Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Prefiled testimony

Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO

Files6

Search terms highlighted
Eversource rate increase is on 8 pages across 4 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
Words on different pages

Text of Exhibit CLP-ADDITIONS-REBUTTAL-3.pdf

Extracted from the file · 73 pages · 332,525 characters

Text of Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf

Extracted from the file · 8 pages · 21,808 characters

1 page match
  1. Page 131 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 131 of 502
  2. Page 132 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 132 of 502 Project Authorization Form 2019 Medium Customer Permission / Siting Council / Municipal approvals 2018 Low Design to minimize customer impact. Project Preplanning and customer/community outreach will be initiated. Delays due to inclement weather is always a risk 2019 Low Medium Every opportunity to keep outage schedules from changing are made. This project will be constructed by outside contractors. Delay of installing equipment for lack of funding this project 2019 medium was ordered with a pre-approval of $2.7M. The risk is landing the equipment on a foundation that has not yet been approved. The project has been delayed in approvals elevating the risk to medium. Sound levels exceed state guidelines 2020 Low The risk level has been set to low due to the manufactures specification on reduced noise levels. A sound study will be performed after all installed equipment has been energized. SCLL Conditions References - ES SYS PLAN 010 ES SYS PLAN 015 JA-AM-2001-A Rev 2 Page 9
  3. Page 133 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 133 of 502
  4. Page 134 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 134 of 502
  5. Page 135 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 135 of 502 Project Authorization Form Figure 3 –Aerial view of showing existing abutters. JA-AM-2001-A Rev 2 Page 12
  6. Page 136 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 136 of 502
  7. Page 137 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 137 of 502
  8. Page 138 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 138 of 502
  9. Page 139 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 139 of 502
  10. Page 140 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 140 of 502

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO [26-05-10]

This filing on the current system (opens in a new tab)