  1. Page 13 of 96Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 10 of 93 1 Accordingly, the OCC’s proposed rate base appear to be internally inconsistent. Said 2 simply, the Company is not able to reconcile a rate base calculation that simultaneously 3 (1) reduces utility plant in-service below the actual 2025 test year balance, (2) 4 substantially increases accumulated depreciation and ADIT associated with that plant, 5 and (3) is accompanied by separate OCC testimony that supports a net increase in utility 6 plant in-service through the close of the evidentiary record. These inconsistencies raise 7 fundamental concerns regarding the mathematical accuracy and conceptual basis for 8 the OCC’s proposed $1.151 billion reduction to the Company’s average rate base for 9 the rate year. The Company addresses the OCC’s proposed adjustments to each 10 individual rate base component in greater detail below. A. Materials and Supplies 11 12 Q. What is the Company’s request for materials and supplies in rate base? 13 A. The Company computed a test year five-quarter average (Q4 2024 – Q4 2025) materials 14 and supplies balance of $161.732 million, which was adjusted for inflation using the 15 Moody’s Analytics Inc. Gross Domestic Product – Price Index (“GDP-PI”) forecast for 16 both the interim and rate periods. 17 adjustment of $7.643 million ($161.732 million * 4.73% = $7.643 million) and a rate 18 year inflation adjustment of $2.779 million ([$161.732 million + $7.643 million] * 19 1.64% = $2.779 million). Adjusting for inflation results in a total interim period 20 materials and supplies balance of $169.375 million ($161.732 million + $7.643 million 21 = $169.375 million) and a total rate year ending materials and supplies balance of 22 $172.154 million ($161.732 million + $7.643 million + $2.779 million = $172.154 This resulted in an interim period inflation
  2. Page 14 of 96Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 11 of 93 1 million). The average of both the ending interim and rate year balance is $170.765 2 million ([$169.375 million + $172.154 million] / 2 = $170.765 million), which 3 represents the Company’s proposed materials and supplies balance included in rate 4 base. The Company provides detailed information on this request in Schedule WP B- 5 4.0, at 1 and the Revenue Requirement Panel’s pre-filed testimony, Exhibit CLP- 6 REVREQ-1, at 27-30. 7 Q. What is Mr. Defever’s response to this proposal? 8 A. Mr. Defever recommends the removal of all inflationary adjustments to the materials 9 and supplies balance, which results in a reduction to the amount included in rate base 10 of $9.033 million. 12 11 Q. What is Mr. Defever’s reasoning behind this reduction? 12 A. Mr. Defever concluded that inflation “is not a known and measurable increase” 13 and 13 removed the inflationary adjustment of $9.033 million in his proposed revenue 14 requirement calculation. 15 Q. Does the Company agree with Mr. Defever’s determination and conclusions? 16 A. No. The Company does not agree that inflation would not qualify as a known and 17 measurable adjustment. This argument was used consistently throughout Mr. 18 Defever’s testimony to support various adjustments and rather than rebutting the 12 Defever Testimony, at 7 and Exhibit JD-1, Schedule B-1. 13 Defever Testimony, at 7.
  3. Page 15 of 96

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 12 of 93 1 argument throughout our testimony, we have consolidated our arguments in a separate 2 section of our testimony below. B. Customer Advances for Construction 3 4 Q. Please describe what is considered a customer advance for construction. 5 A. A customer advance for construction represents a cash advance from a new customer 6 to cover certain construction costs. These amounts are refundable to project owners at 7 a future date either in full or in part upon completion of project milestones. If these 8 amounts are forfeited, the balance would be credited against project costs included in 9 rate base. These amounts are reflected within FERC Account 252 Customer Advances 10 for Construction on the balance sheet. 11 Q. Has the Company’s included Customer Advances for Construction in Rate Base? 12 A. No. The Company has not included customer advances for construction in rate base in 13 either of the Company’s two most recent rate cases in both Docket No. 17-10-46 and 14 14-05-06. 15 Q. What is Mr. Defever’s recommendation for customer advances? 16 A. Mr. Defever’s recommendation is to include the “most recent balance” for customer advances for construction of $19.485 million in rate base. 14 17 14 Defever Testimony, at 9
  4. Page 16 of 96Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 13 of 93 1 2 Q. What was Mr. Defever’s justification to include customer advances for construction in rate base? 3 A. Mr. Defever contends that these balances have increased substantially since March 4 2023, argues that other companies in Connecticut include refundable advances in rate 5 base (citing two water companies) and noted he believes prior to the Company’s two 6 most recent rate cases customer advances were included in rate base. 7 Q. Does the Company agree with Mr. Defever’s conclusions? 8 A. No. Consistent with recent CL&P rate case proceedings (both Docket No. 17-10-46 9 and 14-05-06) the Company has not included these amounts in rate base. As outlined 10 above, these amounts are typically refunded to customers in full and as a result do not 11 represent funds utilized by the Company to support long-term capital projects or 12 initiatives. 13 If PURA were to depart from recent rate case precedent to include these amounts in 14 rate base, simply selecting the “most recent balance”, as suggested by Mr. Defever, is 15 not a proper or supportable methodology. It is also important to highlight that the “most 16 recent balance” referenced by Mr. Defever also happens to be the largest balance in the 17 past three years by a significant margin. In fact, from March 2023 to November 2025 18 the average monthly customer advance balance was approximately $2.7 million, 19 starting in December 2025 this balance increased dramatically to the June 2026 amount 20 of $19.485 million. This increase is primarily driven by one single project initiated in 21 December 2025, where a customer paid a refundable advance of approximately $8.1
  5. Page 17 of 96Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 14 of 93 1 million. The Company provides details on the increase in this balance in recent months 2 within both OCC-676 and OCC-936. 3 The goal of any rate case is to establish a just and reasonable level of distribution 4 revenues for the Company to operate the business by incorporating a representable 5 level of rate base and annual operating costs in rates. Mr. Defever argues a five-quarter 6 average balance is not needed for customer advances, similar to some of his other 7 proposals, because “an average would be more appropriate for amounts that 8 fluctuate.” 15 He neglects to highlight that these amounts have fluctuated significantly 9 in recent months moving from an average balance of $2.7 million from March 2023 to 10 November 2025 to an average of $18 million from December 2025 to June 2026. Thus, 11 the Company contends if such an amount were to be included in rates the significant 12 projects included in this balance outlined in both OCC-676 and OCC-936 should be 13 normalized to achieve a representative and historical level of customer advances in 14 rates. C. Utility Plant In-Service 15 16 Q. What is the Company’s request for utility plant in-service in rate base? 17 A. The Company’s test year actual utility plant in-service balance was $8.828 billion as of 18 December 31, 2025. This test year balance includes all electric plant that is used, useful 19 and providing active service to customers as of December 31, 2025, and was based on 15 Defever Testimony, at 12-13.
  6. Page 18 of 96

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 15 of 93 1 the electric plant amounts included in FERC Account 101 and FERC Account 106. 2 Refer to Table 3 of Exhibit CLP-REVREQ-1 at 21 for a detailed reconciliation of the 3 test year amount to the audited Annual FERC Form 1 financial statements. 4 The Company proposed an adjustment to the test year balance for both capital additions 5 and retirements by individual plant account through the end of the rate year (June 30, 6 2028) utilizing the Company’s internal forecasts. The Company incorporated capital 7 additions of $848 million and retirements of ($152) million for a net adjustment of $696 8 million in the interim period (January 1, 2026 – June 30, 2027) and capital additions of 9 $665 million and retirements of ($116) million for a net adjustment of $549 million in 10 the Rate Year (July 1, 2027 – June 30, 2028). 11 These adjustments resulted in a beginning rate year (July 1, 2027) utility plant in- 12 service balance of $9.523 billion ($8.828 billion + 695 million = $9.523 billion) and an 13 ending rate year (June 30, 2028) utility plant in-service balance of $10.073 billion 14 ($9.523 billion + $549 million = $10.073 billion). These beginning and ending utility 15 plant in-service balances produced an average value for the rate year of $9.798 billion 16 ([9.523 billion + $10.073 billion] / 2 = $9.798 billion), which was used in calculating 17 the Company’s rate base. 18 The Company provides detailed information on this request in Exhibit CLP-REVREQ- 19 2, Schedule WP B-2.0 to WP B-2.5 and the Revenue Requirement Panel’s pre-filed 20 testimony, Exhibit CLP-REVREQ-1, at 20-24.
  7. Page 19 of 96

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 16 of 93 1 Q. What is Mr. Defever’s response to this proposal? 2 A. Mr. Defever recommends an adjustment to the Company’s average utility plant inservice balance for the rate year of $1.014 billion 16 or approximately 10 percent. 3 4 5 Q. Was Mr. Defever’s recommendations based explicitly on his own findings and conclusions? 6 A. No. Mr. Defever’s adjustments to the average utility plant in-service for the rate year include recommendations from OCC witness Nikhil Balakumar. 17 7 8 Q. What were the capital recommendations from Mr. Balakumar? 9 A. Mr. Balakumar recommended the following capital adjustments in his pre-filed 10 testimony: 11 • A disallowance of $26.5 million for 2022-2023 direct-buried cable replacement costs. 18 12 13 • A potential disallowance of capacity additions for “Peak Load/Capacity project 14 placed in service from 2023 through 2025” totaling $145.4 million if the 15 Company cannot produce “contemporaneous evaluation of non-wires 16 alternatives, the load forecast and the authorization documents” for each project 16 Exhibit JD-1, Schedule B, line 1 and Schedule B-4, lines 15 - 19. 17 Defever Testimony, at 3. 18 Balakumar Testimony, at 92.
  8. Page 20 of 96

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 17 of 93 1 prior to the record closing. The proposed disallowance would be calculated as 2 “the cost above the least-cost alternative where one was available.” 19 3 • To “[i]nclude in rate base only plant additions that are completed, in service 4 and documented as of the last supplemental filing before the record closed, and 5 exclude all forecasted plant.” Mr. Balakumar projected the utility plant amount 6 eligible for inclusion in rate base at $645.3 million ($847.8 million - $202.5 7 million = $645.3 million). Thus, proposing to remove approximately $202.5 8 million of interim period projected capital additions and all projected rate year 9 capital additions of $664.9 million.20 10 • Additionally, Mr. Balakumar identified areas that were open for additional 11 information from the Company and committed to providing final 12 recommendations on those additions in the surrebuttal testimony. 21 Finally, he 13 recommended it be required the Company have before-and-after storm 14 performance data for the resiliency programs and requests PURA weigh the 19 Balakumar Testimony, at 92-93. 20 Balakumar Testimony, at 93. 21 Balakumar Testimony, at 92.
  9. Page 21 of 96

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 18 of 93 1 absence of measured benefits in deciding whether resiliency additions place in 2 service after 2020 were prudently incurred. 22 3 4 Q. Do you have any specific rebuttal regarding the merits of Mr. Balakumar’s testimony? 5 A. No. Our testimony is specifically focused on how Mr. Defever adopted Mr. 6 Balakumar’s recommendations into the OCC’s revenue requirement calculation in 7 Exhibit JD-1. 8 Balakumar’s testimony at Exhibit CLP-ADDITIONS-REBUTTAL-1. The Capital Additions panel has addressed the details of Mr. 9 10 Q. How did Mr. Defever incorporate the testimony and recommendations of Mr. Balakumar into his proposed revenue requirement calculation? 11 A. Mr. Defever adjusted the average utility plant in-service calculated by the Company 12 for the rate year (July 1, 2027 – June 30, 2028) by $1.039 billion to incorporate Mr. 13 Balakumar’s recommendations. His adjustment is the culmination of the 14 recommended utility plant adjustments for (1) the direct buried cable projects ($26.5 15 million), (2) the potential capital disallowance for peak load / capacity additions 16 ($145.4 million), (3) the interim period (January 1, 2026 – June 30, 2027) capital not 17 expected to be supported by the close of the evidentiary record (projected to be $202.5 18 million) and (4) all rate year (July 1, 2027 – June 30, 2028) capital additions ($664.9 19 million). These amounts total $1.039 billion ($26.5 million + $145.4 million + $202.5 20 million +$664.9 million = $1.039 billion), which was subtracted from the Company’s 22 Balakumar Testimony, at 93.
  10. Page 22 of 96

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 19 of 93 1 average rate year utility plant in-service of $9.978 billion in Exhibit JD-1 Schedule B 2 Line 1. 3 4 Q. Did Mr. Defever properly reflect the capital recommendations from Mr. Balakumar’s testimony into the average rate base calculation for the rate year? 5 A. No. The Company identified material issues and mathematical errors in Mr. Defever’s 6 calculation of witness Balakumar’s recommendations within his revenue requirement 7 calculation. 8 Q. Please summarize these issues and mathematical errors. 9 A. The Company identified multiple issues in Mr. Defever’s adoption and implementation 10 of Mr. Balakumar’s recommendations, including both a misapplication of Mr. 11 Balakumar’s proposed treatment of certain capital projects and a material mathematical 12 error in calculating the average rate year plant additions. 13 First, Mr. Defever appears to have removed the entire $145.4 million of Peak Load / 14 Capacity capital additions identified in Mr. Balakumar’s testimony. These projects 15 were placed in service between 2023 and 2025. However, Mr. Balakumar does not 16 recommend an outright disallowance of these investments. Rather, he requests 17 additional information regarding the Company’s evaluation of non-wires alternatives 18 and other load-related considerations and recommends that PURA “not find a project 19 prudent where the Company cannot make that showing and disallow the cost above the 20 least-cost alternative where one was available.” 23 Accordingly, Mr. Defever’s removal 23 Balakumar Testimony, at 92-93.

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: BRENDAN J. O’BRIEN AND GARRETT J. MURRAY [26-05-10]

This filing on the current system (opens in a new tab)