Prefiled testimony
Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO
Files6
Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
PDF · 152 KB · 3 pagesText searchable
Download Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdfRead the text of Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
Exhibit CLP-ADDITIONS-REBUTTAL-1.pdf
PDF · 361 KB · 34 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-1.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-1.pdf
Exhibit CLP-ADDITIONS-REBUTTAL-2.pdf
PDF · 872 KB · 6 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-2.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-2.pdf
Exhibit CLP-ADDITIONS-REBUTTAL-3.pdf
PDF · 6.7 MB · 73 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-3.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-3.pdf
Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf
PDF · 1.1 MB · 8 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-4.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf
Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED.pdf
PDF · 52 MB · 502 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED.pdf
Text of Exhibit CLP-ADDITIONS-REBUTTAL-3.pdf
Extracted from the file · 73 pages · 332,525 characters
Text of Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf
Extracted from the file · 8 pages · 21,808 characters
Page 266 of 502
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 266 of 502Page 267 of 502
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 267 of 502Page 268 of 502
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 268 of 502Page 269 of 502
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 269 of 502Page 270 of 502
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 270 of 502Page 271 of 502
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 271 of 502Page 272 of 502
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 272 of 502Page 273 of 502
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 273 of 502Page 274 of 502
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 274 of 502 Figure 2: Simplified One-Line Diagram for Final Arrangement JA-AM-2001-A Rev. 6 Page 11Page 275 of 502
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 275 of 502 II. Required Studies: The following studies are on-going with the engineering vendor; they will be completed prior to IFC completion DC Load Study and Battery Capacity Analysis AC Load Study Voltage Drop Calculations Station Lighting Level Study Grounding Study Lightning Protection Study Structural and Foundation Calculations Sound Study, pre-project sound study has been completed III. Other Site Considerations: 1. Real Estate/Siting & Permitting Considerations (i.e., acquisitions, offset encroachment, ROW impacts): a. Site modifications requiring permitting review includes the addition of lightning masts and lighting modifications to the station layout. b. An Exempt Modification has been submitted to and approved by the Connecticut Siting Council (CSC) 2. Environmental: a. Soil contamination analysis was performed and reported in the GZA Environmental Assessment Report dated October 7, 2021. In summary: Soil samples were taken and elevated arsenic levels were detected; site soil that is unable to be reused will be properly disposed of at an off-site location. b. Wetlands impact: There are no disruptions of wetlands as part of this project. c. Audible Noise Level Changes/Considerations: i. The new power transformer at the site is to be designed to meet applicable requirements without need for external mitigation measures. It is not expected that the new transformer will exceed audible noise levels set by the state of Connecticut and a sound wall is not expected to be needed; however, there is risk allocated to post study upgrades. 3. Transmission Line Considerations: Line outages will be necessary for moving the 115kV JA-AM-2001-A Rev. 6 Page 12
As listed on the current system
Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO [26-05-10]