Prefiled testimony
Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO
Files6
Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
PDF · 152 KB · 3 pagesText searchable
Download Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdfRead the text of Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
Exhibit CLP-ADDITIONS-REBUTTAL-1.pdf
PDF · 361 KB · 34 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-1.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-1.pdf
Exhibit CLP-ADDITIONS-REBUTTAL-2.pdf
PDF · 872 KB · 6 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-2.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-2.pdf
Exhibit CLP-ADDITIONS-REBUTTAL-3.pdf
PDF · 6.7 MB · 73 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-3.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-3.pdf
Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf
PDF · 1.1 MB · 8 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-4.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf
Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED.pdf
PDF · 52 MB · 502 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED.pdf
Page 25 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 23 of 32 1 possible that an NWA solution will ultimately not be selected as the preferred solution 2 due to inferior technical or cost elements (id.). 3 Consistent with the Company’s focus on using finite resources efficiently and 4 effectively, Eversource uses this initial screening to ensure that, from a practical and 5 Company policy standpoint, the identified capital project does not pose any 6 insurmountable obstacles for an NWA solution before further analysis is conducted (id. 7 at 9). To this end, the Critical Suitability Criteria included in the NWA Screening Tool 8 poses a go-no-go decision point in the NWA screening process. Any project site that 9 does not pass both criteria listed below will be disqualified from further NWA 10 consideration and the Company will move forward with developing a traditional 11 solution: 12 • 13 14 Asset Health Index < 0.5: Any substation with a transformer’s asset health index above 0.5 will not be considered as an NWA candidate; and • Year of First Violation ≥ 2: Any constraint that appears with two or fewer years 15 from the base year will not be considered for an NWA solution, as the 16 timeframes for solution design and procurement would not be amenable, and a 17 traditional solution provides a faster and safer alternative to address the issues 18 identified at the site (id.). 19 Based on the design of the NWA Framework, as well as the Company’s commitment 20 to cost-effective utilization of its resources, no further analysis will be performed toPage 26 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 24 of 32 1 engineer or design an NWA solution for an identified capital project if the NWA 2 solution does not pass the NWA Screening stage, and is therefore considered non- 3 viable. 4 Accordingly, Mr. Balakumar is incorrect in concluding that NWA analyses will always 5 be accompanied by well-developed designs and cost estimates. 6 7 Q. Were all of the capacity projects included in OCC-805, Attachment 1 required to be screened under the 2021 NWA Framework? 8 A. No. A review of the 10 in-service capacity projects included in OCC-805, Attachment 9 1 indicates that five of the projects (CS00273, CS00272, CS00247, 201444, and 10 CS00061) were placed into service in either 2018 or 2019, well before the Company, 11 on its own initiative, developed and implemented the 2021 NWA Framework. Further, 12 the 2021 NWA Framework, which the Company developed and implemented on its 13 own initiative, could not be utilized retroactively as the wires solutions were already 14 placed into service. 15 Although Projects CS00273, CS00272, CS00247, 201444, and CS00061 could not be 16 screened under the 2021 NWA Framework, the Company still identified and evaluated 17 wires alternatives to the selected wires solution. All of the PAFs associated with 18 Projects CS00273, CS00272, CS00247, 201444, and CS00061 include alternatives 19 along with a technical and/or operational explanation supporting the chosen solution. 20 The PAFs also include explanations regarding the limits or deficiencies associated with 21 the alternatives that ultimately led the Company’s subject matter experts to discard thePage 27 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 25 of 32 1 alternatives in favor of the selected solution. The relevant PAFs are being provided as 2 Exhibit CLP-ADDITIONS-REBUTTAL-8 for ease of review. 3 4 Q. Are Mr. Balakumar’s conclusions about the remaining projects on OCC-805, Attachment 1 correct? 5 A. No. Again, a review of the project documentation the Company provided for Projects 6 CS00365, CS00284, CS00516, CS00261, and CS00166 demonstrates that these 7 projects either failed to pass the NWA Screening or were presented to and approved by 8 the Solution Design Committee (“SDC”) 3 prior to the development and implementation 9 of the 2021 NWA Framework. Given its focus on efficiently and effectively utilizing 10 its resources and funds to ensure that customers receive safe and reliable service, the 11 Company does not retroactively apply the 2021 NWA Framework to wires solutions 12 that have already been approved by the SDC and are progressing through final design 13 and construction. Due to this, a number of the projects were not analyzed under the 14 2021 NWA Framework based on the year they were presented to and approved by the 15 SDC. We address each of the projects below. The relevant PAFs are being provided 16 as Exhibit CLP-ADDITIONS-REBUTTAL-8 for ease of review. 17 3 The SDC’s role is to ensure that the best solution for the identified need is selected (Exhibit CLPADDITIONS-1, at 36). The SDC reviews the selected solution, as well as the project alternatives, scope and conceptual grade cost estimates during the solution vetting process (id.). Following its review, the SDC will confirm that the project initiator has selected the best solution for the identified need (id.).Page 28 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 26 of 32 1 • Project CS00166 – as shown on page 27 of the PAF, this project was presented 2 to the SDC on November 13, 2019. The SDC reviewed the preferred solution, 3 as well as the alternative solutions described on pages 27 through 29 of the PAF. 4 Following this review, the SDC approved the chosen wires solution. Even if 5 Project CS00166 had been subject to the 2021 NWA Framework, the 6 information included in the PAF’s project need and justification sections 7 demonstrates that the capacity needs associated with the project could not be 8 characterized as modest in size or short in duration, making them suitable for 9 lower-cost alternatives such as NWAs (Balakumar Testimony at 86). 10 • Project CS00261 – As shown on pages 1 and 18 of the PAF, this project was 11 presented to the SDC on February 19, 2020. The SDC reviewed the preferred 12 solution, as well as the alternative solutions described on pages 18 through 21 13 of the PAF. Following this review, the SDC approved the chosen wires 14 solution. Even if Project CS00261 had been subject to the 2021 NWA 15 Framework, the information included in the PAF’s project need and 16 justification sections demonstrates that the capacity needs associated with the 17 project could not be characterized as modest in size or short in duration, making 18 them suitable for lower-cost alternatives such as NWAs (Balakumar Testimony 19 at 86). 20 21 • Project CS00516 – As shown on page 1 of the PAF, the alternatives and complete preferred project scope was presented to the SDC on December 8,Page 29 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 27 of 32 1 2021. The information provided on pages 5 and 10 of the PAF demonstrate that 2 this project did not pass the NWA Screening Tool due to the poor health index 3 of the transformers at issue in connection with this project, meaning that an 4 NWA was not viable to address the capacity issues identified by the Company. 5 Accordingly, since the project did not pass the NWA Screening Tool, the 6 Company did not expend further resources or funds on analyzing NWA 7 solutions. The SDC reviewed the preferred solution, as well as the alternative 8 solutions described on pages 9 and 10 of the PAF. Following this review, the 9 SDC approved the chosen wires solution. 10 • Project CS00284 - As shown on page 21 of the PAF, this project was presented 11 to the SDC on July 8, 2020. The SDC reviewed the preferred solution, as well 12 as the alternative solutions described on pages 21-27 of the PAF. Following 13 this review, the SDC approved the chosen wires solution. Even if Project 14 CS00284 had been subject to the 2021 NWA Framework, the information 15 included in the PAF’s project need and justification sections demonstrates that 16 the capacity needs associated with the project could not be characterized as 17 modest in size or short in duration, making them suitable for lower-cost 18 alternatives such as NWAs (Balakumar Testimony at 86). 19 Project CS00365 – following extensive technical review, the Company’s 20 subject matter experts (“SMEs”) determined that 21 appropriate solution for this project. an NWA was not an Specifically, the Company’s SMEsPage 30 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 28 of 32 1 determined that a battery energy storage system (“BESS”) was not feasible for 2 a number of reasons, including: (1) the size of the BESS that would be required 3 to address the identified capacity issues; (2) that the transformer assets, given 4 their age and condition, would not pass the NWA screening; and (3) the fact 5 that a BESS would not provide any of the same benefits that the Company, and 6 its customers, would realize through converting the substation from 27.6 kV 7 voltage to 23 kV. Following a review of the preferred project scope, as well as 8 the alternatives, the SDC approved the preferred scope on May 26, 2021. 9 10 11 Q. Do you agree with Mr. Balakumar’s recommendation that PURA disallow certain costs associated with the capacity projects listed OCC-805, Attachment 1 if the overload forecasts supporting those projects did not occur? 12 A. No, we do not agree with that. On page 88 of his testimony, Mr. Balakumar states that 13 if after further discovery, the record shows that the Company built capacity without 14 evaluating lower-cost alternatives, or that the forecast overloads did not occur, he plans 15 to recommend that PURA disallow the difference between the cost of the project and 16 the cost of the least-cost alternative. As discussed above, the Company did consider 17 lower-cost alternatives to the chosen capacity solutions, either through its 2021 NWA 18 Framework, which the Company implemented years prior to PURA establishing an 19 NWS mandate showcasing the Company’s commitment to evaluating all options 20 (noting that the authority refused to discuss and admit into evidence the Company’s 21 NWA Framework in the original 17-12-03RE07 docket), or its analysis of alternate 22 wires solutions. Moreover, the Company’s forecast already considers a load offset forPage 31 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 29 of 32 1 all existing DER, in queue DER, and forecasted DER, as well as all impacts from 2 energy efficiency and demand response programs. Thus, based on the evidence 3 provided by the Company demonstrating the prudence of the capacity projects listed 4 on OCC-805, Attachment 1, there is no basis for cost disallowances. 5 This is equally true for Mr. Balakumar’s contention that failure of the forecast overload 6 to occur forms the basis for cost disallowance. This conclusion is flawed in that it 7 subverts PURA’s prudence standard by applying hindsight bias to the Company’s 8 operational decisions. In selecting the solutions for the capacity issues identified for 9 each of the projects listed in OCC-805, Attachment 1, the Company had to rely on the 10 information that was available at the time, including the forecasted overloads within 11 the ten-year planning horizon at that time. The fact that the forecasted overloads the 12 Company relied upon did not exactly match actual loading conditions is not evidence 13 that the Company acted imprudently. The Company’s decisions as they relate to the 14 projects at issue are the definition of prudence: utilizing the available information, the 15 Company forecasted the potential for overload conditions based on its planning 16 standards and industry-accepted practices, identified the risks to customers due to 17 overloaded equipment, and developed solutions and alternatives to mitigate/eliminate 18 the condition and the associated risks. Pursuant to its obligation to provide safe, 19 reliable service to all customers, the Company was compelled to act on the available 20 information and analysis that identified customers at risk of loss of service. To do 21 otherwise, and risk prolonged customer interruptions and wide-scale disruption, wouldPage 32 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 30 of 32 1 have been imprudent. Consequently, the Company took reasonable steps to develop 2 and construct projects that ensure the continued provision of safe and reliable service 3 to all customers. 4 III. RESPONSE TO INCLUSION OF CAPITAL ADDITIONS IN RATE BASE 5 6 Q. Please summarize Mr. Balakumar’s testimony regarding capital additions eligible for inclusion in rate base. 7 A. Mr. Balakumar argues that PURA should include in rate base only plant completed, in 8 service and documented through the Company’s “final supplemental filing before the 9 record closes” (Balakumar Testimony at 91, 92, 93). Mr. Balakumar estimates that, of 10 the $847.8 million in interim period plant the Company requested from January 2026 11 through June 2028, approximately $202.5 million will remain as forecasted plant at the 12 close of the record and therefore should not be included in rate base. Additionally, he 13 argues that the full $664.9 million requested for the Rate Year should also not be 14 included in rate base (id. at 93). 15 16 Q. How do you respond to Mr. Balakumar’s recommendations regarding capital additions eligible for inclusion in rate base? 17 A. Although the Company does not agree with all aspects of Mr. Balakumar’s testimony 18 on this topic, the Company does not dispute that PURA should rely on plant additions 19 documentation produced to the evidentiary record. In this proceeding, the Company 20 has made a proposal to implement a performance-based, multi-year rate plan 21 (“PBMRP”), that would commence July 1, 2027, with the issuance of PURA’s decision 22 in this proceeding. As part of the PBMRP, the Company is proposing to implement anPage 33 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 31 of 32 1 F Factor component to address the cost of plant additions during the stay-out period. 2 The Company’s proposed F Factor is addressed in the testimony of the Company’s 3 Leadership Panel, Exhibit CLP-ELP-1 and Exhibit CLP-ELP-REBUTTAL-1, and is 4 modelled on PURA’s preliminary conception of the CT-Bar. If approved by PURA, 5 the F Factor would recover the cost of capital additions placed into service on and after 6 January 1, 2027, through the term of the PBMRP. 7 Although PURA’s final decision in this case on the PBMRP is unknown, Mr. 8 Balakumar’s arguments are consistent with PURA’s decisions in its recent rate cases 9 of including in rate base only those capital additions for which there is project 10 documentation available in the record, substantiating the in-service date. Therefore, 11 the Company agrees with the testimony of OCC’s witness, Mr. Balakumar that PURA 12 should include the cost of plant additions in rate base for which there is such 13 documentation, which the Company plans on producing through December 31, 2026, 14 covering the gap year between the test year ending December 31, 2025 and December 15 31, 2026, which is the year prior to the implementation of the Company’s proposed F 16 Factor, if ultimately approved by PURA. 17 In response to Mr. Balakumar’s claims and recommendations on this point, we are 18 adopting our first, second and third supplements (separately filed in the docket), for the 19 purposes of this rebuttal testimony, as Exhibits CLP-ADDITIONS-REBUTTAL-5 20 through CLP-ADDITIONS-REBUTTAL-7. Collectively, this documentation provides 21 the necessary details for costs incurred in January through September 2026 for projectsPage 34 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 32 of 32 1 placed in service prior to December 31, 2025, plus the cost documentation of 120 2 projects placed in service through the first nine months of 2026. All of these plant 3 additions were included in the forecasted plant amounts shown in Schedule B-2.1 and 4 Schedule B-2.2 of PURA’s Standard Filing Requirements. 5 IV. CONCLUSION 6 Q. Does this conclude your testimony? 7 A. Yes, subject to reserving the Company’s right to respond to additional issues raised in 8 discovery or at hearings.
Text of Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf
Extracted from the file · 8 pages · 21,808 characters
Text of Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED.pdf
Extracted from the file · 502 pages · 144,946 characters
As listed on the current system
Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO [26-05-10]