Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Prefiled testimony

Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO

Files6

Search terms highlighted
Eversource rate increase is on 8 pages across 4 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
Words on different pages

Text of Exhibit CLP-ADDITIONS-REBUTTAL-3.pdf

Extracted from the file · 73 pages · 332,525 characters

Text of Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf

Extracted from the file · 8 pages · 21,808 characters

1 page match
  1. Page 271 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 271 of 502
  2. Page 272 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 272 of 502
  3. Page 273 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 273 of 502
  4. Page 274 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 274 of 502 Figure 2: Simplified One-Line Diagram for Final Arrangement JA-AM-2001-A Rev. 6 Page 11
  5. Page 275 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 275 of 502 II. Required Studies: The following studies are on-going with the engineering vendor; they will be completed prior to IFC completion DC Load Study and Battery Capacity Analysis AC Load Study Voltage Drop Calculations Station Lighting Level Study Grounding Study Lightning Protection Study Structural and Foundation Calculations Sound Study, pre-project sound study has been completed III. Other Site Considerations: 1. Real Estate/Siting & Permitting Considerations (i.e., acquisitions, offset encroachment, ROW impacts): a. Site modifications requiring permitting review includes the addition of lightning masts and lighting modifications to the station layout. b. An Exempt Modification has been submitted to and approved by the Connecticut Siting Council (CSC) 2. Environmental: a. Soil contamination analysis was performed and reported in the GZA Environmental Assessment Report dated October 7, 2021. In summary: Soil samples were taken and elevated arsenic levels were detected; site soil that is unable to be reused will be properly disposed of at an off-site location. b. Wetlands impact: There are no disruptions of wetlands as part of this project. c. Audible Noise Level Changes/Considerations: i. The new power transformer at the site is to be designed to meet applicable requirements without need for external mitigation measures. It is not expected that the new transformer will exceed audible noise levels set by the state of Connecticut and a sound wall is not expected to be needed; however, there is risk allocated to post study upgrades. 3. Transmission Line Considerations: Line outages will be necessary for moving the 115kV JA-AM-2001-A Rev. 6 Page 12
  6. Page 276 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 276 of 502 capacitor coupled voltage transformer (CCVT) connection points. 4. Distribution Feeder Circuit Considerations: Distribution bus outage will be required for connection of the bus tie switch and conduit. Outages on distribution feeders may also be required when tying new feeders into existing distribution duct banks. The Project team has not yet determined if a mobile is needed at this time. Initial discussions with the SOC has indicated a mobile is not required. 5. This project scope does not include any IEC 61850 communications protocol. WORK ORDER: 40495301 – Carmel Hill Transmission JA-AM-2001-A Rev. 6 Page 13
  7. Page 277 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 277 of 502
  8. Page 278 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 278 of 502
  9. Page 279 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 279 of 502 JA-AM-2001-A Rev. 6 Page 16
  10. Page 280 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 280 of 502 WORK ORDER: 40495301 – Rocky River Transmission Remote End Relay Work JA-AM-2001-A Rev. 6 Page 17

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO [26-05-10]

This filing on the current system (opens in a new tab)