Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Files2

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
  1. Page 44 of 105

    1 PURA should understand how prior work, deferred work, and proposed TSP 2 spending fit together before approving forward funding. 3 Fourth, outcomes and overlap have not always been clearly measured. As 4 discussed above, the Company could not identify the reliability performance 5 expected when it authorized its 2021–2025 reliability capital, has not quantified 6 the benefits of certain resiliency programs, and has not shown whether proposed 7 TSP resiliency work overlaps with plant placed in service since 2017. 8 My conclusions on whether the 2017–2025 additions were prudently incurred are 9 set out in the Capital Additions section of my testimony. For purposes of the TSP, 10 the point is narrower: if the documentation supporting in-service plant is limited, 11 PURA should not approve forward spending for projects that are still conceptual, 12 lack completed alternatives analyses, or do not yet have quantified benefits. 13 E. Advancing the Grid Tier 14 15 Q41 What proposed investments do you address that were included in the “Advancing the Grid” Tier? 16 A. My testimony addresses the following investments: 17 • Distributed Energy Resource Management System ($24.1 million)130 18 • Grid Compensation Fund ($38 million) 19 • Planning Analytics – Advanced Forecasting and Planning Tools ($15 20 million) 130 DERMS investment were included in both the “Sustained” and “Advancing the Grid” tier. Both set of investments are addressed here. Direct Testimony of Nikhil Balakumar Page 41
  2. Page 45 of 105

    • 1 2 Shared Hosting for Advancement of Renewable Energy (SHARE) Program 3 4 Q42 Are there other proposed investments in this rate case related to grid modernization? 5 A. Yes, the Company is proposing a rollout of AMI. While AMI is proposed as a 6 separate investment from the “Advancing the Grid” tier, it is a core grid 7 modernization investment that should be deployed in coordination with related 8 investments including DERMS as well as advanced forecasting and planning 9 tools. While I address the AMI investment in Section V, I address my 10 recommendations on how this coordination should occur below. 11 12 Q43 How should the Company approach the sequencing and prioritization of grid modernization investments under this tier? 13 A. The Company’s approach should include a coordinated set of investments 14 grounded in key goals and associated use cases to realize such goals. Grid 15 modernization should serve the purpose of enabling a flexible, optimized, cost- 16 effective grid that maximizes the utilization of the system leading to the deferral 17 and/or efficient buildout of infrastructure.131 Fostering and scaling a robust market 18 for cost-effective integration and utilization of DERs is central to achieving this 19 vision. The Company acknowledges this by identifying DER enablement and a 20 dynamic modern grid as two goals for its proposed TSP. However, the Company 21 must provide additional detail on how these objectives will be achieved and how 22 specific investments are directly tied to this approach. 131 PURA Investigation into Distribution System Planning of the Electric Distribution Companies, Docket No. 17-12-03 (October 2, 2019), available at https://www.dpuc.state.ct.us/2nddockcurr.nsf/8e6fc37a54110e3e852576190052b64d/0e5fc32986954bf785 25875200798b44/$FILE/171203-100219%20InterimDecision.pdf (“The Authority’s Framework for an Equitable Modern Grid has four objectives: (1) support (or remove barriers to) the growth of Connecticut’s green economy; (2) enable a cost-effective, economy-wide transition to a decarbonized future; (3) enhance customer access to a more resilient, reliable, and secure commodity; and (4) advance the ongoing energy affordability dialogue in the State, particularly in underserved communities.”) Direct Testimony of Nikhil Balakumar Page 42
  3. Page 46 of 105

    1 2 Q44 What key DER use cases will support these objectives and should be tied to the proposed grid modernization investments? 3 A. There are three key DER use cases that support these objectives and should 4 5 inform the Company’s investment strategy: • Dynamic Flexible Interconnection (“Flex IX”): This is the process by 6 which the utility use real-time data and control systems to dynamically 7 manage DER output and which allows the Company to fully utilize 8 available capacity and integrate more clean energy in constrained areas. 9 This can drive affordability by using grid modernization technologies such 10 as Distributed Energy Resource Management Systems (DERMS) to 11 integrate greater amounts of DER capacity within the existing system and 12 defer distribution system upgrades. These additional DERs can then be 13 utilized for distribution and bulk power system grid services as described 14 below. PURA’s proposed final decision in Docket No. 25-01-27 recently 15 set forth a pathway for dynamic flexible interconnection. 16 • DER Grid Services (Distribution System): This is the process by which 17 the utility dispatches individual and/or aggregated DERs to address local 18 distribution constraints (e.g specific substations and feeders). This can 19 drive affordability by utilizing the flexibility of DERs to defer distribution 20 system upgrades and ideally is done in a coordinated manner where DERs 21 can provide services to the bulk power system as well to maximize their 22 value across the system. PURA’s proposed final decision in Docket No. 23 21-05-15RE02 acknowledges this as it includes a DER Services Metric 24 tracks how DERs contribute to grid services across established programs. 25 • DER Grid Services (Bulk Power System): This is the process by which 26 individual DERs and/or aggregated DERs are dispatched to address bulk 27 power system constraints, provided they are coordinated with and do not 28 conflict with distribution system constraints and obligations. This can 29 drive affordability by utilizing the flexibility of DERs to defer 30 transmission upgrades, mitigate spikes in capacity prices and ideally is Direct Testimony of Nikhil Balakumar Page 43
  4. Page 47 of 105

    1 done in a coordinated manner where DERs can provide services to the 2 distribution system as well to maximize their value across the system. 3 Q45 How must the distribution system evolve to support these use cases? 4 A. The distribution system must transition from a model based on static, conservative 5 assumptions to one driven by dynamic hosting capacity and real-time 6 optimization. Historically, utilities have managed grid access and infrastructure 7 planning using "worst-case scenario" snapshots. This approach is inherently 8 inefficient because it treats the grid's capacity as a fixed, immovable value, 9 leading to unnecessary interconnection denials and premature infrastructure 10 upgrades. Currently, utility planning often relies on a single or very few data 11 points to estimate “peak load,” which then dictates multimillion-dollar capital 12 investments. For example: • 13 Fixed Export Limits: For DER interconnection, utilities may use a 14 single "minimum load" value to set export limits, assuming that high solar 15 generation will always occur when local demand is at its lowest. • 16 The "One-Hour" Peak: Utilities often design an entire substation 17 upgrade based on the estimated load of a single, extreme peak hour of the 18 year. This results in an asset that may be significantly underutilized for 19 the remaining 8,759 hours. 20 Moreover, it’s important to note that the distribution system has traditionally been 21 modeled and planned at the substation level and that this evolution should apply 22 to both feeders and substations. 23 24 Q46 What is dynamic hosting capacity and how does it improve grid performance? 25 A. Dynamic hosting capacity recognizes that the grid’s ability to accommodate 26 resources is not static; it fluctuates constantly based on time of day, weather, and Direct Testimony of Nikhil Balakumar Page 44
  5. Page 48 of 105

    1 localized demand.132 The diagram below illustrates the concept of dynamic 2 hosting capacity in the context of DER interconnection which shows that hosting 3 capacity varies throughout the year and that DERs are only offered capacity based 4 on the most conservative hosting capacity value in the year. 5 Figure 4: Dynamic Hosting Capacity133 6 7 By running the system according to real-time conditions rather than conservative 8 static limits, we can unlock several DER strategies and associated benefits: • 9 Increased DER Integration via Dynamic Flexible Interconnection: 10 Dynamic flexible interconnection allows more resources to connect to the 11 grid immediately by curtailing their output in real-time during rare periods 12 of actual congestion. Pepco acknowledges this their concept paper stating 13 “current interconnection policies often use a DER’s full nameplate 14 capacity as a conservative assumption, treating every DER as if it is 15 always exporting 100% of its power to the grid. This assumption is 16 inaccurate and can lead to unnecessary system upgrades or the denial of 17 new DER interconnections, even when there is available capacity”.134 The 18 figure below illustrates how greater amounts of DERs can be 19 interconnected when interconnecting these assets based on the dynamic 132 National Renewable Energy Laboratory (NREL), Advanced Hosting Capacity Analysis. https://www.nrel.gov/solar/market-research-analysis/advanced-hosting-capacity-analysis 133 Electric Power Research Institute (EPRI), Principles of Access for Flexible Interconnection Solutions, at 3 (Jul. 31, 2020), https://www.epri.com/research/products/000000003002018506. 134 At 13-14 Direct Testimony of Nikhil Balakumar Page 45
  6. Page 49 of 105

    1 hosting capacity of the system and curtailing the DERs during the short 2 periods when they exceed that hosting capacity. 3 Figure 5: Dynamic Hosting Capacity – Dynamic Flexible Interconnection135 4 • 5 Targeted Locational Dispatch via DER Distribution Grid Services: 6 Utilities can dispatch individual or aggregated DERs in real-time to 7 provide distribution grid services, addressing the actual peaks of the 8 system exactly when and where they occur, thereby deferring or 9 eliminating the need for traditional capital upgrades. 10 11 Figure 6: Dynamic Hosting Capacity – DER Distribution Grid Services 135 Electric Power Research Institute (EPRI), Principles of Access for Flexible Interconnection Solutions, at 3 (Jul. 31, 2020), https://www.epri.com/research/products/000000003002018506. Direct Testimony of Nikhil Balakumar Page 46
  7. Page 50 of 105

    1 2 Q47 What capabilities are needed to fully utilize dynamic hosting capacity and enable a flexible, cost-effective grid? 3 A. To move away from "fit-and-forget" infrastructure and toward a truly optimized 4 grid, the utility must possess two core capabilities: • 5 6 Real-Time Visibility: The ability to see exactly how much capacity is available at any given node at any specific moment. • 7 8 Granular Control: The ability to communicate with and optimize DERs to curtail and/or dispatch them to align with system needs. 9 Without these capabilities, the utility is forced to remain conservative, resulting in 10 higher costs and slower decarbonization. The Company’s proposed investments 11 should be focused on deploying and leveraging these capabilities to demonstrate 12 and scale the three DER strategies described above. My recommendations below 13 for each proposed investment reflect this approach. 14 DERMS 15 Q48 Please describe the Company’s proposed DERMS investment. 16 A. The Company requests $24.7 million136 as part of its “DERMS Demonstration” to 17 demonstrate the value proposition of advanced DERMS capabilities, including (1) 18 use of DER to increase system efficiency and reduce line losses; (2) integration of 19 multiple types of DER in a microgrid application for critical load; and (3) 20 investigation of lower cost approaches to communication and control of stand- 21 alone solar and storage facilities integrated into the Company’s centralized 22 DERMS system.137 This would serve as the first investment the Company is 23 making in DERMS in Connecticut though it has made some enabling DERMS 136 The Company proposed $10.7 million for its core DERMS deployment and $14 million for its DERMS demonstration. 137 Exhibit CLP-TSP-1, at 68. Direct Testimony of Nikhil Balakumar Page 47
  8. Page 51 of 105

    1 investments including Advanced Distribution Management System (“ADMS”) 2 power flow and aggregator DERMS.138 3 4 Q49 Please describe the use cases the Company intends to enable with DERMS and the current progress on deployment. 5 A. The Company expects the initial use cases to include flexible interconnection and 6 local capacity relief at substations with the Grid Compensation Fund serving as an 7 important enabler of the DERMS demonstration. The Company states the 8 DERMS demonstration could incorporate the use of dynamic flexible 9 interconnection and proves an example where the Grid Compensation Fund could 10 provide incentives in exchange for a customer allowing use of an advanced 11 inverter for a voltage management use case. Moreover, the Company is taking the 12 following steps to deploy DERMS139: • 13 ADMS-DERMS Integration: The Company plans to integrate its ADMS 14 and DERMS solutions from GE Vernova, which are designed to operate as 15 an integrated solution. The ADMS-DERMS integration is currently in the 16 planning stage. • 17 DERMS DER Technical & Operational Requirements: The Company 18 is currently evaluating and developing the technical and operational 19 requirements for the DERMS-DER gateway, including communication 20 protocols 138 139 OCC-582,(a), at 2. OCC-582, at 2-3. Direct Testimony of Nikhil Balakumar Page 48
  9. Page 52 of 105

    • 1 Grid DERMS – Edge DERMS Architecture: The Company is currently 2 in the planning stage for designing the formal architecture governing the 3 interaction between the grid DERMS and an aggregator/edge DERMS • 4 Communications Architecture: The Company is currently evaluating the 5 communication architecture that will support direct communication with 6 third-party DERs and aggregator/edge DERMS platforms • 7 Deployment Timelines: The Company estimates it would take 8 approximately 18-months to implement a grid DERMS solution, including 9 integration with third-party aggregator DERMS providers. Assuming a 10 project start in mid-2027, the Company would have a fully functioning 11 DERMS solution at the beginning of 2029 12 Q50 What is your position on the Company’s proposal? 13 A. DERMS is a foundational solution to enabling a “flexibility first” approach to 14 scale the integration & utilization of DERs to drive a more flexible, cost-effective 15 grid. While I appreciate the Company’s responses on its plan to deploy DERMS, 16 the current plan represents an incremental approach with no clear line of sight into 17 how flexibility first solutions (i.e dynamic flexible interconnection, DER 18 distribution grid services and DER bulk power services) will be demonstrated and 19 scaled by end of the proposed TSP term. Though DERMS is new in Connecticut, 20 it is not new for Company140 or for utilities across the country. Thus, any plan 21 should take lessons learned from other jurisdictions and accelerate the path from 22 demonstrations to scalability. 140 The Company notes its experience with DERMS in Massachusetts. Direct Testimony of Nikhil Balakumar Page 49
  10. Page 53 of 105

    1 Specifically, the Company’s DERMS proposal has the following gaps: 2 • Targeted deployment is too limited: The Company states the DERMS 3 demonstration program is designed to implement multiple DERMS-dependent 4 use cases in a “targeted location”141 and identifies the Triangle substation was 5 identified as an opportunity for a DERMS demonstration.142 However, simply 6 focusing on one location could limit the ability to demonstrate and scale key 7 DER use cases including the ones the Company mentions. The Company itself 8 acknowledges DER potential is in rural areas in contrast to where load is 9 concentrated143 which means that focusing on one location will limit the 10 ability to demonstrate both flexible interconnection and local distribution grid 11 services. Moreover, the locations of aggregated DERs from the Company’s 12 connected solutions program may not overlap with load constraints but 13 nevertheless it will be critical to demonstrate utility DERMS to an 14 edge/aggregator DERMS dispatch to build the technical foundation to 15 leverage VPPs to address distribution constraints. 141 OCC-584, (b), at 3. OCC-585, (a), at 1. 143 Exhibit CLP-TSP-3, at 29. 142 Direct Testimony of Nikhil Balakumar Page 50
Words on different pages

As listed on the current system

Prefiled testimony: 10/21/2026 - Sponsor: TBD / Witness: Nikhil Balakumar [26-05-10]

This filing on the current system (opens in a new tab)