  1. Page 9 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA 26. Summary of Recommendations for Marginal Cost of Service Studies . . . . . . . . . . . . . 224 26.1 Improving Marginal Cost Methods. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 224 26.2 Moving Toward Broader Reform. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 224 Works Cited in Part IV . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 226 Part V: After the Cost of Service Study 27. Using Study Results to Allocate the Revenue Requirement. . . . . . . . . . . . . . . . . . . . . . . 230 27.1 Role of the Regulator Versus Role of the Analyst . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 230 27.2 Presenting Embedded Cost of Service Study Results. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 230 27.3 Presenting Marginal Cost of Service Study Results. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 232 27.4 Gradualism and Non-Cost Considerations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 237 28. Relationship Between Cost Allocation and Rate Design . . . . . . . . . . . . . . . . . . . . . . . . . . 240 28.1 Class Impacts Versus Individual Customer Impacts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 240 28.2 Incorporation of Cost Allocation Information in Rate Design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 241 28.3 Other Considerations in Rate Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 242 Works Cited in Part V. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 244 Conclusion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 245 Appendix A: FERC Uniform System of Accounts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 247 Appendix B: Combustion Turbine Costs Using a Real Economic Carrying Charge Rate. . . . 250 Appendix C: Inconsistent Calculation of Kilowatts in Marginal Cost Studies. . . . . . . . . . . . 252 Appendix D: Transmission and Distribution Replacement Costs as Marginal Costs. . . . . . 253 Appendix E: Undervaluation of Long-Run Avoided Generation Costs in the NERA Method . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 255 Glossary. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 256 | 7
  2. Page 10 of 276

    8 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Acknowledgments Editorial assistance was provided by Ruth Hare, Camille Kadoch, Donna Brutkoski and Tim Simard. The authors wish to express their appreciation to the following people — many of whom are former state utility commissioners — for providing helpful insights into early drafts of this manual: Ron Binz, Public Policy Consulting John Colgan, Colgan Consulting Mike Florio, Gridworks Jeff Goltz, Cascadia Law Group Renz Jennings Douglas Jester, 5 Lakes Energy Carl Linvill, RAP David Littell, RAP Karl Rábago, Pace Energy and Climate Center Rich Sedano, RAP John Shenot, RAP Frederick Weston, RAP Melissa Whited, Synapse Energy Economics Tim Woolf, Synapse Energy Economics The authors also thank Jonathan Wallach of Resource Insight Inc. for his contribution to this effort. In preparing this manual, the authors drew inspiration from the work and ideas of many others in addition to those discussed within. They include: Peter Bradford Eugene Coyle Phil Jones Sharon Nelson Tom Power George Sterzinger John Stutz That said, responsibility for the information and views set out in this work lies entirely with the authors.
  3. Page 11 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA About the Authors Jim Lazar, senior advisor with the Regulatory Assistance Project, is an economist who studied economics and energy at Western Washington University and the University of Washington. He has maintained a consulting practice in utility regulation and pricing and has made more than 100 appearances as an expert witness in rate proceedings in many different jurisdictions. His first utility rate proceeding was in 1974. As a RAP senior advisor, he has advised utility regulators across the United States and in Europe, India, Asia, Africa and South America. He is a former member of the U.S. Department of Energy Electricity Advisory Committee. Mr. Lazar has published more than 20 reference handbooks and topical papers on utility regulation and planning. Paul Chernick, president of Resource Insight Inc., studied technology and policy at the Massachusetts Institute of Technology. He has advised clients on a wide range of issues, including restructuring policy; estimation of stranded costs; market price forecasts; market valuation of generation resources and divestiture of generation assets; planning and rate-making for central supply, energy efficiency, renewable and distributed resources, and least-cost compliance with environmental regulations; cost allocation and rate design; transmission and distribution planning; and valuation of environmental externalities. Mr. Chernick has testified in more than 300 regulatory and judicial proceedings. He began his career in 1977 with the Massachusetts attorney general’s office. William Marcus, principal of MCPM Economics — a successor company to JBS Energy Inc., where he worked for 32 years — studied economics at Harvard University and the University of Toronto. He began his energy career with the California Energy Commission in 1978. Mr. Marcus has more than 40 years of experience analyzing utility resource plans, costs and rates. He has prepared cost and rate studies for numerous clients and has testified as an expert witness in more than 40 jurisdictions. Taken together, the three authors have more than 120 years of experience in cost allocation and rate design issues. They have been qualified and testified as expert witnesses before 43 state utility regulatory agencies, eight Canadian provinces and many other local, state and federal regulatory bodies. About the Editor Mark LeBel, associate at the Regulatory Assistance Project, has more than a decade of experience working on the overlapping economics and law of energy and environmental policy in the United States. As a member of RAP’s U.S. team, he focuses on rate design and regulatory reform, including compensation for distributed energy resources, the evolution of the electricity system and beneficial electrification. | 9
  4. Page 12 of 276

    10 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Figures Figure 1. Simplified rate-making process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Figure 2. Traditional embedded cost of service study flowchart. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Figure 3. Increase in US wind and solar generation from 2008 to 2018 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 Figure 4. Modern embedded cost of service study flowchart . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Figure 5. Sankey diagram for traditional embedded cost of service study. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 Figure 6. Sankey diagram for modern embedded cost of service study. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 Figure 7. Illustrative traditional electric system. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32 Figure 8. Illustrative modern electric system. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 Figure 9. Underground distribution circuit with radial secondary lines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37 Figure 10. Detail of underground distribution circuit with networked secondary lines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37 Figure 11. Secondary distribution pole layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 Figure 12. Electric delivery system line losses. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 Figure 13. Pearl Street Station, first commercial power plant in the United States . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43 Figure 14. Investor-owned electric utility service territories in Texas. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45 Figure 15. US average retail residential electricity prices through 2018 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46 Figure 16. Permissible overload for varying periods. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57 Figure 17. Summer peak day load from 10 residential customers on one line transformer. . . . . . . . . . . . . . . . . . . . . . . . . 59 Figure 18. Traditional embedded cost of service study flowchart. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70 Figure 19. Modern embedded cost of service study flowchart . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73 Figure 20. Sankey diagram for legacy embedded cost of service study. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76 Figure 21. Sankey diagram for modern embedded cost of service study. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77 Figure 22. Customer behavior in Sacramento Municipal Utility District pricing pilot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84 Figure 23. Evolution of system load in Hawaii on typical June weekday . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85 Figure 24. Illustrative Texas wind and solar resource compared with load shape. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86 Figure 25. Forecasts of electric vehicle share of sales. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86 Figure 26. Estimated grid integration costs for electric vehicles. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87 Figure 27. US solar photovoltaic installations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90 Figure 28. Substation backfeeding during high solar hours. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91 Figure 29. Projections for US coal generating capacity. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97
  5. Page 13 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 11 Figure 30. ERCOT load and real-time prices in 2017. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 110 Figure 31. Capacity revenue percentage in relation to capacity factor in PJM. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111 Figure 32. Cost of combustion turbine plant in service in 2011. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 115 Figure 33. Simplified generation dispatch duration illustrative example . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 119 Figure 34. Illustrative customer class load in each hour. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 119 Figure 35. Illustration of decomposition approach to allocating resource mix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 122 Figure 36. Transmission east of San Francisco Bay . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 136 Figure 37. Transmission system with uniformly distributed demand and generation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 138 Figure 38. Transmission system with remote and centralized generation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 139 Figure 39. Stub pole used to guy a primary pole. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 144 Figure 40. San Diego Gas & Electric circuit peaks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150 Figure 41. Month and hour of Delmarva Power & Light substation peaks in 2014 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 151 Figure 42. Typical utility estimates of diversity in residential loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 154 Figure 43. US load growth by customer class since 1990. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 174 Figure 44. Estimated revenue and cost from serving additional electric vehicle load. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 175 Figure 45. Daily dispatch for illustrative hourly allocation example. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 179 Figure 46. Class loads for illustrative hourly allocation example. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 180 Figure 47. Comparison of temporal distributions for combustion turbine cost recovery . . . . . . . . . . . . . . . . . . . . . . . . . . 251
  6. Page 14 of 276

    12 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Tables Table 1. Types of meters and percentage of customers with each in 2017 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Table 2. Cost drivers for power supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56 Table 3. Cost drivers for transmission. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58 Table 4. Cost drivers for distribution. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60 Table 5. Illustrative load research data. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66 Table 6. Simple allocation factors derived from illustrative load research data. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67 Table 7. Composite allocation factors derived from illustrative load research data. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68 Table 8. 1992 NARUC cost allocation manual classification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72 Table 9. Results of two illustrative embedded cost of service study approaches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74 Table 10. Illustrative allocation factors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75 Table 11. Illustrative marginal cost results by element. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80 Table 12. Cost components of conventional generation, 2018 midpoint estimates. . . . . . . . . . . . . . . . . . . . . . . . . . . . 109 Table 13. Energy portion of 2017 net revenue for New York ISO. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111 Table 14. Equivalent peaker method analysis using replacement cost estimates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 116 Table 15. Equivalent peaker method analysis using 2017 gross plant in service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 117 Table 16. Equivalent peaker method classification of nonfuel operations and maintenance costs . . . . . . . . . . . . . . . 117 Table 17. Class share of each generation type under probability-of-dispatch allocation. . . . . . . . . . . . . . . . . . . . . . . . 120 Table 18. Allocation of 400 MWs excess capacity to reflect load risk. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 124 Table 19. Attributes of generation classification options. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 129 Table 20. Illustrative example of energy-classified cost per MWh by time of use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 129 Table 21. Illustrative example of time-of-use allocation of energy-classified costs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 130 Table 22. Attributes of generation demand allocation options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 132 Table 23. Summary of conceptual generation classification by technology. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 132 Table 24. Summary of generation allocation approaches. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 133 Table 25. Illustrative annual generation data. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 134 Table 26. Allocation of generation capacity costs by traditional methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 134 Table 27. Modern hourly allocation of generation capacity costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 134 Table 28. Summary of transmission classification and allocation approaches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 141 Table 29. Illustrative allocation of transmission costs by different methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 141
  7. Page 15 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 13 Table 30. Residential shared transformer example . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 155 Table 31. Smart grid cost classification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 157 Table 32. Summary of distribution allocation approaches. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 158 Table 33. Illustrative allocation of distribution substation costs by different methods . . . . . . . . . . . . . . . . . . . . . . . . . 159 Table 34. Illustrative allocation of primary distribution circuit costs by different methods. . . . . . . . . . . . . . . . . . . . . . 160 Table 35. Illustrative allocation of distribution line transformer costs by different methods . . . . . . . . . . . . . . . . . . . . 160 Table 36. Illustrative allocation of customer-related costs by different methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 161 Table 37. Illustrative cost study with differential treatment of new resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 176 Table 38. Bonneville Power Administration rate summary, October 2017 to September 2019. . . . . . . . . . . . . . . . . . . 177 Table 39. Hourly class load share and resource output. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 181 Table 40. Class shares of resource cost responsibilities and load. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 181 Table 41. Illustrative example of allocating marginal distribution demand costs by two methods. . . . . . . . . . . . . . . . 192 Table 42. Illustrative example of new-customer-only method for marginal customer costs. . . . . . . . . . . . . . . . . . . . . 212 Table 43. Illustrative example of rental method for marginal customer costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 213 Table 44. Illustrative comparison of rental versus new-customer-only method for overall distribution costs. . . . . . 213 Table 45. Computing class rate of return in an embedded cost study. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 231 Table 46. Illustrative marginal cost results by element. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 232 Table 47. Illustrative load research data for marginal cost of service study . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 232 Table 48. Illustrative marginal cost revenue requirement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 233 Table 49. EPMC adjustment where revenue requirement less than marginal cost . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 233 Table 50. EPMC adjustment where revenue requirement more than marginal cost. . . . . . . . . . . . . . . . . . . . . . . . . . . . 234 Table 51. Illustrative functionalized equal percentage of marginal cost results. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 234 Table 52. Total EPMC results with lower marginal generation costs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 235 Table 53. Functionalized EPMC example with lower marginal generation costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 235 Table 54. Residential embedded cost responsibility across four scenarios . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 236 Table 55. Use of inverse elasticity rule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 236 Table 56. Consideration of multiple cost of service studies. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 237
  8. Page 16 of 276

    14 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Introduction and Overview T Charting a new path on cost allocation is an important part of utility cost allocation for a wide range of practitioners, including utilities, intervenors, utility creating the fair, efficient and clean regulators and other policymakers. Cost allocation is electric system of the future. one of the major steps in the traditional regulatory he purpose of this manual is to provide a comprehensive reference on electric process for setting utility rates. In this step, the regulators are best practices that have been developed over the past several primarily determining how to equitably divide a set amount decades and points toward needed innovations. The authors of of costs, typically referred to as the revenue requirement, this manual believe strongly that charting a new path forward among several broadly defined classes of ratepayers. The on cost allocation is an important part of creating the fair, predominant impact of different cost allocation techniques efficient and clean electric system of the future. is which group of customers pays for which costs. In many cases, this is the share of costs paid by residential customers, commercial customers and industrial customers. Scope and Context of This Manual In addition, the data and analytical methods used to This manual focuses on cost allocation practices for inform cost allocation are often relevant to the final step of electric utilities in the United States and their implications. the traditional regulatory process, known as rate design. In Our goal is to serve as both a practical and theoretical this final step, the types of charges for each class of ratepayers guide to the analytical techniques involved in the equitable are determined — which can include a per-month charge; distribution of electricity costs. This includes background on charges per kilowatt-hour (kWh), which can vary by season regulatory processes, purposes of regulation, the development and time of day; and different charges based on measurements of the electricity system in the United States, current best of kilowatt (kW) demand — as well as the price for each type practices for cost allocation and the direction that cost of charge. As a result, cost allocation decisions and analytical allocation processes should move. Most of the elements of techniques can have additional efficiency implications. this manual will be applicable elsewhere in the Americas, as Cost allocation has been addressed in several important books and manuals on utility regulation over the past well as in Europe, Asia and other regions. The rate-making process for investor-owned utilities 60 years, but much has changed since the last comprehensive (IOUs) has three steps: (1) determining the annual revenue publication on the topic — the 1992 Electric Utility Cost requirement, (2) allocating the costs of the revenue require- Allocation Manual from the National Association of ment among the defined rate classes and (3) designing the Regulatory Utility Commissioners (NARUC). Although rates each customer ultimately will pay. Figure 1 on the next these works and historic best practices are foundational, the page presents a highly simplified version of these steps. legacy methods of cost allocation from the 20th century are In the cost allocation step, there are two major quantita- no more suited to the new realities of the 21st century than tive frameworks used around the United States: embedded the engineering of internal combustion engines is to the cost of service studies and marginal cost of service studies. design of new electric motors. New electric vehicles (EVs) may Embedded cost studies typically are based on a single year- look similar on the outside, but the design under the hood is long period, using the embedded cost revenue requirement completely different. This handbook both describes the current and customer usage patterns in that year to divide up costs.
  9. Page 17 of 276

    REGULATORY ASSISTANCE PROJECT (RAP)® ELECTRIC COST ALLOCATION FOR A NEW ERA | 15 Figure 1. Simplified rate-making process Determine revenue requirement Net rate base (Plant in service – depreciation reserve) x + Rate of return Depreciation expense (Plant in service x depreciation rate) + Operating expense (Fuel + purchased power + labor + labor overheads + supplies + services + income taxes) + = Other taxes $ millions Allocate costs among customer classes Design retail rates Residential Commercial Industrial Dollars Cents per Cents per kWh month per kWh off-peak peak Dollars Cents per Cents per kWh month per kWh off-peak peak Street lighting Dollars Dollars per Cents per kW Cents month per kWh per kWh monthly peak off-peak Dollars per light per month Marginal cost of service studies, in contrast, look at how costs The analysis for a marginal cost of service study starts are changing over time in response to changes in customer with a similar functionalization step, but that is followed by usage. estimation of marginal unit costs for each element of the Regardless of which framework will be used, an enor- system, calculation of a marginal cost revenue requirement mous amount of data is typically collected first, starting with (MCRR) for each class as well as for the system as a whole, the costs that make up the revenue requirement, energy and then reconciliation with the annual embedded cost usage by customer class and measurements of demand at revenue requirement. various times and often extending to data on generation This cost allocation manual is intended to build upon pre- patterns. Furthermore, when the quantitative cost of service vious works on the topic and to illuminate several areas where study is completed, regulators typically don’t take the results the authors of this manual disagree with the approaches of the as the final word, often making adjustments for a wide range previous publications. Important works include: of policy considerations after the fact. • Traditionally, the analysis for an embedded cost of service study is itself divided into three parts: functionalization, classification and allocation. Figure 2 on the next page shows the traditional flowchart for this process. Principles of Public Utility Rates by James C. Bonbright (first edition, 1961; second edition, 1988). • Public Utility Economics by Paul J. Garfield and Wallace F. Lovejoy (1964).
  10. Page 18 of 276

    16 | ELECTRIC COST ALLOCATION FOR A NEW ERA REGULATORY ASSISTANCE PROJECT (RAP)® Figure 2. Traditional embedded cost of service study flowchart Revenue requirement Functionalization Generation Distribution Transmission Billing and customer service Classification Demand-related Energy-related Customer-related Allocation Residential • Commercial The Economics of Regulation: Principles and Institutions by Alfred E. Kahn (first edition Volume 1, 1970, and Volume 2, 1971; second edition, 1988). • The Regulation of Public Utilities by Charles F. Phillips (1984). • The 1992 NARUC Electric Utility Cost Allocation Manual. Of course, cost allocation has been touched upon in other works, including RAP’s publication Electricity Regulation in the United States: A Guide by Jim Lazar (second edition, 2016). However, since the 1990s, there has been neither a comprehensive treatment of cost allocation nor one that addresses the emerging issues of the 21st century. This manual incorporates the elements of these previous works that remain relevant, while adding new cost centers, new operating regimes and new technologies that today’s cost analysts must address. Industrial Street lighting Continuing Evolution of the Electric System Since the establishment of electric utility regulation in the United States in the early 20th century, the electric system has undergone periods of great change every several decades. Initial provision of electricity service in densely populated areas was followed by widespread rural electrification in the 1930s and 1940s. In the 1950s and 1960s, vertically integrated utilities, owning generation, transmission and distribution simultaneously, were the overwhelmingly dominant form of electricity service across the entire country. However, the oil crisis in the 1970s sparked a chain reaction in the electric industry. That included a new focus by utilities on baseload generation plants, typically using coal or nuclear power. At the same time, the federal government began to open up competition in the electric system with the passage of the Public Utilities Regulatory Policy Act (PURPA)
1 page match

As listed on the current system

Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Melissa Whited [26-05-10]

This filing on the current system (opens in a new tab)