  1. Page 17 of 105

    1 innovation and software tools including those to support DER integration, 2 clean-energy advancement and advancing the grid toward modernization. 3 Q15 What is your understanding of the Company’s request? 4 A. In the Targeted System Performance tier, the Company asks PURA to approve 5 $3.985 billion of capital spending over five years, from 2027 through 2031. This 6 includes $3.611 billion in the Sustained tier, which increases from $667 million in 7 2027 to $757 million in 2031.11 The Company describes the sustained tier as “the 8 minimum level of investment needed to maintain reliability performance; meet 9 regulatory obligations; and maintain asset health and foundational system 10 planning capacity for safety and reliable operations.”12 The second tier, Targeted 11 System Performance, adds $374 million, including $155.0 million for resilience, 12 $143.3 million for asset health, and $75.8 million for enhanced reliability.13 In 13 this second tier, the Company also proposes approximately $71 million of 14 incremental O&M, including a $38 million Grid Services Compensation Fund.14 15 The third tier, Advancing the Grid, builds off of the first two tiers then adds an 16 additional $396 million for a total of $4.381 billion. Under all three tiers, 17 vegetation management spending would increase from $59 million to $91 million 18 a year beginning in 2028.15 19 The Company presents the three tiers as “budget options” to allow PURA to 20 consider the appropriate balance between system needs and customer costs16, 21 while recommending the second tier, a.k.a. the Targeted System Performance 22 tier.17 However, if PURA considers the proposed TSP, it should evaluate the 11 Exh. CLP-TSP-3 at 10. Exh. CLP-TSP-1 at 17. 13 Response to OCC-809. 14 Exh. CLP-TSP-3 at 43. 15 Id. at 11. 16 Exh. CLP-TSP-1 at 47. 17 Exh. CLP-TSP-3 at 7, 11. 12 Direct Testimony of Nikhil Balakumar Page 14
  2. Page 18 of 105

    1 proposal in the context of what the most strategic and cost-effective investments 2 should be approved - not artificially created tiers. 3 Q16 What would PURA be approving if it adopted one of the tiers? 4 A. PURA should be approving more than a planning concept as Eversource has 5 proposed. The Company proposes to recover TSP capital through the F-Factor 6 under its proposed Performance-Based Multi-Year Rate Plan (“PBMRP”), which 7 the Company describes as “tethered to the planned capital investment plan 8 described in the TSP Plan.”18 The Company states that the F-Factor would 9 provide “revenue support for ongoing capital expenditures,” subject to “periodic 10 and ongoing prudence reviews,” a cap, and “downward-only reconciliation in the 11 event actual overall plant-in-service is less than the capital expenditure 12 forecast.”19 The reconciliation compares total plant in service to the total forecast. 13 It does not compare individual projects or programs. Funds forecasted for a 14 project that is deferred or cancelled can be spent on other work without a refund. 15 The Company also states that PURA would make its prudence determination on 16 planned plant additions “in the next rate case at such time that those projects are 17 placed in-service.”20 18 Approval of a tier would therefore place five years of forecast capital into rates 19 before many of the projects have a defined scope, cost estimate, in-service date or 20 alternatives analysis. 21 Q17 What is your primary position on the TSP? 22 A. In conjunction with OCC Witnesses Wilson and Tully, we recommend that the 23 Authority deny the Company’s PBMRP proposal and only approve a one-year 24 rate plan in this docket. I agree with the concerns Ms. Wilson and Mr. Tully have 18 Exh. CLP-ADDITIONS-1 at 54. Response to OCC-579(a)(ii). 20 Exh. CLP-ADDITIONS-1 at 54. 19 Direct Testimony of Nikhil Balakumar Page 15
  3. Page 19 of 105

    1 outlined regarding the lack of in-depth capital planning that would protect 2 Eversource customers from unnecessary costs in a multi-year rate plan tied to a 3 forward-looking capital plan. 4 Q18 If PURA intends to approve a version of the TSP, what is your position? 5 A. The Company’s proposal represents a “business-as-usual” approach focused on 6 traditional capital expenditures and lacks a sense of urgency to scale up grid 7 modernization investments that will accelerate the transition towards a more 8 dynamic and cost-effective system. The Company itself states that the third tier of 9 investment (i.e. Advancing the Grid) is a “longer-term proposition for 10 Connecticut.” This contradicts its stated goals on DER enablement and a dynamic 11 modern grid and the priorities of utilities across the country. 12 Modernizing the grid should not be a longer-term proposition, but should be 13 strategically designed now to ensure the Company can rapidly scale up the tools 14 and programs that would defer traditional buildout and run its system as 15 efficiently as possible. If PURA decides to approve a version of the TSP, the 16 Company should not accept Eversource’s artificial tiering but instead prioritize 17 investments within the proposed TSP that enable it to rapidly scale up to a 18 “flexibility first” approach that ensures future capital plans consider the full range 19 of modern, cost-effective solutions. Specifically, Eversource should be using the 20 upcoming term of the proposed TSP to rapidly gain operational experience with 21 key DER flexibility approaches such that these programs can be scaled by the end 22 of the TSP term and leading into the next cycle of investments. 23 As described in my testimony below, my recommendations outline a streamlined 24 and strategic alternative proposal to support these objectives that a) reduces 25 investment levels across the Sustained and Targeted System Performance tiers 26 while b) bringing forward key Advancing the Grid Investments. Direct Testimony of Nikhil Balakumar Page 16
  4. Page 20 of 105

    1 B. Sustained Tier 2 Q19 How does the Company define and justify the Sustained tier? 3 A. The Sustained tier totals $3.611 billion from 2027 through 2031.21 The Company 4 describes it as necessary to maintain reliability “at levels that the Company has 5 generally maintained since the last rate case in Docket No. 17-10-46 (2018),” and 6 as “the minimum level of investment needed” to do so.22 The Company projects 7 that the tier would improve five-year SAIDI by 0.7 minutes, which it describes as 8 maintains current performance.23 9 The Sustained tier, however, is not simply a continuation of current spending. It 10 includes several significant increases. The Company proposes to increase 11 substation transformer replacements from an average of three per year in the 2026 12 budget to six per year, compared with a historical pace of one to two per year.24 It 13 also increases Grid Modernization spending from $10 million in 2026 to a $14 14 million per year, and vegetation management from $59 million to $91 million per 15 year.25 In addition, the tier includes $400 million for New Customer and $393 16 million for Peak Load/Capacity. 26 17 Because the Company describes this tier as the minimum needed, it should show 18 why each of these increases is necessary to achieve that result. The record does 19 not yet demonstrate that connection. 21 Exh. CLP-TSP-3 at 8. Exh. CLP-TSP-1 at 17. 23 Exh. CLP-TSP-3 at 8, 11. 24 Exh. CLP-TSP-3 at 11, Response to OCC-597. 25 Exh. CLP-TSP-3 at 11. 26 Response to OCC-811. 22 Direct Testimony of Nikhil Balakumar Page 17
  5. Page 21 of 105

    1 2 Q20 How does the Sustained tier compare with Company’s capital spending since 2017? 3 A. The Sustained tier exceeds the Company’s actual capital expenditures in every 4 year from 2017 through 2024. The Company’s annual Capital Books report those 5 expenditures and provide the closest comparison in the record to the proposed 6 five-year plan.27 From 2017 through 2024, Connecticut Distribution capital 7 expenditures averaged $434 million per year and peaked at $558 million in 8 2023.28 By comparison, the Sustained tier would spend $667 million in 2027 and 9 average about $722 million per year over five years.29 10 Figure 1: Connecticut Distribution Capital, Actual and Planned, Compared with the Sustained Tier ($ million) 11 12 The largest growth categories show a similar pattern on an in-service basis 13 (Figure 1). Under the Sustained tier, annual New Customer investment would be 14 nearly twice the historical average, Peak Load/Capacity would be about two and a 15 half times higher, and substation transformer replacement would be nearly six 16 times higher. The historical amounts are plant placed in service, while the tier 17 amounts are planned investment, so the comparison is indicative rather than exact. 27 Exh. CLP-ADDITIONS-12. Exh. CLP-ADDITIONS-12 at 28, 45, 65, 83, 102, 121, 145, 167. 29 Exh. CLP-TSP-3 at 10. 28 Direct Testimony of Nikhil Balakumar Page 18
  6. Page 22 of 105

    1 Table 1: Sustained Tier Compared With 2017–2025 In-Service Additions30 Category Peak Load / Capacity New Customer Substation transformer replacement 2017–2025 in service (avg. per year) $31.0M $42.6M Sustained tier 2027–2031 (avg. per year) $78.6M $80.0M $8.6M $48.7M Increase 2.5× 1.9× 5.7× 2 3 4 Q21 Is the Company’s description of the Sustained tier as a minimum consistent with its 2025 capital plan? 5 A. No. The Company’s own statements do not support treating the Sustained tier as a 6 clear minimum. 7 First, the Company states that past investments have consistently proven to be 8 “right sized” to maintain reliability and that the system “has continued to perform 9 well for customers, so long as there is adequate and consistent investment made to 10 maintain the system in its current state, which the Company has achieved.” The 11 Company now states that “the system is at a crossroads where a step-up in 12 investment is needed.”31 If past spending was sufficient to maintain reliability, the 13 Company should explain why a much higher level is now the minimum needed to 14 do the same. 15 Second, the Company cut its 2025 Connecticut capital plan for reasons unrelated to 16 system need to $375.3 million, from $450.6 million actual in 2024.32 The 2025 17 capital book states that the Plan reflects a reduction in spending for Connecticut to 18 lower the cost recovery risk, and identifies a “decrease in overall CT capital plan 19 due to regulatory recovery risk” 33 as the first variance driver. When asked 20 whether that level fell below what was needed to maintain reliability, the Company 30 Response to OCC-811. Exh. CLP-TSP-1 at 22–23. 32 Id. at 167. 33 Exh. CLP-ADDITIONS-12 at 167. 31 Direct Testimony of Nikhil Balakumar Page 19
  7. Page 23 of 105

    1 responded that the 2025 investment amount was not below the level the Company 2 considered necessary to maintain reliability in the short term.34 It added that “there 3 is no ‘reliability or safety consequence’ associated with such a short-term deviation 4 in budget expenditures”, and that it took “significant care to identify capital work 5 that could be toggled back without an immediate impact to safety and reliability.”35 6 The Company’s dedicated reliability investment was $123.4 million in the 2025 7 plan. Under the Sustained tier it would be $236.6 million in 2027.36 8 The Company also states that a sustained reduction in spending could affect 9 reliability by 12 to 15 percent over five years, “assuming no improvement in the 10 reduced expenditure level.” 37 I do not dispute that consistent investment is 11 necessary. The issue is that the Company has not shown where the actual 12 minimum lies between the lower 2025 spending level and the Sustained tier’s 13 average of about $722 million per year. 14 Finally, the Company acknowledges that its reliability “remains in the top quartile 15 based on the IEEE benchmarking study.” 38 PURA has identified top-quartile 16 performance in the four years before a rate case as a consideration in deciding 17 whether to approve a plan designed to improve reliability further.39 The Sustained 18 tier, by the Company’s own description, is designed to maintain performance, not 19 improve it. Holding a top-quartile position should not require spending well above 20 the levels that produced that position. 21 Q22 How does the Company calculate the reliability benefit of each tier? 22 A. The Company assigns SAIDI improvement to only two capital programs – 23 Reliability Improvement Specific Projects and the Smart Switches Program, along 34 Response to OCC-795. Response to OCC-781. 36 Response to OCC-795. 37 Response to OCC-781. 38 Exh. CLP-TSP-3 at 32; 39 Docket No. 17-12-03RE08, Decision at 44. 35 Direct Testimony of Nikhil Balakumar Page 20
  8. Page 24 of 105

    1 with vegetation management. It then applies a “System Degradation” factor that 2 worsens SAIDI by the same 15.6 minutes under both tiers.40 3 I have several concerns with this approach. First, the degradation factor has a 4 significant effect on the result, but the Company has not provided the basis for 5 that assumption. Second, the Sustained tier produces a net SAIDI improvement of 6 only 0.7 minutes, or about one percent of 2025 Blue-Sky SAIDI, even though the 7 Company describes the tier as the minimum needed to maintain reliability.41 8 Third, the additional SAIDI benefit of the TSP tier comes entirely from the same 9 two reliability programs. The Company assigns no SAIDI benefit to the resilience 10 or asset health portions of the second tier of proposed TSP investment, which 11 accounts for about $298 million of the $374 million.42 12 13 Q23 Has the Company’s past capital spending delivered the reliability results it now projects? 14 A. The Company’s own data does not show that it has. From 2021 through 2025, the 15 Company placed about $985 million of reliability capital in service.43 Over the 16 same period, Blue-Sky SAIDI increased from 70.7 minutes in 2021 to 77.5 17 minutes in 2025, after improving slightly through 2023.44 I am not suggesting that 18 reliability capital produced no benefit, or that a single year’s result proves 19 anything. Weather and other factors affect annual reliability results. But the 20 Company asks PURA to accept a projected 6.1-minute improvement under the 21 TSP tier, while also explaining that its past spending “cannot necessarily be 22 directly and instantaneous[ly] translated to SAIDI and SAIFI performance.” 23 When asked to identify the expected reliability performance associated with the 24 2021–2025 spending when it was authorized, the Company did not identify one.45 40 Response to OCC-807. Exh. CLP-TSP-1 at 17, 76; Response to OCC-807. 42 Response to OCC-809. 43 Response to OCC-804 Attachment 1. 44 Exh. CLP-TSP-1 at 76, Table 1. 45 Response to OCC-804. 41 Direct Testimony of Nikhil Balakumar Page 21
  9. Page 25 of 105

    1 The selection process behind that spending also matters. The Company’s cost- 2 effectiveness ranking tool, ReBOT, was first used “to drive reliability work in 3 2024 to support the selection of the 2025 TripSaver program.”46 None of the 4 2017–2024 reliability capital was selected using that tool. In 2023, when actual 5 spending exceeded plan by $91.5 million, the Company identified the two largest 6 additions to the capital plan as an approximately $22.0 million trip-saver program 7 and approximately $20.0 million of circuit patrol fixes addressing deficiencies 8 identified by a third party.47 9 The 2017–2025 record is therefore important context for evaluating the 10 Company’s new five-year projections. That record does not, by itself, support pre- 11 approving five more years of substantially higher spending on the strength of 12 projected reliability benefits. I address the prudence of the 2017–2025 additions 13 separately in the Capital Additions section of my testimony. 14 Figure 2: Reliability Capital Placed in Service and Blue-Sky SAIDI, 2021–2025 15 16 46 47 Response to OCC-792. Responses to OCC-780 and OCC-792. Direct Testimony of Nikhil Balakumar Page 22
  10. Page 26 of 105

    1 The Sustained Tier’s Growth Drivers 2 Q24 What spending is at issue? 3 A. The Company’s direct testimony states that average baseline funding for Peak 4 Load/Capacity is approximately $50 million per year for substations and $19 5 million per year for lines, or about $345 million over five years.48 The Company’s 6 capital-plan presentation, however, shows $393 million of Capacity spending over 7 the same five-year period under the Targeted System Performance tier.49 In 8 discovery, the Company also reports $393 million for both the Sustained and 9 Targeted System Performance tiers. 10 The capital-plan presentation and discovery responses are consistent with each 11 other, but they leave an approximately $48 million difference from the amount 12 described in direct testimony. The Company should explain whether that 13 difference reflects updated estimates, different project scope, or another 14 adjustment, and identify the amount actually included in its request. It should also 15 reconcile that amount to the underlying substation and line projects, annual 16 spending, and any program-level allowances. Without that reconciliation, it is 17 difficult to determine what work the proposed funding would support. 18 19 Q25 Was the Company required to evaluate non-wires solutions before seeking funding for its capacity projects? 20 A. Yes. The Company’s own planning documents and PURA’s NWS process both 21 call for alternatives to be identified and compared before a wires solution is 22 funded.50 The Company’s 2021 NWA Framework screens station capacity needs 23 first, using standard technical and cost assumptions, so that only viable candidates 24 proceed to detailed engineering; its economic test compares the present value of 48 Exhibit CLP-TSP-1 at 50 Exhitbit CLP-TSP-3 at 42 50 I use “non-wires solutions” (“NWS”) in this section and retain “NWA” when referring to the Company’s 2021 NWA Framework. 49 Direct Testimony of Nikhil Balakumar Page 23