The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 12 of 93 1 argument throughout our testimony, we have consolidated our arguments in a separate 2 section of our testimony below. B. Customer Advances for Construction 3 4 Q. Please describe what is considered a customer advance for construction. 5 A. A customer advance for construction represents a cash advance from a new customer 6 to cover certain construction costs. These amounts are refundable to project owners at 7 a future date either in full or in part upon completion of project milestones. If these 8 amounts are forfeited, the balance would be credited against project costs included in 9 rate base. These amounts are reflected within FERC Account 252 Customer Advances 10 for Construction on the balance sheet. 11 Q. Has the Company’s included Customer Advances for Construction in Rate Base? 12 A. No. The Company has not included customer advances for construction in rate base in 13 either of the Company’s two most recent rate cases in both Docket No. 17-10-46 and 14 14-05-06. 15 Q. What is Mr. Defever’s recommendation for customer advances? 16 A. Mr. Defever’s recommendation is to include the “most recent balance” for customer advances for construction of $19.485 million in rate base. 14 17 14 Defever Testimony, at 9Page 16 of 96
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 13 of 93 1 2 Q. What was Mr. Defever’s justification to include customer advances for construction in rate base? 3 A. Mr. Defever contends that these balances have increased substantially since March 4 2023, argues that other companies in Connecticut include refundable advances in rate 5 base (citing two water companies) and noted he believes prior to the Company’s two 6 most recent rate cases customer advances were included in rate base. 7 Q. Does the Company agree with Mr. Defever’s conclusions? 8 A. No. Consistent with recent CL&P rate case proceedings (both Docket No. 17-10-46 9 and 14-05-06) the Company has not included these amounts in rate base. As outlined 10 above, these amounts are typically refunded to customers in full and as a result do not 11 represent funds utilized by the Company to support long-term capital projects or 12 initiatives. 13 If PURA were to depart from recent rate case precedent to include these amounts in 14 rate base, simply selecting the “most recent balance”, as suggested by Mr. Defever, is 15 not a proper or supportable methodology. It is also important to highlight that the “most 16 recent balance” referenced by Mr. Defever also happens to be the largest balance in the 17 past three years by a significant margin. In fact, from March 2023 to November 2025 18 the average monthly customer advance balance was approximately $2.7 million, 19 starting in December 2025 this balance increased dramatically to the June 2026 amount 20 of $19.485 million. This increase is primarily driven by one single project initiated in 21 December 2025, where a customer paid a refundable advance of approximately $8.1Page 17 of 96
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 14 of 93 1 million. The Company provides details on the increase in this balance in recent months 2 within both OCC-676 and OCC-936. 3 The goal of any rate case is to establish a just and reasonable level of distribution 4 revenues for the Company to operate the business by incorporating a representable 5 level of rate base and annual operating costs in rates. Mr. Defever argues a five-quarter 6 average balance is not needed for customer advances, similar to some of his other 7 proposals, because “an average would be more appropriate for amounts that 8 fluctuate.” 15 He neglects to highlight that these amounts have fluctuated significantly 9 in recent months moving from an average balance of $2.7 million from March 2023 to 10 November 2025 to an average of $18 million from December 2025 to June 2026. Thus, 11 the Company contends if such an amount were to be included in rates the significant 12 projects included in this balance outlined in both OCC-676 and OCC-936 should be 13 normalized to achieve a representative and historical level of customer advances in 14 rates. C. Utility Plant In-Service 15 16 Q. What is the Company’s request for utility plant in-service in rate base? 17 A. The Company’s test year actual utility plant in-service balance was $8.828 billion as of 18 December 31, 2025. This test year balance includes all electric plant that is used, useful 19 and providing active service to customers as of December 31, 2025, and was based on 15 Defever Testimony, at 12-13.Page 18 of 96
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 15 of 93 1 the electric plant amounts included in FERC Account 101 and FERC Account 106. 2 Refer to Table 3 of Exhibit CLP-REVREQ-1 at 21 for a detailed reconciliation of the 3 test year amount to the audited Annual FERC Form 1 financial statements. 4 The Company proposed an adjustment to the test year balance for both capital additions 5 and retirements by individual plant account through the end of the rate year (June 30, 6 2028) utilizing the Company’s internal forecasts. The Company incorporated capital 7 additions of $848 million and retirements of ($152) million for a net adjustment of $696 8 million in the interim period (January 1, 2026 – June 30, 2027) and capital additions of 9 $665 million and retirements of ($116) million for a net adjustment of $549 million in 10 the Rate Year (July 1, 2027 – June 30, 2028). 11 These adjustments resulted in a beginning rate year (July 1, 2027) utility plant in- 12 service balance of $9.523 billion ($8.828 billion + 695 million = $9.523 billion) and an 13 ending rate year (June 30, 2028) utility plant in-service balance of $10.073 billion 14 ($9.523 billion + $549 million = $10.073 billion). These beginning and ending utility 15 plant in-service balances produced an average value for the rate year of $9.798 billion 16 ([9.523 billion + $10.073 billion] / 2 = $9.798 billion), which was used in calculating 17 the Company’s rate base. 18 The Company provides detailed information on this request in Exhibit CLP-REVREQ- 19 2, Schedule WP B-2.0 to WP B-2.5 and the Revenue Requirement Panel’s pre-filed 20 testimony, Exhibit CLP-REVREQ-1, at 20-24.Page 19 of 96
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 16 of 93 1 Q. What is Mr. Defever’s response to this proposal? 2 A. Mr. Defever recommends an adjustment to the Company’s average utility plant inservice balance for the rate year of $1.014 billion 16 or approximately 10 percent. 3 4 5 Q. Was Mr. Defever’s recommendations based explicitly on his own findings and conclusions? 6 A. No. Mr. Defever’s adjustments to the average utility plant in-service for the rate year include recommendations from OCC witness Nikhil Balakumar. 17 7 8 Q. What were the capital recommendations from Mr. Balakumar? 9 A. Mr. Balakumar recommended the following capital adjustments in his pre-filed 10 testimony: 11 • A disallowance of $26.5 million for 2022-2023 direct-buried cable replacement costs. 18 12 13 • A potential disallowance of capacity additions for “Peak Load/Capacity project 14 placed in service from 2023 through 2025” totaling $145.4 million if the 15 Company cannot produce “contemporaneous evaluation of non-wires 16 alternatives, the load forecast and the authorization documents” for each project 16 Exhibit JD-1, Schedule B, line 1 and Schedule B-4, lines 15 - 19. 17 Defever Testimony, at 3. 18 Balakumar Testimony, at 92.Page 20 of 96
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 17 of 93 1 prior to the record closing. The proposed disallowance would be calculated as 2 “the cost above the least-cost alternative where one was available.” 19 3 • To “[i]nclude in rate base only plant additions that are completed, in service 4 and documented as of the last supplemental filing before the record closed, and 5 exclude all forecasted plant.” Mr. Balakumar projected the utility plant amount 6 eligible for inclusion in rate base at $645.3 million ($847.8 million - $202.5 7 million = $645.3 million). Thus, proposing to remove approximately $202.5 8 million of interim period projected capital additions and all projected rate year 9 capital additions of $664.9 million.20 10 • Additionally, Mr. Balakumar identified areas that were open for additional 11 information from the Company and committed to providing final 12 recommendations on those additions in the surrebuttal testimony. 21 Finally, he 13 recommended it be required the Company have before-and-after storm 14 performance data for the resiliency programs and requests PURA weigh the 19 Balakumar Testimony, at 92-93. 20 Balakumar Testimony, at 93. 21 Balakumar Testimony, at 92.Page 21 of 96
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 18 of 93 1 absence of measured benefits in deciding whether resiliency additions place in 2 service after 2020 were prudently incurred. 22 3 4 Q. Do you have any specific rebuttal regarding the merits of Mr. Balakumar’s testimony? 5 A. No. Our testimony is specifically focused on how Mr. Defever adopted Mr. 6 Balakumar’s recommendations into the OCC’s revenue requirement calculation in 7 Exhibit JD-1. 8 Balakumar’s testimony at Exhibit CLP-ADDITIONS-REBUTTAL-1. The Capital Additions panel has addressed the details of Mr. 9 10 Q. How did Mr. Defever incorporate the testimony and recommendations of Mr. Balakumar into his proposed revenue requirement calculation? 11 A. Mr. Defever adjusted the average utility plant in-service calculated by the Company 12 for the rate year (July 1, 2027 – June 30, 2028) by $1.039 billion to incorporate Mr. 13 Balakumar’s recommendations. His adjustment is the culmination of the 14 recommended utility plant adjustments for (1) the direct buried cable projects ($26.5 15 million), (2) the potential capital disallowance for peak load / capacity additions 16 ($145.4 million), (3) the interim period (January 1, 2026 – June 30, 2027) capital not 17 expected to be supported by the close of the evidentiary record (projected to be $202.5 18 million) and (4) all rate year (July 1, 2027 – June 30, 2028) capital additions ($664.9 19 million). These amounts total $1.039 billion ($26.5 million + $145.4 million + $202.5 20 million +$664.9 million = $1.039 billion), which was subtracted from the Company’s 22 Balakumar Testimony, at 93.Page 22 of 96
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 19 of 93 1 average rate year utility plant in-service of $9.978 billion in Exhibit JD-1 Schedule B 2 Line 1. 3 4 Q. Did Mr. Defever properly reflect the capital recommendations from Mr. Balakumar’s testimony into the average rate base calculation for the rate year? 5 A. No. The Company identified material issues and mathematical errors in Mr. Defever’s 6 calculation of witness Balakumar’s recommendations within his revenue requirement 7 calculation. 8 Q. Please summarize these issues and mathematical errors. 9 A. The Company identified multiple issues in Mr. Defever’s adoption and implementation 10 of Mr. Balakumar’s recommendations, including both a misapplication of Mr. 11 Balakumar’s proposed treatment of certain capital projects and a material mathematical 12 error in calculating the average rate year plant additions. 13 First, Mr. Defever appears to have removed the entire $145.4 million of Peak Load / 14 Capacity capital additions identified in Mr. Balakumar’s testimony. These projects 15 were placed in service between 2023 and 2025. However, Mr. Balakumar does not 16 recommend an outright disallowance of these investments. Rather, he requests 17 additional information regarding the Company’s evaluation of non-wires alternatives 18 and other load-related considerations and recommends that PURA “not find a project 19 prudent where the Company cannot make that showing and disallow the cost above the 20 least-cost alternative where one was available.” 23 Accordingly, Mr. Defever’s removal 23 Balakumar Testimony, at 92-93.Page 23 of 96
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 20 of 93 1 of the entire $145.4 million appears both premature and inconsistent with Mr. 2 Balakumar’s recommendation, which contemplates a potential disallowance only 3 where the requisite showing is not made and, even then, only for costs exceeding an 4 available least-cost alternative. 5 Second, and more significantly, Mr. Defever made a mathematical error in 6 implementing Mr. Balakumar’s recommendation regarding rate year capital additions. 7 The Company projects approximately $664.9 million of capital additions during the 8 July 1, 2027 through June 30, 2028 rate year. Because those additions are projected to 9 be placed in service throughout the rate year, the Company appropriately calculated the 10 average rate year balance by including only 50 percent, or approximately $332.5 11 million, in rate base ([$0 + $664.9 million] ÷ 2 = $332.5 million). Mr. Defever, 12 however, removed the entire $664.9 million from rate base. In doing so, he effectively 13 removed approximately $332.5 million of plant that was never included in the 14 Company’s proposed average rate base for the rate year in the first place. This is not a 15 difference in ratemaking methodology or regulatory judgment. It is a mathematical 16 error that, by itself, understates Mr. Defever’s calculated utility plant in-service by 17 approximately $332.5 million, accounting for more than 30 percent of his proposed 18 reduction to utility plant. 19 These issues are significant because they demonstrate that Mr. Defever’s proposed rate 20 base reduction is not simply the product of differing judgments concerning the 21 appropriate level of capital investment. Rather, a material portion of the reductionPage 24 of 96
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 21 of 93 1 results from both an apparent misapplication of Mr. Balakumar’s recommendations 2 ($145.4 million in total) and a mathematical error ($332.5 million) that removes from 3 rate base hundreds of millions of dollars of plant that the Company never included in 4 its initial average rate year balance. 5 6 Q. Did Mr. Defever remove any of the estimated retirements included within the Company’s average rate year utility plant in-service? 7 A. No. As outlined above, the Company’s calculation of the average rate year utility plant 8 in-service reflects both projected capital additions and the associated estimated 9 retirements during the interim and rate-year periods. Although Mr. Defever removed 10 certain projected interim and rate year capital additions consistent with Mr. 11 Balakumar’s recommendations, he did not make any corresponding adjustment to 12 remove the estimated retirements associated with those capital additions. 13 This omission does not directly affect rate base because the estimated retirements 14 included in the Company’s initial application reduce utility plant in-service and 15 accumulated depreciation by equal amounts. It does, however, affect Mr. Defever’s 16 calculation of depreciation expense and other adjustments. The Company addresses 17 those impacts in greater detail below. 18 19 Q. Did Mr. Defever propose additional adjustments to the total utility plant inservice? 20 A. Yes. Mr. Defever rejected the Company’s proposal regarding vegetation management 21 costs that proposed all vegetation management costs be expensed moving forward 22 rather than the current practice which has some costs recovered through O&M and
As listed on the current system
Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: BRENDAN J. O’BRIEN AND GARRETT J. MURRAY [26-05-10]