  1. Page 47 of 105

    1 done in a coordinated manner where DERs can provide services to the 2 distribution system as well to maximize their value across the system. 3 Q45 How must the distribution system evolve to support these use cases? 4 A. The distribution system must transition from a model based on static, conservative 5 assumptions to one driven by dynamic hosting capacity and real-time 6 optimization. Historically, utilities have managed grid access and infrastructure 7 planning using "worst-case scenario" snapshots. This approach is inherently 8 inefficient because it treats the grid's capacity as a fixed, immovable value, 9 leading to unnecessary interconnection denials and premature infrastructure 10 upgrades. Currently, utility planning often relies on a single or very few data 11 points to estimate “peak load,” which then dictates multimillion-dollar capital 12 investments. For example: • 13 Fixed Export Limits: For DER interconnection, utilities may use a 14 single "minimum load" value to set export limits, assuming that high solar 15 generation will always occur when local demand is at its lowest. • 16 The "One-Hour" Peak: Utilities often design an entire substation 17 upgrade based on the estimated load of a single, extreme peak hour of the 18 year. This results in an asset that may be significantly underutilized for 19 the remaining 8,759 hours. 20 Moreover, it’s important to note that the distribution system has traditionally been 21 modeled and planned at the substation level and that this evolution should apply 22 to both feeders and substations. 23 24 Q46 What is dynamic hosting capacity and how does it improve grid performance? 25 A. Dynamic hosting capacity recognizes that the grid’s ability to accommodate 26 resources is not static; it fluctuates constantly based on time of day, weather, and Direct Testimony of Nikhil Balakumar Page 44
  2. Page 48 of 105

    1 localized demand.132 The diagram below illustrates the concept of dynamic 2 hosting capacity in the context of DER interconnection which shows that hosting 3 capacity varies throughout the year and that DERs are only offered capacity based 4 on the most conservative hosting capacity value in the year. 5 Figure 4: Dynamic Hosting Capacity133 6 7 By running the system according to real-time conditions rather than conservative 8 static limits, we can unlock several DER strategies and associated benefits: • 9 Increased DER Integration via Dynamic Flexible Interconnection: 10 Dynamic flexible interconnection allows more resources to connect to the 11 grid immediately by curtailing their output in real-time during rare periods 12 of actual congestion. Pepco acknowledges this their concept paper stating 13 “current interconnection policies often use a DER’s full nameplate 14 capacity as a conservative assumption, treating every DER as if it is 15 always exporting 100% of its power to the grid. This assumption is 16 inaccurate and can lead to unnecessary system upgrades or the denial of 17 new DER interconnections, even when there is available capacity”.134 The 18 figure below illustrates how greater amounts of DERs can be 19 interconnected when interconnecting these assets based on the dynamic 132 National Renewable Energy Laboratory (NREL), Advanced Hosting Capacity Analysis. https://www.nrel.gov/solar/market-research-analysis/advanced-hosting-capacity-analysis 133 Electric Power Research Institute (EPRI), Principles of Access for Flexible Interconnection Solutions, at 3 (Jul. 31, 2020), https://www.epri.com/research/products/000000003002018506. 134 At 13-14 Direct Testimony of Nikhil Balakumar Page 45
  3. Page 49 of 105

    1 hosting capacity of the system and curtailing the DERs during the short 2 periods when they exceed that hosting capacity. 3 Figure 5: Dynamic Hosting Capacity – Dynamic Flexible Interconnection135 4 • 5 Targeted Locational Dispatch via DER Distribution Grid Services: 6 Utilities can dispatch individual or aggregated DERs in real-time to 7 provide distribution grid services, addressing the actual peaks of the 8 system exactly when and where they occur, thereby deferring or 9 eliminating the need for traditional capital upgrades. 10 11 Figure 6: Dynamic Hosting Capacity – DER Distribution Grid Services 135 Electric Power Research Institute (EPRI), Principles of Access for Flexible Interconnection Solutions, at 3 (Jul. 31, 2020), https://www.epri.com/research/products/000000003002018506. Direct Testimony of Nikhil Balakumar Page 46
  4. Page 50 of 105

    1 2 Q47 What capabilities are needed to fully utilize dynamic hosting capacity and enable a flexible, cost-effective grid? 3 A. To move away from "fit-and-forget" infrastructure and toward a truly optimized 4 grid, the utility must possess two core capabilities: • 5 6 Real-Time Visibility: The ability to see exactly how much capacity is available at any given node at any specific moment. • 7 8 Granular Control: The ability to communicate with and optimize DERs to curtail and/or dispatch them to align with system needs. 9 Without these capabilities, the utility is forced to remain conservative, resulting in 10 higher costs and slower decarbonization. The Company’s proposed investments 11 should be focused on deploying and leveraging these capabilities to demonstrate 12 and scale the three DER strategies described above. My recommendations below 13 for each proposed investment reflect this approach. 14 DERMS 15 Q48 Please describe the Company’s proposed DERMS investment. 16 A. The Company requests $24.7 million136 as part of its “DERMS Demonstration” to 17 demonstrate the value proposition of advanced DERMS capabilities, including (1) 18 use of DER to increase system efficiency and reduce line losses; (2) integration of 19 multiple types of DER in a microgrid application for critical load; and (3) 20 investigation of lower cost approaches to communication and control of stand- 21 alone solar and storage facilities integrated into the Company’s centralized 22 DERMS system.137 This would serve as the first investment the Company is 23 making in DERMS in Connecticut though it has made some enabling DERMS 136 The Company proposed $10.7 million for its core DERMS deployment and $14 million for its DERMS demonstration. 137 Exhibit CLP-TSP-1, at 68. Direct Testimony of Nikhil Balakumar Page 47
  5. Page 51 of 105

    1 investments including Advanced Distribution Management System (“ADMS”) 2 power flow and aggregator DERMS.138 3 4 Q49 Please describe the use cases the Company intends to enable with DERMS and the current progress on deployment. 5 A. The Company expects the initial use cases to include flexible interconnection and 6 local capacity relief at substations with the Grid Compensation Fund serving as an 7 important enabler of the DERMS demonstration. The Company states the 8 DERMS demonstration could incorporate the use of dynamic flexible 9 interconnection and proves an example where the Grid Compensation Fund could 10 provide incentives in exchange for a customer allowing use of an advanced 11 inverter for a voltage management use case. Moreover, the Company is taking the 12 following steps to deploy DERMS139: • 13 ADMS-DERMS Integration: The Company plans to integrate its ADMS 14 and DERMS solutions from GE Vernova, which are designed to operate as 15 an integrated solution. The ADMS-DERMS integration is currently in the 16 planning stage. • 17 DERMS DER Technical & Operational Requirements: The Company 18 is currently evaluating and developing the technical and operational 19 requirements for the DERMS-DER gateway, including communication 20 protocols 138 139 OCC-582,(a), at 2. OCC-582, at 2-3. Direct Testimony of Nikhil Balakumar Page 48
  6. Page 52 of 105

    • 1 Grid DERMS – Edge DERMS Architecture: The Company is currently 2 in the planning stage for designing the formal architecture governing the 3 interaction between the grid DERMS and an aggregator/edge DERMS • 4 Communications Architecture: The Company is currently evaluating the 5 communication architecture that will support direct communication with 6 third-party DERs and aggregator/edge DERMS platforms • 7 Deployment Timelines: The Company estimates it would take 8 approximately 18-months to implement a grid DERMS solution, including 9 integration with third-party aggregator DERMS providers. Assuming a 10 project start in mid-2027, the Company would have a fully functioning 11 DERMS solution at the beginning of 2029 12 Q50 What is your position on the Company’s proposal? 13 A. DERMS is a foundational solution to enabling a “flexibility first” approach to 14 scale the integration & utilization of DERs to drive a more flexible, cost-effective 15 grid. While I appreciate the Company’s responses on its plan to deploy DERMS, 16 the current plan represents an incremental approach with no clear line of sight into 17 how flexibility first solutions (i.e dynamic flexible interconnection, DER 18 distribution grid services and DER bulk power services) will be demonstrated and 19 scaled by end of the proposed TSP term. Though DERMS is new in Connecticut, 20 it is not new for Company140 or for utilities across the country. Thus, any plan 21 should take lessons learned from other jurisdictions and accelerate the path from 22 demonstrations to scalability. 140 The Company notes its experience with DERMS in Massachusetts. Direct Testimony of Nikhil Balakumar Page 49
  7. Page 53 of 105

    1 Specifically, the Company’s DERMS proposal has the following gaps: 2 • Targeted deployment is too limited: The Company states the DERMS 3 demonstration program is designed to implement multiple DERMS-dependent 4 use cases in a “targeted location”141 and identifies the Triangle substation was 5 identified as an opportunity for a DERMS demonstration.142 However, simply 6 focusing on one location could limit the ability to demonstrate and scale key 7 DER use cases including the ones the Company mentions. The Company itself 8 acknowledges DER potential is in rural areas in contrast to where load is 9 concentrated143 which means that focusing on one location will limit the 10 ability to demonstrate both flexible interconnection and local distribution grid 11 services. Moreover, the locations of aggregated DERs from the Company’s 12 connected solutions program may not overlap with load constraints but 13 nevertheless it will be critical to demonstrate utility DERMS to an 14 edge/aggregator DERMS dispatch to build the technical foundation to 15 leverage VPPs to address distribution constraints. 141 OCC-584, (b), at 3. OCC-585, (a), at 1. 143 Exhibit CLP-TSP-3, at 29. 142 Direct Testimony of Nikhil Balakumar Page 50
  8. Page 54 of 105

    • 1 Minimal commitments on use case implementation: The Company vaguely 2 discusses that dynamic flexible interconnection could be implemented via the 3 demonstration but provides no commitments or plans to do so. Moreover, the 4 Company states the Grid Services Compensation Fund is an important enabler 5 of the DERMS demonstration and provides examples of how the Grid 6 Compensation fund could be tied to DERMS.144 While I acknowledge the 7 Company is in the planning stages, any approval of this investment should 8 require a detailed plans on how and when use cases will be demonstrated and 9 scaled. This should include details of the offerings, targeted locations and 10 milestones for when demonstrations will occur. • 11 No plan to scale: The Company states that a fully functioning DERMS 12 solution could be available at the beginning of 2029 but primarily discusses 13 the demonstration program which will inform efforts to deploy at scale across 14 Connecticut.145 However, the Company offers no process or milestones for 15 how and when DERMS will be scaled and for what use cases. When detailing 16 the implementation of each use, the Company should also provide milestones 17 on any subsequent evaluation period post demonstrations and when a scalable 18 plan will be developed. 19 While I appreciate that DERMS is in its early planning stages and agree that it is 20 appropriate to initially deploy DERMS at targeted locations, an iterative roadmap 21 needs to be established for how, when and where DER use cases the Company 22 intends to demonstrate each use case and how that will be scaled up. Such a 23 roadmap is critical as DERMS is the connective tissue and unifying technology 24 across a broad set of DER use cases and transitioning to a flexible, cost-effective 25 grid. PURA acknowledges this in Docket No. 25-01-27 stating DERMS can 26 “provide value across utility operations broadly” and “enable numerous present 144 145 OCC-584, (b), at 3. OCC-584, (b), at 3. Direct Testimony of Nikhil Balakumar Page 51
  9. Page 55 of 105

    1 and future utility functions in addition to flexible interconnection”.146 Both 2 Illinois147 and Massachusetts148 have developed and/or required such roadmaps, 3 which can be used to accelerate progress in Connecticut. 4 Q51 What should be included in this roadmap regarding flexible interconnection? 5 A. I recommend two key components be included in this roadmap: (1) commitments 6 and timelines for estimated MWs enabled and (2) a broader voltage management 7 strategy to support DER integration. 8 PURA’s proposed decision on dynamic flexible interconnection requires a phased 9 approach starting with 10% of substations by May 1, 2028 to 100% of substations 10 by November 1, 2030, which aligns with my recommendation to scale up 11 flexibility first approaches in the TSP term. As part of this roadmap, the Company 12 should conduct a broader analysis of its substations to estimate how many MWs 13 of additional DERs can be integrated and layout a timeline for doing so in the 14 TSP term. Commonwealth Edison in Illinois recently committed to enabling 650+ 15 MW of DERs over the next 5 years of their Multi-Year Integrated Grid Plan as 16 described in the figure below. 146 Docket No. 25-01-27, Proposed Decision, September 15, 2026, at 19. ComEd Grid Plan: DERMS and Flexible Interconnection Roadmap, January, 16, 2026. https://icc.illinois.gov/docket/P2026-0047/documents/375128/files/657435.pdf 148 D.P.U. 23-115/D.P.U. 23-117/D.P.U. 23-126, Order, DPU directed the filing of a DERMS readiness plan, August 11, 2026, at 91. 147 Direct Testimony of Nikhil Balakumar Page 52
  10. Page 56 of 105

    1 2 Figure 7: Commonwealth Edison DERMS and Flex IX Roadmap149 3 It is also important to recognize that this use case primarily relies on DERMS 4 managing thermal constraints to accommodate more DERs. However, as more 5 DERs are integrated beyond the static limits of the system, voltage issues are 6 expected to rise which could limit the potential of dynamic flexible 7 interconnection even if dynamic hosting capacity is available. ComEd recently 8 proposed a Voltage Optimization Merger with plans to integrate Voltage 9 Optimization (“VO”) functionality into the DERMS platform to enable more 10 precise voltage management control in areas with high-DER penetration. This 11 would expand DERMS functionality to coordinate with voltage regulators and 12 capacitors, enabling closed-loop voltage control for both firm and flexible 13 DERs.150 Thus, this roadmap should also include a broader strategy to integrate 14 DERMS with the Company’s broader voltage management strategy to mitigate 15 the voltage impacts of DERs and thus maximize DER integration. 149 ComEd Grid Plan: DERMS and Flexible Interconnection Roadmap, January, 16, 2026, at 12. https://icc.illinois.gov/docket/P2026-0047/documents/375128/files/657435.pdf 150 ComEd Grid Plan: DERMS and Flexible Interconnection Roadmap, January, 16, 2026, at 16-17. Direct Testimony of Nikhil Balakumar Page 53