  1. Page 11 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 9 of 32 1 five-year planning models, measuring them against operational performance targets 2 and financial objectives. 3 comprehensive analyses of system risks and requirements, aligned with budgetary 4 targets. The Company selects individual projects based on analytical assessments from 5 system modeling, methodological studies, and observed data, considering factors such 6 as aging infrastructure, system conditions, reliability, customer growth, and resource 7 availability. 8 The annual capital plan for CL&P is developed by Electric Engineering with input from 9 Electric Operations (including the CL&P President) on a project-specific basis, in line 10 with the financial and performance targets established within the Strategic Plan. The 11 capital plan involves a combination of individual major capital projects; capital 12 programs composed of “sub-projects;” and “line of business” work (for example, non- 13 discretionary core projects) to be funded during the upcoming year. A variety of factors 14 are considered in determining which capital investments are necessary to achieve 15 operating objectives, including but not limited to aging infrastructure needs, system 16 conditions, reliability performance, new customer growth and resource availability. 17 Multi-year funding for major projects is also reviewed through the annual budgeting 18 process. The CL&P capital plan is developed through a detailed prioritization process 19 identifying the appropriate mix of work that will best address system-related issues 20 while adhering to financial and performance targets established in the Strategic 21 Planning process. The Company prioritizes and ranks projects through
  2. Page 12 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 10 of 32 1 Second, the Company’s spending plan undergoes rigorous senior and Board-level 2 oversight. After finalization, the Chief Financial Officer presents the budget to the 3 Eversource Board of Trustees Finance & Risk Committee for review. Multiyear 4 funding for major projects is also reviewed as part of the annual budgeting process. 5 Contrary to Mr. Balakumar’s assertion, the plan reviewed by the Board is a budget 6 forecast, not a spending cap. It is common for project needs to arise after Board 7 approval, and deviations are a normal aspect of the capital program. 8 Third, every capital project is evaluated under a formal Project Authorization Policy 9 (“PAP”), which establishes a clear framework for decision-making, evaluation, and 10 approval of capital spending. The Company records authorizations in the PowerPlan 11 system, the central repository for all authorizations, and approves projects according to 12 the Delegation of Authority (“DOA”), with all required sign-offs. The Company has 13 provided these policies as evidence in this proceeding (Exhs. CLP-ADDITIONS-10A 14 through 10C). 15 16 Q. What types of controls apply over the course of the year, as individual projects are developed and initiated? 17 A. On a monthly basis, detailed O&M and Capital reports are generated for each 18 functional organization in the Financial Performance System (FPS) dashboard 19 application. 20 organization, as well as subordinates and analysts that oversee cost control centers 21 within the functional organization. The O&M detail reports provide actual, budget and These reports can be accessed by the owners of each functional
  3. Page 13 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 11 of 32 1 variance information by cost category. The capital detail reports provide actual, budget 2 and variance information by project category. Budget analysts communicate regularly 3 with the owners of each functional organization to assist in understanding their area 4 financial results and the drivers of variances. In addition, budget analysts meet monthly 5 with the Vice President and Director of Financial Planning and Analysis to review the 6 O&M and capital detail reports by organization and discuss the major drivers of the 7 variances. 8 In addition, as discussed in Exhibit CLP-ADDITIONS-1, the Company’s PAP imposes 9 strict cost controls on capital projects. A Project Authorization Form (“PAF”) must be 10 completed, and the project budget approved, for any project that meets or exceeds the 11 PAP’s cost thresholds. If a project’s costs are anticipated to exceed the authorized 12 budget, whether because of a change in scope or a revised cost estimate, the project 13 manager and project originator must promptly submit a Supplemental Authorization 14 Form (“SAF”). The SAF is approved under the DOA policy based on the project’s 15 revised total cost, and the Vice President of Financial Planning and Analysis or a 16 designee must approve every SAF reflecting a cost increase of $1 million or more. This 17 requirement keeps senior management informed of cost drivers while projects are still 18 in development, so that management can assess near-term and long-term steps to 19 contain costs and deploy the Company’s resources efficiently. Any PAF or SAF may 20 be rejected at any stage, including for insufficient detail, unsupported estimates, or
  4. Page 14 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 12 of 32 1 constructability concerns. In that event, the project initiator must address each reason 2 for rejection before resubmitting the form for review and approval. 3 In this context, if individual projects emerge that were not part of the budget, or if 4 project cost for individual projects increase due to various factors, then the Company 5 may defer projects or shift construction schedules to remain within the overall annual 6 expenditure budget. If additional funding is needed due to unforeseen circumstances, 7 then the Project Manager is required to seek approval through a supplemental review 8 for additional funding through CPAC or EPAC, which are the review committees for 9 distribution line projects and substation projects, respectively. The total annual capital 10 budget is not considered when evaluating and developing individual project cost. 11 Instead, the summation of all the individual projects in the capital plan comprise the 12 total annual expenditure and individual projects are prioritized and may be deferred or 13 modified to meet the annual, overall expenditure budget. 14 CL&P also has enhanced independent oversight. In June 2022, as a provision of the 15 2021 Storm Settlement in Docket No. 17-12-03RE11, the CL&P Subsidiary Board was 16 expanded to include three independent board members. This board now reviews 17 CL&P’s financial results, including capital investments, and approves larger-scale 18 capital projects as required under the Delegation of Authority Policy. In addition, the 19 Company has recently put in place an enhanced iteration of its existing capital 20 governance process that pulls all internal stakeholders together in a monthly meeting
  5. Page 15 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 13 of 32 1 to discuss progress and performance on the capital plan centered around execution of 2 project work and impact to capital budgets. 3 In this context of these controls, the Company’s budget process is both disciplined and 4 adaptable. The budget process remains flexible to accommodate contingencies and 5 emerging system needs or financial developments throughout the year. 6 Company’s primary objective is to maintain an optimal balance between essential 7 infrastructure work and cost-effective capital allocation. The 8 9 Q. Do you have an analysis of the drivers of the budget variance in 2018 and 2023, which are project years that Mr. Balakumar calls out in his testimony? 10 A. Yes. As part of the Company’s compliance in Docket No. 17-10-46 and the 2018 Rate 11 Settlement, the Company is required to file a report each year providing information 12 on the capital budget plan and the drivers of variances by program category. 13 Specifically, the Company is required to make filings each year as compliance with 14 Order No. 11, in Docket No. 17-10-46, Application of The Connecticut Light and 15 Power Company d/b/a Eversource Energy for an Amendment of Rate Tariffs, decision 16 issued April 18, 2018. The Company is providing the Order No. 11 compliance reports 17 for 2018 and 2023, herewith, as Exhibits CLP-ADDITIONS-REBUTTAL-2 and CLP- 18 ADDITIONS-REBUTTAL-3, for ease of reference. These compliance filings provide 19 specific information on the drivers of the budget variance and an explanation as to the 20 reasons that the Company’s capital additions were reasonable and prudent in those 21 years.
  6. Page 16 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 14 of 32 B. 1 Direct Buried Cable 2 3 Q. How do you respond to Mr. Balakumar’s claims with respect to the costs-per-mile associated with the direct buried cable replacement program? 4 A. First, an important point to remember is the replacement of direct buried cable is part 5 of the Company’s Core Capital program, which means that the capital investment is 6 recovered through the annual Electric System Infrastructure charge, which PURA 7 reviews annually. More specifically, PURA reviewed the decision surrounding the 8 Company’s decision to transition to a replacement program in the 2019 timeframe in 9 Docket No. 21-01-03 and found those projects to be eligible for recovery through rates. 10 In addition, Exhibit CLP-CAPITAL-REBUTTAL-4 provides a copy of a compliance 11 filing that the Company made on December 11, 2019, in Docket No. 17-10-46, 12 Application of The Connecticut Light and Power Company d/b/a Eversource Energy 13 for an Amendment of Rate Tariffs, decision issued April 18, 2018 (compliance with 14 Order No. 4), which reviews the basis for the 2019 decision to transition the program 15 from a repair to replacement strategy. 16 contemporaneous justification for its decision to modify its approach to the replacement 17 of direct-buried cable. 18 Following this program change in 2019, the Company continued to innovate on its 19 construction methods for this replacement program. As Mr. Balakumar acknowledges, 20 beginning in 2024, the Company instituted a hybrid approach combining proactive 21 replacements with repair work to extend the life of segments that had not experienced 22 as many failures. This new approach has reduced the amount of miles replaced, the This filing provided PURA with
  7. Page 17 of 34Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 15 of 32 1 time for construction and the inconvenience to customers associated with planned 2 outages to accommodate the construction, helping to mitigate construction cost 3 increases driven by increases in labor and materials costs. 4 5 Q. What was the basis for the Company’s decision to transition to a full-scale replacement program for direct-buried cable beginning in 2019? 6 A. Capital additions made through the Company’s URD/DB Cable Reliability program 7 were completed to address direct buried cable for reliability performance and repetitive 8 events. The distribution system encompasses a substantial component of direct-buried 9 cable in residential areas, which was placed in the ground in the 1970s and 1980s. At 10 the time, the installation of the cable did not include any conduit. Utility companies 11 simply dug a trench, put the cable into the ground, and hooked it up to the system. In 12 the last 10 to 20 years, the direct-buried cable has been failing at an exponentially 13 increasing rate. Historically, the Company would repair the cable when it failed rather 14 than replacing it because the cable could generally continue to be used and did not 15 require elimination. 16 In 2018, it became clear that the repair strategy was no longer a viable method to triage 17 direct-buried cable failures given that engineering analysis showed that the cable was 18 failing repeatedly in the same areas requiring multiple field visits and repeat outages to 19 customers. Through this assessment, the Company determined that the repair strategy 20 should be substituted for a replacement strategy to achieve a more cost-effective 21 outcome as well as address the cable asset condition as a result in being direct buried
  8. Page 18 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 16 of 32 1 installed where the soil conditions have accelerated the degradation of the cable 2 integrity. A repair strategy works if the repairs are occasional and the remainder of the 3 cable remains in good condition. However, the analysis showed that replacement of 4 this failing cable over the long term was a superior, permanent solution that would 5 greatly improve reliability of service, and replacement of this faulty equipment would 6 eliminate the need to continue to remediate temporary repairs that require additional 7 work in the future. From a customer and operations perspective, the issue with the 8 failing direct-buried cable is resolved when the Company replaces it. Accordingly, 9 starting in 2019, it was necessary to institute a course of replacement with annual 10 replacement targets. The replacement program was designed to improve system 11 reliability by minimizing the likelihood of recurring outages on the same cable and 12 eliminating recurring field responses. The Company provided additional details about 13 its URD-DB cable reliability program in its December 11, 2019 compliance filing in 14 Docket No. 17-10-46 at Exhibit 1(b), Pages 2-3, which is reproduced as Exhibit CLP- 15 ADDITIONS-REBUTTAL-4, with this testimony. 16 17 18 Q. What information did the Company rely on in making its decision to change its program approach in 2024 to implement a hybrid repair and replacement approach? 19 A. In 2024, based on its experience over the previous five years, the Company decided to 20 make a change to its program approach to mitigate the impact on customers and to 21 reduce the overall cost of the program. This change resulted primarily from an 22 assessment of customer impact rather than any technical assessment. The Company’s
  9. Page 19 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 17 of 32 1 experience over the years 2019 to 2024 was that customers were highly inconvenienced 2 by the planned service outages that are necessary to accommodate the replacement of 3 underground electric facilities providing service to customer premises. To address this 4 inconvenience, the Company found it necessary to use temporary on-site generation to 5 maintain a level of service to the affected customers during the replacement work, 6 adding unanticipated complications and cost to the overall project. The Company 7 determined that, with the hybrid approach, the Company can be more strategic about 8 where and when it implements a replacement approach and can do so within 9 implicating the need for on-site generation to mitigate the impacts of the work on 10 customers. 11 Q. What is the inherent flaw in Mr. Balakumar’s cost-per-mile view on prudence? 12 A. Mr. Balakumar’s cost-per-mile approach is not a reasonable or valid perspective to 13 determine the merits of the Company’s operational strategy. For one thing, Mr. 14 Balakumar’s approach quite simply compares a pre-COVID program cost (2019-2021) 15 to a post-COVID program cost (2022-2023), which is a cost change that had nothing 16 to do with the Company’s 2019 transition to a replacement approach, but rather 17 coincides directly with the supply chain issues and inflation trends that occurred in 18 2022 and 2023. Reproducing the cost-per-mile information submitted by the Company 19 in response to OCC-798, it is clear that there is a break between the 2019-2021 period 20 and the 2022-2025 period, which coincides directly with the post-COVID inflation 21 impacts on construction costs.
  10. Page 20 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 18 of 32 Cost Per Mile 1 Year 2017 2018 2019 2020 2021 2022 2023 2024 2025 Cost Per Mile $399,571 $653,419 $567,974 $906,990 $803,309 $1,229,449 $1,050,430 $1,190,929 $1,250,441 2 3 Based on these figures, the average cost-per-mile in the 2019 to 2021 timeframe was 4 approximately $750,000, as noted by Mr. Balakumar (Balakumar Testimony at 89), 5 increasing to approximately $1,140,000 in the 2022 to 2023 timeframe, and now 6 stabilized ($1,180,000 for the time frame 2022 through 2025). In this time period, the 7 primary drivers of cost increased in the range of 50 percent between the pre-COVID 8 and post-COVID time frame. The drivers of program costs reflect this increase, as 9 follows: Cost Element 10 Materials Contractors Engineering, supervision, lobby stock and vehicles Average Cost per Mile 2019-2021 $24,633 $401,808 $320,211 Average Cost per Mile 2022-2023 $35,653 $604,828 $474,706 Percent Change 45% 51% 48% 11 In addition, the “cost-per-mile” is not simply the labor and material to replace a direct- 12 buried cable, but for this program, it is the total cost to restore power to customer as
Words on different pages
1 page match

Text of Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf

Extracted from the file · 8 pages · 21,808 characters

Text of Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED.pdf

Extracted from the file · 502 pages · 144,946 characters

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO [26-05-10]

This filing on the current system (opens in a new tab)