Prefiled testimony
Witness: Melissa Whited
Files3
Synapse - Eversource COS and Rate Design Testimony Final.pdf
PDF · 829 KB · 48 pagesText searchable
Download Synapse - Eversource COS and Rate Design Testimony Final.pdfRead the text of Synapse - Eversource COS and Rate Design Testimony Final.pdf
MW-2- Synapse Attachment.pdf
PDF · 4.6 MB · 276 pagesText searchable
Download MW-2- Synapse Attachment.pdfRead the text of MW-2- Synapse Attachment.pdf
MW-1 - Synapse Attachment.pdf
PDF · 734 KB · 13 pagesText searchable
Download MW-1 - Synapse Attachment.pdfRead the text of MW-1 - Synapse Attachment.pdf
Page 74 of 276
72 | ELECTRIC COST ALLOCATION FOR A NEW ERA 6.1.2 Classification The second step of the process classifies each function or subfunction (i.e., each type of plant and expense) as being caused by one or more categories of factors. In particular, most cost of service studies use the classification categories of demand (meaning some measure of loads in peak hours or other hours that contribute to stressing system reliability or increasing capacity requirements on the generation, REGULATORY ASSISTANCE PROJECT (RAP)® Table 8. 1992 NARUC cost allocation manual classification Cost function Typical cost classification Production Demand-related Energy-related Transmission Demand-related Energy-related Distribution Demand-related Energy-related Customer-related Customer service Customer-related Demand-related transmission or distribution systems), energy and customer number, and some use other categories (e.g., direct assignment, such as of street lighting). The classification of most costs as demand-, energy- or Source: National Association of Regulatory Utility Commissioners. (1992). Electric Utility Cost Allocation Manual customer-related dates back many decades. These categories can still be used but need to be interpreted more carefully as more important than others in driving energy costs. With the utility system has changed in many ways: improved information about class loads, and with a range • Utility planning has become more sophisticated. of new technologies, it may be appropriate to move past the • Utilities have access to more granular and comprehensive traditional energy and demand classifications and create new data on load and equipment condition. more granular distinctions, as discussed further in Chapter 17. • The variety of generation resources has increased to include wind, solar and other renewables with perfor- Utility Cost Allocation Manual, showing how the classification mance characteristics very different from legacy thermal step worked in that period (p. 21). and hydro resources. • Table 8 reproduces a table from the 1992 NARUC Electric This was a simplification even at the time, and changes Multiple storage technologies are affecting generation, to the industry and in the available data and analytical transmission and distribution costs. techniques merit reevaluation and reform. For example, a Legacy hydro, nuclear and fossil resources continue to legacy framework for variable renewable capacity, particularly operate and provide benefits to the utility system, but wind and solar, could treat the investment for utility-owned new similar resources and even continued operation of resources as 100% demand-related, since there are no vari- some existing units may no longer be cost-effective. Until able fuel costs. However, power purchase agreements for they are retired, all or a portion of costs will remain in these same resources are typically priced on a per-kWh basis the allocation study. from independent power producers. This could lead to two Demand response programs have increased in scale, role different approaches for the same asset depending on the and variety. ownership model, an obvious error in analysis that should be Utility spending on energy efficiency programs has avoided by considering the actual products and services being increased. provided. In addition, most of the benefits of wind and solar Advanced metering technology has added system benefits do not necessarily accrue at peak hours — the underlying to a traditionally customer-related asset. justification of a demand-related classification. Similarly, The demand and energy classifications are often analog meters were only useful for measuring customer usage treated as totally separate but, as discussed in Chapter 5, and billing, but new AMI provides data that can be used for the load in many hours contributes to needs that have system planning and provides new opportunities for energy traditionally been classified to demand, and some hours are management and peak load reduction. • • • •Page 75 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA 6.1.3 Allocation | 73 noncoincident peak) at any time during the year. Usage of The final step of the standard allocation process is the application of an allocation factor, or allocator, to each cost these peak-based demand allocators is often referred to as the peak responsibility method. category.47 An allocator is a percentage breakdown of the Generation allocators are sometimes differentiated selected cost driver among classes. Within each broad type among resources, to reflect the usage of different types of of classification, utilities use multiple allocators for various capacity and to retain the benefit of legacy resources for cost categories. For example, many different measures historic loads. Customer allocators are often weighted by of “demand” are used to allocate demand-related costs, the average cost of providing the service to customers in the including various measures of contribution to coincident various classes so that the cost of customer relations, for peaks (a single annual system coincident peak, or 1 CP); example, may be allocated with a weight of 1 for residential the average of several high-load monthly coincident peaks customers, 2 for small commercial, 5 for medium commercial (e.g., 3 CP or 4 CP); the average of all 12 monthly coincident and 20 for industrial. peak contributions (12 CP); the average of class contribution Other costs, such as A&G expenses, are sometimes to some number of high-load hours (e.g., 200 CP); or allocated on the basis of a labor allocator where the different measurements of class maximum load (class classification and allocation of underlying labor costs for the Figure 19. Modern embedded cost of service study flowchart Revenue requirement Functionalization Generation Distribution Transmission Billing, customer service, and A&G costs Time assignment Peak hours Intermediate hours All hours, including off-peak Site infrastructure, billing and collection Allocation Residential Secondary commercial Primary industrial Street lighting 47 Note that “allocation” is the term normally used for the entire process of assigning revenue requirements to classes and is also the term used for the last step of that process.Page 76 of 276
74 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® system is used for a set of other purposes. This is sometimes approach may entirely bypass the traditional classification referred to as an internal allocator because it comes internally step, at least between energy and demand.48 Some relatively from previous calculations in the process. This is in contrast recent approaches recognize the complexity of cost drivers with “external allocators” based on facts and calculations and combine classification and allocation into time-varying outside of the cost allocation process, such as system peak direct assignment of costs, as explained in Part II. and energy usage. Lastly, a variety of costs may be allocated These time-varying allocation methods are discussed based on a revenue allocator, which is based on the division of in Chapter 17 and Section 9.2; Figure 19 shows a simplified costs across all the classes. version. Table 9 shows a simplified allocation study (very few cost 6.1.4 Potential for Reform categories and only two customer classes) and a caricature As hourly data become available for all parts of the system, of the effect of using very different approaches. Both are from transmission lines and substations through distribution embedded cost studies, but they produce dramatically feeders and line transformers to individual customers, an different results. additional approach to classification and allocation becomes The first study uses what might have passed for a feasible: assigning costs directly to the time periods or reasonable cost allocation method a few decades ago, with operating conditions in which they are used and useful. This all generation capacity and transmission costs allocated Table 9. Results of two illustrative embedded cost of service study approaches Legacy study: Peak responsibility/minimum system Cost category Revenue requirement Allocation method Residential Commercial and industrial Modern study: Base-peak/basic customer Allocation method Residential Commercial and industrial Generation Baseload $100,000,000 Peak demand (1 CP) $60,000,000 $40,000,000 All energy $50,000,000 $50,000,000 Peaking $50,000,000 Peak demand (1 CP) $30,000,000 $20,000,000 On-peak energy $27,500,000 $22,500,000 Fuel $100,000,000 All energy $50,000,000 $50,000,000 All energy $50,000,000 $50,000,000 Subtotal $140,000,000 $110,000,000 $127,500,000 $122,500,000 Peak demand (1 CP) $12,000,000 $8,000,000 75% all energy/ 25% on-peak energy $10,300,000 $9,800,000 Circuits $50,000,000 50% peak demand/ $37,500,000 50% customer $12,500,000 75% all energy/ 25% on-peak energy $25,600,000 $24,400,000 Transformers $20,000,000 Customer $18,000,000 $2,000,000 75% all energy/ 25% on-peak energy $10,300,000 $9,800,000 Advanced meters $10,000,000 Customer $9,000,000 $1,000,000 50% customer/ 25% all energy/ 25% on-peak energy $7,100,000 $2,900,000 $64,500,000 $15,500,000 $43,000,000 $37,000,000 $18,000,000 $2,000,000 Customer $18,000,000 $2,000,000 $234,500,000 $135,500,000 $198,750,000 $171,250,000 $0.156 $0.09 $0.133 $0.114 -15% +26% Transmission $20,000,000 Distribution Subtotal Billing and collection $20,000,000 Total $370,000,000 Average per kWh Customer $0.123 Difference Note: Numbers may not add up to total because of rounding. 48 Some costs associated with providing service under rare combinations of load and operating contingencies may not fit well into this framework.Page 77 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 75 The point of these illustrative examples is not to suggest Table 10. Illustrative allocation factors a specific approach, nor to defend any of the individual Residential Commercial and industrial Peak demand (1 CP) 60% 40% classification and allocation assumptions affect study results. All energy 50% 50% Simply stating that a proposed cost assignment between On-peak energy 55% 45% Customer 90% 10% 50% peak demand (1 CP)/ 50% customer 75% 25% 75% all energy/ 25% on-peak energy 51.3% 48.8% 50% customer/ 25% all energy/ 25% on-peak energy 71.3% 28.8% Method Method allocation methods shown, but to illustrate how different classes is “based on the cost of service” may ignore the very important judgments that goes into the assumptions of the study. Table 10 shows the illustrative allocators that drive the results in Table 9. Figure 20 on the next page shows a Sankey diagram for the legacy embedded cost of service study shown in Table 9. In that legacy study, most costs are classified as demand-related, and 60% of demand-related costs get allocated to the residential class. Similarly, a significant on the highest-hour peak demand and most distribution amount of costs are classified as customer-related, which are costs allocated based on customer count. The second uses then overwhelmingly allocated to the residential class. This is a simple time-based assignment method, in which all costs because the minimum system method classifies all metering, are allocated to usage in the hours for which the costs are billing and line transformers as customer-related, along with incurred. This method recognizes that costs have a base a portion of the distribution system. level needed to provide service at all hours and incremental In contrast, Figure 21 on Page 77 shows a Sankey diagram costs to provide service at peak hours. It also recognizes the for the modern study in Table 9. More than half of peak hours multiple purposes for which advanced meter investments are costs are allocated to the residential class, but the peak hours made. The results are quite striking, with the second study classification is much less significant than the demand-related showing a residential class revenue requirement 15% lower classification in the legacy study. Similarly, the basic customer than the first. This set of assumptions probably forms the method classifies only billing and a portion of advanced bookends between which most well-developed embedded metering costs as customer-related. These costs are still cost studies would fall. primarily allocated to the residential class, but the aggregated The first approach presents a legacy method that some differential nevertheless comes out significantly lower than in industrial and large commercial customer representatives still the legacy study. The remainder of advanced metering costs sometimes propose. The second is a method that residential is split between all energy and on-peak energy because the consumer advocates often champion. This change in method purpose of these investments is to reduce energy costs and drives a significant change in the result. Both of these are peak capacity requirements. “cost of service” results.Page 78 of 276
76 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Figure 20. Sankey diagram for legacy embedded cost of service study Revenue requirement: 370 Billing & collection: Transmission: Generation: 250 Energy-related: 100 20 Demand-related: 195 Residential: 234.5 Distribution: 80 Customerrelated: 75 Commercial and industrial: 135.5 20Page 79 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 77 Figure 21. Sankey diagram for modern embedded cost of service study Revenue requirement: 370 Billing & collection: Transmission: Generation: 250 20 Distribution: 80 20 Customerrelated: All hours: 270 Residential: 198.75 Peak hours: 75 Commercial and industrial: 171.25 20Page 80 of 276
78 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® “Fixed” versus “variable” costs In the past, some cost allocation studies have relied on a simplified model of cost causation, in which certain costs are labeled as variable and then classified as energy-related and apportioned among classes based on class kWh usage. The remaining costs, labeled as fixed, are classified as demand-related or customer-related and allocated on some measure of peak demand or customer number, respectively.49 This antiquated approach is based on fundamental misconceptions regarding cost causation. But it still underlies many arguments about cost allocation, perhaps because it typically works to the benefit of customer classes with high load factors and small numbers of customers — which describes most util- • Purchased power charges that depend on the amount of energy taken by the utility.52 Over the decades, nearly every other utility cost has been described as fixed in one context or another: capital, labor, materials and contract services. Most of these costs are fixed for the coming year, in the sense that they are committed (investments made, contracts signed, employees hired) and will not be immediately changed by usage levels (energy, demand or number of customers). However, almost all of these cost accounts are variable over a period of several years, and energy consumption may affect: ities’ large industrial classes, data centers and even supermar- • Whether excess generation capacity or other redundant kets.50 This technique ignores the reality that modern electric facilities can be retired or mothballed in order to reduce systems trade off capital, labor, contractual obligations, fuel operating and capital expenditures or repurposed to increase and other expenditures to minimize costs. the net benefits of the facility. One of the problems with using the fixed/variable dichotomy to classify costs is the ambiguity of the concept of a cost being “fixed.” Nearly all observers agree that certain generation costs are variable because they are short-term marginal costs that vary directly with usage patterns. These costs include: • Whether additional facilities are needed (increasing capital and operating costs). • Whether contracts are extended. • The cost of capacity that is built (e.g., combined cycle versus combustion turbine plants, larger T&D equipment to reduce losses). • Fuel purchasing and disposal costs.51 As a result, these costs are not fixed over the planning horizon. • Variable operating costs related to consumables From an economic perspective more generally, all costs vary in (e.g., water, limestone, activated carbon, ammonia) the long run. injected to increase output, reduce emissions or provide cooling to the power plant as it produces energy. Relatedly, nearly all competitive businesses and fee-charging • Allowances or offsets that must be purchased to emit public services recover their fixed costs based on units sold. various pollutants. 49 In rate design, this approach has been extended to argue that all “fixed” costs must be recovered through fixed charges, often meaning customer and demand charges. These approaches promote neither equity nor efficiency. 50 Similarly, the fixed/variable approach is attractive to those who would justify rate designs with lower energy charges and higher customer and demand charges. Customers do not pay an access fee to enter a supermarket. 51 In previous decades, utilities would even argue that some fuel costs are fixed, on the grounds that having fuel on hand was necessary to allow the plant to function when required, or that a certain amount of fuel was required for startup, before any energy could be generated. These arguments appear to have largely disappeared, although similar issues are raised by the fuel security debate at FERC. 52 Many observers would add another category — expenses whose amount and timing vary with hours of operation, output or unit starts — even though not all cost of service studies separate those costs from other O&M expenses.Page 81 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® Restaurants, theaters and airlines have many costs that can be characterized as fixed (land, buildings, equipment, a large share of labor) and vary their unit prices by time of use but ultimately recover their capital investments and long-term costs from sales of output. RAP has done extensive analysis of utility distribution system investment and the relationship of that investment to the number of customers, peak demands and total kWhs. We found that these costs are roughly linear with respect to each of these metrics (Shirley, 2001). ELECTRIC COST ALLOCATION FOR A NEW ERA | 79 6.2 Marginal Cost of Service Studies The fundamental principle of marginal cost pricing is that economic efficiency is served when prices reflect current or future costs — that is, the true value today of the resources that are being used to serve demand — rather than historical embedded costs. Advocates for a marginal cost of service study approach work backward from this pricing concept to suggest that cost allocation should be based around marginal costs as well. Critics of marginal Some version of the fixed/variable distinction may have been cost methods often point out that this economic theory close to reality in the middle of the last century. Most utilities is appropriate only when other conditions are present, relied primarily on fossil steam plants, using newer, more including that all other goods are priced based on marginal efficient plants to serve baseloads and older plants to serve costs, that there are no barriers to entry or exit from the intermediate and peak loads. The capital costs of each were market and that capital is fungible. not very different. Fuel costs for oil, coal and natural gas were This is a very broad concept because it abstracts from not very different. And because little was required in terms of and does not consider both theoretical and computational emissions controls, coal plants were not much more expen- issues associated with the development of marginal costs. In sive than other fossil-fueled plants.53 By the 1970s, however, contrast to the static snapshot that is typical of embedded conditions had changed radically. Oil prices rose dramatically, cost approaches, marginal cost of service studies account new coal plants were required to reduce air emissions, and for how costs change over time and which rate class new generation technologies arose: nuclear, with high capital characteristics are responsible for driving changes in cost. and O&M cost but low fuel prices; and combustion turbines, Importantly, marginal costs can be measured in the short with low capital and O&M costs but high fuel costs. Utilities run or long run. At one extreme, a true short-run marginal suddenly had a menu of options among generation technol- cost study will measure only a fraction of the cost of service, ogies, including the potential for trading off short-term fuel the portion that varies from hour to hour with usage costs for long-term capital investments. Today that menu has assuming no changes in the capital stock. At the other, a expanded even more and includes storage, demand response, total service long-run incremental cost study measures the price-responsive customer load and distributed generation. cost of replacing today’s power system with a new, optimally designed and sized system that uses the newest technology. As a result, the fixed/variable distinction has lost relevance In between is a range of alternatives, many of which have and adherents over the last several decades. For example, been used in states like Maine, New York, Montana, many regulators classify capital investments using methods Oregon and California in determining revenue allocation that recognize the contribution of energy requirements to among classes. the need for a wide variety of “fixed” costs for generation, transmission and distribution.54 There is a strong theoretical link between optimal rate design and long-run marginal costs. Allocation based on marginal costs works backward from this premise; because pricing 53 In some areas, such as the U.S. Northwest, Manitoba and Québec, utilities had access to ample low-cost hydro facilities and mostly avoided construction of thermal generation. 54 These methods are discussed in chapters 9, 10 and 11. should be determined on this basis, cost allocation should as well. In its simplest form, a marginal cost study computes marginal costs for different elements of service, which can be estimated using a number of techniques, including proxies,Page 82 of 276
80 | ELECTRIC COST ALLOCATION FOR A NEW ERA regressions and other cost data. Table 11 shows illustrative marginal costs for different elements of the electric system. Different marginal cost of service studies may base their costing on different elements of the system or different combinations. The categories of costs included in each element can also be more or less expansive. The estimated marginal costs are then multiplied by the billing determinants for each class. This produces a class marginal cost revenue requirement and, when combined with other classes, a system MCRR. However, revenue determination solely on this marginal cost basis will typically be greater or less than the allowed revenue requirement, which is normally computed on an embedded cost basis. It is only happenstance REGULATORY ASSISTANCE PROJECT (RAP)® Table 11. Illustrative marginal cost results by element Cost Units per unit Customer connection Dollars per year $80 Secondary distribution Dollars per kW $40 Primary distribution Dollars per kW $80 Transmission Dollars per kW $50 Generation capacity Dollars per kW $100 On-peak Dollars per kWh $0.10 Midpeak Dollars per kWh $0.07 Off-peak Dollars per kWh $0.05 Energy by time period if marginal costs and embedded costs produce the same revenue or even similar levels of revenue. As a result, a first developed in the late 1970s was that generation costs marginal cost of service study must be adjusted to recover the were made up of capacity and energy costs, but the embedded correct annual amount from the revenue requirement. plant was not classified to obtain these costs. Marginal Two notable long-run methods are discussed in this energy costs were based on the incremental operating costs section: the long-run marginal cost approaches advocated of the system (discussed in Chapter 18 in more detail), while by Lewis Perl and his colleagues at the consulting firm capacity costs were the least cost of new capacity (at the time, National Economic Research Associates (NERA) — now typically a combustion turbine). The annualization for the NERA Economic Consulting — and the total service long- capacity costs of all types is not based on the embedded rate run incremental cost approach.55 In the 1980s, during the of return but on a real economic carrying charge (RECC) rate PURPA hearing era, many states considered and a few adopted that yields the same present value of revenue requirements the NERA method to measuring long-run marginal costs. when adjusted for inflation. California, Oregon, Montana and New York are examples For transmission and distribution costs in the NERA of states that began relying on this approach to measuring method, the marginal costs have typically been estimated marginal costs. This methodology generally looked at a 10-year by determining marginal investment for new capacity over or longer time horizon to measure what costs would change in a number of historical and projected years and relating that response to changes in peak demand and energy requirements investment to changes in some type of load or capacity during different time periods and the number of customers measure in kWs. This relationship can be found either served (National Economic Research Associates, 1977). One using regression equations (cumulative investment versus essential element of this was to define the cost of generation cumulative increase in load over the time period) or by to meet peak period load growth (peaker units and associated simply dividing the number of dollars of investment by the T&D capacity) as much higher than the cost to meet off-peak total increase in load over the time period. O&M costs are load growth (increased utilization of existing assets). This generally based on some type of average over a number of approach was influenced by Alfred Kahn’s theoretical focus on historical and projected years, although obvious trends or peak load costs and management (Kahn, 1970), and he himself anomalies can be taken into account. was associated with NERA for many years. For generation, one of the theoretical advances that made marginal cost of service studies attractive when they were 55 Short-run marginal cost approaches are actually much simpler, primarily varying fuel consumption and purchased power costs, but are applicable only in a limited number of circumstances.Page 83 of 276
REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 81 For customer costs, the same type of arguments over presence of either can shift costs sharply among consumer classification between distribution demand and customer classes. Because of this imbalanced result, regulators have costs occur as in embedded cost studies. The marginal cost adopted modifications to this methodology to equalize the study needs data on the current costs of hooking up new time horizon for different elements of the cost of service. For customers by class. The method for annualizing the costs is example, not all customers will require new service drops in dispute (RECC versus a new-customer-only method that and meters over a 10-year period — only new customers and assigns the costs by new and replacement customers). O&M those whose existing facilities fail. Some states apportion costs are again typically based on some type of average over costs within functional categories, avoiding this problem and historical and projected years. addressing markets with partial retail choice. The time horizon used for the NERA approach has In contrast to the NERA approach and other marginal proven controversial because it assumed the utility would cost approaches, which start from the parameters and install exactly the number of new customer connections and investments found in the existing system, the total service distribution lines required by new customers (i.e., all cus- long-run incremental cost approach looks at a period long tomer costs are “marginal”) but would consider the adequacy enough so that all costs truly are variable. This allows for of existing generation and transmission (which may be an estimate of what the system would look like if it were oversized to meet current needs) in determining the need for completely constructed using today’s technologies and today’s additional generation and transmission (meaning only some costs. Today, new generation is often cheaper than existing G&T costs are “marginal”). Many utilities have used a 10-year resources, while the cost of transmission and distribution time horizon in this analysis, a period in which many found continues to rise. substantial excess capacity and, therefore, relatively low costs The TSLRIC approach was developed in the context of to meet increasing power supply needs. In addition, this regulatory reform for telecommunications (International methodology, as most often used, treats the cost of increased Telecommunication Union, 2009). In the 1990s, as telecom- off-peak usage as only the fuel and variable power costs munication technology advanced rapidly, incumbent local and losses associated with operating existing resources for exchange companies (better known as phone companies) additional hours, with no associated investment-related or faced competition from new market entrants that did not have maintenance-related cost, despite the reliance on expensive legacy system costs. These new competitors were able to offer investments to produce that power. service at lower cost than the local phone companies. Regu- The combination of these assumptions meant that many lators did not want to discourage innovation but also did not marginal cost of service studies over the last several decades want existing customers served by the local phone companies would come to three basic conclusions: to suffer rate increases if select customers left the system. • Power supply and transmission costs to meet off-peak The TSLRIC approach constructs a hypothetical system loads were relatively low, due to available excess capacity. with optimal sizing of components, with neither excess Power supply and transmission costs to meet peak load capacity nor deficient capacity. It would use the most modern growth were higher. technology. In the context of an electric utility, it would likely Distribution costs always grew in lockstep with the rely on wind, solar and storage to a greater extent than most number of customers and distribution demands. systems today, which would likely lead to lower costs. But it The most serious shortcoming of the NERA methodology would also incur the cost of today’s environmental and land is that if power supply is surplus due to imperfect forecasting, use restrictions, such as the requirement for lower emissions it assigns a very low cost to power; if it is scarce, the method from generation and undergrounding of transmission and assigns a very high cost. Neither of those circumstances distribution lines. These requirements have substantial is caused by the action of consumers in any class, but the societal benefits but can also drive up electric system costs. • •
As listed on the current system