Prefiled testimony
Witness: Melissa Whited
Files3
Synapse - Eversource COS and Rate Design Testimony Final.pdf
PDF · 829 KB · 48 pagesText searchable
Download Synapse - Eversource COS and Rate Design Testimony Final.pdfRead the text of Synapse - Eversource COS and Rate Design Testimony Final.pdf
MW-2- Synapse Attachment.pdf
PDF · 4.6 MB · 276 pagesText searchable
Download MW-2- Synapse Attachment.pdfRead the text of MW-2- Synapse Attachment.pdf
MW-1 - Synapse Attachment.pdf
PDF · 734 KB · 13 pagesText searchable
Download MW-1 - Synapse Attachment.pdfRead the text of MW-1 - Synapse Attachment.pdf
Page 251 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® to assess whether costs booked to operating accounts instead belong in this account. Accounts 433 and 436 to 439 are retained earnings accounts. These accounts, which reflect profits not distributed to shareholders as dividends, do not appear in rate cases. Accounts 440 to 449 are revenue accounts, using broad customer classes developed by FERC (residential, commercial, ELECTRIC COST ALLOCATION FOR A NEW ERA | 249 Regional market expenses are in accounts 575 (operating) and 576 (maintenance). The bulk of these costs are expenses paid to ISOs under FERC tariff and some internal market monitoring and similar costs. Distribution operating expenses follow plant and are in accounts 580 to 590. Corresponding maintenance expenses are in accounts 591 to 598. industrial, railways, other public authority and sales for resale). These FERC accounts often do not correspond to utility rate classes in a cost allocation study. Accounts 450 to 456 are revenues that do not come from rates or wholesale transactions. They include late payment charges (Account 450), tariffed service charges (mostly in Account 451), rents (Account 453) and other revenues (Account 456). 500 to 599: Production, Transmission and Distribution Expenses Production expenses are divided similarly to plant and are broken down at the level of individual plants in FERC Form 1. Steam production operating expenses are in accounts 500 to 509, and maintenance expenses are in accounts 510 to 514. Nuclear production operating expenses are accounts 517 to 527, and nuclear maintenance expenses are in accounts 528 to 532. Hydroelectric production expenses are in accounts 535 to 540, and hydro maintenance expenses are in accounts 541 to 545. Other production plant expenses are in accounts 546 to 550, and other maintenance expenses are in accounts 551 to 554. Again, the definition includes combustion turbines, wind and solar, as above. Purchased power is in Account 555; production load dispatching is in Account 556; and miscellaneous production expenses (e.g., power procurement administration, renewable energy credits) are in Account 557. Transmission operating expenses are in accounts 560 to 567; maintenance expenses are in 568 to 573. Of note, wheeling expenses (transmission by others) are in Account 565, and certain expenses paid to ISOs under FERC tariffs are included as subaccounts of Account 561. 600 to 899: Accounts Reserved for Gas and Water Utilities Not discussed further. 900 to 949: Customer Accounts; Customer Service and Information, Sales, and General and Administrative Expenses Customer accounting expenses are accounts 901 to 905. Accounts 901 and 905 are generalized expenses, while Account 902 is meter reading. Account 903 is the catchall, including sending bills, collecting money, credit, call centers and similar items. Account 904 is uncollectible accounts expense. Customer service and information expenses are accounts 907 to 910. Energy efficiency and demand response costs are typically found in Account 908, and Account 909 is instructional advertising. Sales and marketing expenses are accounts 911 to 916. They include an advertising component in Account 913. Administrative and general expenses are accounts 920 to 935. There are elements for administrative salaries (920) and nonlabor expenses (921) and contracts (923), as well as insurance (924 and 925), pensions and benefits (926), regulatory commission expenses (928), miscellaneous expenses (930) and rental of buildings and maintenance of general plant (931 to 935). They may include costs from holding companies. Costs in Account 922 are transferred out, either to capital or to other utility affiliates. In these areas, the FERC Uniform System of Accounts is not particularly uniform. For example, the costs for the same function, such as a key account representative, can appear in accounts 903, 908, 912 or administrative account 920, depending on the utility. Generation procurement expenses, which appear to belong in Account 557, can also end up in the administrative accounts 920 and 921.Page 252 of 276
250 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Appendix B: Combustion Turbine Costs Using a Real Economic Carrying Charge Rate 253 A real economic carrying charge (RECC) rate is revenue requirements, one can then calculate the RECC. This designed to measure the economic return expected is the number of dollars in the first year that, when increased for an asset whose value increases at the rate of at the rate of inflation every year, results in the same present inflation every year. An economic carrying charge also has the value at the end of the time period as the present value of property of measuring the value of deferring the construction revenue requirements.256 of an asset from one year to the next. A levelized nominal-dollar stream of numbers is one way Figure 47 on the next page is a conceptual example to show the capital and operations and maintenance (O&M) to represent the cost of a power plant. It reflects that if the costs for a combustion turbine with a 30-year life. The utility actually bought a combustion turbine today, its costs assumptions used in this example regarding the combustion would be locked in for the 30-year life of the plant. However, turbine’s capital and O&M costs, as well as capital structure, using a RECC is more appropriate because it enables the were developed in a Southwest Public Service Co. case in analyst to develop a cost stream for a period shorter than the Texas.257 The result is that, for this example, the nominal full life of the plant.254 dollar revenue requirement (capital plus O&M) in the The first step in calculating the RECC begins with first year is $83.54 per kW-year, declining to about $33 per calculating the year-by-year revenue requirement of a given kW-year at the end of the plant’s 30-year life as the plant is asset. One must look at the entire time stream of ownership depreciated. The nominal levelized cost is $63.20. The first- of an asset and calculate a present value of revenue require- year cost using the RECC is $53.47. ments over the life of the asset using utility accounting. Costs are somewhat sensitive to financial input assump- The discount rate used in such a calculation is typically the tions. For example, using the capital structure (51% equity and utility rate of return. (However, there are arguments among 49% debt) and return on equity (9.3%) offered by the Office analysts as to whether that discount rate is reduced for the of Public Utility Counsel, the first-year RECC in this case tax deductibility of bond interest.255) The present value of would be $52.32. Using Southwest Public Service Co.’s capital revenue requirements includes return, depreciation, and structure (58% equity and 42% debt) and return on equity income and property taxes and may include certain other (10.25%), the first-year RECC would be $57.51. costs such as property insurance. From this present value of 253 This appendix is adapted from Marcus, W. (2018, May). Cross-rebuttal testimony on behalf of the Office of Public Utility Counsel, Appendix A. Public Utility Commission of Texas Docket No. 47527. 256 This method of calculating the RECC was developed by National Economic Research Associates (now known as NERA Economic Consulting) in the late 1970s. 254 Costs calculated based upon time periods shorter than 25 years are considered deferred rather than avoided because combustion plant life cycles are 25 years or greater. 257 The case is Public Utility Commission of Texas Docket No. 47527. The capital and O&M costs ($621 per kW and $7.27 per kW-year, respectively) and the inflation rate (1.74%) are from testimony of J. Pollock on behalf of Texas Industrial Energy Consumers (2018, April 25). Property tax rates (0.67%) are those estimated in testimony of N. Koch on behalf of Southwest Public Service Co., Attachment NK-RR-5 (2017, August 21). In addition, the capital structure (48% debt, 52% equity) and return on equity (9.6%) are from the settlement of Southwest Public Service’s previous case in Docket No. 45524, with the cost of debt adjusted to the level from Docket No. 47527 (4.38%). 255 Marcus, W. (2013, December). Testimony on behalf of The Utility Reform Network, pp. 2-5. California Public Utilities Commission Application No. 13-04-012.Page 253 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 251 Figure 47. Comparison of temporal distributions for combustion turbine cost recovery $100 $90 Dollars per kilowatt-year Real economic carrying charge Revenue requirement $80 Nominal levelized cost $70 $60 $50 $40 $30 $20 $10 $0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Year Sources: Based on testimony in Public Utility Commission of Texas Docket No. 47527 and settlement of Docket No. 45524 involving Southwest Public Service Co.Page 254 of 276
252 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Appendix C: Inconsistent Calculation of Kilowatts in Marginal Cost Studies T wo examples of problematic inconsistencies in measures of demand are identified here to illustrate the problem. Although we have chosen these particular distribution marginal costs. Southern California Edison has the same problem, only worse. Its marginal costs are calculated based on system examples, we recognize that additional inconsistencies are capacity, not demand. System capacity is usually much higher likely to be found when analyzing other cost studies. than system demand. As an example, Southern California Pacific Gas & Electric measures demand (except for Edison’s subtransmission substation capacity is about 37,000 new hookups, which are measured based on demand at the MWs, even though its time-varying system demand is about transformer) using the hottest year in 10 years to develop the 16,000 MWs. The result is that the company obtains a low marginal cost per kW of regional distribution demand. It thus figure in dollars per kW of capacity (developed using a NERA develops a lower cost per kW than if it used a normal year. Economic Consulting regression based on 37,000 MWs of The company then multiplies this cost by a peak capacity capacity). It then multiplies this figure by 16,000 MWs of allocation factor based on a normal year.258 The peak capacity time-varying demand. As a result, about 57% of real costs allocation factor is lower than even the peak demand of of Edison subtransmission investments disappear in the the normal year. As a result of the inconsistent measures of NERA cost allocation methodology. This mismatch benefits demand, its marginal cost revenue requirement of demand large customers, whose total distribution costs have a larger is too low relative to its marginal cost revenue requirement fraction of subtransmission costs than smaller customers.259 of customer costs, inflating the role of customer costs in 258 California Office of Ratepayer Advocates. (2017, February). Testimony, Chapter 4. California Public Utilities Commission Application No. 16-06013. 259 Marcus, W. (2018, March 23). Testimony on behalf of The Utility Reform Network, pp. 23-28. California Public Utilities Commission Application No. 17-06-030.Page 255 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 253 Appendix D: Transmission and Distribution Replacement Costs as Marginal Costs 260 A competitive business could not continue to operate firm is able to charge its customers has not increased in real in the intermediate term if its prices did not recover terms and the number of packages that its existing customers its costs of doing business. These include the full send and have delivered, on average, has not changed. The amount of its O&M costs, plus a return on new capital expen- question for the delivery company is then: Is the marginal ditures (including both capital additions and replacements cost of replacing its trucks at least equal to the marginal to the existing system that are necessary to serve the loads of revenue it will retain by continuing its ability to serve its its existing customer base) and investments required to serve existing customer base? If not, then the company will not new loads and customers. This definition would exclude all make the replacements, and it will choose to exit the delivery sunken capital costs. business and employ its capital elsewhere. Just because the To understand this point, an example from another in- decision does not include the possibility of new, additional dustry might be helpful. Assume that package delivery growth customers does not mean the delivery company would not has stagnated in a given area, such that only the same number make its decision to replace its fleet on the basis of marginal of packages must be delivered for each of the next 10 years. cost and revenue. Then assume that the delivery company (which serves only The difference between the NERA utility system and this area) must replace a portion of its fleet of delivery trucks the trucking company is largely of degree, not kind: Utility in order to keep delivering this stable number of packages replacements are required less frequently than those of the at some point during this time frame. The NERA method of trucking company and can often be deferred for years; wires marginal cost analysis would assume that the replacement must serve a fixed route, whereas the route of a delivery trucks are not a marginal cost of serving the demand for truck may change; and the utility is a monopoly, whereas a packages in this area. As a result, the NERA method assumes trucking company may not be. However, the recovery of the that it would be economically inefficient for the trucking cost of replacements is still part of the long-run marginal cost company to recover the cost of those replacement trucks structure of both companies. Neither could stay in business (unless a portion of the costs could be recovered in advance in a competitive market if each does not recover replacement at a time when the package demand in the area was grow- costs in some way. ing, prior to the time when truck replacement was actually In essence, the NERA method’s view of this issue is based required), because it would require charging more than the on the assumption that marginal cost applies only to new marginal cost of operating the existing trucks. demand and not to the retention of existing demand. But this Moreover, assume that the real cost of trucks increased view of marginal cost is not economically correct. First, if the dramatically in the period between the time the delivery utility does not make required replacements, it will no longer company purchased its original delivery truck fleet and the be able to supply load. If it cannot supply load, the quantity time it ultimately needs to make replacements of the original fleet (similar to real increases in, for example, the cost of pole replacement and substation transformers due to higher materials costs). Assume also that the price the trucking 260 This discussion is adapted from Jones, G., and Marcus, W. (2015, March 13). Testimony on behalf of The Utility Reform Network, pp. 23-26. California Public Utilities Commission Application No. 14-06-014.Page 256 of 276
254 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® demanded from the utility will necessarily decline — utility demand, which is what the marginal principles with which customers will necessarily have to demand their electrons we are concerned are to measure in the first place. Finally, a from other sources, such as exclusive distributed generation business that cannot continue to serve its existing customers and storage. Second, marginal cost principles include small under its cost structure cannot stay in business without changes in costs for small changes in production (not neces- losing demand from customers that it can no longer serve sarily increases) as a result of changes in demand. Without economically. Replacement costs (with a few exceptions like replacement, and therefore continued service, the utility undergrounding for policy and aesthetic reasons) are required would not be able to serve the load demanded by existing to assure that loads of existing customers do not decline due customers. Were this to occur, the marginal change would to a dilapidated and disintegrating system. be a decline in demand, but it would still be a change inPage 257 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 255 Appendix E: Undervaluation of Long-Run Avoided Generation Costs in the NERA Method T he theoretical framework of the NERA method to equation embodies the fact that, for example, the SRMC justify the marginal costs based on a combustion calculated for a utility system with 100 MWs of must-take turbine for capacity plus projected short-run wind generation added to the system is below that calculated marginal costs (SRMC) for energy is predicated on the assumption that a utility will add a baseload resource only at the time it will lower average generation costs. Using this fact in the base case without the wind generation. For the average cost to decline when a new plant is added, a second inequality must also hold: alone, it can be demonstrated mathematically that SRMC, assuming the existence of the new plant (SRMC1 henceforth), can be below the price that a utility would pay to costeffectively build a new plant. The following discussion focuses on the energy cost term. For the cost-effectiveness above to hold, the annual NPC < ACNP The new plant must be cheaper than the costs avoided on the existing system by the plant. Since SRMC1 <= ACNP, a new utility generating station can be cost-effective if its cost is greater than SRMC1, as the following inequality shows: capital cost plus total operating costs of the new plant, less the annual and fixed operating costs of peaking capacity, SRMC1 < > NPC <= ACNP If SRMC1 > NPC, then the resource is an “inframarginal” must be less than the energy costs on the new system avoided resource with costs well below system marginal costs and by the new plant. Only if these conditions hold would the would be cost-effective at a time of system need for capacity. new plant reduce energy costs. If the only resources that a utility was building were infra- In the following mathematical demonstration: marginal, then SRMC1 represents avoided cost because the • SRMC refers solely to energy costs. utility plant would be cheaper. • The cost of a peaker is subtracted from the cost of the If utility plant were infinitely divisible and the utility new plant. system were in equilibrium, the special case of a fourth • SRMC1 is the SRMC with the new plant included. equation would be true: • The avoided cost from a new plant (ACNP) is the energy SRMC1 = ACNP = NPC cost on the existing system avoided by the new plant. In other words, short-run and long-run avoided cost • SRMC2 is the SRMC without the new plant. • The new plant cost (NPC) is the total capital plus would be equal. However, if SRMC1 < NPC, then the utility’s short-run operating cost of the new plant net of peaker capital and marginal costs under the NERA method are less than long- fixed operating costs. run avoided costs. Use of SRMC1 for resource plan evaluation The following inequality must hold: and rate design thus would skew results away from options SRMC1 <= ACNP <= SRMC2 that may be cheaper than the new plant and would result in It essentially states that the SRMC curve declines as allocation and rate design decisions that undervalue energy resources with low fuel costs are added to a utility system that is otherwise the same. In nonmathematical terms, the relative to other components of marginal cost.Page 258 of 276
256 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Glossary Adjustment clause Alternating current Abbreviation: AC A rate adjustment mechanism implemented on a recurring Current that reverses its flow periodically. Electric utilities and ongoing basis to recover changes in expenses or capital generate and distribute AC electricity to residential and expenditures that occur between rate cases. The most business consumers. common adjustment clause tracks changes in fuel costs and costs of purchased power. Some utilities have weather Ampere normalization adjustment clauses that correct for abnormal The standard unit of electrical current, formally defined as a weather conditions. See also tracker and rider/tariff rider. quantity of electricity per second. This unit is often used to describe the size of the service connection and service panel Administrative and general costs Abbreviation: A&G for an electricity customer. Capital investments and ongoing expenses that support all of a utility’s functions. One example of such a capital Ancillary service investment is an office building that houses employees for the One of a set of services offered and demanded by system entire utility. An example of such an ongoing expense is the operators, utilities and, in some cases, customers, generally salaries of executives who oversee all parts of the utility. addressing system reliability and operational requirements. Ancillary services include such items as voltage control and Advanced metering infrastructure Abbreviation: AMI support, reactive power, harmonic control, frequency control, The combination of smart meters, communication systems, spinning reserves and standby power. The Federal Energy system control and data acquisition systems, and meter Regulatory Commission defines ancillary services as those data management systems that together allow for metering services “necessary to support the transmission of electric of customer energy usage with high temporal granularity; power from seller to purchaser given the obligations of the communication of that information to the utility and, control areas and transmitting utilities within those control optionally, to the customer; and the potential for direct areas to maintain reliable operations of the interconnected end-use control in response to real-time cost variations and transmission system.” system reliability conditions. AMI is an integral part of the smart grid concept. Automated meter reading Abbreviation: AMR Automated meter reading systems use radio or other means Allocation/cost allocation to download data from meters periodically without a need The assignment of utility costs to customers, customer groups for a meter reader to visit each location. They typically do or unbundled services based on cost causation principles. not include interval data of sufficient precision to support advanced services such as critical peak pricing. More Allocation factor/allocator sophisticated systems are usually called advanced metering A computed percentage for each customer class of the share infrastructure. of a particular cost or group of costs each class is assigned in a cost of service study. Allocation factors are based on data that may include customer count, energy consumption, peak or off-peak capacity, revenue and other metrics.Page 259 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 257 Average-and-peak method Behind the meter A method of apportioning demand-related generation, Installations of electrical equipment at customer premises, transmission or distribution costs that assigns a portion of connected to the building or facility wiring at a point costs equal to the system load factor to all classes based on where any impacts are measured by the flow through the the kWh usage (average demand) of the class and the balance customer meter. This may include solar photovoltaic or of costs to each class based on peak demand of each class. The other generating resources, batteries or other storage, or metric for peak demand can be any of those described under load control equipment. Behind-the-meter installations are peak responsibility method. usually owned by the retail customer but may be called upon to provide grid services. Avoided cost The cost not incurred by not providing an incremental British thermal unit Abbreviation: Btu unit of service. Short-run avoided cost is the incremental A unit of heat, defined as the amount necessary to raise the variable cost to produce another unit from existing facilities. temperature of 1 pound of water by 1 degree Fahrenheit. Long-run avoided cost includes the cost of the next power Multiples of this unit are frequently used to describe the plant a utility would have to build to meet growing demand, energy content of fuels. plus the costs of augmenting reliability reserves, additional transmission and distribution facilities, environmental costs Capacity and line losses associated with delivering that power. The ability to generate, transport, process or utilize power. Capacity is measured in watts, usually expressed as kilowatts Base-intermediate-peak method Abbreviation: BIP (1,000 watts), megawatts (1,000 kilowatts) or gigawatts (1,000 The base-intermediate-peak cost allocation method assigns megawatts). Generators have rated capacities that describe each component of generation and often transmission and the output of the generator when operated at its maximum distribution plant to a category of whether it is fully required output at a standard ambient air temperature and altitude. in all hours (base) or required only in intermediate or peak hours. It then allocates those costs based on the usage of Capacity factor customer classes in each time period. The ratio of total energy produced by a generator for a specified period to the maximum it could have produced if it Baseload generation/baseload units/baseload had run at full capacity through the entire period, expressed capacity/baseload resources as a percentage. Fossil-fueled generating units with high Electricity generating units that are most economically run capacity factors are generally considered baseload power for extended hours. Typical baseload units include coal-fired plants, and those with low capacity factors are generally and nuclear-fueled steam generators. considered peaking units. These labels do not apply to wind or solar units because the capacity factors for these Basic customer method technologies are driven by weather conditions and not A distribution cost allocation approach that classifies decisions around optimal dispatch. only customer-specific costs — such as meters, billing and collection — as customer-related costs, with all other Capacity-related costs distribution and operating costs assigned based on demand or See demand-related costs. energy measures of usage.Page 260 of 276
258 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Circuit Competitive proxy method This generally refers to a wire that conducts electricity from The usage of information on energy and capacity revenue in one point to another. At the distribution level, multiple competitive wholesale markets in order to classify generation customers may be served by a single circuit that runs from assets for vertically integrated utilities between energy- a local substation or transformer to those customers. At the related and demand-related. transmission level, the term “circuit” may also describe a pathway along which energy is transported or the number of Conductor wires strung along that pathway. See also conductor. The individual wire or line that carries electricity from one point to another. Classification A step in some cost allocation methods in which costs are Connection charge defined into categories such as energy-related, demand- An amount to be paid by a customer to the utility, in a lump related and customer-related. sum or installments, for connecting the customer’s facilities to the supplier’s facilities. Coincident peak Abbreviation: CP The combined demand of a single customer or multiple Contribution in aid of construction customers at a specific point in time or circumstance, relative Utilities sometimes require customers to pay a portion of the to the peak demand of the system, in which “system” can refer cost of extending distribution service into sparsely populated to the aggregate load of a single utility or of multiple utilities areas. These contributions are recorded as a contribution in a geographic zone or interconnection or some part thereof. in aid of construction or sometimes as a customer advance that is refundable if additional customers in that area opt for Combined cycle unit electricity service. A type of generation facility based on combustion that combines a combustion turbine with equipment to capture Cooperative Abbreviation: co-op waste heat to generate additional electricity. This results in A not-for-profit utility owned by the customer-members. more efficient operation (higher output per unit of fuel input). A co-op is controlled by a member-elected board that includes representatives from business customers. Combustion turbine A power plant that generates electricity by burning oil or Cost allocation natural gas in a jet engine, which spins a shaft to power Division of a utility’s revenue requirement among its a generator. Combustion turbines are typically relatively customer classes. Cost allocation is an integral part of a low efficiency, have lower capital costs than other forms of utility’s cost of service study. generation and are used primarily as peaking power plants. Cost of service Community choice aggregation Regulators use a cost of service approach to determine a fair Community choice aggregation involves a municipality price for electric service, by which the aggregate costs for or other local entity serving as the electricity purchasing providing each class of service (residential, commercial and central agent for all customers within a geographic area. The industrial) are determined. Prices are set to recover those distribution system is still operated by a regulated utility. In costs, plus a reasonable return on the invested capital portion some cases, customers can opt out and use another method of those costs. to obtain electricity supply.
As listed on the current system
Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Melissa Whited [26-05-10]