Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Prefiled testimony

Witness: BRENDAN J. O’BRIEN AND GARRETT J. MURRAY

Files2

Search terms highlighted
Eversource rate increase is on 25 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
25 pages match
  1. Page 87 of 96

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 84 of 93 1 rate year utility plant in-service is approximately $94.275 million ($36.396 + ($115.758 2 * 50%) = $94,275). Applying the 3.10 percent composite depreciation rate results in 3 an additional $2.923 million overstatement of Mr. Defever’s depreciation expense 4 reduction. 5 Collectively, these errors overstate Mr. Defever’s proposed depreciation expense 6 reduction by approximately $17.7 million or 17 percent. 7 differences in judgment regarding depreciation methodology or rates, which is 8 addressed separately within Mr. Ned Allis’ rebuttal testimony at CLP- 9 DEPRECIATION-REBUTTAL-1; they are the direct consequence of errors and 10 inconsistencies 11 recommendations. Moreover, because the same underlying utility plant in-service 12 errors flow through multiple components of the revenue requirement, their effects are 13 compounded rather than isolated. in Mr. Defever’s implementation of Again, these are not the OCC’s capital 14 15 Q. Does the Company have any additional comments regarding the depreciation expense reflected in the annual revenue requirement? 16 A. As noted above, the Company’s response to the depreciation rates suggested by Mr. 17 Garrett are addressed by Mr. Ned Allis within Exhibit CLP-DEPRECIATION- 18 REBUTTAL-1. The Company would like to highlight that any depreciation expense 19 adjustment adopted in a final decision would need to reflect the final approved utility 20 plant in-service by plant account multiplied by the approved depreciation rates for each 21 asset classification, as has consistently been the case in previous rate cases. This
  2. Page 88 of 96

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 85 of 93 1 calculation will ensure that depreciation expense set in base distribution rates is 2 appropriately calculated to reflect the utility plant in-service approved. O. Property Tax Expense 3 4 Q. What is the Company’s computation of its property tax expense? 5 A. The Company’s calculation of property tax expense for the rate year was based on four 6 components: (1) base historical actual property taxes (2023 and 2024); (2) a reduction 7 to reflect depreciation on those historical assets; (3) additional property taxes on new 8 capital additions for 2025 and 2026 and (4) a reduction for property taxes on retired 9 assets in 2025 and 2026. This resulted in a rate year property tax expense of $158.561 10 million.98 11 The Company provides detailed information on this request in Exhibit CLP-REVREQ- 12 2, Schedule WP C-3.37 pages 1 – 21 and the Revenue Requirement Panel’s pre-filed 13 testimony, Exhibit CLP-REVREQ-1, at 122-124. 14 Q. Did Mr. Defever make any adjustments to property tax expense? 15 A. Yes, although Mr. Defever did not make any direct recommendations or provide any 16 specific testimony regarding his adjustments to property tax expense, he did 17 recommend a reduction to property tax expense of $16.411 million. 99 98 99 Exhibit CLP-REVREQ-2 Schedule C-3.37 Line 24. Exhibit JD-1, Schedule C page 2, Line 23
  3. Page 89 of 96

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 86 of 93 1 In our review of Exhibit JD-1, it appears Mr. Defever calculated this adjustment by 2 applying a property tax ratio of 1.62 percent to the total plant reductions recommended 3 by the OCC. Mr. Defever calculated the property tax ratio by dividing the Company’s 4 rate year property tax expense by the Company’s rate year utility plant in-service. 100 5 Q. Does Mr. Defever provide any testimony supporting his calculations? 6 A. No. Mr. Defever does not offer any testimony supporting the property tax expense 7 adjustment or calculations included in Exhibit JD-1. Although Mr. Defever does not 8 expressly explain these calculations in his testimony, he states that his revenue 9 requirement incorporates recommendations from other OCC witnesses, including Mr. 10 Balakumar with respect to capital additions. Accordingly, the Company understands 11 these adjustments to represent Mr. Defever’s attempt to reflect the property tax expense 12 impacts associated with his adoption of those witnesses’ recommendations. 13 14 Q. How did Mr. Defever calculate the property tax expense adjustment for the plant adjustments recommended? 15 A. To calculate the estimated property tax expense impacts of the OCC’s recommended 16 plant reductions, Mr. Defever utilized the property tax ratio outlined above, which he 17 multiplied by the total plant adjustment suggested by the OCC of $1.014 billion. 18 Q. Does the Company agree with Mr. Defever’s property tax expense calculation? 19 A. No. As discussed above, the Company has identified multiple material errors and 20 inconsistencies in Mr. Defever’s calculation of utility plant in-service. Given rate year 100 Exhibit JD-1 Schedule C, page 2, Line 21
  4. Page 90 of 96

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 87 of 93 1 property tax expense is directly impacted by utility plant in-service, those same errors 2 flow directly through to and materially overstate Mr. Defever’s proposed reduction to 3 property tax expense. 4 Specifically, the Company identified three errors in Mr. Defever’s property tax expense 5 calculations: (1) property tax expense related to the removal of $145.4 million of Peak 6 Load/Capacity capital additions that Mr. Balakumar has not recommended be 7 disallowed yet; (2) the failure to recognize that the property tax on January 1, 2027 – 8 June 30, 2028 capital is not included in the cost of service 101; and (3) property tax 9 expense related to the removal of the $26.5 million of DB cable was calculated on the 10 gross balance, rather than the current actual net book value of the capital. 11 Given Mr. Defever applies a 1.62 percent property tax rate to his calculated reduction 12 in utility plant in-service, each of these underlying errors directly overstates his 13 proposed reduction to property tax expense. First, using Mr. Defever’s approach of 14 applying the 1.62 percent rate to the $145.4 million Peak Load / Capacity adjustment 15 results in an approximately $2.355 million overstatement of the property tax reduction. 16 In addition, using Mr. Defever’s approach of applying the 1.62 percent rate to the 17 $867.4 million future plant adjustment results in an additional $14.051 million 18 overstatement. 101 See Exhibit CLP-REVREQ-2, Work Paper C-3.37, page 21 of 21 which shows the last year of capital included in property taxes is calendar year 2026 which is billed over the fiscal year July 1, 2027 through June 30, 2028.
  5. Page 91 of 96

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 88 of 93 1 Collectively, these errors overstate Mr. Defever’s proposed reduction to property tax 2 expense by approximately $16.406 million, or 99.9 percent. Importantly, these are not 3 independent differences in judgment or property tax methodology. Rather, they are the 4 direct consequence of the same mathematical errors and inconsistencies in Mr. 5 Defever’s implementation of the OCC’s capital recommendations discussed above. 6 Those errors originate in his calculation of utility plant in-service and compound as the 7 incorrect plant balance flows through other components of the revenue requirement 8 calculation, including depreciation expense, accumulated depreciation, ADIT, and 9 property tax expense. Accordingly, a single error in the underlying plant calculation 10 can have multiple and cumulative effects on the OCC’s ultimate revenue requirement 11 recommendation, which when corrected will materially increase their proposed 12 revenue requirement. 13 14 IV. ERRORS, DUPLICATIVE DISALLOWANCES AND METHODOLOGICAL INCONSISTENCIES 15 16 Q. What conclusions does the Company draw from the mathematical errors and inconsistencies identified in the OCC’s proposed revenue requirement? 17 A. The Company has significant concerns regarding the reliability of the OCC’s proposed 18 revenue requirement. As discussed above, in the relatively short period available to 19 review the OCC’s and all other intervenor’s testimony and prepare rebuttal testimony, 20 the Company identified multiple material mathematical errors, inconsistencies, and 21 apparent misapplications of other OCC witnesses’ recommendations within Mr. 22 Defever’s revenue requirement calculation. These are not simply differences in
  6. Page 92 of 96Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 89 of 93 1 ratemaking judgment or disagreements regarding reasonable assumptions. Several are 2 mathematical or computational errors that have a direct and material effect on the 3 OCC’s proposed rate base and revenue requirement. 4 For example, the Company identified that Mr. Defever: 5 1) Removed the full $664.9 million of projected rate year capital additions, even 6 though the Company’s average rate year calculation included only 7 approximately $332.5 million of those additions. As a result, Mr. Defever 8 effectively removed approximately $332.5 million of utility plant in-service 9 that was never included in the Company’s proposed average rate base for the 10 rate year to begin with. 11 2) Applied the ADIT adjustment associated with the approximately $1.014 billion 12 reduction to utility plant in-service in the wrong direction. Rather than reducing 13 the associated ADIT liability, Mr. Defever increased it by approximately 14 $130.759 million. Correcting the direction of that adjustment would increase 15 his calculated rate base by approximately $261.518 million. 16 3) Removed historical plant balances without removing all prior accumulated 17 depreciation associated with those assets. Certain projects subject to Mr. 18 Defever’s adjustments have been in service and depreciating since 2022. 19 Removing the gross plant associated with those projects while retaining
  7. Page 93 of 96Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 90 of 93 1 accumulated depreciation previously recorded on those same assets produces 2 an asymmetrical and overstated reduction to net plant in service. 3 4) Applied the treatment adopted by PURA in the Yankee Gas Decision, other 4 recent rate cases (UI Final Decision in Docket No. 24-10-04, CNG and SCG 5 Remand Decisions in Docket Nos. 25-11-13 and 25-11-14 respectively) and 6 proposed herein by Mr. Balakumar inconsistently. While the OCC relies on a 7 cutoff at the close of the evidentiary record to exclude subsequent projected 8 plant additions, Mr. Defever does not apply a corresponding cutoff to the 9 projected accumulated depreciation. 10 applying that treatment consistently would reduce forecasted accumulated 11 depreciation by approximately $100 million, thereby materially increasing rate 12 base relative to Mr. Defever’s calculation. Based on the Company’s analysis, 13 5) Appears to have incorporated the full $145.4 million of Peak Load / Capacity 14 investments as a disallowance, notwithstanding that Mr. Balakumar’s 15 recommendation did not simply disallow those investments. Instead, Mr. 16 Balakumar proposed additional review and, where the required showing could 17 not be made, a potential disallowance based on costs above an available least- 18 cost alternative. 19 6) Double-counted the disallowance of investor relations costs. Mr. Defever 20 recommends the removal of all investor relations costs totaling $480,000 and 21 immediately following this proposal applies a separate $217,000 reduction for 22 costs he identifies as “investor relations costs.” His recommended disallowance
  8. Page 94 of 96

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 91 of 93 1 represents another error, where Mr. Defever is proposing a duplicative 2 disallowance removing $217,000 of investor relations costs twice, which again 3 understates the Company’s revenue requirement. 4 These errors and inconsistencies are material individually and even more significant in 5 the aggregate. Most importantly, they were identified within the limited time available 6 to review the testimony and supporting workpapers of the OCC and all other 7 intervenors and prepare rebuttal testimony, while Company witnesses also respond to 8 hundreds of discovery responses, participated in on-site audits and performed their 9 typical day-to-day responsibilities. The Company therefore does not believe it would 10 be reasonable to assume that the errors identified herein necessarily represent all errors 11 or inconsistencies within Mr. Defever’s revenue requirements calculation. 12 To be clear, the Company is not suggesting that every disagreement with an OCC 13 witness or any party constitutes an error. There are legitimate areas in this proceeding 14 where the Company and OCC witnesses simply disagree regarding assumptions, 15 methodologies, or appropriate ratemaking treatments, and the Company addresses 16 those substantive disagreements above and throughout our collective rebuttal 17 testimonies. Many of the issues identified above however are different. They include 18 mathematical errors, inconsistent and asymmetrical calculations, duplicative
  9. Page 95 of 96

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 92 of 93 1 adjustments and instances in which Mr. Defever’s model does not appear to accurately 2 implement the recommendations on which he is relying upon. 3 This distinction is particularly important because the OCC’s overall recommendation 4 would move the Company from a calculated base revenue deficiency, excluding 5 storms, of approximately $451 million to an approximately $10 million reduction in 6 base distribution rates. As outlined in the introduction above, such a decrease to base 7 distribution rates is mathematically at odds with the Company’s actual test year ROE 8 of 6.51% 102 and such a consequential recommendation should rest on a revenue 9 requirement calculation that is mathematically sound, consistent, symmetrical and 10 accurately reflects the underlying recommendations of the OCC’s other witnesses. 11 These errors identified by the Company demonstrate that Mr. Defever’s calculation 12 does not presently satisfy that standard. 13 Accordingly, the Company respectfully submits that caution is warranted before 14 relying on Mr. Defever’s proposed revenue requirement. The magnitude and nature of 15 the errors identified during the Company’s limited rebuttal review demonstrate that 16 individual adjustments cannot be evaluated in isolation. PURA should consider 17 whether the OCC’s proposed revenue requirement, taken as a whole, has been 18 demonstrated to be mathematically reliable and internally consistent before using it as 19 a basis for establishing the Company’s just and reasonable rates. 20 102 March 6, 2026 compliance filing in Docket No. 76-03-07RE01, tab “Exhibit 1 (C) (1a) – 5 Qtr”.
  10. Page 96 of 96

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-REVREQ-REBUTTAL-1 November 18, 2026 Page 93 of 93 1 V. CONCLUSION 2 Q. Does this conclude your testimony? 3 A. Yes, subject to reserving the Company’s right to respond to additional issues raised in 4 discovery, surrebuttal and at hearings.

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: BRENDAN J. O’BRIEN AND GARRETT J. MURRAY [26-05-10]

This filing on the current system (opens in a new tab)