Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Files3

Search terms highlighted
Eversource rate increase is on 6 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
5 pages match
Words on different pages
  1. Page 65 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | zero emissions electric resources. A seasonal and time-varying for single-family and multifamily residential customers. cost study and time-varying rates may enable appropriate cost There are many reasons to believe that the cost of serving recovery without need for a separate class. multifamily buildings is substantially lower than serving Several states have considered creating a separate rate 63 single-family homes on average: class for customers with solar PV systems. Because solar • Shared service drops. customers may have different usage patterns than other • Increased diversity of load for line transformers and sec- customers, this is reasonable to investigate. However, it is not clear that there is a significant cross-subsidy to address, ondary distribution lines, enabling more efficient sizing. • Reduced cost of distribution per customer, since no particularly at low levels of PV adoption. Current rate design distribution lines are required between customers in the practices for solar customers in many jurisdictions — such building.38 as net metering using flat volumetric rates, monthly netting • Reduced coincidence with both summer and winter peak and crediting at the retail rate — are fairly simple. These loads because common walls reduce space conditioning rate design practices could be improved significantly over use relative to single-family units of the same square time and integrated with broader rate design reforms. For footage, and because lighting and baseload appliances such example, a time-varying cost study would allow the creation as refrigerators and water heaters (if electric) are a larger of more granular time-varying rates so that solar customers percentage of loads for units with fewer square feet. pay an appropriate price for power received during nonsolar • Reduced need for secondary distribution lines in cases hours and are credited with an appropriate price for power where the multifamily building can be served directly delivered to the distribution system during solar hours. This from the transformer. would include changes to netting periods, which would reveal • Reduced summer peak coincidence if space cooling is more information about how a solar customer actually uses provided through a separate commercial account for the the electric system. building, rather than as part of the individual residential accounts. In terms of rate classes for specific technologies, some utilities separate out customers with electric water heating as • Reduced costs of manual meter reading, where still a proxy for a flat load shape and the potential for load control. applicable. In the future, some utilities may seek to make electric vehicle There may be countervailing considerations in some adoption a separate rate class as a substantially controllable service territories, such as if multifamily buildings are served load with distinct usage characteristics. However, these by more expensive underground service and single-family technologies may not need consideration as a separate rate buildings are served with cheaper overhead lines. A similar class, particularly given efforts to improve the cost causation set of considerations may cause some utilities to disaggregate basis of rate design more generally. Again, time-varying rates customers by geography, such as those residing inside and will appropriately charge customers with peak-oriented loads outside city limits.39 Customers in deeply rural areas tend and appropriately benefit customers with loads concentrated to be more expensive to serve, since they typically are too in low-cost hours or controlled into those hours. far from their neighbors to share transformers, require a Some utilities have implemented separate rate classes 38 This distinction is important where some distribution costs are classified as customer-related. In those situations, each multifamily building (rather than each meter) should be treated as one customer, as would a single commercial customer of the same size and load. 39 For example, Seattle City Light, a municipal utility, has two rate schedules for most commercial and industrial classes within the city: one for the highly networked higher-cost underground system in the urban core, long run of primary line along the public way, and generally and another for the balance of the city, plus separate higher rates for the adjacent cities and towns where it provides service. Compare Schedules MDC, MDD, MDS and MDT at Seattle City Light (n.d.). The city of Austin, Texas, also applies different rates to customers outside the city limits (Austin Energy, 2017). In many places, cities impose franchise fees or municipal taxes that make customer bills inside cities higher than those outside cities, even though the cost data may suggest the opposite is more equitable.
  2. Page 66 of 276

    64 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® have higher unit costs related to lower load per mile of cross-subsidies within customer classes in a relatively distribution line.40 straightforward manner that also provides additional effi- Analysts may want to employ a simple standard for ciency benefits. In principle, perfectly designed time- and deciding when to divide a subclass for analytical purposes, location-varying pricing for all electric system components based on whether the groups are large enough and distinct and externalities, applied identically to all customers, could enough to form a separate class or subclass. One such eliminate the need for customer classes and cost allocation guideline might be that, if more than 5% of customers or entirely while providing perfectly efficient price signals. This 5% of sales within a class have distinct cost characteristics, is unlikely to be the case for the foreseeable future but illus- differentiation is worth considering. If fewer than that, trates the conceptual point that an efficient improvement to although the per-customer cost shifts may be significant, the rate design may be a strictly preferred option compared with overall impact on other customers will likely be immaterial. the creation of a new rate class. For example, certain types of If 2% of the load in a class is paying 20% too much or too customers could be put on technology-neutral time-varying little, for example, other customers’ bills will change only rates on an opt-out or mandatory basis, such as customers 0.4%. But if 15% of the load is 20% more or less expensive, with storage, electric vehicles or distributed generation. the impact on other users rises to 3%. The trajectory of these impacts over time can also be relevant. Although improved distributional equity from additional rate classes is a laudable goal, and indeed advances the prima- 5.3 Load Research and Data Collection Any cost of service study, as well as rate design, load ry goal of cost allocation, there are countervailing consider- forecasting, system planning and other utility functions, ations that may dictate keeping the number of rate classes on depends heavily on load research data. Cost allocation, in the smaller side. First, there are administrative and substan- particular, requires reasonably accurate estimates for each tive concerns around adding rate classes, both in litigation at class or group distinguished in the analysis, the number state regulatory commissions and in real-world implementa- of customers, their energy usage (annual, monthly and tion. Some potential distinctions among customers may be sometimes more granular time periods), their kW demand at difficult to implement because they involve subjective and various times and under various conditions, and sometimes potentially controversial determinations by on-the-ground more technical measures such as power factor. The key utility personnel. In creating new distinctions, regulators, principle is that there is diversity among customers in each utilities and stakeholders must all have confidence that there class, meaning the consumption characteristics for the are true cost differentials between the customer types and group are less erratic than those of any individual customer. that there will be little controversy in the application of the Load research is the process of estimating that diversity. differentials. Some analysts object to customer classes based At the very least, these data must be available by class on adoption of particular end uses, although this may serve as across the entire system. For some applications, these data a proxy for significantly different usage profiles. Furthermore, are useful and even essential at a more granular level, such as some utilities and parties in a rate case may propose rate for each substation, feeder or even customer. Ideally, the cost classes that effectively allow undue discrimination. If the of service study would be able to draw on information about proper data aren’t available to scrutinize such claims, either the hourly energy usage by class, as well as the contribution publicly or for parties in a rate case, then this may allow an of each class to the sum of the customer contributions to end-run around one of the significant motivations for postage the maximum loads across the line transformers serving the stamp pricing: preventing price discrimination. Lastly, as described above for electric heating and solar PV customers, rate design changes can also address certain 40 These factors may be offset by the utility’s policy for charging new customers for extending the distribution system, as discussed in Section 11.2
  3. Page 67 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 65 class, the feeders serving the class, the substations serving are usually publicly available for regulated utilities. Neither the class and so on. Modern AMI and advanced distribution sampled load nor proxy load will provide the precision of monitoring systems, if properly configured, can provide those comprehensive interval metering, but they can provide data. Some utilities now routinely collect interval load data at reasonable estimates of the contribution of the group to each level of the system, while others are starting to acquire demand at each hour, enabling development of cutting-edge those capabilities. techniques such as time-specific allocation methods. The data needed for different cost allocation frameworks Different elements of load research data are relevant in and methods can vary greatly, and it is difficult to generalize the creation of allocation factors for different parts of the because of this. But at a high level, embedded cost techniques system. For example: rely on one year of data or the equivalent forecast for one • Most residential customers may be served through a year. For many inputs, marginal cost techniques often rely transformer shared with other residential, commercial on multiple years of data in order to estimate how costs are and street lighting customers, so the allocation of changing with respect to different factors over time. Different transformer costs to each class should ideally be derived data may be needed for each step of the process, starting from their contribution to the high-load periods of each from the functionalization of costs down to the creation such transformer. of allocation factors, or allocators, to split up the costs to • customer classes. Some residential customers are served from feeders that peak in the morning and others from feeders that peak in Where the utility’s metering and data collection do not midday or the evening; some of those feeders may reach directly provide comprehensive load data for all customers their maximum load or stress in the summer and others and system components, two options are available. The first in the winter. The sum of the class contribution to the and generally preferable option is sampling. Most investor- various peak hours of the various feeders determines the owned and larger consumer-owned utilities install interval share of peak-related costs allocated to the class for this meters specifically for load research purposes on a sample portion of the distribution system. of customers in each class that does not have widespread • At the bulk power level, all customers share the gener- interval metering.41 The number and distribution of those ation and transmission system, and the diversity of all meters should be determined to provide a representative usage should be reflected, whether at the highest system mix of customer loads within the class (or other subgroups hour of the year (a method known as 1 CP, for coincident of interest) and to produce estimates of critical values (such peak), the highest hour of each month (12 CP) or the as contribution to the monthly system peak load) that reach highest 200 hours of the year (200 CP), all on-peak target levels of statistical significance.42 These samples are hours, midpeak hours and off-peak hours, or any other typically a few hundred per class in order to meet the PURPA criteria relevant for allocation. standard. Second, some smaller utilities borrow “proxy data” Table 5 on the next page shows illustrative load research from a nearby utility with similar customer characteristics data for four customer classes. For the purposes of clear and more robust load research capabilities. Class load data examples throughout the manual, we adopt the convention 41 Utilities usually have interval meters on customers over some consumption threshold for billing purposes. Smaller customers may have meters that record only total energy consumption over the billing period (typically a month), or both monthly energy and maximum hourly (or 15-minute) demand, neither of which provides any useful data for allocating timedependent costs. 42 In 1979, FERC issued regulations to implement PURPA § 133 (16 U.S.C. § 2643), which requires the gathering of information on the cost of service. C.F.R. Title 18, Chapter 1, Subchapter K, Part 290.403(b) established the requirement, since repealed, that “the sampling method and procedures for collecting, processing, and analyzing the sample loads, taken together, shall be designed so as to provide reasonably accurate data consistent with available technology and equipment. An accuracy of plus or minus 10 percent at the 90 percent confidence level shall be used as a target for the measurement of group loads at the time of system and customer group peaks.” See Federal Energy Regulatory Commission Order 48 (1979).
  4. Page 68 of 276

    66 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Table 5. Illustrative load research data Residential Secondary commercial Primary industrial Street lighting Total 1,000,000 1,000,000 1,000,000 100,000 3,100,000 1,000,000 1,000,000 N/A 100,000 2,100,000 Summer 600,000 650,000 500,000 30,000 1,780,000 Winter 400,000 350,000 500,000 70,000 1,320,000 Daytime 600,000 700,000 500,000 0 1,800,000 Off-peak 400,000 350,000 500,000 90,000 1,340,000 Midpeak 550,000 600,000 470,000 9,000 1,629,000 Critical peak 50,000 50,000 30,000 1,000 131,000 Line transformers used 20,000 10,000 N/A 20,000 50,000 Transformers, services Customers 100,000 20,000 2,000 50,000 172,000 Billing 2,000 1,000 N/A 100 3,100 Input to line transformers Class NCP: circuit 400 400 250 100 1,150 Primary distribution Class NCP: substation 300 300 225 100 925 Substations System 1 CP 250 300 200 0 750 System monthly 12 CP 225 250 175 10 660 System 200 CP 200 240 150 10 600 Used for Energy metrics (MWhs) Total Total secondary Energy by time period All energy-related costs, including generation, transmission, primary distribution Customer metrics Demand metrics (MWs) Sum of customer NCP Transmission, generation of a commercial customer class of all general service voltage (primary industrial) have no utility-provided line customers served at secondary voltage, labeled as “Secondary transformers, and the first level at which their demand is commercial,” and an industrial customer class of all general typically relevant is the circuit level. service customers served at primary voltage, labeled as “Primary industrial.” The street lighting class is important to note with respect to the volatility of results. Because this class has In this illustration, the sum of individual customer zero daytime usage and a very different (typically completely noncoincident peak demands is 3,100 MWs, excluding the stable overnight) load profile than other classes, it is highly primary industrial class that is not shown in the table.43 affected by the choice between noncoincident methods and However, the coincident peak demand served by the either coincident or hourly methods. In addition, because utility becomes more diverse as we move up the system, a streetlights represent many points of delivery but are typically phenomenon described in more detail in Section 5.1. As a located only in places where other customers are nearby, this result, the observed coincident peak demands are lower at class almost never “causes” the installation of a transformer more broadly shared portions of the system. At the highest or the creation of a secondary delivery point but also does level, this illustrative system has a 750-MW coincident peak account for a huge number of the individual points of use demand for the highest single hour, labeled as “System 1 CP.” In between, the sum of the class NCPs at the circuit level, labeled as “Class NCP: circuit,” is 1,150 MWs, and the sum of the class NCPs at the substation level, labeled as “Class NCP: substation,” is 925 MWs. Customers served at primary 43 In Table 5, the sum of customer NCPs for the primary industrial class is shown as “N/A” because these customers do not use line transformers and thus this demand metric is not generally relevant to this class. For more general purposes, we are assuming that the sum of customer NCPs for the primary industrial class in this illustration is 300 MWs, bringing the overall total to 3,400 MWs.
  5. Page 69 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 67 Table 6. Simple allocation factors derived from illustrative load research data Residential Secondary commercial Primary industrial Street lighting Used for Energy metrics (MWhs) Total 32% 32% 32% 3% 48% 48% N/A 5% Summer 34% 37% 28% 2% Winter 30% 27% 38% 5% Daytime 33% 39% 28% 0% Off-peak 30% 26% 37% 7% Midpeak 34% 37% 29% 1% 38% 38% 23% 1% Line transformers used 40% 20% N/A 40% Transformers, services Customers 79% 17% 3% 1% Billing 65% 32% N/A 3% Input to line transformers Total secondary Energy by time period Critical peak All energy-related costs, including generation, transmission, distribution Customer metrics Demand metrics (MWs) Sum of customer NCP Class NCP: circuit 35% 35% 22% 9% Primary distribution (legacy) Class NCP: substation 32% 32% 24% 11% Substations System 1 CP 33% 40% 27% 0% System monthly 12 CP 34% 38% 27% 2% System 200 CP 33% 40% 25% 2% Transmission, generation Note: Class percentages may not add up to 100 because of rounding. on the system. Put another way, we all like streetlights near system total, then converting to percentages. For embedded our homes and businesses, but nearly all of them go in as a cost of service studies, this manual recommends the use of secondary effect of residential or commercial development; a class hourly energy use as a common allocation factor for all few are along major highways without a nearby residence or shared system components in generation, transmission and business, but these are rare. distribution where the system is made up of components The next step is generating allocation factors to be used in essential for service at any hour, but sized for maximum the allocation phase of the cost study. For embedded cost stud- levels of usage, and where the class contribution to that ies, these are applied to the total investment and expense by usage varies. The only one of these factors that is not self- FERC account, while in marginal cost studies they are applied explanatory is the midpeak factor, which takes both on-peak to the calculated unit costs for each type of system component. and critical peak usage into account, reflecting class usage Table 6 shows the data above converted to allocation in all higher-cost hours. This is illustrative of the probability- factors. The only implicit assumption is that the circuit-level of-dispatch method, in which the likelihood of any resource peak demand for the residential class is one-fourth of the being dispatched at specified hours is measured. There is no customer NCP demand due to load diversity and that for diversity of street lighting usage in this example, but little the commercial class it is one-half, reflecting lower diversity or no demand imposed at the system peak hours. Customer of commercial customer usage across the day compared weighting factors are typically based on the relative cost of with residential load. The raw factors are computed simply meters and billing services for different types of customers, by dividing each class contribution to each category by the based on complexity.
  6. Page 70 of 276

    68 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Table 7. Composite allocation factors derived from illustrative load research data Method Equivalent peaker Components 20% system 200 CP/ 80% energy Residential Secondary commercial Primary industrial Street lighting Used for 32% 34% 31% 3% Generation, transmission On-peak 50% midpeak/ 50% critical peak 36% 38% 26% 1% Peaking generation Average and peak 50% class NCP/ 50% energy 34% 34% 27% 6% Primary distribution Minimum system 50% customer/ 50% class NCP: circuit 57% 26% 12% 5% Equivalent peaker for transformers 20% delivery points/ 80% customer NCP 60% 30% 0% 11% Circuits (legacy) Line transformers and secondary service lines Note: Class percentages may not add up to 100 because of rounding. In Table 6, we have calculated allocation factors shown as Given the wide diversity of utilities and their load a class percentage of each usage metric. In Part II, we discuss patterns, readers should be careful about overgeneralizing in what circumstances each of these will be appropriate for from these illustrative examples. However, some patterns embedded cost of service studies. In many cases, weighted will hold true across the board. For example, the minimum combinations of these are appropriate. Several commonly system method will always allocate more costs to classes with used composite allocation factors are shown in Table 7, large numbers of customers, at least compared with the basic computed by weighting values in Table 6. customer method.
  7. Page 71 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 69 6. Basic Frameworks for Cost Allocation W e group cost allocation studies into two primary Generally speaking, in the traditional model displayed in families. Embedded cost studies look at existing Figure 18 on the next page, functionalization identifies the costs making up the existing revenue require- purpose served by each cost (or the underlying equipment or ment. Marginal cost studies look at changes in cost that activity), classification identifies the general category of fac- will be driven by changes in customer requirements over a tors that drive the need for the cost, and allocation selects the reasonable planning period of perhaps five to 20 years. In the parameter to be used in allocating the cost among classes.44 same family as marginal cost studies, total service long-run Although they are convenient parts of organizing a incremental cost (TSLRIC) studies look at the cost of creating cost of service study, functionalization and classification a new system to provide today’s needs using today’s technol- decisions are not necessarily critical to the final class cost ogies, optimized to today’s needs. Each has a relevant role in allocations. The cost of service study can get to the same final determining the optimal allocation of costs, and regulators allocation in several ways. For example, consider the reality may want to consider more than one type of study when that a portion of transmission costs is driven by the need making allocation decisions for major utilities that affect to interconnect remote generation to avoid fuel costs. This millions of consumers. can be reflected by functionalizing a portion of transmission 6.1 Embedded Cost of Service Studies cost as generation, or by classifying a portion of transmission in the same manner as the remote generation, or it can be recognized by using a systemwide transmission allocator with Embedded cost of service studies may be the most some energy component. In either case, a portion of costs is common form of utility cost allocation study, often termed allocated based on energy throughput, not solely on design “fully allocated cost of service studies.” Most state regulators capacity or actual capacity utilization. require them, and nearly all self-regulated utilities rely on embedded cost of service studies. The distinctive feature 6.1.1 Functionalization In this first step, cost of service studies divide the utility’s of these studies is that they are focused on the cost of service and usage patterns in a test year, typically either accounting costs into a handful of top-level functions that immediately before the filing of the rate case or the future mirror the elements of the electric system. At a minimum, year that begins when new rates are scheduled to take effect. this includes three functions:45 This means there is very little that accounts for changes • Generation:46 the power plants and supporting equip- over time, so it is primarily a static snapshot approach. ment, such as fuel supply and interconnections, Embedded cost of service studies are also closely linked to the as well as purchased power. revenue requirement approved in a rate case, which can be administratively convenient. 44 The third step is usually called allocation, which is the same as the name of the entire process. This step involves the selection or development of allocation factors. Some analysts refer to this third step as factor allocation to prevent confusion. 45 Some of the costs, such as for energy efficiency programs and advanced • Transmission: high-voltage lines (which may range from 50 kV to over 300 kV) and the substations connecting meters, may serve multiple functions and must be assigned among those functions or treated as special functional categories. 46 Some sources use the term “production” instead. This manual uses the term “generation” and generally includes exports from storage facilities under this category.
  8. Page 72 of 276

    70 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Figure 18. Traditional embedded cost of service study flowchart Revenue requirement Functionalization Generation Billing and customer service Distribution Transmission Classification Demand-related Energy-related Customer-related Allocation Residential Secondary commercial Primary industrial those lines, moving bulk power from generation to the distribution system. • Street lighting them (meter reading, billing, communicating). • General plant and administrative and general expenses: Distribution: lower-voltage primary feeders (in older Overhead investments and expenses that jointly serve systems, 4 kV and 8 kV; in newer areas, typically 13 kV to multiple functions (e.g., administration, financial, legal 34 kV) that run for many miles, mostly along roadways, services, procurement, public relations, human resources, and the distribution substations that step power down regulatory, information technology, and office buildings to distribution voltages; line transformers that step the and equipment) can be kept separate at this stage. In primary voltages down to secondary voltages (mostly some circumstances, these costs could be attributed 120 V and 240 V); and the secondary lines that connect to certain functions but are not tracked that way in a the transformers to some customers’ service drops. utility’s system of accounts. Although some utility analysts combine all costs into • Public policy program costs: In many jurisdictions, these these three functions, the better practice is to include other costs are administered and allocated through another functions as well at this stage: process; but if handled in a rate case, energy efficiency • Billing and customer service: Also known as retail service and other public policy programs should be tracked or erroneously labeled entirely as customer-related separately. costs, these are directly related to connecting customers Historically, in most cases functionalization decisions (service drops, traditional meters) and interacting with can follow the utility’s accounting and are noncontroversial.
  9. Page 73 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA The investment that is booked as generation units is usually role in operations, such as networking together the part of the generation function. But there are exceptions. utility’s service territory, providing radial supply to In some situations, the function of an investment may scattered distribution substations or importing not match the accounting category. Examples include the low-cost baseload energy from distant suppliers. following: • • Transmission lines and substations that are dedicated to connecting specific generating plants to the bulk • Segregating lower-voltage subtransmission facilities • Treating interconnections differently from the internal transmission network. accounting records as transmission but are more properly • functionalized as generation. Distribution Substations that contain switching equipment to connect • Separating substations from lines. Separating substations, lines (comprising overhead transmission lines of the same voltage to one another, poles, underground conduit and the wires) and line high-voltage transformers that connect transmission transformers. lines of different voltages, and lower-voltage transformers 71 (typically under 100 kV) from higher-voltage facilities. transmission network. These assets are often in the • | • Segregating costs of system monitoring, control and that connect transmission to distribution. These facilities optimization related to reducing losses, improving may be carried in the accounting records as entirely power quality and integrating distributed renewables transmission or entirely distribution but are properly and storage. split between transmission and distribution in the • Dividing lines into primary and secondary components. functionalization process. • In some cases, separating underground from overhead Equipment within transmission substations that look lines. like distribution equipment (e.g., poles, line transformers, Billing and customer service secondary conductors, lighting). These might be booked • Subfunctionalizing meters, services, meter reading, in distribution accounts but are functionally part of the billing, customer service and other components, each of transmission substation. which may be allocated separately. In addition, many cost of service studies subfunctionalize • Separating meters by technology — traditional kWh some costs within a function, such as the following: meters, demand meters, remotely read meters and Generation advanced meters with hourly load recording and other • Differentiating baseload generation (which runs when- capabilities — with different costs and different functions ever it is available or nearly so), intermediate generation (including, for the advanced meters, services to the entire (which typically runs several hours daily) and peaking system). • generation (which runs only in a few high-load hours General plant and administrative and general expenses and when other generation is unavailable). • Subfunctionalizing by type of cost: pensions and benefits, Separating generators by technology to recognize such property insurance, legal, regulatory, administration, factors as renewable resources procured to meet energy- buildings, office equipment and so on. based environmental goals, the differing reliability In the future, organizing costs by function probably will contributions per installed kW of various technologies still be helpful in organizing thinking about cost causation, (e.g., wind, solar, thermal) and the differences in cost but the cost of service study may need to differentiate structure and output pattern between thermal, wind, functions in new ways. For example, distributed generation, solar and hydro resources. storage, energy efficiency, demand response and smart grid Transmission technologies can provide services that span generation, • transmission and distribution. Categorizing lines (and associated substations) by their
  10. Page 74 of 276

    72 | ELECTRIC COST ALLOCATION FOR A NEW ERA 6.1.2 Classification The second step of the process classifies each function or subfunction (i.e., each type of plant and expense) as being caused by one or more categories of factors. In particular, most cost of service studies use the classification categories of demand (meaning some measure of loads in peak hours or other hours that contribute to stressing system reliability or increasing capacity requirements on the generation, REGULATORY ASSISTANCE PROJECT (RAP)® Table 8. 1992 NARUC cost allocation manual classification Cost function Typical cost classification Production Demand-related Energy-related Transmission Demand-related Energy-related Distribution Demand-related Energy-related Customer-related Customer service Customer-related Demand-related transmission or distribution systems), energy and customer number, and some use other categories (e.g., direct assignment, such as of street lighting). The classification of most costs as demand-, energy- or Source: National Association of Regulatory Utility Commissioners. (1992). Electric Utility Cost Allocation Manual customer-related dates back many decades. These categories can still be used but need to be interpreted more carefully as more important than others in driving energy costs. With the utility system has changed in many ways: improved information about class loads, and with a range • Utility planning has become more sophisticated. of new technologies, it may be appropriate to move past the • Utilities have access to more granular and comprehensive traditional energy and demand classifications and create new data on load and equipment condition. more granular distinctions, as discussed further in Chapter 17. • The variety of generation resources has increased to include wind, solar and other renewables with perfor- Utility Cost Allocation Manual, showing how the classification mance characteristics very different from legacy thermal step worked in that period (p. 21). and hydro resources. • Table 8 reproduces a table from the 1992 NARUC Electric This was a simplification even at the time, and changes Multiple storage technologies are affecting generation, to the industry and in the available data and analytical transmission and distribution costs. techniques merit reevaluation and reform. For example, a Legacy hydro, nuclear and fossil resources continue to legacy framework for variable renewable capacity, particularly operate and provide benefits to the utility system, but wind and solar, could treat the investment for utility-owned new similar resources and even continued operation of resources as 100% demand-related, since there are no vari- some existing units may no longer be cost-effective. Until able fuel costs. However, power purchase agreements for they are retired, all or a portion of costs will remain in these same resources are typically priced on a per-kWh basis the allocation study. from independent power producers. This could lead to two Demand response programs have increased in scale, role different approaches for the same asset depending on the and variety. ownership model, an obvious error in analysis that should be Utility spending on energy efficiency programs has avoided by considering the actual products and services being increased. provided. In addition, most of the benefits of wind and solar Advanced metering technology has added system benefits do not necessarily accrue at peak hours — the underlying to a traditionally customer-related asset. justification of a demand-related classification. Similarly, The demand and energy classifications are often analog meters were only useful for measuring customer usage treated as totally separate but, as discussed in Chapter 5, and billing, but new AMI provides data that can be used for the load in many hours contributes to needs that have system planning and provides new opportunities for energy traditionally been classified to demand, and some hours are management and peak load reduction. • • • •
1 page match

As listed on the current system

Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Melissa Whited [26-05-10]

This filing on the current system (opens in a new tab)