Prefiled testimony
Witness: Melissa Whited
Files3
Synapse - Eversource COS and Rate Design Testimony Final.pdf
PDF · 829 KB · 48 pagesText searchable
Download Synapse - Eversource COS and Rate Design Testimony Final.pdfRead the text of Synapse - Eversource COS and Rate Design Testimony Final.pdf
MW-2- Synapse Attachment.pdf
PDF · 4.6 MB · 276 pagesText searchable
Download MW-2- Synapse Attachment.pdfRead the text of MW-2- Synapse Attachment.pdf
MW-1 - Synapse Attachment.pdf
PDF · 734 KB · 13 pagesText searchable
Download MW-1 - Synapse Attachment.pdfRead the text of MW-1 - Synapse Attachment.pdf
Page 245 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 243 Proper data must be available so all parties can scrutinize whether distinctions Proper data must be available to all parties so they can scrutinize the made between customer classes are distinctions made between customer based on cost and not improper motives classes and whether these are truly based like price discrimination. on cost and not improper motives like additional efficiency benefits from improved pricing. price discrimination. Some analysts feel that a smaller number of rate classes will be fairer on balance, The same non-utility cost principles often apply to special and many equity issues within a customer class can be dealt rates for new industrial customers to encourage economic with through rate design. development within a service territory. Other common non-cost considerations come into play Lastly, in some states, legislatures have dictated some in designing rates for low- and limited-income consumers. elements of rate design, constraining the discretion of In an engineering sense, these customers may differ very little the commission. In Connecticut and California, statutory from other residential consumers in the metrics typically limitations on residential customer charges dictate, used in a cost of service study. But regulators, on their respectively, the basic customer method246 and a cap own initiative or under direction from their legislatures, of $10 a month adjusted for inflation.247 may adopt non-cost-based discounts for these customers. 246 See Connecticut General Statutes, Title 16, § 16-243bb, limiting the residential fixed charge to “only the fixed costs and operation and maintenance expenses directly related to metering, billing, service connections and the provision of customer service.” 247 California Public Utilities Code § 739.9(f).Page 246 of 276
244 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Works Cited in Part V Bonbright, J. (1961). Principles of public utility rates. New York, NY: Columbia University Press. Jenks, B. (1994, September). The incredible, disappearing residential exchange benefit. Oregon Citizens’ Utility Board. Lazar, J., and Gonzalez, W. (2015). Smart rate design for a smart future. Montpelier, VT: Regulatory Assistance Project. Retrieved from https://www.raponline.org/knowledge-center/smart-rate-design-for-a-smart-future/ Massachusetts Department of Public Utilities. (2018, January 5). Docket No. 17-05, order establishing Eversource’s rate structure. Retrieved from https://fileservice.eea.comacloud.net/FileService.Api/file/FileRoom/9170110 Washington Utilities and Transportation Commission. (1981). Cause U-81-41, second supplemental order in rate case for Puget Sound Power and Light Co. Washington Utilities and Transportation Commission. (1982). Cause U-82-10, second supplemental order in rate case for Washington Water Power. Washington Utilities and Transportation Commission. (1984). Cause U-84-65, third supplemental order in rate case for Pacific Power. Wisconsin Public Service Commission. (2016, December 22). Docket No. 6680-UR-120, final decision in rate case for Wisconsin Power and Light Co. Retrieved from http://apps.psc.wi.gov/vs2015/ERF_view/viewdoc.aspx?docid=295820Page 247 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 245 Conclusion C ost allocation is a complex exercise dependent on period when the resource is needed, to ensure equitable sound judgment. No less an authority than the U.S. treatment of customer classes. Supreme Court has made this point: • are becoming essential components of the modern A separation of properties is merely a step in the grid. The distribution system may also begin to serve determination of costs properly allocable to the various as a gathering system for power flowing from locations classes of services rendered by a utility. But where, as of local generation to other parts of the utility service here, several classes of services have a common use of territory, the opposite of historical top-down electric the same property, difficulties of separation are obvious. Allocation of costs is not a matter for the slide-rule. It involves judgment on a myriad of facts. It has no claim to an exact science.248 These words from Justice William Douglas are just as Consumer-sited resources, including solar and storage, distribution. • Short-run variable costs are generally diminishing as capital and data management tools are substituted for fuel and labor. Simply stated, this means that many of the cost allocation applicable today as they were when written in 1945. What has methods used in the previous century are not appropriate changed since 1945 are the facts, which in turn require new to the electric utilities of tomorrow. As we’ve discussed in judgments. In particular, advancements in technology have this manual, new methods, new metrics and new customer had a great impact and reverberating effects on our power class definitions will be needed. The role of the cost analyst system. Multiple aspects of our power system are continuing remains unchanged: We are assigned the task of determining to evolve, and cost allocation methods must change to reflect an equitable allocation of costs among customer classes. what we are experiencing. Over the past few decades, key The methods analysts used in the past must give way to new changes in the power system that have consequences on how methods more applicable to today’s grid, today’s technologies we allocate costs include: and today’s customer needs. • • • Renewable resources are replacing fossil-fueled This manual has identified current best practices in cost generation, substituting invested capital in place of allocation methodology. These will also need to evolve to variable fuel costs. keep up with the technological changes our electric system Peaking resources are increasingly located near load is experiencing. Perhaps the most important evolution in centers, eliminating the need for transmission line methodology recognizes that utility grids are built for the investment to meet peak demand served by peaking general purpose of providing electricity service. The largest units. Long transmission lines are often needed to bring single cost of building the grid is to ensure that it provides not only baseload coal and nuclear resources but also kWhs to customers during all hours of the day and night. wind and other renewable resources, even if they may Thus, similar to the way we price gasoline, groceries and have limited peaking value relative to their total value to clothing, most costs of the grid should be assigned on a usage the power system. basis, recovered in the sale of each kWh. In this same context, Advanced battery storage is a new form of peaking the cost of connecting to the grid may be a customer-specific resource — one that can be located almost anywhere on cost. For items such as groceries and clothing, customers bear the grid and has essentially no variable costs. The total costs of storage still need to be assigned to the time 248 Colorado Interstate Gas Co. v. Federal Power Commission, 324 U.S. 581, 589 (1945).Page 248 of 276
246 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® the cost of “connecting to the grid,” by traveling to a retailer. resource for the purposes for which it was constructed and The balance of the “grid” cost can and should be recovered in the functions it provides today. In general, assets that serve in the price of each unit. all hours should have their costs assigned to all hours; those As we have noted in this manual, a variety of cost alloca- that serve only in limited periods, or are upsized at additional tion methods are currently in use across the country. There cost for certain periods, should have costs assigned to the are certain changes in cost allocation methodology that will relevant periods. The traditional methods of defining costs be specific to the approach appropriate for different regions. as customer-related, demand-related and energy-related However, this manual identifies certain changes in method- must give way to time-varying purposes, so costs can be fairly ology that will be of general application across the continent, assigned among time periods in the new era. including: • • Assigning costs to time periods of usage (such as critical change. Although these are used in fewer states than peak, on-peak, midpeak, off-peak and super-off-peak), embedded cost methods, they also need significant changes rather than the much coarser metrics of “demand” and to be relevant in the modern electric industry environment. “energy” used in the past. Methods must be updated to recognize both (1) the Differentiating among types of generation, recognizing substitution of capital costs for short-run variable operating that some are relied on during peak periods, while others costs and (2) DER solutions for generation, transmission and are relied on during all hours or some other subset of distribution. hours during the year. • • • Not surprisingly, marginal cost methods also must Whether the cost allocation method has changed or not, Considering that the utilization of some utility assets it is always important to present cost allocation data clearly, may have changed. Plants that were built as baseload so that regulators can do their job. Most regulators expect units may now be operated only intermittently, as newer quality technical analysis of costs but apply judgment in resources with different cost characteristics become more the application of those results. They may want to consider valuable to the grid. the results of multiple studies using different methods. Realizing that most utility assets serve shared customer Gradualism in the implementation of change has important loads, with different customers using these at different value to avoid sudden impacts that may devastate residential, times. The application of time-differentiated cost analysis commercial or industrial customers. Data and analytical to apportioning the costs of a shared system becomes results should be presented in a way that informs regulators. critical. We must still recognize, however, that “allocation of costs Recognizing that smart grid systems make it possible to is not a matter for the slide-rule,” as Justice Douglas wrote provide better service at lower cost by including targeted nearly a century ago. energy efficiency and demand response measures to This manual attempts to define methods that are relevant meet loads at targeted times and places, and thus that today and will be applicable into the future as the industry those costs must, to some extent, follow the savings they continues to evolve and as technology continues to drive enable. changes in costs, investment and expenses. The reasoned Embedded cost of service modeling practices must analyst will always need to apply creativity and skill to the also be modified to account for new changes in the electric system. Key in this is the need to consider each asset and task of allocating costs.Page 249 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 247 Appendix A: FERC Uniform System of Accounts S ince about 1960, the Federal Energy Regulatory • Commission has required electric utilities to follow its Deferred tax assets (Account 190, usually netted with accounts 282 and 283). Uniform System of Accounts. The system has accounts for both a utility’s balance sheet and its income statement.249 200 to 299: Liabilities and Other Credits The liability accounts (200 series) have some accounts The balance sheet accounts include 100 to 299, with 300 to 399 providing more detail on utility plant and accounts traditionally in rate base and some not. The largest elements included as offsets that reduce 430 to 439 providing more detail on retained earnings. Income statement accounts are 400 to 499, excepting 430 to rate base are accumulated deferred income tax liabilities 439. Many of the accounts relevant to utility rate case filings (accounts 282 and 283). In addition, rate base reductions and cost of service studies are identified below. come from: • 100 to 199: Assets and Other Debits Customer deposits (Account 235, in most but not all states). • Customer advances for construction (Account 252).251 and depreciation reserve (Account 108) — which constitute • Deferred credits (regulatory liabilities, in Account 254). plant in rate base — and construction work in progress • Unfunded pension liabilities (no specific account). The asset accounts include plant in service (Account 101) (Account 107), along with a number of smaller accounts. Elements of the amount of debt and equity, including In most states, not all of these accounts are in rate discounts on issuance and amounts arising from refinancing base,250 but the ones that typically are include: past debt, are included in the capital structure, while most • Accounts receivable other than from customers accounts payable are subsumed in the cash working capital (Account 143). computation. • Fuel inventories (accounts 120 — nuclear, 151 and 152). • Emissions allowances inventories (Account 158). • Materials and supplies inventories (Account 154). • Prepayments (Account 165, for items such as postage and accounts (providing more detail into utility plant included in insurance and in some cases pensions). Account 101, by type). The accounts are subdivided for electric Certain deferred debits (Account 182, especially service252 into: • regulatory assets for which the utility has invested money but not recovered it). 249 The information here comes from Title 18, Part 101 of the Code of Federal Regulations. Retrieved from https://www.ecfr.gov/cgi-bin/text-idx?c =ecfr&SID=054f2bfd518f9926aac4b73489f11c67&rgn=div5&view=t ext&node=18:1.0.1.3.34&idno=18. For a useful summary, see Phan, D. (2015, August). Uniform System of Accounts [Presentation for NARUC]. Retrieved from https://pubs.naruc.org/pub.cfm?id=53720E26-2354D714-5100-3EBD02A2034E 250 Most states use a cash working capital calculation that encompasses the utility’s accounts receivable and accounts payable for utility service (not always uniformly) so that these items are not in rate base directly but are included in the cash working capital calculation. Arkansas is an exception, 300 to 399: Plant Accounts The accounts in the 300 series are plant-in-service Accounts 301 to 303: intangible plant. Today, the costs cover mostly computer software, although there are some so this general discussion does not apply. Arkansas’ modified balance sheet approach puts most of the asset items in rate base and most of the liabilities (200-series accounts) in the capital structure as zero-cost capital. 251 Unlike customer advances for construction, contributions in aid of construction do not have a specific place in the Uniform System of Accounts but are simply subtracted from the amount of plant included in summary Account 109 and the detailed accounts 364 to 370. 252 The 300-series accounts used for gas, water and so on are different from the electric accounts.Page 250 of 276
248 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® legacy items for paying for franchises. These costs are usually 365 overhead wires, 366 underground conduit, 367 under- included with general and common plant as an overhead in ground wires, 368 line transformers (also including capacitors cost allocation. and voltage regulators), 369 services (sometimes divided Accounts 310 to 317: steam production plant. These costs into overhead and underground subaccounts), 370 meters, include costs of coal, oil and gas steam plants; some utilities 371 installations on customer premises (usually lighting include combined cycle steam turbines here. Biomass and excluding streetlights but may include demand response geothermal plants owned by utilities would also appear here. equipment) and 373 streetlights. Account 363, used very Most utilities maintain records of these accounts to the level infrequently now, is the FERC account where energy storage of the power plant, if not the individual unit of each plant, plant installed on the distribution system would be included. which are reported in each utility’s annual report to FERC Accounts 382, 383 and 389 to 399: general plant or (FERC Form 1), although they may be summarized in cost of service studies. Accounts 320 to 326: nuclear plant. Again, utilities maintain separate records for each nuclear plant or unit, which are presented in FERC Form 1. common plant. Accounts 382 and 383 are for general plant (largely computer systems) used in regional market operations, particularly for utilities that are members of ISOs. Accounts 389 to 399 include land, buildings, furniture, Accounts 330 to 337: hydroelectric plant. Utilities computer hardware, vehicles and other similar items. Items generally maintain separate records for each hydro plant, at specific power plant sites can be allocated with the plant. which are also required to be filed as part of FERC Form 1. Others are part of overhead costs. For an electric and gas Pumped storage is included with other hydroelectric plant. utility, some items in these accounts can be “electric general Accounts 340 to 347: other power generation. These plant” (items used at a power plant site, for example), while include a mix of combustion turbines, combined cycles (as others are the portion of “common plant” allocated to the some utilities place entire combined cycles in these accounts), electric department of an electric and gas utility. General reciprocating engines, and wind and solar generation owned plant can also be allocated from a holding company serving a by the utility. number of utilities. Account 348 is for energy storage plant with a generation function, excluding pumped hydro. This is a new addition to the Uniform System of Accounts and includes batteries, flywheels, compressed air and other storage. Asset retirement obligations are included in each of the 400 to 499: Income and Revenue Accounts Account 403 (depreciation) and Account 405 (amortization) are subdivided at least by type of plant (different types of production plant, transmission, distribution and general). broad categories of production plant (accounts 317, 326 and Many utilities subdivide this further by the FERC plant 347). Asset retirement obligations are not included in rate base accounts and by individual power plant or unit. and are not directly found in cost of service studies. Aside from Account 408 (taxes other than income) is subdivided into nuclear power plants (where they are related to the decommis- accounts for property taxes, payroll taxes and other taxes sioning fund), these costs only appear indirectly through the (usually a small amount). calculation of negative net salvage as part of depreciation. Current and deferred income taxes are found in accounts Accounts 350 to 357: transmission accounts. Costs are 409 and 410 and are usually calculated with significant detail divided by type of plant, not by the function or voltage level of plant. Account 351 is a recently added account for energy storage plant used on the transmission system. in revenue requirement studies. The remainder of these accounts do not appear directly in rate cases. Account 426 is noteworthy because it includes Accounts 360 to 374: distribution accounts. Of the nonoperating expenses such as fines and penalties, lobbying, major accounts, 362 is distribution substations, 364 is poles, donations and so on. Revenue requirement analysts often tryPage 251 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® to assess whether costs booked to operating accounts instead belong in this account. Accounts 433 and 436 to 439 are retained earnings accounts. These accounts, which reflect profits not distributed to shareholders as dividends, do not appear in rate cases. Accounts 440 to 449 are revenue accounts, using broad customer classes developed by FERC (residential, commercial, ELECTRIC COST ALLOCATION FOR A NEW ERA | 249 Regional market expenses are in accounts 575 (operating) and 576 (maintenance). The bulk of these costs are expenses paid to ISOs under FERC tariff and some internal market monitoring and similar costs. Distribution operating expenses follow plant and are in accounts 580 to 590. Corresponding maintenance expenses are in accounts 591 to 598. industrial, railways, other public authority and sales for resale). These FERC accounts often do not correspond to utility rate classes in a cost allocation study. Accounts 450 to 456 are revenues that do not come from rates or wholesale transactions. They include late payment charges (Account 450), tariffed service charges (mostly in Account 451), rents (Account 453) and other revenues (Account 456). 500 to 599: Production, Transmission and Distribution Expenses Production expenses are divided similarly to plant and are broken down at the level of individual plants in FERC Form 1. Steam production operating expenses are in accounts 500 to 509, and maintenance expenses are in accounts 510 to 514. Nuclear production operating expenses are accounts 517 to 527, and nuclear maintenance expenses are in accounts 528 to 532. Hydroelectric production expenses are in accounts 535 to 540, and hydro maintenance expenses are in accounts 541 to 545. Other production plant expenses are in accounts 546 to 550, and other maintenance expenses are in accounts 551 to 554. Again, the definition includes combustion turbines, wind and solar, as above. Purchased power is in Account 555; production load dispatching is in Account 556; and miscellaneous production expenses (e.g., power procurement administration, renewable energy credits) are in Account 557. Transmission operating expenses are in accounts 560 to 567; maintenance expenses are in 568 to 573. Of note, wheeling expenses (transmission by others) are in Account 565, and certain expenses paid to ISOs under FERC tariffs are included as subaccounts of Account 561. 600 to 899: Accounts Reserved for Gas and Water Utilities Not discussed further. 900 to 949: Customer Accounts; Customer Service and Information, Sales, and General and Administrative Expenses Customer accounting expenses are accounts 901 to 905. Accounts 901 and 905 are generalized expenses, while Account 902 is meter reading. Account 903 is the catchall, including sending bills, collecting money, credit, call centers and similar items. Account 904 is uncollectible accounts expense. Customer service and information expenses are accounts 907 to 910. Energy efficiency and demand response costs are typically found in Account 908, and Account 909 is instructional advertising. Sales and marketing expenses are accounts 911 to 916. They include an advertising component in Account 913. Administrative and general expenses are accounts 920 to 935. There are elements for administrative salaries (920) and nonlabor expenses (921) and contracts (923), as well as insurance (924 and 925), pensions and benefits (926), regulatory commission expenses (928), miscellaneous expenses (930) and rental of buildings and maintenance of general plant (931 to 935). They may include costs from holding companies. Costs in Account 922 are transferred out, either to capital or to other utility affiliates. In these areas, the FERC Uniform System of Accounts is not particularly uniform. For example, the costs for the same function, such as a key account representative, can appear in accounts 903, 908, 912 or administrative account 920, depending on the utility. Generation procurement expenses, which appear to belong in Account 557, can also end up in the administrative accounts 920 and 921.Page 252 of 276
250 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Appendix B: Combustion Turbine Costs Using a Real Economic Carrying Charge Rate 253 A real economic carrying charge (RECC) rate is revenue requirements, one can then calculate the RECC. This designed to measure the economic return expected is the number of dollars in the first year that, when increased for an asset whose value increases at the rate of at the rate of inflation every year, results in the same present inflation every year. An economic carrying charge also has the value at the end of the time period as the present value of property of measuring the value of deferring the construction revenue requirements.256 of an asset from one year to the next. A levelized nominal-dollar stream of numbers is one way Figure 47 on the next page is a conceptual example to show the capital and operations and maintenance (O&M) to represent the cost of a power plant. It reflects that if the costs for a combustion turbine with a 30-year life. The utility actually bought a combustion turbine today, its costs assumptions used in this example regarding the combustion would be locked in for the 30-year life of the plant. However, turbine’s capital and O&M costs, as well as capital structure, using a RECC is more appropriate because it enables the were developed in a Southwest Public Service Co. case in analyst to develop a cost stream for a period shorter than the Texas.257 The result is that, for this example, the nominal full life of the plant.254 dollar revenue requirement (capital plus O&M) in the The first step in calculating the RECC begins with first year is $83.54 per kW-year, declining to about $33 per calculating the year-by-year revenue requirement of a given kW-year at the end of the plant’s 30-year life as the plant is asset. One must look at the entire time stream of ownership depreciated. The nominal levelized cost is $63.20. The first- of an asset and calculate a present value of revenue require- year cost using the RECC is $53.47. ments over the life of the asset using utility accounting. Costs are somewhat sensitive to financial input assump- The discount rate used in such a calculation is typically the tions. For example, using the capital structure (51% equity and utility rate of return. (However, there are arguments among 49% debt) and return on equity (9.3%) offered by the Office analysts as to whether that discount rate is reduced for the of Public Utility Counsel, the first-year RECC in this case tax deductibility of bond interest.255) The present value of would be $52.32. Using Southwest Public Service Co.’s capital revenue requirements includes return, depreciation, and structure (58% equity and 42% debt) and return on equity income and property taxes and may include certain other (10.25%), the first-year RECC would be $57.51. costs such as property insurance. From this present value of 253 This appendix is adapted from Marcus, W. (2018, May). Cross-rebuttal testimony on behalf of the Office of Public Utility Counsel, Appendix A. Public Utility Commission of Texas Docket No. 47527. 256 This method of calculating the RECC was developed by National Economic Research Associates (now known as NERA Economic Consulting) in the late 1970s. 254 Costs calculated based upon time periods shorter than 25 years are considered deferred rather than avoided because combustion plant life cycles are 25 years or greater. 257 The case is Public Utility Commission of Texas Docket No. 47527. The capital and O&M costs ($621 per kW and $7.27 per kW-year, respectively) and the inflation rate (1.74%) are from testimony of J. Pollock on behalf of Texas Industrial Energy Consumers (2018, April 25). Property tax rates (0.67%) are those estimated in testimony of N. Koch on behalf of Southwest Public Service Co., Attachment NK-RR-5 (2017, August 21). In addition, the capital structure (48% debt, 52% equity) and return on equity (9.6%) are from the settlement of Southwest Public Service’s previous case in Docket No. 45524, with the cost of debt adjusted to the level from Docket No. 47527 (4.38%). 255 Marcus, W. (2013, December). Testimony on behalf of The Utility Reform Network, pp. 2-5. California Public Utilities Commission Application No. 13-04-012.Page 253 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 251 Figure 47. Comparison of temporal distributions for combustion turbine cost recovery $100 $90 Dollars per kilowatt-year Real economic carrying charge Revenue requirement $80 Nominal levelized cost $70 $60 $50 $40 $30 $20 $10 $0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Year Sources: Based on testimony in Public Utility Commission of Texas Docket No. 47527 and settlement of Docket No. 45524 involving Southwest Public Service Co.Page 254 of 276
252 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Appendix C: Inconsistent Calculation of Kilowatts in Marginal Cost Studies T wo examples of problematic inconsistencies in measures of demand are identified here to illustrate the problem. Although we have chosen these particular distribution marginal costs. Southern California Edison has the same problem, only worse. Its marginal costs are calculated based on system examples, we recognize that additional inconsistencies are capacity, not demand. System capacity is usually much higher likely to be found when analyzing other cost studies. than system demand. As an example, Southern California Pacific Gas & Electric measures demand (except for Edison’s subtransmission substation capacity is about 37,000 new hookups, which are measured based on demand at the MWs, even though its time-varying system demand is about transformer) using the hottest year in 10 years to develop the 16,000 MWs. The result is that the company obtains a low marginal cost per kW of regional distribution demand. It thus figure in dollars per kW of capacity (developed using a NERA develops a lower cost per kW than if it used a normal year. Economic Consulting regression based on 37,000 MWs of The company then multiplies this cost by a peak capacity capacity). It then multiplies this figure by 16,000 MWs of allocation factor based on a normal year.258 The peak capacity time-varying demand. As a result, about 57% of real costs allocation factor is lower than even the peak demand of of Edison subtransmission investments disappear in the the normal year. As a result of the inconsistent measures of NERA cost allocation methodology. This mismatch benefits demand, its marginal cost revenue requirement of demand large customers, whose total distribution costs have a larger is too low relative to its marginal cost revenue requirement fraction of subtransmission costs than smaller customers.259 of customer costs, inflating the role of customer costs in 258 California Office of Ratepayer Advocates. (2017, February). Testimony, Chapter 4. California Public Utilities Commission Application No. 16-06013. 259 Marcus, W. (2018, March 23). Testimony on behalf of The Utility Reform Network, pp. 23-28. California Public Utilities Commission Application No. 17-06-030.