Utility Dockets and Filings

Prefiled testimony

Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO

Files6

Search terms highlighted
Eversource rate increase is on 8 pages across 4 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
Words on different pages

Text of Exhibit CLP-ADDITIONS-REBUTTAL-3.pdf

Extracted from the file · 73 pages · 332,525 characters

Text of Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf

Extracted from the file · 8 pages · 21,808 characters

1 page match
  1. Page 1 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 1 of 502
  2. Page 2 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 2 of 502
  3. Page 3 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 3 of 502 Connecticut Light & Power Speci c Project Proposal - Project #: CS00061 A Northeast Utilities Company Background / Scope Issue: Project Descrip on: 12/11/14 - This is being presented for ENG approval. The total es mated cost is $8.42M and the proposed ISD is 5/31/19. however, the addi onal cost is an es mated $613k, raising the total cost to $9.03M, The cost of the Transmission por on of the project, to is not included in the above costs. There are two Transmission alterna ves: 1. . The best op on has not been determined yet. There is a rela vely small di erence in cost to Distribu on for either op on. The main di erence is the is chosen, which adds approximately $300k compared to the . Major Materials: Asset & Investment Management System 01/28/2015 Page 3 of 10
  4. Page 4 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 4 of 502 Connecticut Light & Power Speci c Project Proposal - Project #: CS00061 A Northeast Utilities Company Other Considera ons: Revision / ACT Comments: If we don't do this project, what will happen? Environmental Soil Contamina on: No Change Water Pollu on: No Change Natural Habitats: No Change Alterna ves considered based on Environmental Impact or Descrip on of Aspects Oil Spill Risks Considered? Safety Concerns With This Project? Explain: External Stakeholders Customer Impact / Involvement Cust. Impacted: Crit. Cust. Impacted: Adjoining Property Owner Consent Required: Other U lity Pole Custodian Area: State Highway Permit Required: Reloca on / New Service New Srvc. Contact: Customer Type: Request Number: Asset & Investment Management System Approx. Pole Count (NU): Approx. Pole Count (Other): Town Hearing Required: Easement Required: Requestor Type: State Highway Project #: Route #: 01/28/2015 Page 4 of 10
  5. Page 5 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 5 of 502
  6. Page 6 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 6 of 502 Connecticut Light & Power Speci c Project Proposal - Project #: CS00061 A Northeast Utilities Company Conservation and Load Management C&LM programs implemented in accordance with TD 190 - Targeted Application of C&LM Measures to Peak Load Planning Needs. a. C&LM programs - Estimated load saved (provided by C&LM): b. Estimated savings needs to be reflected in the load. Does the estimated savings defer the year of need? If yes, what is the new projected year of need? Additional Justification / Comments: Asset & Investment Management System 01/28/2015 Page 6 of 10
  7. Page 7 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 7 of 502
  8. Page 8 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 8 of 502
  9. Page 9 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 9 of 502
  10. Page 10 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 10 of 502

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO [26-05-10]

This filing on the current system (opens in a new tab)