1 page match
  1. Page 7 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 5 of 32 1 considered and the load forecast and authorization documents for each Peak 2 Load/Capacity project placed in service from 2023 through 2025 (id. at 9, 87-88, 92). 3 Third, Mr. Balakumar raises a number of issues in areas he identifies as “pending 4 Company data,” without discussing the basis for his conclusions or making specific 5 recommendations and our testimony does not address these issues. Instead, our joint 6 rebuttal testimony addresses his claims on alleged improper budget overruns, direct- 7 buried cable replacements and capacity additions. 8 A. Actual Expenditures Exceeding Budget Plans 9 10 11 Q. How do you respond to Mr. Balakumar’s criticism that the Company’s capital expenditures show “weak cost control over the overall portfolio (Balakumar Testimony at 83)? 12 A. There is no validity to this claim whatsoever. The Company’s rigorous practices and 13 procedures are thoroughly documented in the record of this proceeding and the 14 Company’s capital spending is managed through a disciplined, multi-level process that 15 incorporates risk-based analysis, cross-functional review, formal authorization, and 16 independent oversight at every stage, from budget development to project execution 17 (see, e.g., Exh. CLP-ADDITIONS-1, at 12-45; CLP-ADDITIONS-10A through 10C; 18 OCC-966). Through the process, the capital expenditures in excess of budget represent 19 very deliberate decisions to accommodate work in a given fiscal period that must get 20 done in order to provide safe and reliable service to customers. Moreover, the alleged 21 over-spending that he has identified averages only 11% per year, at his own admission. 22 This is not a significant margin of variance given the pressing needs of the system and
  2. Page 8 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 6 of 32 1 the Company’s obligations to provide safe and reliable service under a wide range of 2 reasonably foreseeable circumstances and weather events. 3 4 Q. Is budget control an area that the Management Audit completed in 2025 examined in some detail? 5 A. Yes, considerable time and resources was devoted to the evaluation of the Company’s 6 capital and operating expense planning as part of the “Management Audit of 7 Eversource Energy’s Connecticut Companies,” published by PURA in February 2025 8 (Exhibit CLP-ELP-4). With respect to the Company’s annual capital plan and the 9 controls applicable to the execution of the annual capital plan, the final management 10 report made the following findings: 11 Chapter 1: Executive Management 12 13 14 15 16 Finding #29: All three CT Companies participate in two forward-looking planning processes: 1) a long-term, five-year, strategic capital plan (“Strategic Capital Plan” for CL&P … and 2) a detailed short-term, one-year capital and O&M budget (“Corporate Operating Plan” for CL&P … the “Annual Budgets”) that follows the Strategic Capital Plan/5-Year Plan processes. 17 18 19 20 Finding #33: Continuous updates to the [Long Range Plan] are made throughout the year to reflect changes in legislation, regulatory outcomes, prevailing economic conditions, or any other significant events. The resultant LRP spans a six-year period: the current year plus a five-year forecast. 21 22 23 24 25 Finding #34: Eversource’s LRP includes both a capital spending component and a broader five-year financial forecast. Each CT Company submits capital spending templates for their organization for consolidation into the Eversource LRP. Eversource’s Financial Strategy group maintains Eversource’s five-year financial forecast … which is later consolidated with Eversource’s. 26 27 28 Finding #36: The Vice President of [Financial Planning & Analysis] is responsible for keeping the Eversource CEO, Eversource CFO, and Eversource Controller apprised of monthly financial results and explanations of material budget variances.
  3. Page 9 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 7 of 32 1 2 3 4 5 6 7 Finding #37. Each CT Company President and their Operations and Planning departments, in collaboration with the Engineering department and embedded Eversource investment planning groups within the Finance organization, conduct more detailed capital and O&M budget planning processes after the Eversource LRP is reviewed by the Eversource [Board of Trustees] in June. The capital budgeting process starts with the first year of the LRP, which originates from the Strategic Capital Plan …. 8 9 10 11 12 13 14 15 16 17 18 19 20 Finding #38: The CT Company Presidents are responsible for managing their respective capital and O&M budgets throughout the year. Embedded employees from Eversource’s FP&A group communicate regularly with the CT Company Presidents to help them understand their results, and these employees review budget variances on a monthly basis. Each month, the CT Company Presidents and other direct reports present an operational, consolidated financial briefing to the Eversource COO. These briefings include key industry trends (supply chain disruptions, fuel pricings, etc.), O&M and capital budget variances at the operating company and major division level (safety, engineering, etc.), O&M budget and capital variances at the cost element level (Labor, Materials, etc.), … staffing capital and O&M budget variances including overtime analysis, storm expense and deferred costs to date by state, and operational items such as meter inventory and active work order counts. 21 22 23 24 Finding #40: CL&P regularly files with the Connecticut Public Utilities Regulatory Authority (“the PURA”) both the following year’s capital budget and a budget-to-actual comparison to their long-term capital forecast. Any variances greater than 10% must be noted and justified in the filing. 25 (Exhibit CLP-ELP-4, at pages 19-21). 26 Based on this in-depth assessment of the Company’s budget-control processes, the 27 Management Audit Report concluded that “[t]he Capital Plan vs Actual spend across 28 the three [CT] Companies were mostly within tolerance, and any variances were not 29 deemed systemic in nature” (Exhibit CLP-ELP-4, at page 25 of 443).
  4. Page 10 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 8 of 32 1 2 Q. Would you provide additional detail on the formulation of the annual capital budget and the processes that apply to mid-year adjustments to the plan? 3 A. Yes. CL&P’s capital program encompasses a range of project categories necessary to 4 build, maintain, improve and operate the electric distribution system safely and 5 reliably. The project categories are targeted at achieving safe and reliable operation, 6 enabling new customer growth, eliminating capacity limitations, supporting business 7 operations, and maintaining asset health, including remediation of equipment failures, 8 transformer replacements and third-party/joint ownership work. 9 From an overall perspective, Eversource’s capital-planning objective for its Operating 10 Companies is to develop capital budgets that represent the optimal balance of executing 11 infrastructure work necessary to maintain and improve the performance of the system, 12 while assuring a cost-efficient use of the capital resources. Risk-based assessments are 13 used to prioritize and rank potential infrastructure projects in accordance with budget 14 targets. At the same time, Eversource maintains a level of flexibility in the budget 15 process to deal with contingencies that inevitably occur during the year. 16 The Company’s capital and operating expense budgets are developed through a 17 rigorous, risk-based and cross-functional process. The capital planning process begins 18 mid-year with a meeting of the Planning Group, which includes staff from Engineering, 19 Electric Operations, and Finance. Each operating area submits its capital plan and 20 resource needs to the CL&P President and Chief Operating Officer for review before 21 submission to the Planning Group. The Planning Group evaluates these plans using
  5. Page 11 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 9 of 32 1 five-year planning models, measuring them against operational performance targets 2 and financial objectives. 3 comprehensive analyses of system risks and requirements, aligned with budgetary 4 targets. The Company selects individual projects based on analytical assessments from 5 system modeling, methodological studies, and observed data, considering factors such 6 as aging infrastructure, system conditions, reliability, customer growth, and resource 7 availability. 8 The annual capital plan for CL&P is developed by Electric Engineering with input from 9 Electric Operations (including the CL&P President) on a project-specific basis, in line 10 with the financial and performance targets established within the Strategic Plan. The 11 capital plan involves a combination of individual major capital projects; capital 12 programs composed of “sub-projects;” and “line of business” work (for example, non- 13 discretionary core projects) to be funded during the upcoming year. A variety of factors 14 are considered in determining which capital investments are necessary to achieve 15 operating objectives, including but not limited to aging infrastructure needs, system 16 conditions, reliability performance, new customer growth and resource availability. 17 Multi-year funding for major projects is also reviewed through the annual budgeting 18 process. The CL&P capital plan is developed through a detailed prioritization process 19 identifying the appropriate mix of work that will best address system-related issues 20 while adhering to financial and performance targets established in the Strategic 21 Planning process. The Company prioritizes and ranks projects through
  6. Page 12 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 10 of 32 1 Second, the Company’s spending plan undergoes rigorous senior and Board-level 2 oversight. After finalization, the Chief Financial Officer presents the budget to the 3 Eversource Board of Trustees Finance & Risk Committee for review. Multiyear 4 funding for major projects is also reviewed as part of the annual budgeting process. 5 Contrary to Mr. Balakumar’s assertion, the plan reviewed by the Board is a budget 6 forecast, not a spending cap. It is common for project needs to arise after Board 7 approval, and deviations are a normal aspect of the capital program. 8 Third, every capital project is evaluated under a formal Project Authorization Policy 9 (“PAP”), which establishes a clear framework for decision-making, evaluation, and 10 approval of capital spending. The Company records authorizations in the PowerPlan 11 system, the central repository for all authorizations, and approves projects according to 12 the Delegation of Authority (“DOA”), with all required sign-offs. The Company has 13 provided these policies as evidence in this proceeding (Exhs. CLP-ADDITIONS-10A 14 through 10C). 15 16 Q. What types of controls apply over the course of the year, as individual projects are developed and initiated? 17 A. On a monthly basis, detailed O&M and Capital reports are generated for each 18 functional organization in the Financial Performance System (FPS) dashboard 19 application. 20 organization, as well as subordinates and analysts that oversee cost control centers 21 within the functional organization. The O&M detail reports provide actual, budget and These reports can be accessed by the owners of each functional
  7. Page 13 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 11 of 32 1 variance information by cost category. The capital detail reports provide actual, budget 2 and variance information by project category. Budget analysts communicate regularly 3 with the owners of each functional organization to assist in understanding their area 4 financial results and the drivers of variances. In addition, budget analysts meet monthly 5 with the Vice President and Director of Financial Planning and Analysis to review the 6 O&M and capital detail reports by organization and discuss the major drivers of the 7 variances. 8 In addition, as discussed in Exhibit CLP-ADDITIONS-1, the Company’s PAP imposes 9 strict cost controls on capital projects. A Project Authorization Form (“PAF”) must be 10 completed, and the project budget approved, for any project that meets or exceeds the 11 PAP’s cost thresholds. If a project’s costs are anticipated to exceed the authorized 12 budget, whether because of a change in scope or a revised cost estimate, the project 13 manager and project originator must promptly submit a Supplemental Authorization 14 Form (“SAF”). The SAF is approved under the DOA policy based on the project’s 15 revised total cost, and the Vice President of Financial Planning and Analysis or a 16 designee must approve every SAF reflecting a cost increase of $1 million or more. This 17 requirement keeps senior management informed of cost drivers while projects are still 18 in development, so that management can assess near-term and long-term steps to 19 contain costs and deploy the Company’s resources efficiently. Any PAF or SAF may 20 be rejected at any stage, including for insufficient detail, unsupported estimates, or
  8. Page 14 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 12 of 32 1 constructability concerns. In that event, the project initiator must address each reason 2 for rejection before resubmitting the form for review and approval. 3 In this context, if individual projects emerge that were not part of the budget, or if 4 project cost for individual projects increase due to various factors, then the Company 5 may defer projects or shift construction schedules to remain within the overall annual 6 expenditure budget. If additional funding is needed due to unforeseen circumstances, 7 then the Project Manager is required to seek approval through a supplemental review 8 for additional funding through CPAC or EPAC, which are the review committees for 9 distribution line projects and substation projects, respectively. The total annual capital 10 budget is not considered when evaluating and developing individual project cost. 11 Instead, the summation of all the individual projects in the capital plan comprise the 12 total annual expenditure and individual projects are prioritized and may be deferred or 13 modified to meet the annual, overall expenditure budget. 14 CL&P also has enhanced independent oversight. In June 2022, as a provision of the 15 2021 Storm Settlement in Docket No. 17-12-03RE11, the CL&P Subsidiary Board was 16 expanded to include three independent board members. This board now reviews 17 CL&P’s financial results, including capital investments, and approves larger-scale 18 capital projects as required under the Delegation of Authority Policy. In addition, the 19 Company has recently put in place an enhanced iteration of its existing capital 20 governance process that pulls all internal stakeholders together in a monthly meeting
  9. Page 15 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 13 of 32 1 to discuss progress and performance on the capital plan centered around execution of 2 project work and impact to capital budgets. 3 In this context of these controls, the Company’s budget process is both disciplined and 4 adaptable. The budget process remains flexible to accommodate contingencies and 5 emerging system needs or financial developments throughout the year. 6 Company’s primary objective is to maintain an optimal balance between essential 7 infrastructure work and cost-effective capital allocation. The 8 9 Q. Do you have an analysis of the drivers of the budget variance in 2018 and 2023, which are project years that Mr. Balakumar calls out in his testimony? 10 A. Yes. As part of the Company’s compliance in Docket No. 17-10-46 and the 2018 Rate 11 Settlement, the Company is required to file a report each year providing information 12 on the capital budget plan and the drivers of variances by program category. 13 Specifically, the Company is required to make filings each year as compliance with 14 Order No. 11, in Docket No. 17-10-46, Application of The Connecticut Light and 15 Power Company d/b/a Eversource Energy for an Amendment of Rate Tariffs, decision 16 issued April 18, 2018. The Company is providing the Order No. 11 compliance reports 17 for 2018 and 2023, herewith, as Exhibits CLP-ADDITIONS-REBUTTAL-2 and CLP- 18 ADDITIONS-REBUTTAL-3, for ease of reference. These compliance filings provide 19 specific information on the drivers of the budget variance and an explanation as to the 20 reasons that the Company’s capital additions were reasonable and prudent in those 21 years.
  10. Page 16 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-1 November 18, 2026 Page 14 of 32 B. 1 Direct Buried Cable 2 3 Q. How do you respond to Mr. Balakumar’s claims with respect to the costs-per-mile associated with the direct buried cable replacement program? 4 A. First, an important point to remember is the replacement of direct buried cable is part 5 of the Company’s Core Capital program, which means that the capital investment is 6 recovered through the annual Electric System Infrastructure charge, which PURA 7 reviews annually. More specifically, PURA reviewed the decision surrounding the 8 Company’s decision to transition to a replacement program in the 2019 timeframe in 9 Docket No. 21-01-03 and found those projects to be eligible for recovery through rates. 10 In addition, Exhibit CLP-CAPITAL-REBUTTAL-4 provides a copy of a compliance 11 filing that the Company made on December 11, 2019, in Docket No. 17-10-46, 12 Application of The Connecticut Light and Power Company d/b/a Eversource Energy 13 for an Amendment of Rate Tariffs, decision issued April 18, 2018 (compliance with 14 Order No. 4), which reviews the basis for the 2019 decision to transition the program 15 from a repair to replacement strategy. 16 contemporaneous justification for its decision to modify its approach to the replacement 17 of direct-buried cable. 18 Following this program change in 2019, the Company continued to innovate on its 19 construction methods for this replacement program. As Mr. Balakumar acknowledges, 20 beginning in 2024, the Company instituted a hybrid approach combining proactive 21 replacements with repair work to extend the life of segments that had not experienced 22 as many failures. This new approach has reduced the amount of miles replaced, the This filing provided PURA with
Words on different pages
1 page match

Text of Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf

Extracted from the file · 8 pages · 21,808 characters

Text of Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED.pdf

Extracted from the file · 502 pages · 144,946 characters

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO [26-05-10]

This filing on the current system (opens in a new tab)