Prefiled testimony
Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO
Files6
Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
PDF · 152 KB · 3 pagesText searchable
Download Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdfRead the text of Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
Exhibit CLP-ADDITIONS-REBUTTAL-1.pdf
PDF · 361 KB · 34 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-1.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-1.pdf
Exhibit CLP-ADDITIONS-REBUTTAL-2.pdf
PDF · 872 KB · 6 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-2.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-2.pdf
Exhibit CLP-ADDITIONS-REBUTTAL-3.pdf
PDF · 6.7 MB · 73 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-3.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-3.pdf
Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf
PDF · 1.1 MB · 8 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-4.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf
Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED.pdf
PDF · 52 MB · 502 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED.pdf
Page 1 of 34
STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY Docket No. 26-05-10 APPLICATION OF THE CONNECTICUT LIGHT AND POWER COMPANY D/B/A EVERSOURCE ENERGY TO AMEND ITS RATE SCHEDULES JOINT REBUTTAL TESTIMONY OF DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO Capital Additions Panel On behalf of The Connecticut Light and Power Company d/b/a Eversource Energy November 18, 2026Page 2 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY JOINT REBUTTAL TESTIMONY OF DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO Table of Contents I. INTRODUCTION ..................................................................................................... 1 II. RESPONSE TO RECOMMENDED CAPITAL DISALLOWANCES ............... 3 A. Actual Expenditures Exceeding Budget Plans ................................................... 5 B. Direct Buried Cable ............................................................................................ 14 C. Capacity Projects ................................................................................................ 20 III. RESPONSE TO INCLUSION OF CAPITAL ADDITIONS IN RATE BASE . 30 IV. CONCLUSION ........................................................................................................ 32Page 3 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 1 of 32 STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY JOINT REBUTTAL TESTIMONY OF DAVID L. GLADEY, JOHN P. DIPAOLATROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO 1 I. INTRODUCTION 2 Q. Please state the names of the witnesses on the Capital Additions Panel. 3 A. The Capital Additions Panel is comprised of David L. Gladey, John P. DiPaola- 4 Tromba, Leanne M. Landry and Jeffrey D. Turano. We are providing this rebuttal 5 testimony on behalf of The Connecticut Power and Light Company d/b/a Eversource 6 Energy (“CL&P,” “Eversource,” or the “Company”). 7 8 Q. Have the members of the Capital Additions Panel previously submitted testimony in this proceeding? 9 A. Yes. On July 14, 2026, we submitted direct, pre-filed testimony to the Public Utilities 10 Regulatory Authority (“PURA”) on behalf of CL&P in support of its application for 11 approval of amended rate schedules. Our direct, pre-filed testimony was designated as 12 Exhibit CLP-ADDITIONS-1. 13 Q. What is the purpose of this panel’s joint rebuttal testimony? 14 A. On October 21, 2026, the Office of Consumer Counsel (“OCC”) filed testimony in this 15 proceeding in accordance with PURA’s procedural schedule. Our joint rebuttal 16 testimony addresses the claims and recommendations put forward by OCC in relation 17 to the Company’s proposed capital additions. Specifically, our testimony addresses thePage 4 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 2 of 32 1 recommendations of OCC’s consultant, Mr. Nikhil Balakumar, to disallow costs 2 associated with investment in direct-buried cable and capacity additions, as well as his 3 criticisms of the Company’s cost controls. Lastly, our testimony responds to his 4 testimony on the documentation associated with actual plant additions completed 5 through December 31, 2026, following the test year ending December 31, 2025. 1 6 Q. Are you presenting any exhibits as part of your rebuttal testimony? 7 A. Yes. We are presenting the following exhibit with our rebuttal testimony: Exhibit Purpose/Description CLP-ADDITIONS-REBUTTAL-1 Joint Rebuttal Testimony of the Capital Additions Panel CLP-ADDITIONS-REBUTTAL-2 Order No. 11 Compliance, Docket No. 17-10-46 on 2018 Core Capital Additions, Budget Variances (May 31, 2019) CLP-ADDITIONS-REBUTTAL-3 Order No. 11 Compliance, Docket No. 17-10-46 on 2023 Core Capital Additions, Budget Variances (May 31, 2024) CLP-ADDITIONS-REBUTTAL-4 Order No. 4 Compliance, Docket No. 17-10-46 on Core Capital Additions CLP-ADDITIONS-REBUTTAL-5 Documentation for Plant Additions Placed in Service through June 30, 2026 (filed as Supplement #1 September 15, 2026) CLP-ADDITIONS-REBUTTAL-6 Documentation for Plant Additions Placed in Service through August 31, 2026. (filed as Supplement #2 October 19, 2026) CLP-ADDITIONS-REBUTTAL-7 Documentation for Plant Additions Placed in Service through September 30, 2026. (filed as Supplement #3 November 18, 2026) CLP-ADDITIONS-REBUTTAL-8 Project Authorization Forms for Capacity Projects 8 Q. How is your testimony organized? 9 A. Our testimony is organized into the following sections: 1 The Company does not respond to every issue raised in the intervenor testimonies. Silence on any issue should not be construed as agreement on any issue.Page 5 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 3 of 32 1 • Section I is the introduction; 2 3 • Section II is the Company’s response to arguments regarding the disallowance of certain capital additions; 4 5 • Section III is the Company’s response to arguments regarding capital additions eligible for inclusion in rate base; and 6 • Section IV is the conclusion. 7 II. RESPONSE TO RECOMMENDED CAPITAL DISALLOWANCES 8 9 Q. Please summarize Mr. Balakumar’s testimony regarding his recommended disallowances of certain capital additions. 10 A. Mr. Balakumar questions three categories of the Company’s capital investments, 11 contending that insufficient documentation has been provided to support their inclusion 12 in rate base (Balakumar Testimony at 83). He also criticizes the Company’s capital 13 spending controls on the basis that expenditures exceeded Board-approved budgets by 14 in eight years, 2017-2024, in the aggregate amount of $350.8 million, which is $44 15 million per year on average, or approximately 11% on the total expenditure (id. at 84). 16 He posits that the largest variances were $84.0 million in 2018 and $91.5 million in 17 2023, which were variances of approximately 26 and 20 percent above plan, 18 respectively (id.). Mr. Balakumar attributes these overruns primarily to additional 19 work added during the year not to individual project cost overruns, where he notes that 20 nearly half of the Company’s individual projects came in more than 10 percent under 21 estimate (id. at 84).Page 6 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 4 of 32 1 2 3 Q. What are the three categories of capital investment that Mr. Balakumar claims have insufficient documentation and are therefore questionable in relation to the prudence of the Company’s cost management (Balakumar Testimony at 83)? 4 A. First, Mr. Balakumar recommends disallowances of costs associated with the 5 Company’s program to replace direct-buried cable. Mr. Balakumar acknowledges that, 6 in 2019, the Company adopted a proactive approach to replace and upgrade longer 7 segments of direct-buried cable around failure points, rather than repairing the cable as 8 failures occurred (id. at 89). However, he claims that the cost-per-mile of replacement 9 more than doubled when comparing the average cost-per-mile between 2019 and 2022 10 to the average cost-per-mile between 2022 and 2023, and that a “prudent utility” would 11 have re-evaluated the program “when its unit cost doubled” (Balakumar Testimony at 12 89). More specifically, Mr. Balakumar asserts that the record does not contain any 13 analysis, at the 2019 decision or when unit costs rose sharply in 2020 and 2022, 14 comparing full replacement with repair (id.). 15 recommends that PURA disallow approximately $26.5 million, 2 net of demonstrated 16 inflation, absent a contemporaneous analysis supporting full replacement (id. at 9, 89, 17 92). 18 Second, Mr. Balakumar argues that the Company needs to provide more documentation 19 to justify $145.4 million in projects that increase capacity. Specifically, he argues that 20 the Company must provide evidence showing that non-wires alternatives were On this basis, Mr. Balakumar Mr. Balakumar calculates this as the difference between (1) the Company’s cost of replacement for 67.6 miles between 2022 and 2023 at a cost of $76.45 million; and (2) the cost of the same work calculated using the 2019–2021 average cost of about $750,000 per mile, or about $50.0 million in total (Balakumar Testimony at 89). The difference between $76.5 million and $50 million equals $26.5 million. 2Page 7 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 5 of 32 1 considered and the load forecast and authorization documents for each Peak 2 Load/Capacity project placed in service from 2023 through 2025 (id. at 9, 87-88, 92). 3 Third, Mr. Balakumar raises a number of issues in areas he identifies as “pending 4 Company data,” without discussing the basis for his conclusions or making specific 5 recommendations and our testimony does not address these issues. Instead, our joint 6 rebuttal testimony addresses his claims on alleged improper budget overruns, direct- 7 buried cable replacements and capacity additions. 8 A. Actual Expenditures Exceeding Budget Plans 9 10 11 Q. How do you respond to Mr. Balakumar’s criticism that the Company’s capital expenditures show “weak cost control over the overall portfolio (Balakumar Testimony at 83)? 12 A. There is no validity to this claim whatsoever. The Company’s rigorous practices and 13 procedures are thoroughly documented in the record of this proceeding and the 14 Company’s capital spending is managed through a disciplined, multi-level process that 15 incorporates risk-based analysis, cross-functional review, formal authorization, and 16 independent oversight at every stage, from budget development to project execution 17 (see, e.g., Exh. CLP-ADDITIONS-1, at 12-45; CLP-ADDITIONS-10A through 10C; 18 OCC-966). Through the process, the capital expenditures in excess of budget represent 19 very deliberate decisions to accommodate work in a given fiscal period that must get 20 done in order to provide safe and reliable service to customers. Moreover, the alleged 21 over-spending that he has identified averages only 11% per year, at his own admission. 22 This is not a significant margin of variance given the pressing needs of the system andPage 8 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 6 of 32 1 the Company’s obligations to provide safe and reliable service under a wide range of 2 reasonably foreseeable circumstances and weather events. 3 4 Q. Is budget control an area that the Management Audit completed in 2025 examined in some detail? 5 A. Yes, considerable time and resources was devoted to the evaluation of the Company’s 6 capital and operating expense planning as part of the “Management Audit of 7 Eversource Energy’s Connecticut Companies,” published by PURA in February 2025 8 (Exhibit CLP-ELP-4). With respect to the Company’s annual capital plan and the 9 controls applicable to the execution of the annual capital plan, the final management 10 report made the following findings: 11 Chapter 1: Executive Management 12 13 14 15 16 Finding #29: All three CT Companies participate in two forward-looking planning processes: 1) a long-term, five-year, strategic capital plan (“Strategic Capital Plan” for CL&P … and 2) a detailed short-term, one-year capital and O&M budget (“Corporate Operating Plan” for CL&P … the “Annual Budgets”) that follows the Strategic Capital Plan/5-Year Plan processes. 17 18 19 20 Finding #33: Continuous updates to the [Long Range Plan] are made throughout the year to reflect changes in legislation, regulatory outcomes, prevailing economic conditions, or any other significant events. The resultant LRP spans a six-year period: the current year plus a five-year forecast. 21 22 23 24 25 Finding #34: Eversource’s LRP includes both a capital spending component and a broader five-year financial forecast. Each CT Company submits capital spending templates for their organization for consolidation into the Eversource LRP. Eversource’s Financial Strategy group maintains Eversource’s five-year financial forecast … which is later consolidated with Eversource’s. 26 27 28 Finding #36: The Vice President of [Financial Planning & Analysis] is responsible for keeping the Eversource CEO, Eversource CFO, and Eversource Controller apprised of monthly financial results and explanations of material budget variances.Page 9 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 7 of 32 1 2 3 4 5 6 7 Finding #37. Each CT Company President and their Operations and Planning departments, in collaboration with the Engineering department and embedded Eversource investment planning groups within the Finance organization, conduct more detailed capital and O&M budget planning processes after the Eversource LRP is reviewed by the Eversource [Board of Trustees] in June. The capital budgeting process starts with the first year of the LRP, which originates from the Strategic Capital Plan …. 8 9 10 11 12 13 14 15 16 17 18 19 20 Finding #38: The CT Company Presidents are responsible for managing their respective capital and O&M budgets throughout the year. Embedded employees from Eversource’s FP&A group communicate regularly with the CT Company Presidents to help them understand their results, and these employees review budget variances on a monthly basis. Each month, the CT Company Presidents and other direct reports present an operational, consolidated financial briefing to the Eversource COO. These briefings include key industry trends (supply chain disruptions, fuel pricings, etc.), O&M and capital budget variances at the operating company and major division level (safety, engineering, etc.), O&M budget and capital variances at the cost element level (Labor, Materials, etc.), … staffing capital and O&M budget variances including overtime analysis, storm expense and deferred costs to date by state, and operational items such as meter inventory and active work order counts. 21 22 23 24 Finding #40: CL&P regularly files with the Connecticut Public Utilities Regulatory Authority (“the PURA”) both the following year’s capital budget and a budget-to-actual comparison to their long-term capital forecast. Any variances greater than 10% must be noted and justified in the filing. 25 (Exhibit CLP-ELP-4, at pages 19-21). 26 Based on this in-depth assessment of the Company’s budget-control processes, the 27 Management Audit Report concluded that “[t]he Capital Plan vs Actual spend across 28 the three [CT] Companies were mostly within tolerance, and any variances were not 29 deemed systemic in nature” (Exhibit CLP-ELP-4, at page 25 of 443).Page 10 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 8 of 32 1 2 Q. Would you provide additional detail on the formulation of the annual capital budget and the processes that apply to mid-year adjustments to the plan? 3 A. Yes. CL&P’s capital program encompasses a range of project categories necessary to 4 build, maintain, improve and operate the electric distribution system safely and 5 reliably. The project categories are targeted at achieving safe and reliable operation, 6 enabling new customer growth, eliminating capacity limitations, supporting business 7 operations, and maintaining asset health, including remediation of equipment failures, 8 transformer replacements and third-party/joint ownership work. 9 From an overall perspective, Eversource’s capital-planning objective for its Operating 10 Companies is to develop capital budgets that represent the optimal balance of executing 11 infrastructure work necessary to maintain and improve the performance of the system, 12 while assuring a cost-efficient use of the capital resources. Risk-based assessments are 13 used to prioritize and rank potential infrastructure projects in accordance with budget 14 targets. At the same time, Eversource maintains a level of flexibility in the budget 15 process to deal with contingencies that inevitably occur during the year. 16 The Company’s capital and operating expense budgets are developed through a 17 rigorous, risk-based and cross-functional process. The capital planning process begins 18 mid-year with a meeting of the Planning Group, which includes staff from Engineering, 19 Electric Operations, and Finance. Each operating area submits its capital plan and 20 resource needs to the CL&P President and Chief Operating Officer for review before 21 submission to the Planning Group. The Planning Group evaluates these plans using
Text of Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf
Extracted from the file · 8 pages · 21,808 characters
Text of Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED.pdf
Extracted from the file · 502 pages · 144,946 characters
As listed on the current system
Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO [26-05-10]