is often helpful to regulators. The Table 46. Illustrative marginal cost results by element Cost Units per unit revenue-cost ratio is probably the easiest way for regulators to understand and use the results of cost of service studies in Customer connection Dollars per year $80 costs. It is important to note that the result of this allocation Secondary distribution Dollars per kW $40 process is to determine a level of revenue that the regulator Primary distribution Dollars per kW $80 deems cost-related. The regulator will often apply other Transmission Dollars per kW $50 non-cost criteria to establish the level of revenue that each Generation capacity Dollars per kW $100 On-peak Dollars per kWh $0.10 Midpeak Dollars per kWh $0.07 Off-peak Dollars per kWh $0.05 determining the fair, just and reasonable apportionment of customer class will pay. Energy by time period 27.3 Presenting Marginal Cost of Service Study Results Marginal cost of service studies reach a very different set of conclusions than embedded cost of service studies. While customer usage to generate a marginal cost revenue require- an embedded cost of service study divides up the allowed ment for each class. Table 46 shows an illustrative marginal revenue requirement among classes, a marginal cost of unit cost result. service study measures (over a short-, intermediate- or Table 47 shows load research data for an illustrative long-run time frame) the costs that would change as utility system with three classes with identical kWh customer count and usage change. consumption but different per-customer usage and very A marginal cost of service study produces a cost for different load shapes. The residential class and secondary each increment of service: the cost of connecting additional commercial class both take power at secondary voltages, but customers, peak capacity at different levels of the system the secondary commercial class has a more peak-oriented and energy costs by time period. These can be multiplied by usage and 10 times the average consumption per customer. Table 47. Illustrative load research data for marginal cost of service study Units Customer connection Secondary distribution Primary distribution Transmission Generation capacity Energy by time period On-peak Residential # of customers 100,000 kWs 300,000 kWs 303,000 kWs 305,000 kWs 307,000 kWhs 245,600,000 Secondary commercial 10,000 Primary industrial 1,000 320,000 N/A 325,000 250,000 325,000 255,000 330,000 258,000 396,000,000 206,400,000 Midpeak kWhs 614,000,000 825,000,000 825,000,000 Off-peak kWhs 614,000,000 252,600,000 442,200,000 1,473,600,000 1,473,600,000 51% 65% All periods Class load factor kWhs 1,473,600,000 55%Page 235 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 233 Table 48. Illustrative marginal cost revenue requirement Residential Customer connection Secondary distribution Primary distribution Transmission Generation capacity Energy by time period On-peak Total Primary industrial $8,000,000 $800,000 $80,000 $12,000,000 $12,800,000 N/A $24,240,000 $26,000,000 $20,000,000 $15,250,000 $16,250,000 $12,750,000 $30,700,000 $33,000,000 $25,800,000 $24,560,000 $39,600,000 $20,640,000 Midpeak Off-peak Secondary commercial $42,980,000 $8,880,000 $24,800,000 $70,240,000 $44,250,000 $89,500,000 $84,800,000 $57,750,000 $158,480,000 $30,700,000 $12,630,000 $22,110,000 $188,430,000 $198,830,000 $159,130,000 $65,440,000 Average marginal cost per kWh $57,750,000 Total $0.128 $0.135 $546,390,000 $0.108 $0.124 The primary industrial class has a less peak-oriented usage the class marginal cost responsibility, as determined by a and 100 times the average consumption per customer of the marginal cost of service study, to the utility embedded cost residential class. revenue requirement determined in the rate proceeding. Table 48 combines the marginal costs by element with The first method is equal percentage of marginal cost, which the load research data to compute a marginal cost revenue itself has two variants. The second is the inverse elasticity requirement for each class, as well as the combined total. rule derived from Ramsey pricing. The approaches are very As shown in Table 48, the illustrative MCRR for all classes different. combined is $546,390,000. It would be pure happenstance In the EPMC approach, the embedded cost revenue if this equaled the embedded cost revenue requirement requirement is compared with the total of the class marginal determined in the rate case. More likely, the revenue cost revenue requirements, also known as the system MCRR. requirement will be significantly more or less. The next step For example, we offer two possible situations in tables 49 in a marginal cost of service study is reconciliation between and 50 — one where the marginal cost is less than the the MCRR results and the establishment of class-by-class revenue requirement, the other where it is more — and show responsibility for the embedded cost revenue requirement. the result of adjusting the revenue for each class by a uniform There are two commonly used methods to reconcile percentage. The class marginal cost revenue requirements Table 49. EPMC adjustment where revenue requirement less than marginal cost Residential Secondary commercial Primary industrial Total Marginal cost revenue requirement $188,430,000 $198,830,000 $159,130,000 $546,390,000 Embedded cost revenue requirement $500,000,000 Ratio of embedded cost to marginal cost Reconciled revenue requirement $172,431,779 $181,948,791 $145,619,429 92% $500,000,000Page 236 of 276
234 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Table 50. EPMC adjustment where revenue requirement more than marginal cost Residential Secondary commercial Primary industrial Total Marginal cost revenue requirement $188,430,000 $198,830,000 $159,130,000 $546,390,000 Embedded cost revenue requirement $600,000,000 Ratio of embedded cost to marginal cost Reconciled revenue requirement $206,918,135 $218,338,549 $174,743,315 110% $600,000,000 are adjusted by the ratio of the embedded cost revenue jurisdictions where power supply is a competitive non-utility requirement to the system MCRR, resulting in the amount service. Assume for purposes of the illustration in Table 50 of the embedded cost revenue requirement that each class is that the total embedded cost revenue requirement of responsible for. In Table 49, the cost responsibility for each $600 million comprises $400 million of generation costs, class is reduced 8% below the marginal cost of service. $60 million of transmission costs and $140 million of It is important to note that the result of this allocation distribution costs. Table 51 shows how to reconcile costs for process is to determine a level of revenue that the regulator each function separately, which are then used to calculate deems cost-reflective. The regulator often will apply other the overall responsibility of each class for the embedded cost non-cost criteria to establish the level of revenue that each revenue requirement. customer class will pay. The illustrative functionalized EPMC results in Table 51 The EPMC is often functionalized, particularly in are close to the total EPMC results but slightly higher for Table 51. Illustrative functionalized equal percentage of marginal cost results Residential Secondary commercial Primary industrial Total Distribution Customer connection $8,000,000 $800,000 $80,000 $8,880,000 Secondary distribution $12,000,000 $12,800,000 N/A $24,800,000 Primary distribution $24,240,000 $26,000,000 $20,000,000 $70,240,000 Marginal cost revenue requirement $44,240,000 $39,600,000 $20,080,000 $103,920,000 $140,000,000 Embedded cost revenue requirement Reconciled distribution revenue requirement Transmission Marginal cost revenue requirement Embedded cost revenue requirement Reconciled transmission revenue requirement Generation Capacity $59,599,692 $53,348,730 $27,051,578 $15,250,000 $12,750,000 $44,250,000 $60,000,000 $20,677,966 $16,250,000 $22,033,898 $17,288,136 $30,700,000 $33,000,000 $25,800,000 Total energy $98,240,000 $109,980,000 $100,500,000 $308,720,000 Marginal cost revenue requirement $128,940,000 $142,980,000 $126,300,000 $398,220,000 $400,000,000 Embedded cost revenue requirement Reconciled generation revenue requirement Total reconciled revenue requirement $129,516,348 $143,619,105 $126,864,547 $209,794,006 $219,001,733 $171,204,261 $89,500,000 $600,000,000Page 237 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 235 Table 52. Total EPMC results with lower marginal generation costs Residential Secondary commercial Primary industrial $133,170,000 $137,240,000 $103,720,000 $374,130,000 Embedded cost revenue requirement $600,000,000 Ratio of embedded cost to marginal cost Reconciled revenue requirement $213,567,476.55 Marginal cost revenue requirement $220,094,619.52 Total $166,337,903.94 160% $600,000,000 residential and slightly lower for primary industrial the residential class actually has a lower share of the customers. embedded cost revenue requirement under functionalization with lower marginal generation costs. Table 54 on the next However, if the marginal generation costs are considerably lower, functionalization can have a different page compares the results for the residential class from impact. Assume that marginal energy costs are half of the tables 50, 51, 52 and 53. estimates in Table 48 and marginal generation capacity costs Comparing the two functionalization scenarios, the are 80% of those in Table 48 (e.g., because of low gas prices, a residential share of embedded costs ends up very slightly shorter time horizon for cost estimation and excess capacity). higher in the lower marginal generation scenario, but the These results are shown in tables 52 and 53. difference is less than 1%. As shown in Table 53, functionalization blunts the impact The second general approach used for marginal cost of lower marginal generation costs. Compared with Table 52, of service study application is the inverse elasticity rule. Table 53. Functionalized EPMC example with lower marginal generation costs Residential Secondary commercial $8,000,000 $800,000 Primary industrial Total Distribution Customer connection $80,000 $8,880,000 Secondary distribution $12,000,000 $12,800,000 N/A $24,800,000 Primary distribution $24,240,000 $26,000,000 $20,000,000 $70,240,000 $44,240,000 $39,600,000 $20,080,000 $103,920,000 $140,000,000 Marginal cost revenue requirement Embedded cost revenue requirement Reconciled distribution revenue requirement $59,599,692 $53,348,730 $27,051,578 $15,250,000 $16,250,000 $12,750,000 $44,250,000 $60,000,000 Transmission Marginal cost revenue requirement Embedded cost revenue requirement Reconciled transmission revenue requirement $20,677,966 $22,033,898 $17,288,136 Generation Capacity $24,560,000 $26,400,000 $20,640,000 $71,600,000 Total energy $49,120,000 $54,990,000 $50,250,000 $154,360,000 $73,680,000 $81,390,000 $70,890,000 $225,960,000 $400,000,000 Marginal cost revenue requirement Embedded cost revenue requirement Reconciled generation revenue requirement Total reconciled revenue requirement $130,430,165 $144,078,598 $125,491,237 $400,000,000 $210,707,823 $219,461,226 $169,830,951 $600,000,000Page 238 of 276
236 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Table 54. Residential embedded cost responsibility across four scenarios High generation marginal costs Low generation marginal costs Total EPMC results $206,918,135 $213,567,477 Functionalized EPMC results $209,794,006 $210,707,823 businesses subscribe to electric service, although customer charges likely influence decisions whether to master-meter multifamily buildings, accessory dwelling units and offices. Economists generally agree that price more significantly influences actual customer usage of kWs and kWhs. This may become significantly different where customers have more feasible choices to disconnect from the grid or As discussed in Chapter 24, it is based on Ramsey pricing, obtain some services from on-site generation and storage. an economic theory that efficiency is enhanced when the For example, pedestrian crossing signals often are now elements of the rate that are “elastic” with respect to price are being installed with solar panels and batteries, without any set equal to some measure of marginal cost, and that adjust- connection to the grid. This phenomenon potentially could ments to reconcile the revenue requirement should be extend to larger users, depending on the levels of monthly applied to the least elastic component or components in customer charges, usage-related charges, and solar and order to maximize economic efficiency. This approach was storage costs. popular during the era when marginal costs were significantly Table 55 shows a marginal cost reconciliation of the higher than average costs reflected in the revenue require- same costs in Table 49 but by first reducing the customer ment.242 For that reason, we show the application of the and secondary costs by class and then applying an EPMC inverse elasticity rule only for a situation where the revenue adjustment to the residual class marginal costs until the requirement is lower than system marginal costs. revenue requirement is reached. The least elastic element of utility service is often deemed In this illustrative example, the residential class benefits to be the connection to the grid: the customer-related substantially and the secondary commercial class benefits component of costs such as billing and collection, and the somewhat compared with the straightforward application secondary service lines to individual structures. Evidence of the EPMC method in Table 49. As a result, the primary suggests this to be true historically. Whether utilities assess a industrial class ends up paying a larger share of the overall monthly customer charge of $5 or $35, nearly all residences and embedded cost revenue requirement. Table 55. Use of inverse elasticity rule Residential Secondary commercial Primary industrial Total $188,430,000 $198,830,000 $159,130,000 $546,390,000 Customer connection costs $8,000,000 $800,000 $80,000 Secondary distribution costs $12,000,000 $12,800,000 N/A Adjusted marginal cost revenue requirement $168,430,000 $185,230,000 $159,050,000 $512,710,000 $500,000,000 Marginal cost revenue requirement Embedded cost revenue requirement Ratio of embedded cost to adjusted marginal cost Reconciled revenue requirement $164,254,647 242 Until the early 1980s, for example, Oregon excluded customer and joint costs from the marginal cost reconciliation process on the theory that these were highly inelastic components of customer demand — to simply $180,638,178 $155,107,176 98% $500,000,000 be connected to the system. When overall rates rose and later costs declined, Oregon moved to an EPMC approach (Jenks, 1994, p. 12).Page 239 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® 27.4 Gradualism and Non-Cost Considerations ELECTRIC COST ALLOCATION FOR A NEW ERA requirement based on both cost and non-cost considerations. Revenue as percentage of revenue requirement by class Source of study Small general Residential service Large Extra large general general service service Regulators frequently depart from the strict application of Utility 91% 113% 110% 108% cost of service study results. Often, regulators reject the Industrial advocate 91% 112% 110% 110% studies that are presented due to inclusion of one or more Consumer advocate 93% 115% 105% 104% allocation factors they find unacceptable. A common example Low-income advocate 97% 113% 103% 99% is the use of the minimum system method to measure a customer-related share of electric or gas distribution system 237 Table 56. Consideration of multiple cost of service studies This section discusses the methods regulators use to reach a decision on the fair apportionment of the revenue | Source: Washington Utilities and Transportation Commission. (1984). Cause U-84-65, third supplemental order in rate case for Pacific Power costs; many regulators have found this methodology as unacceptable today as Bonbright did in 1961. In many cases Based on multiple studies using widely different meth- where multiple studies are presented, the regulator may odologies for the classification and allocation of generation, choose a result that reflects the “range of reasonableness” transmission and distribution costs, the commission was able these studies suggest. In many cases where regulators do to determine a fair allocation of the revenue requirement accept the results of a specific cost of service study, they responsibility, taking into account specific elements within may choose to move only gradually in the direction of the each study where it ruled for or against those elements. The accepted study results. end result of multiple studies produced a range of reason- It is quite common for regulators to consider the results ableness in the allocation of costs. The commission adjusted of multiple cost of service studies in determining an equitable revenues gradually toward the common result of the studies: allocation of costs among customer classes. This can occur in that residential customers were paying slightly less than various ways: their share of costs and that small and large general service • customers were paying slightly more than their share. • Considering multiple embedded cost of service studies or marginal cost of service studies using different classifi- Gradualism is the movement only partway toward the cation or allocation methods, to determine a range of results of cost of service studies in apportioning the revenue reasonableness. requirement based on an accepted cost study. If a cost of Considering both embedded cost of service studies as an service study indicates that a class is paying much less than its indicator of current costs and marginal cost of service fair share of the revenue requirement, immediately moving it studies as an indicator of cost trajectories in setting a to pay its full share of allocated costs may result in excessive reasonable cost allocation. financial pain and dislocation for the affected customers. For example, in one docket, the Washington Utilities and Regulators sometimes impose generic limits on rate changes Transportation Commission compared results of four cost of (such as limiting the increase for any class to 150% of the service studies before making a decision on cost allocation, system average increase) and often impose ad hoc limits, with the results shown in Table 56 (1984, p. 46).243 based on the facts of the case.244 243 Similarly, the Wisconsin Public Service Commission has routinely reviewed multiple cost of service studies and selected a revenue allocation without specifically relying on any one study. See Wisconsin Public Service Commission (2016, pp. 31-32): “As a result, the Commission finds that it is reasonable to continue its long-standing practice of relying on multiple models, as well as other factors, such as customer bill impacts, when determining the final allocation of the revenue requirement.” 244 Where this sort of guideline takes the form of “no class will be assigned more than twice the rate increase applied to any other class,” it is known as 2:1 gradualism.Page 240 of 276
238 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® There are several reasons a regulator will move gradually, fairness as a core principle of rate design, but they including: represent an overwhelmingly subjective metric. Many • To avoid rate shock on any individual customer class. regulators, for example, have declined to reduce rates Rate shock is often defined as a rate increase of more for any customer class in the context of an overall than 5% or 10% at any one rate adjustment. There is no increase but may apply a lower increase to some classes firm standard, but many regulators hesitate to impose a than others. This is a matter of judgment, so this rate adjustment that upsets the budgets of households manual cannot provide any policy guidance on the right or businesses. If an accepted cost of service study approach. (or group of studies) suggests that one class should Each of these factors may represent a reasonable basis for • receive a 15% rate increase while others require no deviating from precise recovery from each customer class of increase, a regulator may reasonably determine to spread its full allocated cost. Legislatures generally grant regulators a the rate increase across all classes in a way that avoids great deal of flexibility in determining rates that are fair, just rate shock within any one. and reasonable and expect them to consider such factors in To recognize that the cost of service study is a snapshot their decisions. and that costs and cost responsibility may shift over time. • • In addition to the principles of gradualism discussed in The allocation of cost may vary significantly from one this section, many regulators consider non-cost factors in year to another because of factors such as fluctuating determining a fair apportionment of costs, including: weather (which may change the peakiness of load, shift • Retention of load that cannot (or will not) pay for its fully highest loads from summer to winter or dramatically allocated cost but can pay more than its incremental cost change irrigation pumping loads). Under these circum- and thus can reduce the revenue requirement borne by stances, shifting revenue requirements back and forth other classes. Examples include electric space heat cus- among classes in each rate proceeding will not improve tomers in summer-peaking utilities, irrigation customers equity. Unnecessary volatility in prices may confuse in winter-peaking utilities and industrial customers facing customers, complicate budgeting and create unnecessary global competition. Utilities frequently develop load political and public-relations problems. retention tariffs to keep those customers on the system, To avoid overcorrecting a temporary imbalance in contributing to paying off embedded costs. Charging full revenue responsibility, in recognition that technology embedded cost to those tariff classes could result in higher, is evolving and the cost structure will be different in the not lower, bills for other customers if the price-sensitive future. Cost of service studies measure costs based only customers depart the system. on either test-year results of operations (embedded cost The objective in those cases is to maximize the benefits of service studies) or an estimate of future costs (marginal to the customers paying full cost, without any partic- cost of service studies) at the time they are produced. ular concern about the interest of the class paying the Costs change dramatically over time as fuel costs change, reduced rate. If faced with the potential loss of a major new technologies become available and older assets shift industry, a regulator may opt to offer a rate significantly to new roles. For example, the study may reflect the costs below the cost basis that would otherwise apply. Some, of legacy steam-electric generation scheduled for retire- for example, have relied on an embedded cost of service ment in the next few years, to be replaced by demand study to determine the general allocation of costs among response measures and distributed storage, which will classes but relied on a short-run marginal cost of service also have T&D benefits. study to determine a “load retention” or “economic devel- To avoid perceptions of inequity and unfairness. opment” rate to retain or attract a major customer. This Bonbright (1961) identified perceptions of equity and is often done in recognition that failure to do so wouldPage 241 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® result in the loss of sales, not to mention broader harms • ELECTRIC COST ALLOCATION FOR A NEW ERA • | 239 Protection of vulnerable customers, for their own sake. (e.g., increased unemployment) to the jurisdiction. The Utilities, regulators and even legislatures seek to reduce loss of sales could trigger a difficult regulatory decision the burden on groups of customers that are financially on whether to apportion the surplus capacity that results stressed. Most frequently, the target group is low-income among the remaining customers or to impose a regulato- residential customers, but the same approach is applied ry disallowance on the utility, forcing utility investors to in some places for agricultural customers, important absorb the stranded asset costs. employers facing competition from outside the service Serving loads that would otherwise impose higher territory and the like. environmental costs of alternative fuels. Examples It is beyond the scope of this manual to attempt to include shore-service rates to discourage ships from identify the entire variety of non-cost factors a regulator running their high-emitting onboard generation while may consider. The process of cost allocation does not occur in port, special rates to displace on-site diesel generation in a vacuum but rather in the context of broader social and and special rates for irrigators that would otherwise use political currents. diesel-powered pumps.Page 242 of 276
240 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® 28. Relationship Between Cost Allocation and Rate Design A s indicated at the outset, cost allocation is the second of three steps in the ratemaking process, beginning with the determination of the revenue requirement and ending with the design of rates. This manual has At its heart, cost allocation is about equity among customer classes. Rate design has a different set of goals. been careful to explain that these are separate phases of a proceeding and may have separate principles that apply, services and how much power they consume. • Principle 3: Customers that supply power to the grid and the results may not always flow neatly from one phase to should be fairly compensated for the full value of the the next. power they supply. At its heart, cost allocation is about equity among cus- These principles provide guidance on how to modernize tomer classes — providing an analytical basis for assigning the rate design, in conjunction with the traditional consider- revenue requirement to the various classes of customers on a ations of customer bill impacts and understandability. system. This may be done strictly on the basis of an analytical cost of service study or, more often, using quantitative cost of service studies as a starting point, with broader considerations including gradualism, economic impacts on the service territory and attention to changes anticipated in future costs. Rate design has a different set of goals. Rates must be sufficient to provide the utility with an opportunity to recover the authorized revenue requirement, but rate design is also about equity among customers within a class and about understandable incentives for customers to make efficient decisions about their consumption that will affect future long-term costs. It is common for a regulator to use a backward-looking embedded cost allocation method and a forward-looking rate design approach that considers where cost trajectories will go. Rate design can also incorporate public policy objectives, including environmental and public health requirements. In Smart Rate Design for a Smart Future (Lazar and Gonzalez, 2015), RAP articulated three principles for modern rate design: • Principle 1: A customer should be able to connect to the grid for no more than the cost of connecting to the grid. • Principle 2: Customers should pay for grid services and power supply in proportion to how much they use these 28.1 Class Impacts Versus Individual Customer Impacts The data used to examine changes in overall costs and bills for rate design are often much more granular, among types of customers, than data used for cost allocation. Most cost allocation studies group customers into a relatively small number of classes for analysis. This is done for analytical simplicity, to provide the regulator a general guide to cost responsibility among the classes. Some do this grouping by voltage level, some by type of customer (e.g., residential vs. commercial vs. irrigation), but nearly all utilities have more individual tariffs than classes examined in the cost of service study. For example, “residential” may be a single class in the cost of service study, but separate tariffs may apply to single-family, multifamily, electric heating, electric water heating and electric vehicle loads. A utility may have a default rate design (e.g., inclining block) and one or more optional rate designs (e.g., TOU or seasonal customers). “Secondary general service” may be a single class in the cost of service study including all secondary voltage business customers that are nonresidential but will include urban commercial retail and office customers, as well as rural agricultural customers.Page 243 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 241 It is common to have separate rate tariffs that focus on the In order to obtain forward-looking embedded costs usage by specific groups of customers to enable them to which are required by the generic order, it is necessary control their bills by focusing their attention on elements of to use historical cost for allocation to production plant their consumption they can easily manage. A cost of service and other categories, followed by a classification method study provides broad guidance on how costs should be appor- which recognizes the current cost relationships between tioned among customer classes. The result may be a uniform baseload and peak facilities (1982, p. 37). percentage allocation of a rate increase (or decrease) or one that is differentially apportioned among the customer classes. This mix of embedded cost principles for cost allocation The class definitions for cost allocation typically look at and marginal cost principles for rate design reflects a sense of large groups of customers with similar service characteristics. balance between the notions of equity of overall cost alloca- Rate design often looks at smaller groups of customers with tion between classes and efficiency of rates applied within similar usage characteristics or even individual customers. classes. Even in states where the embedded cost of service For example, a shift of rate design from an inclining block study does not contain any time differentiation of generation, rate to a time-varying rate may result in sharp increases in the transmission or distribution costs, regulators have adopted bills for some customers with low usage. time-varying retail rates for many classes of customers to The municipal utility for Fort Collins, Colorado, encountered this situation in its 2018 rate review and included a “tier encourage behavior expected to reflect forward-looking and avoidable costs. charge” for all usage over 700 kWhs in part to avoid this kind Although marginal cost of service studies typically of impact. The cost of service study did not contain sufficient do differentiate between time periods, even these studies detail to provide an analytical framework for this decision, provide limited guidance for rate design, simply because the but the rate design analysis showed that apartment residents factors that affect utility system design and construction may and other small users would be adversely affected without not be understandable to consumers. The core principles this consideration of customer impacts. Similarly, when the from Bonbright and many others — that rates be simple, Arizona Corporation Commission adopted inclining block understandable and free from confusion as to calculation rates in the 1980s for Arizona Public Service Co., it also and application — remain important, no matter what the created optional residential TOU and demand-charge rates to results of a cost study may suggest. As a result, further provide a pathway for larger residential users to avoid sharp refinements to this information may be necessary to apply in bill impacts by shifting usage to lower-cost periods. rate design. 28.2 Incorporation of Cost Allocation Information in Rate Design It is often the case that the information developed in the process of cost allocation is relevant to important issues in rate design. In most states, embedded cost of service studies Many analysts who still use legacy cost allocation techniques or otherwise problematic methods argue that this analysis is relevant to rate design. In most cases, this is doubling down on a mistake. For example, use of the minimum system method for determination of residential customer charges is a mistake because it greatly overstates the cost of connecting a customer to the grid. However, some are used to allocate costs among customer classes,245 but regulators consider long-run marginal costs, either implicitly or explicitly, in designing rates within classes. The Washington Utilities and Transportation Commission stated in adopting an embedded cost framework that it wanted to be looking ahead in some parts of the rate-making process: 245 As discussed in Section 6.1, there is a direct relationship between an embedded cost of service study and the revenue requirement, which makes it an analytically convenient method of dividing the revenue requirement. Using a marginal cost of service study for cost allocation requires additional adjustments to ensure the correct amount of revenue will be recovered.
As listed on the current system