  1. Page 256 of 276

    254 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® demanded from the utility will necessarily decline — utility demand, which is what the marginal principles with which customers will necessarily have to demand their electrons we are concerned are to measure in the first place. Finally, a from other sources, such as exclusive distributed generation business that cannot continue to serve its existing customers and storage. Second, marginal cost principles include small under its cost structure cannot stay in business without changes in costs for small changes in production (not neces- losing demand from customers that it can no longer serve sarily increases) as a result of changes in demand. Without economically. Replacement costs (with a few exceptions like replacement, and therefore continued service, the utility undergrounding for policy and aesthetic reasons) are required would not be able to serve the load demanded by existing to assure that loads of existing customers do not decline due customers. Were this to occur, the marginal change would to a dilapidated and disintegrating system. be a decline in demand, but it would still be a change in
  2. Page 257 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 255 Appendix E: Undervaluation of Long-Run Avoided Generation Costs in the NERA Method T he theoretical framework of the NERA method to equation embodies the fact that, for example, the SRMC justify the marginal costs based on a combustion calculated for a utility system with 100 MWs of must-take turbine for capacity plus projected short-run wind generation added to the system is below that calculated marginal costs (SRMC) for energy is predicated on the assumption that a utility will add a baseload resource only at the time it will lower average generation costs. Using this fact in the base case without the wind generation. For the average cost to decline when a new plant is added, a second inequality must also hold: alone, it can be demonstrated mathematically that SRMC, assuming the existence of the new plant (SRMC1 henceforth), can be below the price that a utility would pay to costeffectively build a new plant. The following discussion focuses on the energy cost term. For the cost-effectiveness above to hold, the annual NPC < ACNP The new plant must be cheaper than the costs avoided on the existing system by the plant. Since SRMC1 <= ACNP, a new utility generating station can be cost-effective if its cost is greater than SRMC1, as the following inequality shows: capital cost plus total operating costs of the new plant, less the annual and fixed operating costs of peaking capacity, SRMC1 < > NPC <= ACNP If SRMC1 > NPC, then the resource is an “inframarginal” must be less than the energy costs on the new system avoided resource with costs well below system marginal costs and by the new plant. Only if these conditions hold would the would be cost-effective at a time of system need for capacity. new plant reduce energy costs. If the only resources that a utility was building were infra- In the following mathematical demonstration: marginal, then SRMC1 represents avoided cost because the • SRMC refers solely to energy costs. utility plant would be cheaper. • The cost of a peaker is subtracted from the cost of the If utility plant were infinitely divisible and the utility new plant. system were in equilibrium, the special case of a fourth • SRMC1 is the SRMC with the new plant included. equation would be true: • The avoided cost from a new plant (ACNP) is the energy SRMC1 = ACNP = NPC cost on the existing system avoided by the new plant. In other words, short-run and long-run avoided cost • SRMC2 is the SRMC without the new plant. • The new plant cost (NPC) is the total capital plus would be equal. However, if SRMC1 < NPC, then the utility’s short-run operating cost of the new plant net of peaker capital and marginal costs under the NERA method are less than long- fixed operating costs. run avoided costs. Use of SRMC1 for resource plan evaluation The following inequality must hold: and rate design thus would skew results away from options SRMC1 <= ACNP <= SRMC2 that may be cheaper than the new plant and would result in It essentially states that the SRMC curve declines as allocation and rate design decisions that undervalue energy resources with low fuel costs are added to a utility system that is otherwise the same. In nonmathematical terms, the relative to other components of marginal cost.
  3. Page 258 of 276

    256 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Glossary Adjustment clause Alternating current Abbreviation: AC A rate adjustment mechanism implemented on a recurring Current that reverses its flow periodically. Electric utilities and ongoing basis to recover changes in expenses or capital generate and distribute AC electricity to residential and expenditures that occur between rate cases. The most business consumers. common adjustment clause tracks changes in fuel costs and costs of purchased power. Some utilities have weather Ampere normalization adjustment clauses that correct for abnormal The standard unit of electrical current, formally defined as a weather conditions. See also tracker and rider/tariff rider. quantity of electricity per second. This unit is often used to describe the size of the service connection and service panel Administrative and general costs Abbreviation: A&G for an electricity customer. Capital investments and ongoing expenses that support all of a utility’s functions. One example of such a capital Ancillary service investment is an office building that houses employees for the One of a set of services offered and demanded by system entire utility. An example of such an ongoing expense is the operators, utilities and, in some cases, customers, generally salaries of executives who oversee all parts of the utility. addressing system reliability and operational requirements. Ancillary services include such items as voltage control and Advanced metering infrastructure Abbreviation: AMI support, reactive power, harmonic control, frequency control, The combination of smart meters, communication systems, spinning reserves and standby power. The Federal Energy system control and data acquisition systems, and meter Regulatory Commission defines ancillary services as those data management systems that together allow for metering services “necessary to support the transmission of electric of customer energy usage with high temporal granularity; power from seller to purchaser given the obligations of the communication of that information to the utility and, control areas and transmitting utilities within those control optionally, to the customer; and the potential for direct areas to maintain reliable operations of the interconnected end-use control in response to real-time cost variations and transmission system.” system reliability conditions. AMI is an integral part of the smart grid concept. Automated meter reading Abbreviation: AMR Automated meter reading systems use radio or other means Allocation/cost allocation to download data from meters periodically without a need The assignment of utility costs to customers, customer groups for a meter reader to visit each location. They typically do or unbundled services based on cost causation principles. not include interval data of sufficient precision to support advanced services such as critical peak pricing. More Allocation factor/allocator sophisticated systems are usually called advanced metering A computed percentage for each customer class of the share infrastructure. of a particular cost or group of costs each class is assigned in a cost of service study. Allocation factors are based on data that may include customer count, energy consumption, peak or off-peak capacity, revenue and other metrics.
  4. Page 259 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 257 Average-and-peak method Behind the meter A method of apportioning demand-related generation, Installations of electrical equipment at customer premises, transmission or distribution costs that assigns a portion of connected to the building or facility wiring at a point costs equal to the system load factor to all classes based on where any impacts are measured by the flow through the the kWh usage (average demand) of the class and the balance customer meter. This may include solar photovoltaic or of costs to each class based on peak demand of each class. The other generating resources, batteries or other storage, or metric for peak demand can be any of those described under load control equipment. Behind-the-meter installations are peak responsibility method. usually owned by the retail customer but may be called upon to provide grid services. Avoided cost The cost not incurred by not providing an incremental British thermal unit Abbreviation: Btu unit of service. Short-run avoided cost is the incremental A unit of heat, defined as the amount necessary to raise the variable cost to produce another unit from existing facilities. temperature of 1 pound of water by 1 degree Fahrenheit. Long-run avoided cost includes the cost of the next power Multiples of this unit are frequently used to describe the plant a utility would have to build to meet growing demand, energy content of fuels. plus the costs of augmenting reliability reserves, additional transmission and distribution facilities, environmental costs Capacity and line losses associated with delivering that power. The ability to generate, transport, process or utilize power. Capacity is measured in watts, usually expressed as kilowatts Base-intermediate-peak method Abbreviation: BIP (1,000 watts), megawatts (1,000 kilowatts) or gigawatts (1,000 The base-intermediate-peak cost allocation method assigns megawatts). Generators have rated capacities that describe each component of generation and often transmission and the output of the generator when operated at its maximum distribution plant to a category of whether it is fully required output at a standard ambient air temperature and altitude. in all hours (base) or required only in intermediate or peak hours. It then allocates those costs based on the usage of Capacity factor customer classes in each time period. The ratio of total energy produced by a generator for a specified period to the maximum it could have produced if it Baseload generation/baseload units/baseload had run at full capacity through the entire period, expressed capacity/baseload resources as a percentage. Fossil-fueled generating units with high Electricity generating units that are most economically run capacity factors are generally considered baseload power for extended hours. Typical baseload units include coal-fired plants, and those with low capacity factors are generally and nuclear-fueled steam generators. considered peaking units. These labels do not apply to wind or solar units because the capacity factors for these Basic customer method technologies are driven by weather conditions and not A distribution cost allocation approach that classifies decisions around optimal dispatch. only customer-specific costs — such as meters, billing and collection — as customer-related costs, with all other Capacity-related costs distribution and operating costs assigned based on demand or See demand-related costs. energy measures of usage.
  5. Page 260 of 276

    258 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Circuit Competitive proxy method This generally refers to a wire that conducts electricity from The usage of information on energy and capacity revenue in one point to another. At the distribution level, multiple competitive wholesale markets in order to classify generation customers may be served by a single circuit that runs from assets for vertically integrated utilities between energy- a local substation or transformer to those customers. At the related and demand-related. transmission level, the term “circuit” may also describe a pathway along which energy is transported or the number of Conductor wires strung along that pathway. See also conductor. The individual wire or line that carries electricity from one point to another. Classification A step in some cost allocation methods in which costs are Connection charge defined into categories such as energy-related, demand- An amount to be paid by a customer to the utility, in a lump related and customer-related. sum or installments, for connecting the customer’s facilities to the supplier’s facilities. Coincident peak Abbreviation: CP The combined demand of a single customer or multiple Contribution in aid of construction customers at a specific point in time or circumstance, relative Utilities sometimes require customers to pay a portion of the to the peak demand of the system, in which “system” can refer cost of extending distribution service into sparsely populated to the aggregate load of a single utility or of multiple utilities areas. These contributions are recorded as a contribution in a geographic zone or interconnection or some part thereof. in aid of construction or sometimes as a customer advance that is refundable if additional customers in that area opt for Combined cycle unit electricity service. A type of generation facility based on combustion that combines a combustion turbine with equipment to capture Cooperative Abbreviation: co-op waste heat to generate additional electricity. This results in A not-for-profit utility owned by the customer-members. more efficient operation (higher output per unit of fuel input). A co-op is controlled by a member-elected board that includes representatives from business customers. Combustion turbine A power plant that generates electricity by burning oil or Cost allocation natural gas in a jet engine, which spins a shaft to power Division of a utility’s revenue requirement among its a generator. Combustion turbines are typically relatively customer classes. Cost allocation is an integral part of a low efficiency, have lower capital costs than other forms of utility’s cost of service study. generation and are used primarily as peaking power plants. Cost of service Community choice aggregation Regulators use a cost of service approach to determine a fair Community choice aggregation involves a municipality price for electric service, by which the aggregate costs for or other local entity serving as the electricity purchasing providing each class of service (residential, commercial and central agent for all customers within a geographic area. The industrial) are determined. Prices are set to recover those distribution system is still operated by a regulated utility. In costs, plus a reasonable return on the invested capital portion some cases, customers can opt out and use another method of those costs. to obtain electricity supply.
  6. Page 261 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 259 Cost of service study Customer charge An analysis performed in the context of a rate case that A fixed charge to consumers each billing period, typically to allocates a utility’s allowed costs to provide service among its cover metering, meter reading and billing costs that do not various customer classes. The total cost allocated to a given vary with size or usage. Also known as a basic service charge class represents the costs that class would pay to produce an or standing charge. equal rate of return to other classes. Regulators frequently exercise judgment to adopt rates that vary from study results. Customer class A collection of customers sharing common usage or Critical peak interconnection characteristics. Customer classes may A limited number of hours every year when the electric include residential (sometimes called household), small system, or a portion of it, is under a significant amount of commercial, large commercial, small industrial, large stress that could cause reliability problems or the need for industrial, agriculture (primarily irrigation pumping), mining nontrivial capital investments. and municipal lighting (streetlights and traffic signals). All customers within a class are typically charged the same rates, Critical peak pricing although some classes may be broken down into subclasses A form of dynamic retail rate design where a utility applies a based on the nature of their loads, the capacity of their substantially higher rate, with advance notice to customers, interconnection (e.g., the size of commercial or residential for a limited number of hours every year when the electric service panel) or the voltage at which they receive service. system is projected to be under a significant amount of stress. Customer noncoincident peak demand (or load) Curtailment The highest rate of usage in a measurement period of an This can refer to different sets of practices for either load individual customer — typically in a one-hour, 30-minute or variable renewable generation. With respect to load, or 15-minute interval — unaffected by the usage of other curtailment represents a reduction in usage in response customers sharing the same section of a distribution grid. to prices and programs or when system reliability is Also known as maximum customer demand. See also threatened. Price-responsive load curtailment is also known noncoincident peak. as demand response. Utilities and independent system operators typically have curtailment plans that can be used Customer-related costs if system reliability is threatened. Curtailment of variable Costs that vary directly with the number of customers served renewable generation can take place if there is an economic by the utility, such as metering and billing expenses. or system reliability reason why the electric system cannot take incremental energy from these units. This could occur Decomposition method when there is more energy available than can be transmitted A legacy method that jointly classifies and allocates given delivery constraints, or if the operating constraints of generation assets. This method assumes that customer classes other generators are such that it is more efficient to curtail with high load factors are served by high-capacity-factor renewable generation rather than ramp down other units. baseload resources. In many cases, such a method would advantage the large industrial customer class, although that does depend on the cost of the baseload resources in question. Among other issues, this method ignores reserve requirements or other backup supply needs and any need to equitably share the costs of excess capacity.
  7. Page 262 of 276

    260 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Decoupling for large (and sometimes small) commercial and industrial Decoupling fixes the amount of revenue to be collected customers but have not typically been used for residential and allows the price charged to float up or down between customers because of the very high diversity among rate cases to compensate for variations in sales volume in individual customers’ usage and the higher cost of demand order to maintain the set revenue level. The target revenue meters or interval meters. The widespread deployment of is sometimes allowed to increase between rate cases on the smart meters would enable the use of demand charges or basis of an annual review of costs or a fixed inflator, or on the time-of-use rates for any customer served by those meters. basis of the number of customers served. The latter approach is sometimes known as revenue-per-customer decoupling. Demand meter The purpose is to allow utilities to recover allowed A meter capable of measuring and recording a customer’s costs, independent of sales volumes, without under- or demand. Demand meters include interval meters and smart overcollection over time. Also known as revenue regulation. meters. Default service/default supply Demand-related costs/capacity-related costs In a restructured electric utility, the power supply price a Costs that vary directly with the system capacity to meet peak customer will pay if a different supplier than the distribution demands. This can be measured separately for the generation, utility is not affirmatively chosen. Most residential and small- transmission and distribution segments of the utility system. business consumers are served by the default supply option in areas where it is available. Also known as standard service Demand response offer or basic service. Reduction in energy use in response to either system reliability concerns or increased prices (where wholesale Demand markets are involved) or generation costs (in the case of In theory, an instantaneous measurement of the rate at vertically integrated utilities). Demand response generally which electricity is being consumed by a single customer must be measurable and controllable to participate in or customer class or the entirety of an electric system, wholesale markets or be relied upon by system operators. expressed in kilowatts or megawatts. Demand is the loadside counterpart to an electric system’s capacity. In practical Depreciation terms, electricity demand is actually measured as the average The loss of value of assets, such as buildings and transmission rate of energy consumption over a short period, usually 15 lines, owing to age and wear. minutes or an hour. For example, a 1,000-watt hair dryer run for the entirety of a 15-minute demand interval would cause a Direct current Abbreviation: DC demand meter using a 15-minute demand interval to record 1 An electric current that flows in one direction, with a kilowatt of demand. If that same hair dryer were run for only magnitude that does not vary or that varies only slightly. 7.5 minutes, however, the metered demand would be only 0.5 kilowatt. Not all electric meters measure demand. Distributed energy resource Abbreviation: DER Any resource or activity at or near customer loads that Demand charge generates energy, reduces consumption or otherwise A charge paid on the basis of metered demand typically manages energy on-site. Distributed energy resources for the highest hour or 15-minute interval during a billing include customer-site generation, such as solar photovoltaic period. Demand charges are usually expressed in dollars per systems and emergency backup generators, as well as energy watt units, such as kilowatts. Demand charges are common efficiency, controllable loads and energy storage.
  8. Page 263 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 261 Distributed generation Diversity/customer diversity/load diversity Any electricity generator located at or near customer loads. The measurement of how different customers use power at Distributed generation usually refers to customer-sited different times of the day or year, and the extent to which generation, such as solar photovoltaic systems, but may those differences can enable sharing of system generation, include utility-owned generation or independent power transmission or distribution capacity. For example, schools producers interconnected to the distribution system. use power primarily during the day, and street lighting uses power exclusively during hours of darkness; they are Distribution able to share system capacity. By contrast, continuous-use The delivery of electricity to end users via low-voltage electric customers, such as data centers and all-night mini-marts, power lines (usually 34 kV and lower). preempt the use of capacity. Irrigators use power in summer, and space heat uses power in winter, also allowing Distribution utility the seasonal sharing of generation but sometimes not of A utility that owns and operates only the distribution system. distribution capacity. It may provide bundled service to customers by purchasing all needed energy from one or more other suppliers or may Dynamic pricing require that customers make separate arrangements for Rates that may be adjusted frequently, such as hourly or every energy supply. See also vertically integrated utility. 15 minutes, based on wholesale electricity costs or actual generation costs. Also known as real-time pricing. See also Distribution system critical peak pricing. That portion of the electric system used to distribute energy to customers. The distribution system is usually distinguished Embedded cost of service study from the transmission system on the basis of voltage and A cost allocation study that apportions the actual historic function. Components operating above 100 kV are test year or projected future rate year system costs among considered transmission. Components operating below customer classes, typically using customer usage patterns in 50 kV are considered distribution. Facilities between 50 kV and a single yearlong period to divide up the costs. Sometimes 100 kV are often termed subtransmission but are normally called a fully allocated cost of service study. See also marginal included in the distribution service FERC accounts. After cost of service study and total service long-run incremental energy is received from a large generating facility, its voltage cost. is stepped up to very high levels where it is transported by the transmission system. Power from distributed generating Embedded costs facilities such as small photovoltaic systems is normally The actual current costs, including a return on existing plant, delivered into the distribution system and transported to used to provide service. These are reflected in the FERC nearby customers at the distribution system level without ever system of accounts reported in each utility’s FERC Form 1 entering the transmission system. filing. See also marginal costs. Distribution system operator Energy The entity that operates the distribution portion of an electric A unit of power consumed over a period of time. Energy is system. In the case of a vertically integrated utility, this entity expressed in watt-time units, in which the time units are would also provide generation and transmission services. In usually one hour, such as a kilowatt-hour, megawatt-hour many restructured markets, the distribution system operator and so on. An appliance placing 1 kilowatt of demand on the provides only delivery services and may provide only limited system for an hour will consume 1 kilowatt-hour of energy. energy services as a provider of last resort. See also watt and watt-hour.
  9. Page 264 of 276

    262 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Energy charge costs as energy-related. Commonly used for nuclear, coal and A price component based on energy consumed. Energy hydroelectric resources and associated transmission. charges are typically expressed in cents per kilowatt-hour and Also known as the peak credit method. may vary based on the time of consumption. Externalities Energy efficiency Costs or benefits that are side effects of economic activities The deployment of end-use appliances that achieve the same and are not reflected in the booked costs of the utility. or greater end-use value while reducing the energy required Environmental impacts are the principal externalities caused to achieve that result. Higher-efficiency boilers and air by utilities (e.g., climate impacts or health care costs from air conditioners, increased building insulation, more efficient pollution). lighting and higher energy-rated windows are all examples of energy efficiency. Energy efficiency implies a semipermanent, Extra-high voltage Abbreviation: EHV longer-term reduction in the use of energy by the customer, Transmission lines operating at 765 kV (alternating current) contrasted with behavioral programs that may influence or roughly 400 kV (direct current) or above. short-term usage habits. Because energy efficiency reduces the need for generation, transmission and distribution, these Federal Energy Regulatory Commission costs are properly allocated using the methods applied to all Acronym: FERC three functions. The U.S. agency that has jurisdiction over interstate transmission systems and wholesale sales of electricity. Energy-related costs Costs that vary directly with the number of kilowatt-hours Fixed charge the utility provides over a period of time. Any fee or charge that does not vary with consumption. Customer charges are a typical form of fixed charge. In Equal percentage of marginal cost Abbreviation: EPMC some jurisdictions, customers are charged a connected load A method of adjusting the results of a marginal cost of service charge that is based on the size of their service panel or total study to the system revenue requirement by adjusting the expected maximum load. Minimum bills and straight fixed/ cost responsibility of each class by a uniform percentage. variable rates are additional forms of fixed charges. Often applied within the functional categories of generation, transmission and distribution. Fixed cost This accounting term is meant to denote costs that do not Equivalent forced outage rate vary within a certain period of time, usually one year, primarily The percentage of the hypothetical maximum output of interest expense and depreciation expense. This term is a generating unit during a year that is unavailable due to often misapplied to denote costs associated with plant and unplanned outages, either full or partial, of the unit. equipment (which are themselves denoted as fixed assets in accounting terms) or other utility costs that cannot be Equivalent peaker method changed in the short term. From a regulatory and economics A method of classifying production and transmission costs perspective, the concept of fixed costs is irrelevant. For that assigns a portion of investment and maintenance costs purposes of regulation, all utility costs are variable in the long as demand-related — based on the cost of a peaking resource run. Even the costs associated with seemingly fixed assets, such such as demand response or a peaking power unit that can as the distribution system, are not fixed, even in the short run. be deployed within the service territory — and the balance of Utilities are constantly upgrading and replacing distribution
  10. Page 265 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 263 facilities throughout their systems as more customers are Grid served and customer usage increases, and efforts to reduce The electric system as a whole or the nongeneration portion demand can have immediate impacts on those costs. of the electric system. Flat volumetric rate Heat rate A rate design with a uniform price per kilowatt-hour for all The number of British thermal units that a thermal power levels of consumption. plant requires in fuel to produce 1 kilowatt-hour. Fuel adjustment clause Highest 100 (or 200) hours method An adjustment mechanism that allows utilities to recover A method for allocating demand-related or capacity-related all or part of the variation in the cost of fuel or purchased costs that considers class demand over the highest 100 power from the levels assumed in a general rate case. See also (or 200) hours of usage during the year. adjustment clause. High-voltage direct current Abbreviation: HVDC Fuel cost An HVDC electric power transmission system uses direct The cost of fuel, typically burned, used to create electricity. current for the bulk transmission of electrical power, in Types include nuclear, coal, natural gas, diesel, biomass, contrast to the more common alternating current systems. bagasse, wood and fuel oil. Some generators, such as wind For long-distance transmission, HVDC systems may be less turbines and solar photovoltaic and solar thermal generators, expensive and suffer lower electrical losses. use no fuel or, in the case of hydroelectric generation, virtually cost-free fuel. Hourly allocation An allocation approach in which costs or groups of costs are Functionalization assigned to hourly time periods rather than classified between A step in most cost allocation methods in which costs are demand- and energy-related costs. defined into functional categories, such as generation-related, transmission-related, distribution-related, or administrative Incremental cost and general costs. The short-run cost of augmenting an existing system. An incremental cost study rests on the theory that prices General service should reflect the cost of producing the next unit of energy A term broadly applied to nonresidential customers. It or deployment of the next unit of capacity in the form of sometimes includes industrial customers and sometimes is generation, transmission or distribution. See also long-run distinct from an industrial class. It is often divided into small, marginal costs, short-run marginal costs and total system medium and large by maximum demand or into secondary long-run incremental cost. and primary by voltage. Independent power producer Generation A power plant that is owned by an entity other than an Any equipment or device that supplies energy to the electric utility. May also be referred to as a non-utility electric system. Generation is often classified by fuel source generator. (i.e., nuclear, coal, gas, solar and so on) or by operational or economic characteristics (e.g., “must-run,” baseload, intermediate, peaking, intermittent, load following).