  1. Page 15 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 13 of 32 1 to discuss progress and performance on the capital plan centered around execution of 2 project work and impact to capital budgets. 3 In this context of these controls, the Company’s budget process is both disciplined and 4 adaptable. The budget process remains flexible to accommodate contingencies and 5 emerging system needs or financial developments throughout the year. 6 Company’s primary objective is to maintain an optimal balance between essential 7 infrastructure work and cost-effective capital allocation. The 8 9 Q. Do you have an analysis of the drivers of the budget variance in 2018 and 2023, which are project years that Mr. Balakumar calls out in his testimony? 10 A. Yes. As part of the Company’s compliance in Docket No. 17-10-46 and the 2018 Rate 11 Settlement, the Company is required to file a report each year providing information 12 on the capital budget plan and the drivers of variances by program category. 13 Specifically, the Company is required to make filings each year as compliance with 14 Order No. 11, in Docket No. 17-10-46, Application of The Connecticut Light and 15 Power Company d/b/a Eversource Energy for an Amendment of Rate Tariffs, decision 16 issued April 18, 2018. The Company is providing the Order No. 11 compliance reports 17 for 2018 and 2023, herewith, as Exhibits CLP-ADDITIONS-REBUTTAL-2 and CLP- 18 ADDITIONS-REBUTTAL-3, for ease of reference. These compliance filings provide 19 specific information on the drivers of the budget variance and an explanation as to the 20 reasons that the Company’s capital additions were reasonable and prudent in those 21 years.
  2. Page 16 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 14 of 32 B. 1 Direct Buried Cable 2 3 Q. How do you respond to Mr. Balakumar’s claims with respect to the costs-per-mile associated with the direct buried cable replacement program? 4 A. First, an important point to remember is the replacement of direct buried cable is part 5 of the Company’s Core Capital program, which means that the capital investment is 6 recovered through the annual Electric System Infrastructure charge, which PURA 7 reviews annually. More specifically, PURA reviewed the decision surrounding the 8 Company’s decision to transition to a replacement program in the 2019 timeframe in 9 Docket No. 21-01-03 and found those projects to be eligible for recovery through rates. 10 In addition, Exhibit CLP-CAPITAL-REBUTTAL-4 provides a copy of a compliance 11 filing that the Company made on December 11, 2019, in Docket No. 17-10-46, 12 Application of The Connecticut Light and Power Company d/b/a Eversource Energy 13 for an Amendment of Rate Tariffs, decision issued April 18, 2018 (compliance with 14 Order No. 4), which reviews the basis for the 2019 decision to transition the program 15 from a repair to replacement strategy. 16 contemporaneous justification for its decision to modify its approach to the replacement 17 of direct-buried cable. 18 Following this program change in 2019, the Company continued to innovate on its 19 construction methods for this replacement program. As Mr. Balakumar acknowledges, 20 beginning in 2024, the Company instituted a hybrid approach combining proactive 21 replacements with repair work to extend the life of segments that had not experienced 22 as many failures. This new approach has reduced the amount of miles replaced, the This filing provided PURA with
  3. Page 17 of 34Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 15 of 32 1 time for construction and the inconvenience to customers associated with planned 2 outages to accommodate the construction, helping to mitigate construction cost 3 increases driven by increases in labor and materials costs. 4 5 Q. What was the basis for the Company’s decision to transition to a full-scale replacement program for direct-buried cable beginning in 2019? 6 A. Capital additions made through the Company’s URD/DB Cable Reliability program 7 were completed to address direct buried cable for reliability performance and repetitive 8 events. The distribution system encompasses a substantial component of direct-buried 9 cable in residential areas, which was placed in the ground in the 1970s and 1980s. At 10 the time, the installation of the cable did not include any conduit. Utility companies 11 simply dug a trench, put the cable into the ground, and hooked it up to the system. In 12 the last 10 to 20 years, the direct-buried cable has been failing at an exponentially 13 increasing rate. Historically, the Company would repair the cable when it failed rather 14 than replacing it because the cable could generally continue to be used and did not 15 require elimination. 16 In 2018, it became clear that the repair strategy was no longer a viable method to triage 17 direct-buried cable failures given that engineering analysis showed that the cable was 18 failing repeatedly in the same areas requiring multiple field visits and repeat outages to 19 customers. Through this assessment, the Company determined that the repair strategy 20 should be substituted for a replacement strategy to achieve a more cost-effective 21 outcome as well as address the cable asset condition as a result in being direct buried
  4. Page 18 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 16 of 32 1 installed where the soil conditions have accelerated the degradation of the cable 2 integrity. A repair strategy works if the repairs are occasional and the remainder of the 3 cable remains in good condition. However, the analysis showed that replacement of 4 this failing cable over the long term was a superior, permanent solution that would 5 greatly improve reliability of service, and replacement of this faulty equipment would 6 eliminate the need to continue to remediate temporary repairs that require additional 7 work in the future. From a customer and operations perspective, the issue with the 8 failing direct-buried cable is resolved when the Company replaces it. Accordingly, 9 starting in 2019, it was necessary to institute a course of replacement with annual 10 replacement targets. The replacement program was designed to improve system 11 reliability by minimizing the likelihood of recurring outages on the same cable and 12 eliminating recurring field responses. The Company provided additional details about 13 its URD-DB cable reliability program in its December 11, 2019 compliance filing in 14 Docket No. 17-10-46 at Exhibit 1(b), Pages 2-3, which is reproduced as Exhibit CLP- 15 ADDITIONS-REBUTTAL-4, with this testimony. 16 17 18 Q. What information did the Company rely on in making its decision to change its program approach in 2024 to implement a hybrid repair and replacement approach? 19 A. In 2024, based on its experience over the previous five years, the Company decided to 20 make a change to its program approach to mitigate the impact on customers and to 21 reduce the overall cost of the program. This change resulted primarily from an 22 assessment of customer impact rather than any technical assessment. The Company’s
  5. Page 19 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 17 of 32 1 experience over the years 2019 to 2024 was that customers were highly inconvenienced 2 by the planned service outages that are necessary to accommodate the replacement of 3 underground electric facilities providing service to customer premises. To address this 4 inconvenience, the Company found it necessary to use temporary on-site generation to 5 maintain a level of service to the affected customers during the replacement work, 6 adding unanticipated complications and cost to the overall project. The Company 7 determined that, with the hybrid approach, the Company can be more strategic about 8 where and when it implements a replacement approach and can do so within 9 implicating the need for on-site generation to mitigate the impacts of the work on 10 customers. 11 Q. What is the inherent flaw in Mr. Balakumar’s cost-per-mile view on prudence? 12 A. Mr. Balakumar’s cost-per-mile approach is not a reasonable or valid perspective to 13 determine the merits of the Company’s operational strategy. For one thing, Mr. 14 Balakumar’s approach quite simply compares a pre-COVID program cost (2019-2021) 15 to a post-COVID program cost (2022-2023), which is a cost change that had nothing 16 to do with the Company’s 2019 transition to a replacement approach, but rather 17 coincides directly with the supply chain issues and inflation trends that occurred in 18 2022 and 2023. Reproducing the cost-per-mile information submitted by the Company 19 in response to OCC-798, it is clear that there is a break between the 2019-2021 period 20 and the 2022-2025 period, which coincides directly with the post-COVID inflation 21 impacts on construction costs.
  6. Page 20 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 18 of 32 Cost Per Mile 1 Year 2017 2018 2019 2020 2021 2022 2023 2024 2025 Cost Per Mile $399,571 $653,419 $567,974 $906,990 $803,309 $1,229,449 $1,050,430 $1,190,929 $1,250,441 2 3 Based on these figures, the average cost-per-mile in the 2019 to 2021 timeframe was 4 approximately $750,000, as noted by Mr. Balakumar (Balakumar Testimony at 89), 5 increasing to approximately $1,140,000 in the 2022 to 2023 timeframe, and now 6 stabilized ($1,180,000 for the time frame 2022 through 2025). In this time period, the 7 primary drivers of cost increased in the range of 50 percent between the pre-COVID 8 and post-COVID time frame. The drivers of program costs reflect this increase, as 9 follows: Cost Element 10 Materials Contractors Engineering, supervision, lobby stock and vehicles Average Cost per Mile 2019-2021 $24,633 $401,808 $320,211 Average Cost per Mile 2022-2023 $35,653 $604,828 $474,706 Percent Change 45% 51% 48% 11 In addition, the “cost-per-mile” is not simply the labor and material to replace a direct- 12 buried cable, but for this program, it is the total cost to restore power to customer as
  7. Page 21 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 19 of 32 1 part of the replacement project, including the cost of civil work, on-site generation and 2 other efforts that require additional cost to get the work done. 3 Thus, the central flaw of Mr. Balakumar’s theory is that the changes in cost-per-mile 4 do not coincide with the years in which the Company made changes to its replacement 5 strategy. In the years 2017-2019, the Company’s costs per mile were stable – in the 6 range of $600,000 per mile, until COVID occurred in 2020, starting the upward cost 7 trend. Similarly, the cost-per-mile in 2024 and 2025 is the same as in 2022 – in the 8 range of $1.1 to $1.2 million per mile, although the Company transitioned to a hybrid 9 repair/replacement strategy in 2024. As a result, it is not the Company’s change in 10 program strategy that is driving the cost change. Instead, the Company decided to 11 transition to the repair/replacement strategy to mitigate the impact and inconvenience 12 of the program for customers, while reducing the overall cost of the program as 13 compared to other priorities that the Company has. This is a feasible transition because 14 the Company can maintain reliability through the hybrid repair without needing to rely 15 on as much replacement work as in the past. 16 Without accounting for the impact of post-COVID construction cost changes, Mr. 17 Balakumar’s extrapolation of historical average costs to subsequent years does not 18 demonstrate that the additional expenditures were unreasonable or could have been 19 avoided. Nor does the Company’s adoption of a hybrid replacement and repair strategy 20 suggest that the prior replacement program was imprudent – after COVID, the cost- 21 per-mile for replacement is the same for the hybrid strategy as it was for the
  8. Page 22 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 20 of 32 1 replacement strategy. Instead, the Company’s decision reflected a prudent 2 reassessment of its approach in light of operating experience with customer impacts 3 and changing system needs, calling for a reprioritization and reallocation of capital 4 resources. The Company’s modification of the program in response to new information 5 does not mean the original decisions were unreasonable or imprudent when they were 6 made. 7 As a result, Mr. Balakumar’s proposed adjustment lacks a sound factual and analytical 8 basis for concluding that the Company’s expenditures were imprudent. 9 C. Capacity Projects 10 11 12 Q. Please summarize the portion of Mr. Balakumar’s testimony that is specific to his conclusions and recommendations regarding certain capacity projects placed into service between 2023 and 2025. 13 A. Mr. Balakumar argues that PURA should require the Company produce, before the 14 record closes, the contemporaneous evaluation of non-wires alternatives (“NWAs”), 15 the load forecast and the authorization documents for each Peak Load/Capacity project 16 placed in service from 2023 through 2025 with a total investment of $145.4 million 17 (Balakumar Testimony at 92). In the event that the Company cannot provide the 18 relevant documentation, Mr. Balakumar recommends that PURA determine that the 19 project(s) were imprudent and disallow the cost above the least-cost alternative where 20 one was available (id. at 92-93). We do not agree with this conclusion.
  9. Page 23 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 21 of 32 1 Q. What does Mr. Balakumar rely on to support this recommendation? 2 A. Mr. Balakumar contends that the record currently does not contain sufficient evidence 3 to determine if the Company evaluated lower-cost alternatives before it built the 4 capacity projects placed in service from 2023 through 2025 (Balakumar Testimony at 5 86). In reaching this conclusion, Mr. Balakumar relies primarily on the Company’s 6 response to OCC-805, which requested that the Company address each substation 7 capacity project undertaken during 2017 through 2025, with the load forecast and 8 planning criterion relied upon at authorization; the measured peak load in the five years 9 after in-service; the total cost; and any non-wires alternative evaluation. 10 According to Mr. Balakumar, capacity needs that are modest in size or short in duration 11 are where lower-cost alternatives are most likely to be viable (id. at 86). He references 12 the Company’s Project Authorization Forms (“PAFs”), as well as the 2021 NWA 13 Framework (OCC-578, Attachment 1), as requiring NWA analyses for capacity 14 projects (id.). 15 Next, Mr. Balakumar refers to the Company’s response to OCC-805, Attachment 1, to 16 arrive at the conclusion that the record does not show that the Company applied the 17 required NWA analyses to the capacity projects included in OCC-805, Attachment 1 18 (id. at 88). This conclusion underpins his recommendations to PURA. 19 Q. Are his conclusions regarding the 2021 NWA Framework accurate? 20 A. No. In his testimony, Mr. Balakumar claims that the Company’s response to OCC- 21 805, Attachment 1 does not identify the NWAs considered, their cost relative to the
  10. Page 24 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 22 of 32 1 wires solution, or why they were not selected (Balakumar Testimony at 88). However, 2 this statement rests on the presumption that the Company develops full NWA cost 3 estimates for all capacity projects, which it does not – in accordance with the 4 Company’s screening framework. 5 Importantly, the Company endeavored to submit its 2021 NWA Framework to PURA 6 as part of PURA’s Docket No. 17-12-03RE07 several times and PURA chose not to 7 engage with the Company on this framework, instead opting to create an entirely new 8 process, which took several years to develop (PURA did not require Eversource to 9 follow a PURA-mandated formal NWS framework until 1/1/2025). Consequently, the 10 Company applied its own screening process to review solutions while PURA 11 deliberated on its new process. Thus, as set out in OCC-578, Attachment 1, at 7, the 12 Company utilized an NWA Screening Tool as part of its own 2021 NWA Framework 13 to quickly evaluate the potential applicability of NWA solutions to meet capacity 14 project needs at specific locations, with the intent that only sites that are suitable and 15 viable for NWA solutions will move to a more detailed, engineering analysis stage. 16 The NWA Screening Tool enables rapid initial screening of NWA options against 17 traditional system upgrade projects but does not provide detailed and accurate costing 18 or technical solution design (id.). Once an NWA solution passes the NWA Screening 19 stage as a suitable and technically viable solution, the Company will perform detailed 20 steady-state and transient analysis studies as well as develop engineering designs and 21 cost estimates for the identified solution (id.). It is important to note that it is still
Words on different pages
1 page match

Text of Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf

Extracted from the file · 8 pages · 21,808 characters

Text of Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED.pdf

Extracted from the file · 502 pages · 144,946 characters

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO [26-05-10]

This filing on the current system (opens in a new tab)