    84 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Figure 22. Customer behavior in Sacramento Municipal Utility District pricing pilot Default critical peak pricing Percentage of customers 100% Default time-of-use and critical peak pricing 90% Default time-of-use pricing 80% Opt-in critical peak pricing Opt-in time-of-use pricing 70% 60% 50% 40% 30% 20% 10% 0% Did laundry off-peak Turned off lights Did dishes off-peak Turned off air conditioner Increased temperature on thermostat Source: Potter, J., George, S., and Jimenez, L. (2014). SmartPricing Options Final Evaluation Operating savings from, among other things, reduced demand that had been roughly constant for decades. Due to labor needs and improved outage management. significant solar capacity in some regions, such as California Lastly, smart meters, distribution sensors and modern and Hawaii, costs (e.g., extra spinning reserves, out-of-merit computing power provide utilities with large amounts of data dispatch or quick-start generation) may also be incurred to that can be used to determine the usage patterns of distribu- rapidly ramp up other generation as solar output falls in the tion and transmission equipment in great detail and support late afternoon, particularly if customer load does not drop direct hourly allocation of costs. dramatically from afternoon to evening.58 Excess solar gener- • ation may create ramping costs, while storage resources may 7.1.2 Variable Renewables, Storage, Energy Efficiency and Demand Response New variable renewable resources, such as wind and reduce ramping costs by both raising load at the beginning of the ramp period and trimming the peak toward the end of the ramp period. solar, are highly capital-intensive, and their contribution In Hawaii, June load shapes changed as increased levels to system reliability varies greatly from region to region of distributed solar were added to the system. Figure 23 on the depending on when their generation occurs relative to peak next page illustrates this, using data from the Federal Energy demand.57 The emergence of demand response as a service Regulatory Commission (n.d.). In 2006, the system peak provides an opportunity to meet narrow periods of peak demand was approximately 1,200 MWs at 1 to 3 p.m. By 2017, demand with relatively little capital investment by rewarding with extensive deployment of customer-sited solar, the peak customers who curtail usage on request. demand was 1,068 MWs at 9 p.m. A cost allocation scheme Investments in renewable resources, driven by policy and economic trends, can greatly change patterns in supply and 57 Growth in solar resources, whether central or distributed, gradually reduces the reliability value of incremental solar capacity in many respects; the same is true for wind resources with respect to the reliability value of incremental wind and the equivalent for (if they become economically must be adaptable enough to be relevant as significant changes in the shape and character of utility-served load take place. competitive) tidal and wave energy. In contrast, these different resources may be complementary to one another in certain respects. 58 The resulting load shape, first identified by Denholm, Margolis and Milford in 2008, is commonly known as a duck curve. See also Lazar (2016).
  2. Page 87 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA Figure 23. Evolution of system load in Hawaii on typical June weekday | 85 well to the shape of the summer diurnal load (Slusarewicz and Cohan, 2018; Electric Reliability Council of Texas, 2019). The costs of these resources can be assigned to the 1,200 hours in which they generate energy, as discussed in Chapter 17. Determining the hours that variable resources June 13, 2006 provide energy (on either a historical or normalized forecast basis) is generally straightforward. System demand in megawatts June 5, 2012 Distributed storage presents other issues and 1,000 opportunities, as it is a capital-intensive peaking resource with no direct fuel costs, dependent on charging from other resources, and provides a variety of energy, capacity, transmission, distribution and ancillary services to the system and sometimes backup supply to host customers. Storage may June 20, 2017 800 displace T&D investments, reduce fuel consumption, enable renewable energy integration and provide emergency service at customer sites. Each of these functions has a different place in a modern cost allocation study. A portfolio of energy efficiency measures reduces energy 600 0 2 4 6 8 10 12 14 16 18 20 22 24 Hour of day Data source: Federal Energy Regulatory Commission. Form No. 714 — Annual Balancing Authority Area and Planning Area Report The capacity role and treatment of variable renewable requirements, generation capacity requirements and stress on T&D equipment, as well as reduces customer billing determinants. As discussed in Section 14.1, energy efficiency expenditures can be classified and allocated in proportion to the benefits they produce. The plans and evaluation resources, such as wind and solar, vary among jurisdictions reports of the program administrator (the utility or a third and RTOs. The cost of service study should reflect the role of party authorized to provide those services) generally provide these resources in supply planning, by classifying part of the sufficient data on the load shape and class distribution of load renewable costs as demand-related and allocating those costs reductions. Since energy efficiency costs are recovered through in proportion to class consumption in the hours contributing a variety of mechanisms (rate based or expensed, through base to capacity requirements. This should recognize that different rates or a discrete conservation surcharge or rider), the cost types of variable renewable resources can be complementary allocation should reflect the cost recovery method. in many respects as long as the temporal patterns, either The costs of demand response programs — direct load daily or seasonal, are different. Even solar in slightly different control, customer load automation (e.g., setback thermostats) regions can be complementary since they may not be affected and price-responsive load (e.g., critical peak pricing) — in an identical way by cloud cover. For example, as shown should similarly be apportioned to reflect their benefits, so in Figure 24 on the next page, a mix of wind resources from that cost-effective demand response is a net benefit to both West and South Texas plus solar production combine to pro- participants and nonparticipants.59 An hourly assignment duce an overall resource shape that corresponds moderately method, where the costs of demand response are apportioned 59 Under conventional rate designs, participants (and their classes) generally retain a smaller share of the benefits of demand response (other than incentives for program participation, which may include peak-time rebates) than of energy efficiency programs. Depending on the program design, the incentives for the participants may be reflected in cost allocation and rate design through (1) reduced allocation of costs to the participating customers and classes to reflect improved load shape, (2) payment of incentives (including peak-time rebates) and allocation of those and other utility expenditures as costs, or (3) a combination of the two, as long as the benefits are not double-counted. Dynamic peak pricing may encourage demand response without explicit incentives, with the cost allocation to the participants’ class reflecting the improved load shape.
  3. Page 88 of 276

    86 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Figure 24. Illustrative Texas wind and solar resource compared with load shape 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Hour of day Combined generation Wind in West Texas Solar Wind in South Texas July average load Sources: Adapted from Slusarewicz, J., and Cohan, D. (2018). Assessing Solar and Wind Complementarity in Texas [Licensed under http://creativecommons.org/licenses/by/4.0]. Load data from Electric Reliability Council of Texas. (2019). 2018 ERCOT Hourly Load Data to the hours when it is called upon (to reduce load or provide decades. However, the precise rate of expansion is uncertain. operating reserves), may help match costs to benefits across Figure 25 shows three alternative projections for sales of classes. electric vehicles (Rissman, 2017). For cost allocation purposes, there are two interrelated 7.1.3 Beneficial Electrification of Transportation issues: how to treat existing customers who adopt EVs as well as new dedicated EV charging accounts, and how to allocate Electric vehicles currently use less than 1% of the nation’s electricity, but that is expected to rise sharply in the next two the costs of new utility EV programs, both for demand management and investments in charging stations. Figure 25. Forecasts of electric vehicle share of sales Percentage of new light-duty vehicle sales 70% Bloomberg NEF 60% Energy Policy Simulator 50% 40% 30% 20% US Energy Information Administration 10% 0% 2015 2020 2025 2030 2035 2040 2045 2050 Note: Projections of U.S. market share of EVs are from the Energy Policy Simulator 1.3.1 BAU case, the Energy Information Administration Annual Energy Outlook 2017 “No Clean Power Plan” side case, and the Bloomberg NEF Electric Vehicle Outlook 2017. Source: Rissman, J. (2017). The Future of Electric Vehicles in the U.S.
  4. Page 89 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 87 Figure 26. Estimated grid integration costs for electric vehicles Average marginal cost per plug-in EV $250 $200 $150 No time-of-use pricing 12 a.m. time-of-use pricing $100 $50 $0 2012 Smart charging* 2014 2016 2018 2020 2022 2024 *Not including costs to implement smart charging technology Source: Sacramento Municipal Utility District, personal communication, July 8, 2019 EVs are first being adopted in light-duty vehicle and whether EV adoption is high enough within the rate class market segments, which primarily equates to residential to have an impact on the other customers. However, assuming adoption. These EVs are charged predominantly at home; for the sake of argument that these thresholds are crossed, there is a general consensus that home charging comprises there are alternative ways to address the issue. It is not a over 80% on average (U.S. Department of Energy, n.d.). given that EV charging will increase system peak or otherwise This home EV charging represents a substantial, but not negatively impact other customers. Time-of-use rates and totally unprecedented, amount of new consumption for a other demand management programs can significantly lessen residential customer. The annual consumption for an EV these impacts. Figure 26 shows estimated grid integration represents slightly less than the consumption required for costs for uncontrolled EV charging and two alternative a typical electric water heater (U.S. Department of Energy, methods for managing EV load (Sacramento Municipal Utility n.d.). If uncontrolled, however, this additional consumption District, personal communication, July 8, 2019). could change the load profile significantly for this subset of Many jurisdictions are moving toward widespread TOU customers, potentially leading to additional system costs. rates for residential customers. If these rates are mandatory For example, if EVs begin to charge at home right after the for residential customers or even just the default for residen- workday ends and the sun is setting, then this could increase tial customers with EVs, then that would likely eliminate any system peak and exacerbate ramping issues. cross-subsidy issues between residential customers with and Between rate classes, changes in load profiles can be easily without EVs. Similarly, EVs can be easily integrated into other accounted for in future rate cases as long as there is sufficient demand management programs, or programs specific to EVs load research data on the issue. However, there could also be can be examined. significant changes in customer load profiles within each rate At some point, similar issues may arise for workplace class. As a result, some analysts have suggested that residential charging for light-duty vehicles, and it will be desirable to customers with EVs should be a separate rate class. As a concentrate charging into the hours when generation and threshold matter as discussed in Section 5.2, it is an empirical delivery system capacity is available and unused. For example, question whether customers with EVs have distinct cost it may be desirable to concentrate workplace EV charging characteristics from other customers in the same rate class during periods when solar generation is prevalent.
  5. Page 90 of 276

    88 | ELECTRIC COST ALLOCATION FOR A NEW ERA As of this writing, many different heavy-duty EVs are REGULATORY ASSISTANCE PROJECT (RAP)® outright discounts or alternative rate structures. To date, beginning to be adopted. Many jurisdictions have started to there are significant tensions in all of the proposed solutions adopt electric buses, and a wide range of electric trucks are for these DC fast charging accounts. Given the significant under development, from postal and parcel urban delivery site infrastructure needed to connect the uncontrolled power vehicles to long-haul semitrailers. Fleets of these vehicles will draw from DC fast chargers, the customer NCP demand for have charging requirements measured in MWs, not kWs, and these accounts could be a relevant cost driver. RAP’s preferred it may be desirable to locate these charging facilities where C&I rate design accounts for this by requiring modest they can be directly served from the transmission network, customer NCP demand charges for site infrastructure avoiding the primary distribution network altogether. In this ($1 to $2 per kW) with other elements of the rates established case, these sites will be more like large industrial high-volt- on a time-varying per-kWh basis. Such a rate would provide age customers for cost analysis purposes. Making potential the right blend of incentives to manage usage for DC fast customers aware of this option, to access lower-cost power by chargers through storage or other techniques. As a result, locating adjacent to transmission capacity, may help guide the reforming rate design for C&I customers could be the optimal evolution of this market segment on an economical pathway. solution to this issue, instead of establishing separate rate Lastly, the development of public DC fast charging, classes for DC fast charging or providing arbitrary discounts thought by many to be a prerequisite to scale up EV adoption under existing C&I rate designs. dramatically, is posing a range of new public policy issues. Several states have also begun to implement utility EV DC fast chargers allow for significantly faster recharging than programs, and many more states are considering policies other charging methods, which may be necessary for a variety in this area. Expenditures by regulated utilities to support of EV use cases, including long-distance travel and adoption electric vehicles are justified on a wide array of grounds: in areas where residents cannot charge at home. The power • rating of DC fast chargers is typically over 50 kWs per charging port and could increase significantly (Nicholas and Societal benefits: public health and climate benefits, energy independence and reduced noise. • Electric system benefits to all ratepayers: new load Hall, 2018). These characteristics mean that DC fast chargers at beneficial off-peak hours and flexible new loads to typically cannot be installed for single-family residential optimize ramping. customers. However, DC fast chargers can be installed at • Benefits to participating customers and EV drivers: many commercial and industrial locations with a sufficient increased convenience, lower total driving costs and the service capacity (e.g., a mall) or connected directly as a stand- potential to attract new customers to retail businesses. alone C&I customer with a separate account. One category of utility EV programs is quite similar Many jurisdictions have been wrestling with the proper to other energy and demand management programs. In rate class and rate design for stand-alone DC fast charger the aggregate, uncontrolled EV load could be a significant accounts. This is because these accounts have a load profile addition to peak load that drives many system costs. These without an obvious correspondence to other C&I rate classes. utility EV programs encourage, or in some cases ensure, These accounts have typically been placed in rate classes with that EV charging will take place during off-peak hours to significant demand charges. However, given the high kW minimize system stress and long-run electric system costs. power rating and low utilization rates at this early stage of EV The justifications for these programs and the principles adoption, high demand charges lead to extraordinarily high for allocating the costs are not very different from other bills for these fast charging accounts, at least on an average energy management and demand response programs, with cost per kWh basis. Given the broader public policy need for functionalization, classification and allocation according public DC fast charging, a number of jurisdictions have begun to the benefits of the program or alternatively to classes in to take steps to lower bills for these accounts, either through proportion to customer participation.
  6. Page 91 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® In contrast, another major category of utility EV ELECTRIC COST ALLOCATION FOR A NEW ERA | 89 with efforts to jump-start an infant industry. EV charging programs does raise new questions. Utility expenditures and station program cost responsibility could be more directly investments in support of charging infrastructure are taking a concentrated toward EV drivers over time. This could mean wide variety of forms, including rebates, additional allowances specialized ongoing cost recovery mechanisms, including for interconnection costs, and direct utility ownership and direct assignment of identifiable EV-related costs. However, operation of end-use charging stations. In most of these a jurisdiction that is seeking to accelerate EV adoption would programs, participants are expected to bear some of the costs certainly be free to apply short-run marginal cost-based eco- of the charging station, either upfront or ongoing, although nomic development rates to EV charging development while a few programs may include full utility ownership and simultaneously socializing EV program costs to all ratepayers. responsibility for all ongoing costs. Drivers of EVs are certainly the most direct beneficiaries of these programs, but there are 7.1.4 Distributed Energy Resources a wide range of potential benefits for other ratepayers and Over the last decade, DERs, particularly rooftop solar, society at large. Depending on the perspective, this could have gained significant traction in many jurisdictions. Many justify a wide range of cost allocation techniques, including: states adopted net metering rules for rooftop solar and other • Direct assignment to the customer classes receiving free eligible technologies in the 2000s.62 The federal government or subsidized equipment.60 also established the investment tax credit for commercial and Allocation to all classes in proportion to class revenues residential solar systems in 2005, which was thereafter extend- or energy use to reflect the benefits to each class from ed and expanded to other solar applications. Starting in the increased sales and reduced average costs. late 2000s, costs for solar panels started to drop quickly. These Direct assignment to EV program accounts or a broader policies and trends, in addition to a range of additional state group of identifiable EV customers as program beneficia- policies and incentives, have created a significant new market ries.61 for rooftop solar. As shown in Figure 27 on the next page, These programs are still quite new at the time of adoption of residential solar accelerated to significant levels in publication for this manual, so many of the important the mid-2010s, with more than 2 GWs of installations annually issues are only beginning to be investigated. This is further from 2015 through 2018 (Wood Mackenzie Power & Renew- complicated by cross-cutting issues, such as the integration of ables and Solar Energy Industries Association, 2019, p. 20). energy management programs into utility EV infrastructure Customer-sited adoption of solar can raise several investments and the impacts of cost allocation decisions on cost allocation issues. Unlike EVs, distributed solar reduces the competitive EV charging market and charging station customer load. At the macro level, for utilities without providers who do not (or cannot) benefit from utility support. decoupling, this can lead to underrecovery of revenue One logical outcome across these issues could be apply- and necessitate more frequent rate cases. If adoption of • • ing fully loaded time-varying rates to identifiable EV ac- distributed solar is captured in the load research data, then counts, which may provide higher incremental revenue than cost allocation between rate classes may change over time incremental costs in those hours. This would have the effect depending on the cost allocation techniques used. of socializing a substantial portion of EV program costs across a broader group of ratepayers. This would be consistent 60 The number of EV program participants in a class, but not the total number of customers in the class, may be relevant to allocation of the costs. 61 There are a number of potential variants on this. Direct recovery of costs from a given customer for installation at that customer’s site over time would act as a financing mechanism for that customer. However, specific program costs (e.g., a DC fast charger program) could be recovered The more difficult issue that jurisdictions around the country have been wrestling with is the possibility of through a combination of subsidies from other classes and an ongoing perkWh basis from the accounts that participated in that program. 62 The 2005 Energy Policy Act added net metering to the PURPA standards that each state was required to consider. Pub. L. No. 109-58 § 1251. Retrieved from https://www.congress.gov/109/plaws/publ58/PLAW109publ58.pdf
  7. Page 92 of 276

    90 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Figure 27. US solar photovoltaic installations 18,000 Utility Capacity in megawatts 16,000 Nonresidential 14,000 Residential 12,000 10,000 8,000 6,000 4,000 2,000 0 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Estimated 2023 2024 Source: Wood Mackenzie Power & Renewables and Solar Energy Industries Association. (2019, March). U.S. Solar Market Insight intraclass cross-subsidies between customers with solar and likelihood of lower impacts given the offsetting benefits of those without. Many utilities have proposed special rate de- solar generation.63 signs, changes to net metering rules and separate rate classes Even in jurisdictions with significant penetration levels for customers with solar. As always, the threshold issue for of distributed solar, there have been robust debates about the creating a new rate class is whether customers with solar are existence of significant cross-subsidies and the proper means having material impacts on the other customers. Some util- to address them. As a general matter, most proposals to ities and consumer advocates argue that net metering rules establish separate rate classes for distributed solar have been allow customers with solar to pay less than their fair share of denied so far.64 Utilities have also proposed higher customer system costs. It is important to quantitatively evaluate these charges and special demand charges for solar customers, concerns before making policy adjustments to address them. which have not been widely adopted. However, a variety To begin, the levels of distributed solar adoption across of rate design changes have been adopted to better align the country are quite uneven. While many jurisdictions have compensation with value and reduce the potential for unrea- significant levels of adoption, particularly those with either sonable cross-subsidies. California has begun to address these strong solar resources (such as California and Hawaii) or sup- issues by requiring new residential net metering customers portive state policy environments, many other jurisdictions to be placed on TOU rates, a measure that is integrated with have low levels of adoption. In jurisdictions with low levels a move toward TOU rates for residential customers more of adoption, the impacts on other customers are necessarily generally (California Public Utilities Commission, n.d. and quite small. If only 1% of class load is accounted for by dis- 2016). New York’s Value of Distributed Energy Resources tributed solar, then the worst-case scenario is approximately proceeding has set up specialized export credit compensation 1% higher bills for nonparticipating customers, with a strong for large distributed energy projects, which include values 63 Net ratepayer impacts from solar policies depend on many factors. In jurisdictions with significant renewable portfolio standard costs or separate solar incentive programs, these costs can be quite different than in jurisdictions where the primary solar compensation policy is net metering. It is important to distinguish whether costs to nonparticipating ratepayers are occurring because of the RPS, dedicated solar incentive programs or net metering policies. 64 The exception to date is Kansas, although separate rate classes for solar customers have been authorized by legislative action in additional states (Trabish, 2017). At the time of this writing, this area of policy is rapidly evolving.
  8. Page 93 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 91 Figure 28. Substation backfeeding during high solar hours 6 Average transformer load — December 5 Backfeed occurring 10 a.m. to 2 p.m. 2010 Load in megawatts 2011 4 2012 2013 3 2 August 8, 2013, backfeed condition 1 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Hour of day Source: Hawaiian Electric Company. (2014, April 30). Minimum Day Time Load Calculation and Screening. Distributed Generation Interconnection Collaborative (DGIC) webinar for energy, capacity, delivery and environmental externalities or transmission voltage customers receive a portion of their (New York Public Service Commission, 2017). Tensions in power from generating facilities located along distribution these debates include differentials between short-term and circuits. Where this occurs, some provision should be made to long-term avoided costs due to distributed generation and treat a portion of the distribution investment as a generation- how to consider significant societal externalities such as related cost. Figure 28 shows how some distribution greenhouse gas emissions. substations may backfeed to the transmission system during Customer-sited storage is another DER that is expected solar hours, even if the solar facilities are sited exclusively to grow in importance in the coming decades. Storage can be on the rooftops of secondary voltage customers (Hawaiian used to change the load profile for adopting customers and Electric Company, 2014). even export energy to the grid if the jurisdiction allows it. Under flat volumetric rates, there is little incentive to manage energy usage with storage and little risk of unusually signifi- 7.2 Changes to Regulatory Frameworks cant cross-subsidies. However, storage is becoming econom- As also introduced in Chapter 4, many new regulatory ically attractive in many jurisdictions to C&I customers that issues have arisen since the 1992 NARUC Electric Utility Cost have high demand charges. These demand charges may not Allocation Manual, and some older issues have become more be well designed economically, and storage could allow these prominent and widespread. These issues include: customers to lower their bills substantially. More generally, • markets and retail competition. well-designed time-varying rates and demand charges can give the proper incentives for energy management through • Lastly, higher penetrations of DERs will raise new issues • Performance-based revenue frameworks. • Proliferation of trackers and riders recovering costs outside of rate cases. around the allocation of local distribution facilities. As more DERs are added, there will be some systems where primary Holding company issues due to widespread mergers and new utility conglomerates. storage, but poorly designed rates will give customers correspondingly poor incentives. Restructuring and the emergence of organized wholesale • New types of public policy programs.
  9. Page 94 of 276

    92 | ELECTRIC COST ALLOCATION FOR A NEW ERA • • REGULATORY ASSISTANCE PROJECT (RAP)® Consideration of differential rates of return in cost services should be recovered through the default service, allocation studies. without affecting rate case revenue requirements. Recovery of stranded costs, assets with changed purposes and exit fees. Currently, default service is typically offered on a single residential load profile. We anticipate in the future this will become more granular,67 at least with respect to time of day 7.2.1 Restructuring A few issues in cost allocation are specific to restructured electric utilities and distribution system operators. and season. This may be done with separate default tariffs for different subclasses of customers, such as multifamily, electric heating or electric vehicle owners. Or it may be done more simply, with a time-varying default service option that applies Administrative and General Expenses the same rates to all customers in each period, resulting in The most important of these issues may be that A&G different average rates to customers with different usage costs become a larger share of total costs. As utilities have patterns. A regulator may choose to reconfigure, for retail been restructured, not all have trimmed their management pricing purposes, these costs on a time-varying basis; if this ranks or reduced executive compensation in proportion to occurs, the rate analyst must track this change into the cost the reduction in gross revenues. Regulators may need to allocation process. use utilities that have never had production as proxies to Some ISOs (for example, ISO-NE, MISO, PJM) apply determine appropriate cost levels to be assigned to distribu- separate capacity charges and energy charges for power tion services and the apportionment of that cost. Even for supply delivered to retail providers. Others (such as ERCOT) restructured utilities that do not own generation assets, have eschewed capacity markets, instead concentrating there are costs of maintaining involvement in regional power on time differentiation of costs on a volumetric basis and planning activities, ISO and RTO involvement and NERC allowing competitive energy prices to rise to levels reflective involvement that are more closely related to power supply of scarcity and the value of lost load.68 than the ownership and operation of a distribution system. The rate analyst may be in the position of second- Memberships in various industry organizations may be power guessing the ISO pricing, just as has been the case for supply-related as well. natural gas utilities and FERC-approved pipeline charges for Provision of Generation Services In most states allowing retail competition, the distribution utility also procures and offers, at cost, a default power supply service for customers who do not choose an alternative retail electricity supplier.65 These costs normally will not be included in the cost of service study during a base rate case because they apply only to an optional service and are set decades. If the ISO has treated some costs as capacity-related that can be more economically avoided with storage or demand response within the utility service territory, it may be appropriate to recharacterize these ISO costs as partly capacity-related costs and partly energy-related costs. Transmission Costs In addition to billing for generation capacity and energy through a separate proceeding, generally by competitive bid- in most cases, all ISOs/RTOs bill for transmission service. ding to supply individual classes based on their historical load Most assign transmission costs, project by project, to geo- shapes.66 Any costs incurred by the utility to procure these graphic areas, based on the historical ownership of older 65 Texas has not had any form of default supply since restructuring; all customers must choose a retail electricity supplier. 66 If the utility procures default service at a single price for multiple classes, the regulator should consider whether to differentiate the rates to reflect differences among the classes. 67 See Hledik and Lazar (2016) for a discussion of future pricing options to enable optimal utilization of DERs to meet system and local capacity requirements. 68 We note that the costs of the Alberta capacity market are spread on a timedifferentiated volumetric basis rather than a traditional demand charge; this may be a useful model for U.S. ISOs. For a more robust discussion, see Hogan (2016).
  10. Page 95 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 93 facilities and the loads justifying new facilities. If those charges Many state utility commissions have taken steps to are billed on a capacity basis, the pricing may exceed the cost exclude from the revenue requirement any incentives such of avoidance of some transmission capacity but still be neces- as higher executive compensation that reward shareholder sary for moving energy at nonpeak hours.69 In this situation, benefits (such as for a higher stock price) or rewards for good the analyst may need to consider whether some transmission performance in unregulated operations. Determining the costs are imprudent and should be excluded from the revenue portion of executive compensation that is attributable to requirement or, perhaps due to how the assets are used, to the utility operations, as contrasted with corporate profit split these costs between demand and energy. maximization, is not straightforward. This question may There are many circumstances where the analyst must be approached by using senior management costs at public look through ISO pricing to determine an appropriate basis agencies (such as state departments of transportation, health for retail cost allocation. For example, ERCOT charges and education or universities) as a proxy for the portion of for transmission primarily on a 4 CP basis for the summer executive compensation that should be allocated to utility months (June through September). Similar approaches may service. Large public agencies may have budgets, employee be used in FERC-regulated transmission agreements among counts and subordinate levels of management comparable to affiliates outside of ISOs. These pricing methods and the those of utilities. resulting allocations are administrative simplifications and do Different business operations of a modern utility not necessarily reflect cost causation. The ISO cost alloca- holding company have different risks and rewards. Although tions do not control the retail allocation of transmission management of a distribution utility is complex, the amount costs among customer classes or the manner these costs are of innovation and risk is fundamentally different than in reflected in rate design. other business units of the holding company. As noted by the U.S. Supreme Court: 7.2.2 Holding Companies A public utility is entitled to such rates as will permit it There have been more than 100 mergers of electric util- to earn a return on the value of the property it employs ities since the 1992 NARUC manual. This phenomenon was for the convenience of the public equal to that generally accelerated in 2005 when Congress repealed the Public Utility being made at the same time and in the same region of Holding Company Act. This has resulted in very different cor- the country on investments in other business under- porate relationships than existed in the 1980s and has created takings which are attended by corresponding risks and myriad issues to consider in the cost allocation process, from uncertainties, but it has no constitutional right to profits executive compensation to interservice allocation procedures. such as are realized or anticipated in highly profitable Most utility mergers and acquisitions are justified by pro- enterprises or speculative ventures.70 jections of more efficient management and a corresponding decline in administrative costs. Determining whether these By the same logic, a utility is entitled to recover the promises have been realized is a revenue requirement issue management costs of a company with similar complexity and beyond the scope of this manual. But the apportionment of risk but not necessarily those of a more speculative business administrative costs among unregulated and utility functions, operation. and among utilities within the holding company, are often Shareholder service costs — such as the cost of part of cost allocation. The increased complexity of utility maintaining shareholder data, issuing dividends, issuing holding companies makes this task more difficult. new capital stock and annual meeting costs — must be 69 The Vermont regulator has regularly identified specific nodes where increased efforts for energy efficiency can reduce the need for transmission or distribution capacity upgrades (Vermont Public Service Board, 2007; Vermont System Planning Committee, n.d.). This may provide a foundation for classification of ISO transmission charges and for functionalizing some of these energy efficiency investments as transmission-related or distribution-related capacity costs. 70 Bluefield Water Works v. Public Service Commission, 262 U.S. 679, 692-93 (1923).