    66 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Table 5. Illustrative load research data Residential Secondary commercial Primary industrial Street lighting Total 1,000,000 1,000,000 1,000,000 100,000 3,100,000 1,000,000 1,000,000 N/A 100,000 2,100,000 Summer 600,000 650,000 500,000 30,000 1,780,000 Winter 400,000 350,000 500,000 70,000 1,320,000 Daytime 600,000 700,000 500,000 0 1,800,000 Off-peak 400,000 350,000 500,000 90,000 1,340,000 Midpeak 550,000 600,000 470,000 9,000 1,629,000 Critical peak 50,000 50,000 30,000 1,000 131,000 Line transformers used 20,000 10,000 N/A 20,000 50,000 Transformers, services Customers 100,000 20,000 2,000 50,000 172,000 Billing 2,000 1,000 N/A 100 3,100 Input to line transformers Class NCP: circuit 400 400 250 100 1,150 Primary distribution Class NCP: substation 300 300 225 100 925 Substations System 1 CP 250 300 200 0 750 System monthly 12 CP 225 250 175 10 660 System 200 CP 200 240 150 10 600 Used for Energy metrics (MWhs) Total Total secondary Energy by time period All energy-related costs, including generation, transmission, primary distribution Customer metrics Demand metrics (MWs) Sum of customer NCP Transmission, generation of a commercial customer class of all general service voltage (primary industrial) have no utility-provided line customers served at secondary voltage, labeled as “Secondary transformers, and the first level at which their demand is commercial,” and an industrial customer class of all general typically relevant is the circuit level. service customers served at primary voltage, labeled as “Primary industrial.” The street lighting class is important to note with respect to the volatility of results. Because this class has In this illustration, the sum of individual customer zero daytime usage and a very different (typically completely noncoincident peak demands is 3,100 MWs, excluding the stable overnight) load profile than other classes, it is highly primary industrial class that is not shown in the table.43 affected by the choice between noncoincident methods and However, the coincident peak demand served by the either coincident or hourly methods. In addition, because utility becomes more diverse as we move up the system, a streetlights represent many points of delivery but are typically phenomenon described in more detail in Section 5.1. As a located only in places where other customers are nearby, this result, the observed coincident peak demands are lower at class almost never “causes” the installation of a transformer more broadly shared portions of the system. At the highest or the creation of a secondary delivery point but also does level, this illustrative system has a 750-MW coincident peak account for a huge number of the individual points of use demand for the highest single hour, labeled as “System 1 CP.” In between, the sum of the class NCPs at the circuit level, labeled as “Class NCP: circuit,” is 1,150 MWs, and the sum of the class NCPs at the substation level, labeled as “Class NCP: substation,” is 925 MWs. Customers served at primary 43 In Table 5, the sum of customer NCPs for the primary industrial class is shown as “N/A” because these customers do not use line transformers and thus this demand metric is not generally relevant to this class. For more general purposes, we are assuming that the sum of customer NCPs for the primary industrial class in this illustration is 300 MWs, bringing the overall total to 3,400 MWs.
  2. Page 69 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 67 Table 6. Simple allocation factors derived from illustrative load research data Residential Secondary commercial Primary industrial Street lighting Used for Energy metrics (MWhs) Total 32% 32% 32% 3% 48% 48% N/A 5% Summer 34% 37% 28% 2% Winter 30% 27% 38% 5% Daytime 33% 39% 28% 0% Off-peak 30% 26% 37% 7% Midpeak 34% 37% 29% 1% 38% 38% 23% 1% Line transformers used 40% 20% N/A 40% Transformers, services Customers 79% 17% 3% 1% Billing 65% 32% N/A 3% Input to line transformers Total secondary Energy by time period Critical peak All energy-related costs, including generation, transmission, distribution Customer metrics Demand metrics (MWs) Sum of customer NCP Class NCP: circuit 35% 35% 22% 9% Primary distribution (legacy) Class NCP: substation 32% 32% 24% 11% Substations System 1 CP 33% 40% 27% 0% System monthly 12 CP 34% 38% 27% 2% System 200 CP 33% 40% 25% 2% Transmission, generation Note: Class percentages may not add up to 100 because of rounding. on the system. Put another way, we all like streetlights near system total, then converting to percentages. For embedded our homes and businesses, but nearly all of them go in as a cost of service studies, this manual recommends the use of secondary effect of residential or commercial development; a class hourly energy use as a common allocation factor for all few are along major highways without a nearby residence or shared system components in generation, transmission and business, but these are rare. distribution where the system is made up of components The next step is generating allocation factors to be used in essential for service at any hour, but sized for maximum the allocation phase of the cost study. For embedded cost stud- levels of usage, and where the class contribution to that ies, these are applied to the total investment and expense by usage varies. The only one of these factors that is not self- FERC account, while in marginal cost studies they are applied explanatory is the midpeak factor, which takes both on-peak to the calculated unit costs for each type of system component. and critical peak usage into account, reflecting class usage Table 6 shows the data above converted to allocation in all higher-cost hours. This is illustrative of the probability- factors. The only implicit assumption is that the circuit-level of-dispatch method, in which the likelihood of any resource peak demand for the residential class is one-fourth of the being dispatched at specified hours is measured. There is no customer NCP demand due to load diversity and that for diversity of street lighting usage in this example, but little the commercial class it is one-half, reflecting lower diversity or no demand imposed at the system peak hours. Customer of commercial customer usage across the day compared weighting factors are typically based on the relative cost of with residential load. The raw factors are computed simply meters and billing services for different types of customers, by dividing each class contribution to each category by the based on complexity.
  3. Page 70 of 276

    68 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Table 7. Composite allocation factors derived from illustrative load research data Method Equivalent peaker Components 20% system 200 CP/ 80% energy Residential Secondary commercial Primary industrial Street lighting Used for 32% 34% 31% 3% Generation, transmission On-peak 50% midpeak/ 50% critical peak 36% 38% 26% 1% Peaking generation Average and peak 50% class NCP/ 50% energy 34% 34% 27% 6% Primary distribution Minimum system 50% customer/ 50% class NCP: circuit 57% 26% 12% 5% Equivalent peaker for transformers 20% delivery points/ 80% customer NCP 60% 30% 0% 11% Circuits (legacy) Line transformers and secondary service lines Note: Class percentages may not add up to 100 because of rounding. In Table 6, we have calculated allocation factors shown as Given the wide diversity of utilities and their load a class percentage of each usage metric. In Part II, we discuss patterns, readers should be careful about overgeneralizing in what circumstances each of these will be appropriate for from these illustrative examples. However, some patterns embedded cost of service studies. In many cases, weighted will hold true across the board. For example, the minimum combinations of these are appropriate. Several commonly system method will always allocate more costs to classes with used composite allocation factors are shown in Table 7, large numbers of customers, at least compared with the basic computed by weighting values in Table 6. customer method.
  4. Page 71 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 69 6. Basic Frameworks for Cost Allocation W e group cost allocation studies into two primary Generally speaking, in the traditional model displayed in families. Embedded cost studies look at existing Figure 18 on the next page, functionalization identifies the costs making up the existing revenue require- purpose served by each cost (or the underlying equipment or ment. Marginal cost studies look at changes in cost that activity), classification identifies the general category of fac- will be driven by changes in customer requirements over a tors that drive the need for the cost, and allocation selects the reasonable planning period of perhaps five to 20 years. In the parameter to be used in allocating the cost among classes.44 same family as marginal cost studies, total service long-run Although they are convenient parts of organizing a incremental cost (TSLRIC) studies look at the cost of creating cost of service study, functionalization and classification a new system to provide today’s needs using today’s technol- decisions are not necessarily critical to the final class cost ogies, optimized to today’s needs. Each has a relevant role in allocations. The cost of service study can get to the same final determining the optimal allocation of costs, and regulators allocation in several ways. For example, consider the reality may want to consider more than one type of study when that a portion of transmission costs is driven by the need making allocation decisions for major utilities that affect to interconnect remote generation to avoid fuel costs. This millions of consumers. can be reflected by functionalizing a portion of transmission 6.1 Embedded Cost of Service Studies cost as generation, or by classifying a portion of transmission in the same manner as the remote generation, or it can be recognized by using a systemwide transmission allocator with Embedded cost of service studies may be the most some energy component. In either case, a portion of costs is common form of utility cost allocation study, often termed allocated based on energy throughput, not solely on design “fully allocated cost of service studies.” Most state regulators capacity or actual capacity utilization. require them, and nearly all self-regulated utilities rely on embedded cost of service studies. The distinctive feature 6.1.1 Functionalization In this first step, cost of service studies divide the utility’s of these studies is that they are focused on the cost of service and usage patterns in a test year, typically either accounting costs into a handful of top-level functions that immediately before the filing of the rate case or the future mirror the elements of the electric system. At a minimum, year that begins when new rates are scheduled to take effect. this includes three functions:45 This means there is very little that accounts for changes • Generation:46 the power plants and supporting equip- over time, so it is primarily a static snapshot approach. ment, such as fuel supply and interconnections, Embedded cost of service studies are also closely linked to the as well as purchased power. revenue requirement approved in a rate case, which can be administratively convenient. 44 The third step is usually called allocation, which is the same as the name of the entire process. This step involves the selection or development of allocation factors. Some analysts refer to this third step as factor allocation to prevent confusion. 45 Some of the costs, such as for energy efficiency programs and advanced • Transmission: high-voltage lines (which may range from 50 kV to over 300 kV) and the substations connecting meters, may serve multiple functions and must be assigned among those functions or treated as special functional categories. 46 Some sources use the term “production” instead. This manual uses the term “generation” and generally includes exports from storage facilities under this category.
  5. Page 72 of 276

    70 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Figure 18. Traditional embedded cost of service study flowchart Revenue requirement Functionalization Generation Billing and customer service Distribution Transmission Classification Demand-related Energy-related Customer-related Allocation Residential Secondary commercial Primary industrial those lines, moving bulk power from generation to the distribution system. • Street lighting them (meter reading, billing, communicating). • General plant and administrative and general expenses: Distribution: lower-voltage primary feeders (in older Overhead investments and expenses that jointly serve systems, 4 kV and 8 kV; in newer areas, typically 13 kV to multiple functions (e.g., administration, financial, legal 34 kV) that run for many miles, mostly along roadways, services, procurement, public relations, human resources, and the distribution substations that step power down regulatory, information technology, and office buildings to distribution voltages; line transformers that step the and equipment) can be kept separate at this stage. In primary voltages down to secondary voltages (mostly some circumstances, these costs could be attributed 120 V and 240 V); and the secondary lines that connect to certain functions but are not tracked that way in a the transformers to some customers’ service drops. utility’s system of accounts. Although some utility analysts combine all costs into • Public policy program costs: In many jurisdictions, these these three functions, the better practice is to include other costs are administered and allocated through another functions as well at this stage: process; but if handled in a rate case, energy efficiency • Billing and customer service: Also known as retail service and other public policy programs should be tracked or erroneously labeled entirely as customer-related separately. costs, these are directly related to connecting customers Historically, in most cases functionalization decisions (service drops, traditional meters) and interacting with can follow the utility’s accounting and are noncontroversial.
  6. Page 73 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA The investment that is booked as generation units is usually role in operations, such as networking together the part of the generation function. But there are exceptions. utility’s service territory, providing radial supply to In some situations, the function of an investment may scattered distribution substations or importing not match the accounting category. Examples include the low-cost baseload energy from distant suppliers. following: • • Transmission lines and substations that are dedicated to connecting specific generating plants to the bulk • Segregating lower-voltage subtransmission facilities • Treating interconnections differently from the internal transmission network. accounting records as transmission but are more properly • functionalized as generation. Distribution Substations that contain switching equipment to connect • Separating substations from lines. Separating substations, lines (comprising overhead transmission lines of the same voltage to one another, poles, underground conduit and the wires) and line high-voltage transformers that connect transmission transformers. lines of different voltages, and lower-voltage transformers 71 (typically under 100 kV) from higher-voltage facilities. transmission network. These assets are often in the • | • Segregating costs of system monitoring, control and that connect transmission to distribution. These facilities optimization related to reducing losses, improving may be carried in the accounting records as entirely power quality and integrating distributed renewables transmission or entirely distribution but are properly and storage. split between transmission and distribution in the • Dividing lines into primary and secondary components. functionalization process. • In some cases, separating underground from overhead Equipment within transmission substations that look lines. like distribution equipment (e.g., poles, line transformers, Billing and customer service secondary conductors, lighting). These might be booked • Subfunctionalizing meters, services, meter reading, in distribution accounts but are functionally part of the billing, customer service and other components, each of transmission substation. which may be allocated separately. In addition, many cost of service studies subfunctionalize • Separating meters by technology — traditional kWh some costs within a function, such as the following: meters, demand meters, remotely read meters and Generation advanced meters with hourly load recording and other • Differentiating baseload generation (which runs when- capabilities — with different costs and different functions ever it is available or nearly so), intermediate generation (including, for the advanced meters, services to the entire (which typically runs several hours daily) and peaking system). • generation (which runs only in a few high-load hours General plant and administrative and general expenses and when other generation is unavailable). • Subfunctionalizing by type of cost: pensions and benefits, Separating generators by technology to recognize such property insurance, legal, regulatory, administration, factors as renewable resources procured to meet energy- buildings, office equipment and so on. based environmental goals, the differing reliability In the future, organizing costs by function probably will contributions per installed kW of various technologies still be helpful in organizing thinking about cost causation, (e.g., wind, solar, thermal) and the differences in cost but the cost of service study may need to differentiate structure and output pattern between thermal, wind, functions in new ways. For example, distributed generation, solar and hydro resources. storage, energy efficiency, demand response and smart grid Transmission technologies can provide services that span generation, • transmission and distribution. Categorizing lines (and associated substations) by their
  7. Page 74 of 276

    72 | ELECTRIC COST ALLOCATION FOR A NEW ERA 6.1.2 Classification The second step of the process classifies each function or subfunction (i.e., each type of plant and expense) as being caused by one or more categories of factors. In particular, most cost of service studies use the classification categories of demand (meaning some measure of loads in peak hours or other hours that contribute to stressing system reliability or increasing capacity requirements on the generation, REGULATORY ASSISTANCE PROJECT (RAP)® Table 8. 1992 NARUC cost allocation manual classification Cost function Typical cost classification Production Demand-related Energy-related Transmission Demand-related Energy-related Distribution Demand-related Energy-related Customer-related Customer service Customer-related Demand-related transmission or distribution systems), energy and customer number, and some use other categories (e.g., direct assignment, such as of street lighting). The classification of most costs as demand-, energy- or Source: National Association of Regulatory Utility Commissioners. (1992). Electric Utility Cost Allocation Manual customer-related dates back many decades. These categories can still be used but need to be interpreted more carefully as more important than others in driving energy costs. With the utility system has changed in many ways: improved information about class loads, and with a range • Utility planning has become more sophisticated. of new technologies, it may be appropriate to move past the • Utilities have access to more granular and comprehensive traditional energy and demand classifications and create new data on load and equipment condition. more granular distinctions, as discussed further in Chapter 17. • The variety of generation resources has increased to include wind, solar and other renewables with perfor- Utility Cost Allocation Manual, showing how the classification mance characteristics very different from legacy thermal step worked in that period (p. 21). and hydro resources. • Table 8 reproduces a table from the 1992 NARUC Electric This was a simplification even at the time, and changes Multiple storage technologies are affecting generation, to the industry and in the available data and analytical transmission and distribution costs. techniques merit reevaluation and reform. For example, a Legacy hydro, nuclear and fossil resources continue to legacy framework for variable renewable capacity, particularly operate and provide benefits to the utility system, but wind and solar, could treat the investment for utility-owned new similar resources and even continued operation of resources as 100% demand-related, since there are no vari- some existing units may no longer be cost-effective. Until able fuel costs. However, power purchase agreements for they are retired, all or a portion of costs will remain in these same resources are typically priced on a per-kWh basis the allocation study. from independent power producers. This could lead to two Demand response programs have increased in scale, role different approaches for the same asset depending on the and variety. ownership model, an obvious error in analysis that should be Utility spending on energy efficiency programs has avoided by considering the actual products and services being increased. provided. In addition, most of the benefits of wind and solar Advanced metering technology has added system benefits do not necessarily accrue at peak hours — the underlying to a traditionally customer-related asset. justification of a demand-related classification. Similarly, The demand and energy classifications are often analog meters were only useful for measuring customer usage treated as totally separate but, as discussed in Chapter 5, and billing, but new AMI provides data that can be used for the load in many hours contributes to needs that have system planning and provides new opportunities for energy traditionally been classified to demand, and some hours are management and peak load reduction. • • • •
  8. Page 75 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA 6.1.3 Allocation | 73 noncoincident peak) at any time during the year. Usage of The final step of the standard allocation process is the application of an allocation factor, or allocator, to each cost these peak-based demand allocators is often referred to as the peak responsibility method. category.47 An allocator is a percentage breakdown of the Generation allocators are sometimes differentiated selected cost driver among classes. Within each broad type among resources, to reflect the usage of different types of of classification, utilities use multiple allocators for various capacity and to retain the benefit of legacy resources for cost categories. For example, many different measures historic loads. Customer allocators are often weighted by of “demand” are used to allocate demand-related costs, the average cost of providing the service to customers in the including various measures of contribution to coincident various classes so that the cost of customer relations, for peaks (a single annual system coincident peak, or 1 CP); example, may be allocated with a weight of 1 for residential the average of several high-load monthly coincident peaks customers, 2 for small commercial, 5 for medium commercial (e.g., 3 CP or 4 CP); the average of all 12 monthly coincident and 20 for industrial. peak contributions (12 CP); the average of class contribution Other costs, such as A&G expenses, are sometimes to some number of high-load hours (e.g., 200 CP); or allocated on the basis of a labor allocator where the different measurements of class maximum load (class classification and allocation of underlying labor costs for the Figure 19. Modern embedded cost of service study flowchart Revenue requirement Functionalization Generation Distribution Transmission Billing, customer service, and A&G costs Time assignment Peak hours Intermediate hours All hours, including off-peak Site infrastructure, billing and collection Allocation Residential Secondary commercial Primary industrial Street lighting 47 Note that “allocation” is the term normally used for the entire process of assigning revenue requirements to classes and is also the term used for the last step of that process.
  9. Page 76 of 276

    74 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® system is used for a set of other purposes. This is sometimes approach may entirely bypass the traditional classification referred to as an internal allocator because it comes internally step, at least between energy and demand.48 Some relatively from previous calculations in the process. This is in contrast recent approaches recognize the complexity of cost drivers with “external allocators” based on facts and calculations and combine classification and allocation into time-varying outside of the cost allocation process, such as system peak direct assignment of costs, as explained in Part II. and energy usage. Lastly, a variety of costs may be allocated These time-varying allocation methods are discussed based on a revenue allocator, which is based on the division of in Chapter 17 and Section 9.2; Figure 19 shows a simplified costs across all the classes. version. Table 9 shows a simplified allocation study (very few cost 6.1.4 Potential for Reform categories and only two customer classes) and a caricature As hourly data become available for all parts of the system, of the effect of using very different approaches. Both are from transmission lines and substations through distribution embedded cost studies, but they produce dramatically feeders and line transformers to individual customers, an different results. additional approach to classification and allocation becomes The first study uses what might have passed for a feasible: assigning costs directly to the time periods or reasonable cost allocation method a few decades ago, with operating conditions in which they are used and useful. This all generation capacity and transmission costs allocated Table 9. Results of two illustrative embedded cost of service study approaches Legacy study: Peak responsibility/minimum system Cost category Revenue requirement Allocation method Residential Commercial and industrial Modern study: Base-peak/basic customer Allocation method Residential Commercial and industrial Generation Baseload $100,000,000 Peak demand (1 CP) $60,000,000 $40,000,000 All energy $50,000,000 $50,000,000 Peaking $50,000,000 Peak demand (1 CP) $30,000,000 $20,000,000 On-peak energy $27,500,000 $22,500,000 Fuel $100,000,000 All energy $50,000,000 $50,000,000 All energy $50,000,000 $50,000,000 Subtotal $140,000,000 $110,000,000 $127,500,000 $122,500,000 Peak demand (1 CP) $12,000,000 $8,000,000 75% all energy/ 25% on-peak energy $10,300,000 $9,800,000 Circuits $50,000,000 50% peak demand/ $37,500,000 50% customer $12,500,000 75% all energy/ 25% on-peak energy $25,600,000 $24,400,000 Transformers $20,000,000 Customer $18,000,000 $2,000,000 75% all energy/ 25% on-peak energy $10,300,000 $9,800,000 Advanced meters $10,000,000 Customer $9,000,000 $1,000,000 50% customer/ 25% all energy/ 25% on-peak energy $7,100,000 $2,900,000 $64,500,000 $15,500,000 $43,000,000 $37,000,000 $18,000,000 $2,000,000 Customer $18,000,000 $2,000,000 $234,500,000 $135,500,000 $198,750,000 $171,250,000 $0.156 $0.09 $0.133 $0.114 -15% +26% Transmission $20,000,000 Distribution Subtotal Billing and collection $20,000,000 Total $370,000,000 Average per kWh Customer $0.123 Difference Note: Numbers may not add up to total because of rounding. 48 Some costs associated with providing service under rare combinations of load and operating contingencies may not fit well into this framework.
  10. Page 77 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 75 The point of these illustrative examples is not to suggest Table 10. Illustrative allocation factors a specific approach, nor to defend any of the individual Residential Commercial and industrial Peak demand (1 CP) 60% 40% classification and allocation assumptions affect study results. All energy 50% 50% Simply stating that a proposed cost assignment between On-peak energy 55% 45% Customer 90% 10% 50% peak demand (1 CP)/ 50% customer 75% 25% 75% all energy/ 25% on-peak energy 51.3% 48.8% 50% customer/ 25% all energy/ 25% on-peak energy 71.3% 28.8% Method Method allocation methods shown, but to illustrate how different classes is “based on the cost of service” may ignore the very important judgments that goes into the assumptions of the study. Table 10 shows the illustrative allocators that drive the results in Table 9. Figure 20 on the next page shows a Sankey diagram for the legacy embedded cost of service study shown in Table 9. In that legacy study, most costs are classified as demand-related, and 60% of demand-related costs get allocated to the residential class. Similarly, a significant on the highest-hour peak demand and most distribution amount of costs are classified as customer-related, which are costs allocated based on customer count. The second uses then overwhelmingly allocated to the residential class. This is a simple time-based assignment method, in which all costs because the minimum system method classifies all metering, are allocated to usage in the hours for which the costs are billing and line transformers as customer-related, along with incurred. This method recognizes that costs have a base a portion of the distribution system. level needed to provide service at all hours and incremental In contrast, Figure 21 on Page 77 shows a Sankey diagram costs to provide service at peak hours. It also recognizes the for the modern study in Table 9. More than half of peak hours multiple purposes for which advanced meter investments are costs are allocated to the residential class, but the peak hours made. The results are quite striking, with the second study classification is much less significant than the demand-related showing a residential class revenue requirement 15% lower classification in the legacy study. Similarly, the basic customer than the first. This set of assumptions probably forms the method classifies only billing and a portion of advanced bookends between which most well-developed embedded metering costs as customer-related. These costs are still cost studies would fall. primarily allocated to the residential class, but the aggregated The first approach presents a legacy method that some differential nevertheless comes out significantly lower than in industrial and large commercial customer representatives still the legacy study. The remainder of advanced metering costs sometimes propose. The second is a method that residential is split between all energy and on-peak energy because the consumer advocates often champion. This change in method purpose of these investments is to reduce energy costs and drives a significant change in the result. Both of these are peak capacity requirements. “cost of service” results.