Page 22 of 96
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 19 of 93 1 average rate year utility plant in-service of $9.978 billion in Exhibit JD-1 Schedule B 2 Line 1. 3 4 Q. Did Mr. Defever properly reflect the capital recommendations from Mr. Balakumar’s testimony into the average rate base calculation for the rate year? 5 A. No. The Company identified material issues and mathematical errors in Mr. Defever’s 6 calculation of witness Balakumar’s recommendations within his revenue requirement 7 calculation. 8 Q. Please summarize these issues and mathematical errors. 9 A. The Company identified multiple issues in Mr. Defever’s adoption and implementation 10 of Mr. Balakumar’s recommendations, including both a misapplication of Mr. 11 Balakumar’s proposed treatment of certain capital projects and a material mathematical 12 error in calculating the average rate year plant additions. 13 First, Mr. Defever appears to have removed the entire $145.4 million of Peak Load / 14 Capacity capital additions identified in Mr. Balakumar’s testimony. These projects 15 were placed in service between 2023 and 2025. However, Mr. Balakumar does not 16 recommend an outright disallowance of these investments. Rather, he requests 17 additional information regarding the Company’s evaluation of non-wires alternatives 18 and other load-related considerations and recommends that PURA “not find a project 19 prudent where the Company cannot make that showing and disallow the cost above the 20 least-cost alternative where one was available.” 23 Accordingly, Mr. Defever’s removal 23 Balakumar Testimony, at 92-93.Page 23 of 96
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 20 of 93 1 of the entire $145.4 million appears both premature and inconsistent with Mr. 2 Balakumar’s recommendation, which contemplates a potential disallowance only 3 where the requisite showing is not made and, even then, only for costs exceeding an 4 available least-cost alternative. 5 Second, and more significantly, Mr. Defever made a mathematical error in 6 implementing Mr. Balakumar’s recommendation regarding rate year capital additions. 7 The Company projects approximately $664.9 million of capital additions during the 8 July 1, 2027 through June 30, 2028 rate year. Because those additions are projected to 9 be placed in service throughout the rate year, the Company appropriately calculated the 10 average rate year balance by including only 50 percent, or approximately $332.5 11 million, in rate base ([$0 + $664.9 million] ÷ 2 = $332.5 million). Mr. Defever, 12 however, removed the entire $664.9 million from rate base. In doing so, he effectively 13 removed approximately $332.5 million of plant that was never included in the 14 Company’s proposed average rate base for the rate year in the first place. This is not a 15 difference in ratemaking methodology or regulatory judgment. It is a mathematical 16 error that, by itself, understates Mr. Defever’s calculated utility plant in-service by 17 approximately $332.5 million, accounting for more than 30 percent of his proposed 18 reduction to utility plant. 19 These issues are significant because they demonstrate that Mr. Defever’s proposed rate 20 base reduction is not simply the product of differing judgments concerning the 21 appropriate level of capital investment. Rather, a material portion of the reductionPage 24 of 96
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 21 of 93 1 results from both an apparent misapplication of Mr. Balakumar’s recommendations 2 ($145.4 million in total) and a mathematical error ($332.5 million) that removes from 3 rate base hundreds of millions of dollars of plant that the Company never included in 4 its initial average rate year balance. 5 6 Q. Did Mr. Defever remove any of the estimated retirements included within the Company’s average rate year utility plant in-service? 7 A. No. As outlined above, the Company’s calculation of the average rate year utility plant 8 in-service reflects both projected capital additions and the associated estimated 9 retirements during the interim and rate-year periods. Although Mr. Defever removed 10 certain projected interim and rate year capital additions consistent with Mr. 11 Balakumar’s recommendations, he did not make any corresponding adjustment to 12 remove the estimated retirements associated with those capital additions. 13 This omission does not directly affect rate base because the estimated retirements 14 included in the Company’s initial application reduce utility plant in-service and 15 accumulated depreciation by equal amounts. It does, however, affect Mr. Defever’s 16 calculation of depreciation expense and other adjustments. The Company addresses 17 those impacts in greater detail below. 18 19 Q. Did Mr. Defever propose additional adjustments to the total utility plant inservice? 20 A. Yes. Mr. Defever rejected the Company’s proposal regarding vegetation management 21 costs that proposed all vegetation management costs be expensed moving forward 22 rather than the current practice which has some costs recovered through O&M andPage 25 of 96
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 22 of 93 1 others included in capital. As a result, Mr. Defever recommended “holding the 2 Company to the total 2025 actual expense and capital amounts as they are the most 3 known and measurable.” 24 As a result of this proposal, Mr. Defever increased the 4 average rate year utility plant in-service by $25.2 million within Exhibit JD-1 Schedule 5 B-5, page 1, line 2. 6 7 Q. Does the Company agree with Mr. Defever’s proposal as it relates to vegetation management? 8 A. No. The Company does not agree with Mr. Defever’s proposal as it relates to 9 vegetation management. Please refer to Exhibit CLP-VMP-REBUTTAL-1, for 10 additional information and considerations regarding this proposal. D. Reserve for Depreciation 11 12 13 Q. What is the Company’s request for the reserve for depreciation or accumulated depreciation in rate base? 14 A. The Company’s test year actual reserve for accumulated depreciation was ($1.611) 15 billion as of December 31, 2025. This test year balance includes all accumulated 16 depreciation related to in-service capital additions as of December 31, 2025 and was 17 based on the electric plant amounts included in FERC Account 108 and FERC Account 18 111. Refer to Table 4 of Exhibit CLP-REVREQ-1 at 25 for a detailed reconciliation 19 of the test year amount to the audited Annual FERC Form 1 financial statements. 24 Defever Testimony, at 37.Page 26 of 96
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 23 of 93 1 The Company incorporated depreciation accruals of $396 million, which comes from 2 Schedule C-3.34 (Interim Period), retirements of ($152) million, which comes from 3 Schedule B-2.1 (Utility Plant In-Service) and cost of removal of ($77) million, which 4 comes from the Company’s internal forecasts for a net increase to the reserve for 5 depreciation of $167 million in the interim period; and depreciation accruals of $382 6 million, which comes from Work Paper C-3.34, retirements of ($116) million, which 7 comes from Schedule B-2.1 (Utility Plant In-Service) and cost of removal of ($59) 8 million, which comes from the Company’s internal forecasts for a net increase to the 9 reserve for depreciation of $208 million in the Rate Year. These adjustments to 10 accumulated depreciation through the rate year also incorporate any interim or rate year 11 in-service capital additions projected within total utility plant in-service. 12 The Company provides detailed information on this request in Exhibit CLP-REVREQ- 13 2, Schedule B-3.0, WP B-3.0 and WP B-3.1 and the Revenue Requirement Panel’s pre- 14 filed testimony, Exhibit CLP-REVREQ-1, at 24-27. 15 16 Q. Did Mr. Defever make any adjustments to the average accumulated depreciation during the rate year? 17 A. Yes, although Mr. Defever did not make any direct recommendations specific to 18 accumulated depreciation, he did make one adjustment to reflect the recommendations 19 of OCC witness David Garrett regarding depreciation and Nikhil Balakumar regardingPage 27 of 96
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 24 of 93 1 capital additions. 25 Mr. Defever recommends a reduction to accumulated depreciation 2 of $15.7 million which is reflected in Exhibit JD-1, Schedule B, Line 2. 3 Q. What is Mr. Defever’s reasoning behind this reduction? 4 A. Mr. Defever does not provide direct testimony explaining these adjustments or the 5 methodology used to calculate them. Based on the Company’s review of Exhibit JD- 6 1, Schedules B-4 and B-5, however, it appears that Mr. Defever applied the composite 7 depreciation rate recommended by Mr. Garrett (3.10%) 26 to the utility plant in-service 8 reductions reflected in his revenue requirement calculation to estimate the 9 corresponding reduction in annual depreciation expense. 10 Mr. Defever then appears to average the resulting reduction in depreciation expense 11 and reflects that amount as a reduction to the Company’s average rate year accumulated 12 depreciation balance. Notably, this treatment differs from his treatment of rate year 13 capital additions discussed above, where Mr. Defever removed the full amount of 14 projected rate year capital additions rather than the average balance actually reflected 15 in the Company’s rate base calculation. 16 Although Mr. Defever does not expressly explain these calculations in his testimony, 17 he states that his revenue requirement incorporates recommendations from other OCC 18 witnesses, including Mr. Garrett with respect to depreciation and Mr. Balakumar with 19 respect to capital additions. Accordingly, the Company understands these adjustments 25 Defever Testimony, at 3. 26 Garrett Testimony, Figure 3, at 6.Page 28 of 96
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 25 of 93 1 to represent Mr. Defever’s attempt to reflect the accumulated depreciation impacts 2 associated with his adoption of those witnesses’ recommendations. 3 Q. Does the Company agree with Mr. Defever’s determination and conclusions? 4 A. No. Similar to the Company’s evaluation of Mr. Defever’s conclusions regarding 5 utility plant in-service we have identified multiple issues, inconsistencies and 6 mathematical errors in Mr. Defever’s proposal. 7 Q. Please summarize these issues and mathematical errors. 8 A. The Company identified multiple material errors and inconsistencies in Mr. Defever’s 9 calculation of accumulated depreciation resulting from his attempt to incorporate the 10 recommendations of Mr. Garrett regarding depreciation and Mr. Balakumar regarding 11 capital additions. 12 First, consistent with the utility plant in-service issues discussed above, Mr. Defever 13 appears to have prematurely incorporated depreciation expense and accumulated 14 depreciation adjustments associated with Mr. Balakumar’s review of the Peak Load / 15 Capacity projects placed in service between 2023 and 2025. As discussed above, Mr. 16 Balakumar did not recommend the disallowance of these investments in total. As a 17 result, it is premature to reflect the utility plant in-service, depreciation expense and 18 accumulated depreciation consequences of a capital disallowance that Mr. Balakumar 19 himself did not recommend in the manner assumed by Mr. Defever. 20 Second, Mr. Defever’s treatment of accumulated depreciation is inconsistent with his 21 treatment of the underlying plant balances. Mr. Defever removes from utility plant in-Page 29 of 96
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 26 of 93 1 service the full amount of his assumed disallowances associated with the direct-buried 2 cable projects placed in service in 2022 and 2023 and the Peak Load / Capacity projects 3 placed in service between 2023 and 2025. However, he does not remove the 4 accumulated depreciation previously recorded on those assets. Instead, he calculates 5 only a prospective reduction in accumulated depreciation based on Mr. Garrett’s 6 proposed depreciation rates and then averages that adjustment for the rate year only. 7 This treatment creates a fundamental mismatch. If Mr. Defever removes the historical 8 plant investment from rate base as though those assets had never been included, he 9 must also remove the accumulated depreciation that has accrued on those same assets 10 since they were placed in service. Some of these assets have been depreciating since 11 2022. Removing the entire gross plant balance while leaving most of the associated 12 accumulated depreciation in the reserve produces an asymmetrical and overstated 13 reduction to net plant in service. 14 Third, Mr. Defever does not consistently apply PURA’s treatment of accumulated 15 depreciation from the Yankee Gas rate case Final Decision in Docket No. 24-12-01 16 (“Yankee Gas Decision”), despite relying on that decision elsewhere in his testimony 17 to support various cost-of-service reductions. As discussed above, Mr. Balakumar 18 recommends limiting eligible capital additions to those completed, in service, and 19 documented by the close of the evidentiary record, currently scheduled for March 12, 20 2027. That approach is consistent with PURA’s treatment of projected plant additions 21 and accumulated depreciation not only in Docket No. 24-12-01, but also in UnitedPage 30 of 96
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 27 of 93 1 Illuminating’s most recent rate case in Docket No. 24-10-04 and in the CNG and SCG 2 Remand Decisions in Docket Nos. 25-12-13 and 25-11-14 respectively. 3 Importantly, however, PURA also applied the same cutoff concept to accumulated 4 depreciation. PURA expressly declined to include $38.5 million of accumulated 5 depreciation for the period June 1, 2025 through October 31, 2025 in the Final Decision 6 in Docket No. 24-12-01, stating that the amount would not be included “based on the 7 Authority’s allowed plant-in-service, for purposes of calculating rate base in this 8 proceeding.” 27 The purpose and effect of that treatment was to align the accumulated 9 depreciation included in rate base with the cutoff applied to the corresponding utility 10 plant in-service. 11 Mr. Defever does not apply that same symmetrical treatment here. He effectively 12 adopts the cutoff, suggested by Mr. Balakumar and consistent with the Final Decision 13 in Docket No. 24-12-01, to exclude projected plant additions at the close of the 14 evidentiary record, which reduces rate base, but does not apply the corresponding 15 cutoff to the projected accumulated depreciation, which, if the cutoff were applied 16 consistently, as it should be, would increase rate base. Based on the Company’s 17 analysis, applying the same treatment to accumulated depreciation would reduce the 18 Company’s forecasted average rate year accumulated depreciation balance by 19 approximately $100 million. As a result, Mr. Defever’s reduction to accumulated 27 Yankee Gas Decision, at 30Page 31 of 96
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 28 of 93 1 depreciation would be multiple times greater than the adjustment currently reflected in 2 his analysis if the Final Decision in Docket No. 24-12-01 were applied symmetrically. 3 Taken together, these issues demonstrate a recurring lack of symmetry in Mr. Defever’s 4 calculations. His analysis removes plant without removing all of the accumulated 5 depreciation associated with that plant and applies the Yankee Gas Decision where it 6 reduces the Company’s revenue requirement without applying the corresponding 7 treatment from that same decision where it would increase the Company’s revenue 8 requirement. The result is an inconsistent rate base calculation that systematically 9 recognizes adjustments that reduce rate base without recognizing the corresponding 10 adjustments that would increase it. The Company submits that the same accounting 11 and ratemaking principles must be applied consistently in both directions. E. Accumulated Deferred Income Taxes (“ADIT”) 12 13 Q. What is the Company’s request for ADIT in rate base? 14 A. The Company’s test year actual ADIT was ($1.187) billion as of December 31, 2025. 15 This test year balance includes the tax deferrals resulting from the adoption of the 16 principle of comprehensive inter-period income tax allocation described in General 17 Instruction 18 of the Uniform System of Accounts, which are related to all property 18 other than accelerated amortization property. 19 The Company incorporated post-test year adjustments of ($88.849) million, which 20 were primarily driven by the Company’s plant in-service, including adjustments to tax 21 deferrals on existing plant and new tax deferrals on projected plant in service through