Prefiled testimony
Witness: Melissa Whited
Files3
Synapse - Eversource COS and Rate Design Testimony Final.pdf
PDF · 829 KB · 48 pagesText searchable
Download Synapse - Eversource COS and Rate Design Testimony Final.pdfRead the text of Synapse - Eversource COS and Rate Design Testimony Final.pdf
MW-2- Synapse Attachment.pdf
PDF · 4.6 MB · 276 pagesText searchable
Download MW-2- Synapse Attachment.pdfRead the text of MW-2- Synapse Attachment.pdf
MW-1 - Synapse Attachment.pdf
PDF · 734 KB · 13 pagesText searchable
Download MW-1 - Synapse Attachment.pdfRead the text of MW-1 - Synapse Attachment.pdf
Page 49 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 47 spanning from North Dakota through Michigan and other features of the new California rules, this led to high Indiana and down to Louisiana while also including the wholesale market prices, the bankruptcy of one of the nation’s Canadian province of Manitoba. largest utilities and even the recall and removal of California’s • ISO New England (ISO-NE). governor. • New York Independent System Operator (NYISO). • PJM Interconnection, spanning from New Jersey down through part of North Carolina and extending west 4.5 Opening of the 21st Century The beginning of the 21st century has seen another wave through West Virginia and Ohio, while also including the of dramatic change in the electric sector. Restructured areas Chicago area. have seen significant changes in investment patterns. New Southwest Power Pool (SPP), spanning from North natural gas combined cycle plants have become a much more Dakota down through Arkansas, Oklahoma and northern important source of generation. Aided by a drop in natural Texas. gas prices due to innovations in drilling technology, they • Alberta Electric System Operator (AESO). have been able to outcompete other types of generation. • Independent Electricity System Operator (IESO) in This has meant significant retirements of other types of Ontario. generation, starting with older oil and coal units, which have Organized wholesale markets for energy supply provide also been affected by new pollution control requirements for structured competition among owners of power plants over the last several decades. More recently, nuclear plants while meeting reliability and other constraints. These mar- built in the 1960s through 1980s have started to be retired, kets provide a nominal framework for competition but are in or their owners have claimed that low energy market prices actuality much more deliberately constructed than any actual require additional financial support to enable their continued competitive markets that do not have the same reliability operation. • obligations. Cost analysts should pay careful attention to In addition, global market developments and federal, whether wholesale market structures and tariffs truly reflect state and local policies for renewable generation, as well as cost causation. energy efficiency and demand response, have led to signif- In some states, retail customers were also given the icant expansions in new resources that have zero pollution option of choosing a new retail electricity supplier for the and low marginal costs. Many states have adopted renewable energy component of their rates, typically with utility- portfolio standards (RPS) to accelerate the adoption of procured “basic” or default energy service as the more new renewable technologies, sometimes with requirements widely used option.21 FERC regulates ISOs and RTOs, as for solar or other specific technologies. Storage technology well as the organized wholesale markets they run. However, innovation has further increased options for grid flexibility each traditional regulated utility retained ownership of the and reliability. New technologies to monitor and manage the distribution system as a natural monopoly regulated by the electricity grid have also become much more prevalent as state, and states are the primary regulatory entity for retail a result of continued innovation, cost decreases and policy electricity suppliers. support. Several more states were either in the beginning stages Some jurisdictions are looking at how to maximize the of restructuring or contemplating restructuring in the early benefits of customer-sited investments in energy efficiency, 2000s when a backlash from events in restructured states energy management and distributed generation. Notable halted this trend. Chief among these events was the Califor- examples are the Reforming the Energy Vision process in nia energy crisis, where a drought-induced supply shortfall enabled energy traders to manipulate newly formed energy markets. In combination with infrastructure limitations and 21 Texas is the exception, without any option for utility-provided energy supply service.Page 50 of 276
48 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® New York, E21 in Minnesota and the distribution resources driven by federal tax code provisions, some is due to the plan proceedings in California. These efforts may even extend emergence of specialized companies that build and operate to new market structures at the retail level and new platforms specific types of power generating facilities, and some is due for customers and third parties to exchange data and to offer to public policy decisions to limit ownership of generating and receive new types of services. resources by traditionally regulated utilities. As a result, costs Changes in the electricity system affect many parts of the cost allocation process. First, a utility cost study performed in 1980 might have attributable to these sources of generation are primarily the cost of the energy — which is not divided up into capital costs, maintenance costs, etc., as it was when the generation placed 70% of the utility revenue requirement in the catego- plant was owned and operated by the utility. The 2005 ries of fuel and purchased power, which are generally consid- amendments to PURPA, which state that time-differentiated ered short-run variable energy-related costs. Since that time, cost studies must be considered, provide an imperative to capital has been substituted for fuel, in the form of wind, think carefully about how to assign costs to time periods. solar, nuclear and even high-efficiency combined cycle units Third, a range of supportive state and federal policies, running on low-cost natural gas. Many variable labor costs combined with falling costs, have led to major increases in for customer service and distribution employees, including DERs, notably rooftop solar. Advanced energy storage may be meter readers, have been displaced with capital investments the next great wave on this front, enabling both widespread in distribution automation and smart grid technologies. As energy management and backup power resources. energy storage evolves, even peak hour needs may be met Fourth, today’s sophisticated data and analytical capabil- with no variable fuel costs incurred in the hour when service ities present regulators and analysts alike with a wide range is actually provided. Instead, power may be generated in one of new choices. Several decades ago, analysts were limited to period with a variable renewable resource with no fuel cost22 simple categorizations and shortcuts. This includes the tradi- and saved for a peak hour in a storage system with almost no tional division of costs as customer-related, demand-related variable operating costs. or energy-related. Regulators are no longer bound by these Second, a significant share of electricity generation is limitations and should seek to improve on dated techniques. now owned by non-utility investors. Some of this shift is 22 For example, Xcel Energy has put forward a “steel for fuel” program, which substitutes wind and solar facilities for fuel-burning power plants (Xcel Energy, 2018, p. 5).Page 51 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA Works Cited in Part I Association of Electric Companies of Texas Inc. (2019). Electricity 101. Retrieved from http://www.aect.net/ documents/2019/AECT%20Electricity%20101%202019.pdf Bonbright, J. (1961). Principles of public utility rates. New York, NY: Columbia University Press. California Public Utilities Commission. (2014, December 18). Decision regarding smartmeter opt-out provisions. Application No. 11-03-014 et al., Decision No. 14-12-078. Retrieved from http://docs.cpuc.ca.gov/PublishedDocs/ Published/G000/M143/K904/143904205.PDF Daniels, L. (1988, January 29). Bankruptcy filed by leading utility in Seabrook plant. The New York Times. Retrieved from https://www.nytimes.com/1988/01/29/business/bankruptcy-filed-by-leading-utility-in-seabrook-plant.html Deller, S., Hoyt, A., Hueth, B., and Sundaram-Stukel, R. (2009). Research on the economic impact of cooperatives. Madison: University of Wisconsin Center for Cooperatives. Retrieved from http://reic.uwcc.wisc.edu/sites/all/REIC_ FINAL.pdf Garfield, P., and Lovejoy, W. (1964). Public utility economics. Englewood Cliffs, NJ: Prentice Hall. Gordon, R. (1979). The Powerplant and Industrial Fuel Use Act of 1978 — an economic analysis. Natural Resources Journal 19(4). Retrieved from https://digitalrepository.unm.edu/cgi/viewcontent. cgi?referer=&httpsredir=1&article=3074&context=nrj Kahn, A. (1970 and 1971). The economics of regulation: Principles and institutions (vols. 1 and 2). New York, NY: John Wiley & Sons. Lazar, J. (2014). Performance-based regulation for EU distribution system operators. Montpelier, VT: Regulatory Assistance Project. Retrieved from https://www.raponline.org/knowledge-center/performancebased-regulation-for-eu-distribution-system-operators/ Lazar, J. (2016). Electricity regulation in the United States: A guide (2nd ed.). Montpelier, VT: Regulatory Assistance Project. Retrieved from https://www.raponline.org/knowledge-center/electricity-regulation-in-the-us-a-guide-2/ Lazar, J., and Baldwin, X. (2011). Valuing the contribution of energy efficiency to avoided marginal line losses and reserve requirements. Montpelier, VT: Regulatory Assistance Project. Retrieved from https://www.raponline.org/ knowledge-center/valuing-the-contribution-of-energy-efficiency-to-avoided-marginal-line-losses-and-reserverequirements/ Lazar, J., and Gonzalez, W. (2015). Smart rate design for a smart future. Montpelier, VT: Regulatory Assistance Project. Retrieved from https://www.raponline.org/knowledge-center/smart-rate-design-for-a-smart-future/ Linvill, C., Lazar, J., Dupuy, M., Shipley, J., and Brutkoski, D. (2017). Smart non-residential rate design: Optimizing rates for equity, integration, and DER deployment. Montpelier, VT: Regulatory Assistance Project. Retrieved from https://www.raponline.org/knowledge-center/smart-non-residential-rate-design/ Linvill, C., Shenot, J., and Lazar, J. (2013). Designing distributed generation tariffs well: Fair compensation in a time of transition. Montpelier, VT: Regulatory Assistance Project. Retrieved from https://www.raponline.org/knowledgecenter/designing-distributed-generation-tariffs-well/ | 49Page 52 of 276
50 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Littell, D., Kadoch, C., Baker, P., Bharvirkar, R., Dupuy, M., Hausauer, B., Linvill, C., Midgen-Ostrander, J., Rosenow, J., Xuan, W., Zinaman, O., and Logan, J. (2017). Next-generation performance-based regulation: Emphasizing utility performance to unleash power sector innovation (NREL/TP-6A50-68512). Montpelier, VT and Golden, CO: Regulatory Assistance Project and National Renewable Energy Laboratory. Retrieved from https://www.raponline.org/knowledge-center/next-generation-performance-based-regulation-emphasizing-utilityperformance-unleash-power-sector-innovation/ National Association of Regulatory Utility Commissioners. (1992). Electric utility cost allocation manual. Washington, DC: Author. Retrieved from https://pubs.naruc.org/pub/53A3986F-2354-D714-51BD-23412BCFEDFD National Rural Electric Cooperative Association. (2017). America’s electric cooperatives: 2017 fact sheet. Retrieved from https://www.electric.coop/electric-cooperative-fact-sheet/ Phillips, C. (1984). The regulation of public utilities (1st ed.). Arlington, VA: Public Utility Reports. U.S.-Canada Power System Outage Task Force. (2004). Final report on the August 14, 2003 blackout in the United States and Canada: Causes and recommendations. Retrieved from https://www.energy.gov/sites/prod/files/ oeprod/DocumentsandMedia/BlackoutFinal-Web.pdf U.S. Department of Energy. (2015). United States electricity industry primer (DOE/OE-0017). Washington, DC: Author. Retrieved from https://www.energy.gov/sites/prod/files/2015/12/f28/united-states-electricity-industryprimer.pdf U.S. Energy Information Administration. (2019, March). Monthly energy review (DOE/EIA-0035 [2019/3]). Table 9.8. Washington, DC: Author. Retrieved from https://www.eia.gov/totalenergy/data/monthly/index.php Xcel Energy. (2018, October 2-4). Leading the energy future [Presentation at the Wolfe Research Conference]. Retrieved from investors.xcelenergy.com/file/4025308/Index?KeyFile=1500113448 Zummo, P. (2018). Coast to coast, public power costs less. Arlington, VA: American Public Power Association. Retrieved from https://www.publicpower.org/periodical/article/coast-coast-public-power-costs-lessPage 53 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® Part II: Overarching Issues and Frameworks for Cost Allocation ELECTRIC COST ALLOCATION FOR A NEW ERA | 51Page 54 of 276
52 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® 5. Key Common Analytical Elements S everal key analytical processes and decisions must be One crucial underlying reality is that customers use made regardless of the overall framework and specific electricity at different times, leading to the concept of load methods used for cost allocation. These common diversity. Load diversity means the shared portions of the analytical elements include: system need to be sized to meet only the coincident peak • Cost drivers: What are the key factors that lead different (CP) loads for combined customer usage at each point types of costs to be incurred? of the system,23 rather than the sum of the customers’ Determining customer classes: How many classes of noncoincident peak (NCP) loads.24 This diversity exists on customers should be categorized separately, and how is every point of the system: each class defined? • Customers sharing a transformer have diverse loads. Load research and data collection: What are the key • Loads along a distribution feeder circuit have diversity. patterns of load, delivery and generation that need to • Multiple circuits on a substation have diversity. be recorded and analyzed? For any key data that are • The substations served by a transmission line have load • • not tracked comprehensively, is sampling or another approach used? In any individual rate case, these issues may not be diversity. • Individual utilities in an ISO territory or regional transmission interconnection have diversity. litigated at great length, and many or all parties may rely Diversity of load means the actual electricity system on past practices and precedent. But the decisions made on is significantly less expensive than a system that would be these issues historically by each public utility commission can built to serve the sum of every customer’s individual NCP. have important consequences in the present, particularly as Holding peak load for a customer constant, this also means changes to technology and the regulatory system undermine that a customer with load that varies over time is effectively the basis of past assumptions. much cheaper to serve than a customer that uses the same 5.1 Cost Drivers Effective cost allocation and rate design require the identification of central cost causation factors, or cost drivers. peak amount at every hour. The former customer can share capacity with other customers who use power at other times, but the latter cannot. Another important reality is that the accounting category Within these processes, it is important to identify relatively to which a cost is assigned does not determine its causation. simple metrics (e.g., energy use in various periods, demand An expense item may be due to energy use, peak demands at various times, numbers of customers of various types) that or number of customers; the same is true for capital invest- can be associated with the various customer classes. The cost ments. Capital costs and other expenses that do not vary with allocation process, by its nature, approximates cost responsi- short-run dispatch changes are referred to as fixed costs by bility and is not a tool of exceedingly precise measurements. some analysts, and some cost of service studies assume that 23 As explained throughout this section, the critical coincident peak load may be a single peak hour but more typically is some combination of loads over multiple hours. 24 Several other terms are used for individual customers’ noncoincident peak demand, including “undiversified maximum customer demand.” Unfortunately, both “NCP” and “maximum customer demand” can also be used to refer to various class peaks, particularly when used with modifiers. This manual will use “customer NCP” to refer to individual customer peaks and “class NCP” to refer to aggregated peaks by class, often specifying the level of the system for the relevant class NCP. Class NCP is sometimes referred to as the maximum class peak, maximum diversified demand or other similar terms.Page 55 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 53 these notionally fixed costs cannot be driven by energy use. considered variable with output: the costs of some consum- As discussed in the text box on pages 78-79, this assumption able materials (especially for pollution control equipment), is incorrect. Utilities make investments and commit to “fixed” as well as the costs of replacements (such as lubricants and expenses for many reasons: to meet peak demands, to reduce filters) and overhauls that are required after a specified fuel costs, to reduce energy losses, to access lower-cost energy amount of output, equivalent full-load hours of operation or resources and to expand the system to attract additional similar measures.26 business. As a result, this manual will use the phrase “dispatch In many cases, utilities classify costs based on account- O&M costs” to reflect operations and maintenance costs that ing data and administrative convenience, rather than the vary directly with generation output and “nondispatch O&M underlying reasons why the costs were incurred and why any costs” for O&M costs that are incurred independently of capital investments are still part of the system. For example, output levels. utilities may treat some O&M and interim capital additions as variable and energy-related for one set of purposes, such as 5.1.1 Generation There are several different categories of generation costs, rate design or evaluation of potential generation resources, but treat the same costs as demand-related for cost allocation with different lengths of time for the commitment. Depend- purposes for simplicity. Cost of service studies are normally ing on the technologies in question, long-term capital costs, driven primarily by accounting data that do not readily nondispatch O&M costs and per-kWh fuel costs are substitut- differentiate dispatch O&M costs from nondispatch O&M able — that is, a wind generator with a battery storage system costs and capital additions. involves more capital cost and lower operating cost than a Similarly, other costs, such as pollution controls and ash natural gas combustion turbine unit with the same output. handling and disposal at coal plants, include significant long- The longest-lived category of generation costs is capital run investments that were specifically incurred to support the investment in generation facilities, which are often depreci- energy generation process and generally should be treated as ated on a 30-year timeline and can last even longer. Once the energy-related. These investments would not be needed or investment is made, the depreciation expense typically will would be less costly either if the plant were run less often or if not vary over that time. Of course, a generation facility can the fuel were less polluting. be permanently shut down (retired), temporarily shut down (mothballed) or repurposed before the depreciation period is Short-Run Variable Generation Costs over. Different costs and benefits may be incurred for each of The short-run variable cost of power generation is these three options. It is also possible for a plant’s life to be typically straightforward, primarily entailing a mix of fuel recalculated at some point, with an appropriate change in the costs, dispatch O&M costs for utility-owned generation and depreciation schedule and the annual depreciation expense. purchased power. As a result, the drivers of these costs are There can be significant capital investments and nondis- typically fuel prices, market prices for energy and any ongoing patch O&M costs that are incurred on an annual or monthly contracts the utility has. Utilities can hedge the risk of short- basis, which may not vary directly with the numbers of hours term energy generation costs through a wide range of means, the facility operates. There are also capital investments that including futures contracts for fuel and power. are driven by wear and tear, rather than the passage of time.25 The shortest-term variable costs for utilities are mostly The short-run variable costs of some generation facilities, including storage and dispatchable hydro, are very low. fuel costs and the portions of power purchases that vary Storage facilities require the operation of other resources with energy taken. In addition, some O&M costs are usually (which may well have variable costs) to charge them. Dispatch 25 These costs are comparable to tire replacements that are caused by wear and tear closely correlated with miles driven. 26 These costs are comparable to the costs of automotive oil changes and routine services that are the consequence primarily of miles driven.Page 56 of 276
54 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® decisions for storage and dispatchable hydro resources are adding capacity at any hour to a system, even off-peak hours, typically made to maximize the benefits from the limited has a small but discernible beneficial impact on reliability. supply of other time-shiftable generation resources. Many resources can be justified only if all of the attributes are Prior to PURPA, most long-term purchased power considered, including contribution to meeting peak demand contracts had separate capacity and energy elements. These and contribution to meeting other needs such as fuel cost were mostly for fuel-dependent power plants. This rate form reduction. allowed the owner to obtain capital cost recovery in a predict- The typical vertically integrated utility calculates the in- able payment and the receiving utility to control the output stalled capacity requirement by determining what amount of as needed to fit varying loads, paying for short-run variable existing and new capacity will provide acceptable reliability, costs as incurred. Today many power purchase contracts measured by such statistical parameters as the mathematical are expressed entirely on a volumetric basis, based on an expected value of the number of hours in which it cannot expected pattern of output. This change in how contracts are serve load or of the amount of customer energy it will not be priced in the wholesale market does not dictate any particular able to serve in a year, due to insufficient available genera- approach to how costs are allocated in the retail rate-setting tion. Those expected values are computed from models that process. simulate the scheduling of generation maintenance and the random timing of forced outages for many potential combi- Generation Capacity Costs Beyond these energy needs, most regions of the United nations of outages and load levels. In large portions of North America, the capacity requirement is determined regionally States also plan around the amount of shared generation by an ISO/RTO and then allocated to the load-serving capacity needed, and these processes can drive a significant entities, transmission control areas or utilities.28 amount of generation costs. The amount of capacity required by a utility system, typically denominated in megawatts (MWs) or gigawatts at the time of the system coincident peak, determines whether the utility should retire existing plants, add new resources or delay planned retirements, or keep the system as it is. All those decisions have costs and benefits. Required reserves are usually expressed as the percentage reserve margin, which is: (capacity – peak load) ÷ peak load; or (capacity ÷ peak load) – 1 Capacity may be defined as installed capacity, demon- This determination may be made by an ISO/RTO, a holding strated capacity or unforced capacity (installed capacity company or other aggregation of interconnected load. reduced by the resource’s forced outage rate). There may Although the typical planning procedures used to date by be special provisions to recognize that an installed MW of utilities and ISOs have often served their original purposes to solar, wind or seasonal hydro capacity is not equivalent to an measure the least-cost resources available at the utility system installed MW of combustion turbine capacity with guar- level, these procedures often oversimplify important aspects anteed fuel availability or a MW of battery storage capacity of overall capacity and reliability issues. The key principle is located at a distribution substation. Capacity requirements that reliability-related costs are not all “caused” by one hour may also be satisfied with curtailable load, energy storage or or a few hours of demand during the year. A system must expected price response to peak pricing. The cost of capacity have some form and level of capacity available at all hours. to meet a very short-term need is very different from the cost Loss-of-energy expectation27 studies generally show that of baseload capacity that serves customers around the clock 27 Different analysts refer to related measures as loss-of-load hours, loss-ofload expectation, expected unserved energy and loss-of-load probability. 28 Some of the utilities in the ISOs/RTOs are restructured and do not provide generation services, so the cost of service study need not deal with generation costs. However, all the utilities in the SPP and most of those in MISO are vertically integrated, as are some jurisdictions in PJM (West Virginia, Virginia, Kentucky and the PJM pieces of North Carolina, Indiana and Michigan) and ISO-NE (Vermont) and municipal and cooperative utilities in most restructured jurisdictions.Page 57 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA and throughout the year, and the cost analyst must be aware of these differences. | week) contribute to the need for installed capacity. • Forced outage rates. All generation units experience Peak load is generally the utility’s maximum hourly some mechanical failures. The higher the frequency output requirement under the worst weather conditions of forced outages, the more likely it is that a relatively expected in the average year (e.g., the coldest winter day high-load hour will coincide with outages, eliminating for winter-peaking utilities or the hottest summer day for available reserve and resulting in the loss of load. summer-peaking utilities). In the ISOs/RTOs, the peak load 55 • Unit sizes. If all of a system’s units were very small (say, is usually the utility’s contribution to the actual or expected under 1% of system peak), the random outages could ISO/RTO peak load. Although the reserve margin is often be expected to spread quite evenly through the year. stated on the basis of a single peak hour as a matter of mea- With larger units, outages are much lumpier, and loss surement convention, the derivation of the reserve margin of a small number of large units can create operating takes into account far more information than the load in that problems. Hence, systems with larger units tend to need one hour. The most important parameters in determining the higher reserve margins, all else being equal. required reserve margin are the following: • • • Other operating constraints. Although hydro resources Load shape, especially the relationships among the have the highest overall reliability, they produce power annual and weekly peaks and the number of other hours only when water is available to run them. Some hydro with loads close to the peaks. The system must have resources are required to be operated for flood control, enough reserve capacity to endure generation outages at navigation, irrigation, recreation, wildlife or other pur- the high-load hours. The near-peak hours matter because poses, and these other constraints may affect the ability the probability of any given combination of outages of the resource to provide power at full capacity when coinciding with the peak hour is very low, but if there are system peak loads occur. hundreds of hours in which that combination of outages Some of the factors in this list affect the reliability value would result in a supply shortage, the probability of loss of various types of generation, while others highlight the of load would be much larger. types of load that increase required capacity reserve levels. A Maintenance requirements. Utilities attempt to schedule large unit with frequent forced outages may contribute little generator maintenance in periods with loads lower to ongoing system reliability even though it has a significant than the peak, typically in the autumn and spring, and nameplate capacity. If such a unit has high ongoing costs occasionally in the winter for strongly summer-peaking that could be reduced or eliminated through retirement, utilities and in the summer for strongly winter-peaking continued operation must primarily be justified by its energy utilities. Utilities with both modest maintenance benefits. On the demand side, long daily periods of high loads requirements and several months with loads reliably well can mean that many weekday hours (and even some weekend below those in the peak months can schedule all routine hours) in each month will contribute to capacity require- maintenance in the off-peak months while leaving ments, proportionately shifting capacity responsibility toward enough active capacity to avoid any significant risk of customers with high load factors. Table 2 on the next page a capacity shortage in those months. But many utilities summarizes cost drivers for power supply capacity. have large maintenance requirements (especially for The value of capacity is partly a function of the type of coal-fired and nuclear units) and only modest reductions capacity and the location of that capacity. Although required in peak exposure in the shoulder months. After subtract- capacity (measured in MWs) is determined by demand in a ing required maintenance, the effective reserve margin subset of hours, along with the characteristics of the power may be very similar throughout the year, increasing the plants, the cost of capacity (measured in dollars per MW-year) chance that a combination of outages will result in loss of is in large part determined by energy requirements. load. As a result, high loads in any month (or perhaps any In the previous millennium, the cheapest form ofPage 58 of 276
56 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Table 2. Cost drivers for power supply Resource type Purpose Investmentrelated costs Maintenance costs Fuel costs High High Low Medium Medium Medium Low Low High Very high Low Low or none Baseload nuclear, geothermal Power at all hours Coal, intermediate combined cycle Power at many hours Peaking Power in peak hours, plus reserves at all hours Hydro Power at some or all hours Wind Power at some hours High Low None Solar Power at some hours High Low None Storage Power at peak hours, plus reserves at all hours High Low Low — for purchased kWhs capacity to serve peak needs was typically considered to be a of certain lines can change significantly over time. Carrying combustion turbine. These units had low investment costs more power requires larger conductors, multiple conductors and low ongoing O&M expenses but were inefficient and and/or higher voltages, all of which increase costs. typically used more expensive fuels. These characteristics If each load center in a utility’s territory had about the made them perfect to run infrequently during peak times and amount of generation required to meet its peak load, and the for other short-term reliability needs. Conversely, it made power plants were similar so the utility had no interest in sense to make major investments in units with high upfront exporting power from one area to another, the transmission costs but high efficiency and cheap fuel prices and to run system would exist primarily to allow each load center to these units nearly year-round. These major investments were draw on the others for backup supply when local generation driven by year-round energy requirements, not peak loads. was unavailable. In real utility systems, power plants are often Today, in contrast, the least expensive form of capacity distributed very differently from load, with large centralized to serve extreme peak loads may not be a generating unit at plants built to capture economies of scale, often in areas far all. For very low-duration loads, demand response, customer from major load centers. Generation may be sited remotely response to critical peak pricing or battery storage may be away from load for environmental reasons, to facilitate access the least-cost resource to serve a very short-duration peak, to fuel and to minimize land costs and land use conflict. sometimes described as a needle peak. The ability to curtail Generation plants also tend to vary considerably in fuel an end-use load saves not only the amount of capacity repre- cost, efficiency and flexibility; allowing the utility to use the sented by the reduced load but also the marginal line losses least-cost mix of generation at all load levels may require and reserves that would be required to reliably sustain that additional transmission. load. Similarly, the ability to dispatch DERs also avoids line By contrast, demand response, energy efficiency and losses that would be required to deliver generated capacity to energy storage can be very carefully targeted geographically that location.29 to provide needed capacity in a specific area without the need for any additional transmission. 5.1.2 Transmission The costs of transmission lines depend on the length Although separating all the causes of the structure of an existing transmission system can be difficult, especially for a of the lines, the terrain they must cover and the amount of power they need to carry at different times, sometimes in either direction. The maximum usage of many transmission lines is not necessarily at system peak hours, and the usage 29 The capacity saved can be as high as 1.4 times the load reduced, when marginal line losses and reserves are taken into account. For a detailed discussion of this, see Lazar and Baldwin (2011).
As listed on the current system
Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Melissa Whited [26-05-10]