Prefiled testimony
Witness: Nikhil Balakumar
Files2
26-05-10_Direct Testimony Eclipse FINAL.pdf
PDF · 1.4 MB · 105 pagesText searchable
Download 26-05-10_Direct Testimony Eclipse FINAL.pdfRead the text of 26-05-10_Direct Testimony Eclipse FINAL.pdf
Attachment 1 - Nikhil Balakumar_Resume.pdf
PDF · 126 KB · 2 pagesText searchable
Download Attachment 1 - Nikhil Balakumar_Resume.pdfRead the text of Attachment 1 - Nikhil Balakumar_Resume.pdf
Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Page 79 of 105
1 2 3 Figure 9: ComEd Integrated Data Platform: System Data Requirements194 4 Granular access to such data via an API drives several benefits as identified by the 5 Illinois DER industry195: • 6 Precise and cost-effective siting: Developers often apply to interconnect 7 in a location based on limited hosting capacity map information, which 8 results in the application being rejected or requiring unexpected and cost 9 prohibitive upgrades, which in turn leads to the application being 10 withdrawn. This process wastes significant time and financial resources of 11 both the developer and ComEd, and ultimately leads to slower deployment 12 of clean energy to support the General Assembly’s ambitious clean energy 194 195 https://icc.illinois.gov/docket/P2022-0486/documents/359481/files/629728.pdf Direct Testimony of Kate Tohme, Solar Energy Industries Association, Coalition for Community Solar Access and Illinois Solar Energy & Storage Association, July 16, 2026, at 15-17. https://icc.illinois.gov/docket/P2026-0047/documents/383840/files/675987.pdf Direct Testimony of Nikhil Balakumar Page 76Page 80 of 105
1 and DER deployment goals. The proposed data requirements would allow 2 developers to better understand and anticipate system constraints and 3 reduce surprises upon application. • 4 Minimize infeasible interconnection requests: Limited data results in 5 imprecise interconnection requests, ultimately requiring ComEd to review 6 large amounts of applications that never interconnect due to the 7 application being rejected or requiring cost prohibitive upgrades. By 8 enabling more precise siting, ComEd will be less burdened with infeasible 9 interconnection requests and can reallocate their resources to process 10 viable applications. • 11 Distribution grid services and non-wires alternatives: Access to the 12 proposed data also supports the scaling of distribution grid services by 13 giving DER developers sufficient information to understand how and if 14 they can relieve distribution constraints through new proposed DERs and 15 thus submit more robust non-wires alternatives or grid services proposals. • 16 Application Programming Interface (API): Allows developers to pull 17 data into their own systems to inform development decisions. This is 18 opposed to the existing hosting capacity maps which do not provide a way 19 to efficiently access and use the underlying data. 20 As such, the Company should commit to leveraging this platform as a one-stop 21 shop for future data access and propose solutions to integrate system and 22 rates/tariff information into such a platform. 23 Iterative 8760 Profile Rollout 24 Q80 Please elaborate on your position regarding an iterative 8760 profile rollout. 25 A. The Company intends to use AMI meters to create 8760 profiles.196 However, it is 26 unclear when these profiles will be developed as part of the existing roadmap and 196 OCC-743, (c), at 2. Direct Testimony of Nikhil Balakumar Page 77Page 81 of 105
1 how this will be coordinated with the proposed advanced forecasting & planning 2 tools as well as DERMS. As previously stated in Section V, 8760 profiles are 3 critical to transitioning to a flexible, cost-effective grid and especially to enable 4 key use cases like dynamic flexible interconnection and DER distribution grid 5 services. Moreover, data to create 8760 profiles is a key dependency for the 6 advanced forecasting & planning tools and DERMS. Given that the Company 7 states several capabilities can be realized with the commencement of AMI meter 8 deployment and that such meters are deployed regionally, the Company should in 9 theory be able to enable 8760 profiles iteratively as sufficient AMI is deployed 10 and can be aggregated to develop 8760 profiles at the feeder and substation. 11 Strategic Deployment to Target System Constraints 12 13 Q81 Please elaborate on your position on the strategic deployment of AMI to target system constraints. 14 A. The Company proposes parallel East/West deployment teams to balance rural and 15 metro work but does not appear to consider how a locational deployment could 16 accelerate the transition to a flexibility-first approach. Ideally, this deployment 17 could be done in such a way that AMI iteratively enables 8760 profiles but does 18 so in locations that have or are anticipated to have DER and load constraints. 19 Fortunately, the Company’s approach to balance rural and metro work aligns with 20 this approach as DER and load constraints are typically in rural and metro areas 21 respectfully. The Company should use the locations it identified to prioritize 22 dynamic flexible interconnection, the DER compensation fund and DERMS 23 deployment to inform where AMI should first be strategically deployed. 24 Direct Testimony of Nikhil Balakumar Page 78Page 82 of 105
1 Well Defined Distributed Intelligence Pilot 2 3 Q82 Please elaborate on your position on a well-defined distributed intelligence pilot. 4 A. The Company commits to evaluating distributed intelligence capabilities197 but 5 does not provide a concrete pilot or plan on how such capabilities will be used to 6 support planning and operations. These capabilities have significant potential and 7 have yet to be fully utilized in ongoing deployments. This is why a thoughtful 8 approach that explores specific use cases and allows iteration on these solutions 9 with vendors is critical. Moreover, the Company’s proposed architecture to 10 leverage public carrier cellular network also creates new potential to leverage 11 these capabilities combined with distributed intelligence to unlock new use cases 12 for real-time operations. The Company should propose a concrete distributed 13 intelligence pilot with specific use cases within 1 year of approval of the AMI 14 deployment. 15 Evaluation of Real-time AMI Data Use Cases 16 17 Q83 Please elaborate on your position on an evaluation of real-time AMI data use cases. 18 A. The Company is currently investigating how AMI could support real-time 19 systems such as ADMS & DERMS as well as voltage optimization, given that a 20 public carrier cellular network is incorporated into the communications 21 architecture. Specifically, the Company is evaluating potential future integrations 22 with real-time systems including ADMS and DERMS but these are not included 23 in the Company’s implementation plan.198 Moreover, the Company is currently 24 investigating the technical feasibility, costs, and benefits of an AMI-informed 25 DMS model, including the benefits for voltage optimization. Issues of data 197 198 OCC-748, at 1. OCC-745, (a)(ii), at 2. Direct Testimony of Nikhil Balakumar Page 79Page 83 of 105
1 latency will be included in this investigation.199 AMI provides the most granular 2 data available on the system and should be leveraged where possible to support 3 not just billing but planning and operations. Specifically, there may be potential to 4 defer or eliminate the needs for other sensor investments if AMI can truly be 5 integrated into real-time operations. I support this investigation and request that 6 the Company also investigate the potential of AMI to defer or replace sensor 7 investments and report on its progress as part of any reporting supporting the 8 ongoing deployment. 9 Q84 What is your recommendation? 10 A. I recommend the Company’s proposed AMI investment be approved conditional 11 on the following requirements: • 12 The Company should be required to also a) provide access to raw meter 13 usage data and enrolled programs and b) include and publish additional 14 metrics to report on platform performance as described above. 199 OCC-747, (a), at 1. Direct Testimony of Nikhil Balakumar Page 80Page 84 of 105
• 1 The Company should be required to commit to leveraging this platform as 2 a one-stop shop for future data access and propose solutions to integrate 3 system and rates/tariff information into such a platform. • 4 5 The Company should be required to iteratively enable 8760 profiles at feeders and substations as sufficient AMI is deployed at specific regions. • 6 The Company should be required to use the locations it identified to 7 prioritize dynamic flexible interconnection, the DER compensation fund 8 and DERMS deployment to inform where AMI should first be 9 strategically deployed and enable 8760 profiles in these regions. • 10 The Company should be required to propose a concrete distributed 11 intelligence pilot with specific use cases within 1 year of approval of the 12 AMI deployment. • 13 The Company should be required to include an evaluation of the potential 14 of AMI to defer or replace sensor investments as part of investigating how 15 AMI can support real-time operations and report on the progress of this 16 investigation as part of ongoing AMI updates. 17 V. 18 IN-SERVICE INVESTMENTS A. Purpose and Overview 19 Q85 What is the purpose of this portion of your testimony? 20 A. This portion of my testimony addresses the Company’s request to include in rate 21 base the capital additions it placed in service from January 1, 2017, through 22 December 31, 2025, and its request to include planned plant additions for 2027 23 through the end of the Rate Year in rates. I rely on the joint testimony of the 24 Company’s Additions Panel, the project-level data in its exhibits, and the Direct Testimony of Nikhil Balakumar Page 81Page 85 of 105
1 Company’s responses to interrogatories. I examine whether specific additions 2 were prudent: whether the Company made reasonable decisions about what to 3 build, how to build it, and how to account for it, and whether it had reasonable 4 documentation, vetting and approval processes in place before committing the 5 funds. Where my testimony on the TSP Plan already addresses an issue, I refer to 6 it rather than repeat it. 7 The Company states that it placed approximately $4.3 billion of capital additions 8 in service over this eight year period, and that the costs “were reasonably and 9 prudently incurred.”200 Of the $4.318 billion of net distribution additions, $2.290 10 billion, or 53 percent, was placed in service through annual programs and annual 11 work orders rather than individually authorized projects.201 The Company also 12 asks to include in rates $847.8 million of planned additions for January 2026 13 through June 2027 and $664.9 million for the Rate Year ending June 30, 2028.202 14 15 Q86 What must the Company show to demonstrate the additions were prudently incurred? 16 A. The Company bears the burden of demonstrating that each addition is used and 17 useful and that its cost was prudently incurred. That is, the decision to undertake 18 the work, and the cost of carrying it out, must have been reasonable in light of 19 what the Company knew or should have known at the time.203 20 I have concerns with the prudency of several of the Company’s additions. My 21 review identifies two groups of additions for which the record does not support a 22 finding of prudence, and several areas where the record does not yet contain the 23 information needed to complete the review: 200 Exh. CLP-ADDITIONS-1 at 445. Exh. CLP-ADDITIONS-2; Exh. CLP-ADDITIONS-3. 202 Exh. CLP-ADDITIONS-1 at 52. 203 Conn. Gen. Stat. §§ 16-19e(a) and 16-22. 201 Direct Testimony of Nikhil Balakumar Page 82Page 86 of 105
1 • Capacity additions: The Company placed $145.4 million of Peak Load/Capacity 2 projects in service from 2023 through 2025. The record does not contain the 3 project-level evaluation of non-wires alternatives that the Company’s own 4 planning procedures, and PURA’s November 2022 Non-Wires Solutions decision, 5 contemplate for investments of this kind. 6 • Direct-buried cable: Proactive replacement of direct-buried cable cost about 7 $257 million. The cost per mile tripled, and the Company has since scaled the 8 approach back in favor of repair. The Company has not shown that the proactive 9 replacement approach it adopted in 2019 produced benefits commensurate with its 10 cost, and the record contains no benefit-cost analysis supporting that approach or 11 its continuation as unit costs rose. 12 • Areas pending Company data: Capacity additions placed in service without a 13 documented evaluation of lower-cost alternatives; the proactive direct-buried 14 cable replacement program; capitalized storm restoration from the 2018–2023 15 storms; capitalized storm restoration from the 2018–2023 storms; AMR meter 16 additions; and resiliency programs with no measured storm benefit. The record 17 does not yet contain enough information to determine whether these additions 18 were prudently incurred. I will update my recommendations in surrebuttal 19 testimony and final positions on the prudency of plant will be based on the actual 20 amounts the Company documents and supported through the close of record. 21 22 Beyond these specific items, the record shows weak cost control over the overall 23 portfolio. Spending exceeded the Board-approved plan in seven of eight years. I 24 recommend a specific adjustment for direct-buried cable, documentation 25 requirements for the capacity additions and the areas pending Company data, and 26 a limit on the planned plant additions included in rates. Direct Testimony of Nikhil Balakumar Page 83Page 87 of 105
1 2 Q87 How does actual capital spending compare with the plans approved by the Company’s Board, and what does that show about cost control? 3 A. Connecticut Distribution capital spending exceeded the plan in the Company’s 4 annual Capital Book in seven of the eight years from 2017 through 2024, by a 5 cumulative $350.8 million, or 11 percent (Table 1). 6 Table 4: Connecticut Distribution Capital Spending, Plan Compared with Actual ($ million) 204 Year 2017 2018 2019 2020 2021 2022 2023 2024 2017–2024 Plan 336.0 325.0 360.0 371.0 365.0 434.0 466.4 466.2 3,123.6 Actual 359.0 409.0 417.0 402.0 409.0 469.9 557.9 450.6 3,474.4 Variance +23.0 +84.0 +57.0 +31.0 +44.0 +35.9 +91.5 -15.6 +350.8 Variance (%) +6.8% +25.8% +15.8% +8.4% +12.1% +8.3% +19.6% -3.3% +11.2% 7 8 The overruns did not come from individual projects costing more than estimated. 9 For individually authorized projects begun before 2022, actual direct costs were 10 18 percent below their pre-construction estimates in aggregate, and nearly half 11 came in more than 10 percent under estimate.205 The overruns came from adding 12 work to the portfolio during the year. For 2023, the year with the largest overrun, 13 the two largest additions were a $22.0 million trip saver program and $20.0 14 million of circuit patrol fixes, neither of which was in the plan the Board 15 approved.206 16 This has two implications for prudence. First, project estimates that run well 17 above actual costs do not act as a control. A project can absorb scope growth 18 without triggering the supplemental authorization the Company’s policy requires. 19 Second, the real control point is the decision to add work to the year’s portfolio, 204 Exh. CLP-ADDITIONS-12 at 8, 28, 45, 65, 83, 102, 121, 145, 167. Exh. CLP-ADDITIONS-4. 206 Response to OCC-780. 205 Direct Testimony of Nikhil Balakumar Page 84Page 88 of 105
1 and that is where the record is thinnest. When requesting the documents 2 authorizing spending above plan, the Company referred OCC to its Capital Books 3 and to total-company variance analyses filed in other dockets. It did not provide 4 or identify any authorization.207 As I explain in the Sustained Tier section of my 5 testimony, the Company also cut its 2025 plan for “regulatory recovery risk” and 6 stated that the cut had no reliability consequence. Taken together, these facts 7 show that much of the Company’s capital work was discretionary in timing and 8 scope. That raises the importance of showing that each addition was selected on 9 its merits. 10 11 Q88 Did the Company’s reliability and resiliency additions deliver results, and were they properly accounted for? 12 A. As discussed in the TSP section of my testimony, Blue-Sky SAIDI worsened 13 from 70.7 minutes in 2021 to 77.5 minutes in 2025, while the Company placed 14 $984.6 million of reliability capital in service. It also shows that the Company 15 could not identify the reliability performance it expected when it authorized that 16 capital. I do not repeat that analysis here. For prudence, the more specific problem 17 is what the resiliency portion bought and how it was accounted for. 18 Of the $984.6 million, $390.4 million was placed in service under System 19 Resiliency/Expanded Reliability.208 PURA approved System Resiliency for 2018 20 through 2020, with recovery through the capital tracker. After that approval 21 ended, the Company continued the work and, in 2023, moved it from the 22 Regulatory Commitments category to Reliability. When asked for the reliability 23 benefit measured after completion of each program, the Company provided 24 budget amounts and project listings, not measured benefits.209 207 Response to OCC-779. Response to OCC-804, Attachment 1. 209 Response to OCC-802. 208 Direct Testimony of Nikhil Balakumar Page 85