Prefiled testimony
Witness: Melissa Whited
Files3
Synapse - Eversource COS and Rate Design Testimony Final.pdf
PDF · 829 KB · 48 pagesText searchable
Download Synapse - Eversource COS and Rate Design Testimony Final.pdfRead the text of Synapse - Eversource COS and Rate Design Testimony Final.pdf
MW-2- Synapse Attachment.pdf
PDF · 4.6 MB · 276 pagesText searchable
Download MW-2- Synapse Attachment.pdfRead the text of MW-2- Synapse Attachment.pdf
MW-1 - Synapse Attachment.pdf
PDF · 734 KB · 13 pagesText searchable
Download MW-1 - Synapse Attachment.pdfRead the text of MW-1 - Synapse Attachment.pdf
Page 47 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 45 Figure 14. Investor-owned electric utility service territories in Texas AEP Texas Central Co. AEP Texas North Co. CenterPoint Energy El Paso Electric Co. Entergy Texas Oncor Southwestern Electric Power Co. Texas-New Mexico Power Co. Xcel Energy Source: Association of Electric Companies of Texas Inc. (2019). Electricity 101 A cost analyst may need to examine these costs carefully to which was later repealed. In addition, generation of electricity avoid shifting them to specific customer classes and to spread with natural gas was to be prohibited at existing plants by 1990, these costs systemwide. with an exception for certain combined heat and power (CHP) 4.4 From the Oil Crisis to Restructuring facilities (Gordon, 1979). This law accelerated a trend toward the construction of large capital-intensive nuclear and coal power plants across the country in order to get away from the From the 1950s to the early 1970s, electric sales skyrock- use of oil and natural gas for electricity. The confluence of all eted due to a wide range of new electric end uses, and prices these trends, including high oil prices and expensive capital- were relatively stable. However, the cost structure of the intensive plants entering the rate base, led to major increases utility industry changed drastically after the 1974 oil crisis. in electricity prices, as depicted in Figure 15 on the next page Demand fell rapidly, particularly in locations where oil was using U.S. Energy Information Administration data (2019). used to generate electricity, in response to large price increases Congress also passed PURPA in 1978, which included and fuel shortages. Natural gas prices, which had been partly provisions intended to open up competition in the provision regulated, were gradually deregulated over the next decade, of electricity and to reform state rate-making practices. On but natural gas was thought to be in short supply and available the competition side, PURPA required electric utilities to only for certain uses. No new baseload power plants running purchase power from independent producers at long-term more than 1,500 hours a year could be run on oil or natural prices based on avoided costs. With regard to state rate- gas under the Powerplant and Industrial Fuel Use Act of 1978, making practices, PURPA also required state commissionsPage 48 of 276
46 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Cents per kWh (nominal, including taxes) Figure 15. US average retail residential electricity prices through 2018 14 12 Oil crises and rapid development of coal and nuclear plants 10 8 Restructuring and natural gas development 6 Post-PURPA era 4 2 0 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 2010 2015 Data source: U.S. Energy Information Administration. (2019, March). Monthly Energy Review to consider a series of rate-making standards, including cost of 1992.20 This law called for open access to transmission of service. This standard was widely adopted, but neither service and paved the way for restructuring of the electric PURPA nor the state commissions defined “cost of service.”19 industry, including organized wholesale markets. In several PURPA also requires some method to assure consumer parts of the country, including Texas and the Northeast, representation in the consideration of rate design, through Midwest and West Coast, many states followed these trends either a state consumer advocate or intervenor funding. and passed restructuring acts in the late 1990s, which The widespread end result was low-cost energy required formal separation of certain asset classes and, in generation (particularly after the fall in oil and gas prices some cases, total divestment of generation assets. In several in 1985-1986) and excess capacity in the 1980s, meaning parts of the country, following voluntary criteria articulated the wholesale price of power was often much lower than by FERC in 1996, independent system operators were created full retail rates, even the supply portion of those rates. As to formalize independent control of the electric system and a result, large industrial power users and municipalities to administer organized wholesale markets for energy supply. began demanding the right to become wholesale purchasers FERC also articulated voluntary criteria in 1999 to form of electricity. Given the changes in fuel markets, Congress regional transmission organizations, which contain many of repealed the limits on natural gas usage for electricity in the the same elements as the earlier ISO requirements (Lazar, Natural Gas Utilization Act of 1987. 2016, pp. 21-23). There are currently six ISOs/RTOs operating During the 1980s, major changes occurred in the solely in the U.S., two operating exclusively in Canada and telecommunications and natural gas industries, often termed one that includes areas in both countries: deregulation but more accurately described as restructuring. • California Independent System Operator (CAISO). Following these trends and the demands of larger purchasers • Electric Reliability Council of Texas (ERCOT). for lower rates, Congress passed the Energy Policy Act • Midcontinent Independent System Operator (MISO), 19 The relevant provision of PURPA merely states: “Rates charged by any electric utility for providing electric service to each class of electric consumers shall be designed, to the maximum extent practicable, to reflect the costs of providing electric service to such class” (16 U.S.C. § 2621[d][1]). This was clarified by the 2005 amendments to include “permit identification of differences in cost-incurrence, for each such class of electric consumers, attributable to daily and seasonal time of use of service” (16 U.S.C. § 2625[b][1]). 20 Pub. L. 102-486. Retrieved from https://www.govinfo.gov/content/pkg/ STATUTE-106/pdf/STATUTE-106-Pg2776.pdfPage 49 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 47 spanning from North Dakota through Michigan and other features of the new California rules, this led to high Indiana and down to Louisiana while also including the wholesale market prices, the bankruptcy of one of the nation’s Canadian province of Manitoba. largest utilities and even the recall and removal of California’s • ISO New England (ISO-NE). governor. • New York Independent System Operator (NYISO). • PJM Interconnection, spanning from New Jersey down through part of North Carolina and extending west 4.5 Opening of the 21st Century The beginning of the 21st century has seen another wave through West Virginia and Ohio, while also including the of dramatic change in the electric sector. Restructured areas Chicago area. have seen significant changes in investment patterns. New Southwest Power Pool (SPP), spanning from North natural gas combined cycle plants have become a much more Dakota down through Arkansas, Oklahoma and northern important source of generation. Aided by a drop in natural Texas. gas prices due to innovations in drilling technology, they • Alberta Electric System Operator (AESO). have been able to outcompete other types of generation. • Independent Electricity System Operator (IESO) in This has meant significant retirements of other types of Ontario. generation, starting with older oil and coal units, which have Organized wholesale markets for energy supply provide also been affected by new pollution control requirements for structured competition among owners of power plants over the last several decades. More recently, nuclear plants while meeting reliability and other constraints. These mar- built in the 1960s through 1980s have started to be retired, kets provide a nominal framework for competition but are in or their owners have claimed that low energy market prices actuality much more deliberately constructed than any actual require additional financial support to enable their continued competitive markets that do not have the same reliability operation. • obligations. Cost analysts should pay careful attention to In addition, global market developments and federal, whether wholesale market structures and tariffs truly reflect state and local policies for renewable generation, as well as cost causation. energy efficiency and demand response, have led to signif- In some states, retail customers were also given the icant expansions in new resources that have zero pollution option of choosing a new retail electricity supplier for the and low marginal costs. Many states have adopted renewable energy component of their rates, typically with utility- portfolio standards (RPS) to accelerate the adoption of procured “basic” or default energy service as the more new renewable technologies, sometimes with requirements widely used option.21 FERC regulates ISOs and RTOs, as for solar or other specific technologies. Storage technology well as the organized wholesale markets they run. However, innovation has further increased options for grid flexibility each traditional regulated utility retained ownership of the and reliability. New technologies to monitor and manage the distribution system as a natural monopoly regulated by the electricity grid have also become much more prevalent as state, and states are the primary regulatory entity for retail a result of continued innovation, cost decreases and policy electricity suppliers. support. Several more states were either in the beginning stages Some jurisdictions are looking at how to maximize the of restructuring or contemplating restructuring in the early benefits of customer-sited investments in energy efficiency, 2000s when a backlash from events in restructured states energy management and distributed generation. Notable halted this trend. Chief among these events was the Califor- examples are the Reforming the Energy Vision process in nia energy crisis, where a drought-induced supply shortfall enabled energy traders to manipulate newly formed energy markets. In combination with infrastructure limitations and 21 Texas is the exception, without any option for utility-provided energy supply service.Page 50 of 276
48 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® New York, E21 in Minnesota and the distribution resources driven by federal tax code provisions, some is due to the plan proceedings in California. These efforts may even extend emergence of specialized companies that build and operate to new market structures at the retail level and new platforms specific types of power generating facilities, and some is due for customers and third parties to exchange data and to offer to public policy decisions to limit ownership of generating and receive new types of services. resources by traditionally regulated utilities. As a result, costs Changes in the electricity system affect many parts of the cost allocation process. First, a utility cost study performed in 1980 might have attributable to these sources of generation are primarily the cost of the energy — which is not divided up into capital costs, maintenance costs, etc., as it was when the generation placed 70% of the utility revenue requirement in the catego- plant was owned and operated by the utility. The 2005 ries of fuel and purchased power, which are generally consid- amendments to PURPA, which state that time-differentiated ered short-run variable energy-related costs. Since that time, cost studies must be considered, provide an imperative to capital has been substituted for fuel, in the form of wind, think carefully about how to assign costs to time periods. solar, nuclear and even high-efficiency combined cycle units Third, a range of supportive state and federal policies, running on low-cost natural gas. Many variable labor costs combined with falling costs, have led to major increases in for customer service and distribution employees, including DERs, notably rooftop solar. Advanced energy storage may be meter readers, have been displaced with capital investments the next great wave on this front, enabling both widespread in distribution automation and smart grid technologies. As energy management and backup power resources. energy storage evolves, even peak hour needs may be met Fourth, today’s sophisticated data and analytical capabil- with no variable fuel costs incurred in the hour when service ities present regulators and analysts alike with a wide range is actually provided. Instead, power may be generated in one of new choices. Several decades ago, analysts were limited to period with a variable renewable resource with no fuel cost22 simple categorizations and shortcuts. This includes the tradi- and saved for a peak hour in a storage system with almost no tional division of costs as customer-related, demand-related variable operating costs. or energy-related. Regulators are no longer bound by these Second, a significant share of electricity generation is limitations and should seek to improve on dated techniques. now owned by non-utility investors. Some of this shift is 22 For example, Xcel Energy has put forward a “steel for fuel” program, which substitutes wind and solar facilities for fuel-burning power plants (Xcel Energy, 2018, p. 5).Page 51 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA Works Cited in Part I Association of Electric Companies of Texas Inc. (2019). Electricity 101. Retrieved from http://www.aect.net/ documents/2019/AECT%20Electricity%20101%202019.pdf Bonbright, J. (1961). Principles of public utility rates. New York, NY: Columbia University Press. California Public Utilities Commission. (2014, December 18). Decision regarding smartmeter opt-out provisions. Application No. 11-03-014 et al., Decision No. 14-12-078. Retrieved from http://docs.cpuc.ca.gov/PublishedDocs/ Published/G000/M143/K904/143904205.PDF Daniels, L. (1988, January 29). Bankruptcy filed by leading utility in Seabrook plant. The New York Times. Retrieved from https://www.nytimes.com/1988/01/29/business/bankruptcy-filed-by-leading-utility-in-seabrook-plant.html Deller, S., Hoyt, A., Hueth, B., and Sundaram-Stukel, R. (2009). Research on the economic impact of cooperatives. Madison: University of Wisconsin Center for Cooperatives. Retrieved from http://reic.uwcc.wisc.edu/sites/all/REIC_ FINAL.pdf Garfield, P., and Lovejoy, W. (1964). Public utility economics. Englewood Cliffs, NJ: Prentice Hall. Gordon, R. (1979). The Powerplant and Industrial Fuel Use Act of 1978 — an economic analysis. Natural Resources Journal 19(4). Retrieved from https://digitalrepository.unm.edu/cgi/viewcontent. cgi?referer=&httpsredir=1&article=3074&context=nrj Kahn, A. (1970 and 1971). The economics of regulation: Principles and institutions (vols. 1 and 2). New York, NY: John Wiley & Sons. Lazar, J. (2014). Performance-based regulation for EU distribution system operators. Montpelier, VT: Regulatory Assistance Project. Retrieved from https://www.raponline.org/knowledge-center/performancebased-regulation-for-eu-distribution-system-operators/ Lazar, J. (2016). Electricity regulation in the United States: A guide (2nd ed.). Montpelier, VT: Regulatory Assistance Project. Retrieved from https://www.raponline.org/knowledge-center/electricity-regulation-in-the-us-a-guide-2/ Lazar, J., and Baldwin, X. (2011). Valuing the contribution of energy efficiency to avoided marginal line losses and reserve requirements. Montpelier, VT: Regulatory Assistance Project. Retrieved from https://www.raponline.org/ knowledge-center/valuing-the-contribution-of-energy-efficiency-to-avoided-marginal-line-losses-and-reserverequirements/ Lazar, J., and Gonzalez, W. (2015). Smart rate design for a smart future. Montpelier, VT: Regulatory Assistance Project. Retrieved from https://www.raponline.org/knowledge-center/smart-rate-design-for-a-smart-future/ Linvill, C., Lazar, J., Dupuy, M., Shipley, J., and Brutkoski, D. (2017). Smart non-residential rate design: Optimizing rates for equity, integration, and DER deployment. Montpelier, VT: Regulatory Assistance Project. Retrieved from https://www.raponline.org/knowledge-center/smart-non-residential-rate-design/ Linvill, C., Shenot, J., and Lazar, J. (2013). Designing distributed generation tariffs well: Fair compensation in a time of transition. Montpelier, VT: Regulatory Assistance Project. Retrieved from https://www.raponline.org/knowledgecenter/designing-distributed-generation-tariffs-well/ | 49Page 52 of 276
50 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Littell, D., Kadoch, C., Baker, P., Bharvirkar, R., Dupuy, M., Hausauer, B., Linvill, C., Midgen-Ostrander, J., Rosenow, J., Xuan, W., Zinaman, O., and Logan, J. (2017). Next-generation performance-based regulation: Emphasizing utility performance to unleash power sector innovation (NREL/TP-6A50-68512). Montpelier, VT and Golden, CO: Regulatory Assistance Project and National Renewable Energy Laboratory. Retrieved from https://www.raponline.org/knowledge-center/next-generation-performance-based-regulation-emphasizing-utilityperformance-unleash-power-sector-innovation/ National Association of Regulatory Utility Commissioners. (1992). Electric utility cost allocation manual. Washington, DC: Author. Retrieved from https://pubs.naruc.org/pub/53A3986F-2354-D714-51BD-23412BCFEDFD National Rural Electric Cooperative Association. (2017). America’s electric cooperatives: 2017 fact sheet. Retrieved from https://www.electric.coop/electric-cooperative-fact-sheet/ Phillips, C. (1984). The regulation of public utilities (1st ed.). Arlington, VA: Public Utility Reports. U.S.-Canada Power System Outage Task Force. (2004). Final report on the August 14, 2003 blackout in the United States and Canada: Causes and recommendations. Retrieved from https://www.energy.gov/sites/prod/files/ oeprod/DocumentsandMedia/BlackoutFinal-Web.pdf U.S. Department of Energy. (2015). United States electricity industry primer (DOE/OE-0017). Washington, DC: Author. Retrieved from https://www.energy.gov/sites/prod/files/2015/12/f28/united-states-electricity-industryprimer.pdf U.S. Energy Information Administration. (2019, March). Monthly energy review (DOE/EIA-0035 [2019/3]). Table 9.8. Washington, DC: Author. Retrieved from https://www.eia.gov/totalenergy/data/monthly/index.php Xcel Energy. (2018, October 2-4). Leading the energy future [Presentation at the Wolfe Research Conference]. Retrieved from investors.xcelenergy.com/file/4025308/Index?KeyFile=1500113448 Zummo, P. (2018). Coast to coast, public power costs less. Arlington, VA: American Public Power Association. Retrieved from https://www.publicpower.org/periodical/article/coast-coast-public-power-costs-lessPage 53 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® Part II: Overarching Issues and Frameworks for Cost Allocation ELECTRIC COST ALLOCATION FOR A NEW ERA | 51Page 54 of 276
52 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® 5. Key Common Analytical Elements S everal key analytical processes and decisions must be One crucial underlying reality is that customers use made regardless of the overall framework and specific electricity at different times, leading to the concept of load methods used for cost allocation. These common diversity. Load diversity means the shared portions of the analytical elements include: system need to be sized to meet only the coincident peak • Cost drivers: What are the key factors that lead different (CP) loads for combined customer usage at each point types of costs to be incurred? of the system,23 rather than the sum of the customers’ Determining customer classes: How many classes of noncoincident peak (NCP) loads.24 This diversity exists on customers should be categorized separately, and how is every point of the system: each class defined? • Customers sharing a transformer have diverse loads. Load research and data collection: What are the key • Loads along a distribution feeder circuit have diversity. patterns of load, delivery and generation that need to • Multiple circuits on a substation have diversity. be recorded and analyzed? For any key data that are • The substations served by a transmission line have load • • not tracked comprehensively, is sampling or another approach used? In any individual rate case, these issues may not be diversity. • Individual utilities in an ISO territory or regional transmission interconnection have diversity. litigated at great length, and many or all parties may rely Diversity of load means the actual electricity system on past practices and precedent. But the decisions made on is significantly less expensive than a system that would be these issues historically by each public utility commission can built to serve the sum of every customer’s individual NCP. have important consequences in the present, particularly as Holding peak load for a customer constant, this also means changes to technology and the regulatory system undermine that a customer with load that varies over time is effectively the basis of past assumptions. much cheaper to serve than a customer that uses the same 5.1 Cost Drivers Effective cost allocation and rate design require the identification of central cost causation factors, or cost drivers. peak amount at every hour. The former customer can share capacity with other customers who use power at other times, but the latter cannot. Another important reality is that the accounting category Within these processes, it is important to identify relatively to which a cost is assigned does not determine its causation. simple metrics (e.g., energy use in various periods, demand An expense item may be due to energy use, peak demands at various times, numbers of customers of various types) that or number of customers; the same is true for capital invest- can be associated with the various customer classes. The cost ments. Capital costs and other expenses that do not vary with allocation process, by its nature, approximates cost responsi- short-run dispatch changes are referred to as fixed costs by bility and is not a tool of exceedingly precise measurements. some analysts, and some cost of service studies assume that 23 As explained throughout this section, the critical coincident peak load may be a single peak hour but more typically is some combination of loads over multiple hours. 24 Several other terms are used for individual customers’ noncoincident peak demand, including “undiversified maximum customer demand.” Unfortunately, both “NCP” and “maximum customer demand” can also be used to refer to various class peaks, particularly when used with modifiers. This manual will use “customer NCP” to refer to individual customer peaks and “class NCP” to refer to aggregated peaks by class, often specifying the level of the system for the relevant class NCP. Class NCP is sometimes referred to as the maximum class peak, maximum diversified demand or other similar terms.Page 55 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 53 these notionally fixed costs cannot be driven by energy use. considered variable with output: the costs of some consum- As discussed in the text box on pages 78-79, this assumption able materials (especially for pollution control equipment), is incorrect. Utilities make investments and commit to “fixed” as well as the costs of replacements (such as lubricants and expenses for many reasons: to meet peak demands, to reduce filters) and overhauls that are required after a specified fuel costs, to reduce energy losses, to access lower-cost energy amount of output, equivalent full-load hours of operation or resources and to expand the system to attract additional similar measures.26 business. As a result, this manual will use the phrase “dispatch In many cases, utilities classify costs based on account- O&M costs” to reflect operations and maintenance costs that ing data and administrative convenience, rather than the vary directly with generation output and “nondispatch O&M underlying reasons why the costs were incurred and why any costs” for O&M costs that are incurred independently of capital investments are still part of the system. For example, output levels. utilities may treat some O&M and interim capital additions as variable and energy-related for one set of purposes, such as 5.1.1 Generation There are several different categories of generation costs, rate design or evaluation of potential generation resources, but treat the same costs as demand-related for cost allocation with different lengths of time for the commitment. Depend- purposes for simplicity. Cost of service studies are normally ing on the technologies in question, long-term capital costs, driven primarily by accounting data that do not readily nondispatch O&M costs and per-kWh fuel costs are substitut- differentiate dispatch O&M costs from nondispatch O&M able — that is, a wind generator with a battery storage system costs and capital additions. involves more capital cost and lower operating cost than a Similarly, other costs, such as pollution controls and ash natural gas combustion turbine unit with the same output. handling and disposal at coal plants, include significant long- The longest-lived category of generation costs is capital run investments that were specifically incurred to support the investment in generation facilities, which are often depreci- energy generation process and generally should be treated as ated on a 30-year timeline and can last even longer. Once the energy-related. These investments would not be needed or investment is made, the depreciation expense typically will would be less costly either if the plant were run less often or if not vary over that time. Of course, a generation facility can the fuel were less polluting. be permanently shut down (retired), temporarily shut down (mothballed) or repurposed before the depreciation period is Short-Run Variable Generation Costs over. Different costs and benefits may be incurred for each of The short-run variable cost of power generation is these three options. It is also possible for a plant’s life to be typically straightforward, primarily entailing a mix of fuel recalculated at some point, with an appropriate change in the costs, dispatch O&M costs for utility-owned generation and depreciation schedule and the annual depreciation expense. purchased power. As a result, the drivers of these costs are There can be significant capital investments and nondis- typically fuel prices, market prices for energy and any ongoing patch O&M costs that are incurred on an annual or monthly contracts the utility has. Utilities can hedge the risk of short- basis, which may not vary directly with the numbers of hours term energy generation costs through a wide range of means, the facility operates. There are also capital investments that including futures contracts for fuel and power. are driven by wear and tear, rather than the passage of time.25 The shortest-term variable costs for utilities are mostly The short-run variable costs of some generation facilities, including storage and dispatchable hydro, are very low. fuel costs and the portions of power purchases that vary Storage facilities require the operation of other resources with energy taken. In addition, some O&M costs are usually (which may well have variable costs) to charge them. Dispatch 25 These costs are comparable to tire replacements that are caused by wear and tear closely correlated with miles driven. 26 These costs are comparable to the costs of automotive oil changes and routine services that are the consequence primarily of miles driven.Page 56 of 276
54 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® decisions for storage and dispatchable hydro resources are adding capacity at any hour to a system, even off-peak hours, typically made to maximize the benefits from the limited has a small but discernible beneficial impact on reliability. supply of other time-shiftable generation resources. Many resources can be justified only if all of the attributes are Prior to PURPA, most long-term purchased power considered, including contribution to meeting peak demand contracts had separate capacity and energy elements. These and contribution to meeting other needs such as fuel cost were mostly for fuel-dependent power plants. This rate form reduction. allowed the owner to obtain capital cost recovery in a predict- The typical vertically integrated utility calculates the in- able payment and the receiving utility to control the output stalled capacity requirement by determining what amount of as needed to fit varying loads, paying for short-run variable existing and new capacity will provide acceptable reliability, costs as incurred. Today many power purchase contracts measured by such statistical parameters as the mathematical are expressed entirely on a volumetric basis, based on an expected value of the number of hours in which it cannot expected pattern of output. This change in how contracts are serve load or of the amount of customer energy it will not be priced in the wholesale market does not dictate any particular able to serve in a year, due to insufficient available genera- approach to how costs are allocated in the retail rate-setting tion. Those expected values are computed from models that process. simulate the scheduling of generation maintenance and the random timing of forced outages for many potential combi- Generation Capacity Costs Beyond these energy needs, most regions of the United nations of outages and load levels. In large portions of North America, the capacity requirement is determined regionally States also plan around the amount of shared generation by an ISO/RTO and then allocated to the load-serving capacity needed, and these processes can drive a significant entities, transmission control areas or utilities.28 amount of generation costs. The amount of capacity required by a utility system, typically denominated in megawatts (MWs) or gigawatts at the time of the system coincident peak, determines whether the utility should retire existing plants, add new resources or delay planned retirements, or keep the system as it is. All those decisions have costs and benefits. Required reserves are usually expressed as the percentage reserve margin, which is: (capacity – peak load) ÷ peak load; or (capacity ÷ peak load) – 1 Capacity may be defined as installed capacity, demon- This determination may be made by an ISO/RTO, a holding strated capacity or unforced capacity (installed capacity company or other aggregation of interconnected load. reduced by the resource’s forced outage rate). There may Although the typical planning procedures used to date by be special provisions to recognize that an installed MW of utilities and ISOs have often served their original purposes to solar, wind or seasonal hydro capacity is not equivalent to an measure the least-cost resources available at the utility system installed MW of combustion turbine capacity with guar- level, these procedures often oversimplify important aspects anteed fuel availability or a MW of battery storage capacity of overall capacity and reliability issues. The key principle is located at a distribution substation. Capacity requirements that reliability-related costs are not all “caused” by one hour may also be satisfied with curtailable load, energy storage or or a few hours of demand during the year. A system must expected price response to peak pricing. The cost of capacity have some form and level of capacity available at all hours. to meet a very short-term need is very different from the cost Loss-of-energy expectation27 studies generally show that of baseload capacity that serves customers around the clock 27 Different analysts refer to related measures as loss-of-load hours, loss-ofload expectation, expected unserved energy and loss-of-load probability. 28 Some of the utilities in the ISOs/RTOs are restructured and do not provide generation services, so the cost of service study need not deal with generation costs. However, all the utilities in the SPP and most of those in MISO are vertically integrated, as are some jurisdictions in PJM (West Virginia, Virginia, Kentucky and the PJM pieces of North Carolina, Indiana and Michigan) and ISO-NE (Vermont) and municipal and cooperative utilities in most restructured jurisdictions.
As listed on the current system
Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Melissa Whited [26-05-10]