Prefiled testimony
Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO
Files6
Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
PDF · 152 KB · 3 pagesText searchable
Download Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdfRead the text of Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
Exhibit CLP-ADDITIONS-REBUTTAL-1.pdf
PDF · 361 KB · 34 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-1.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-1.pdf
Exhibit CLP-ADDITIONS-REBUTTAL-2.pdf
PDF · 872 KB · 6 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-2.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-2.pdf
Exhibit CLP-ADDITIONS-REBUTTAL-3.pdf
PDF · 6.7 MB · 73 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-3.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-3.pdf
Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf
PDF · 1.1 MB · 8 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-4.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf
Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED.pdf
PDF · 52 MB · 502 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED.pdf
Text of Exhibit CLP-ADDITIONS-REBUTTAL-3.pdf
Extracted from the file · 73 pages · 332,525 characters
Text of Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf
Extracted from the file · 8 pages · 21,808 characters
Page 296 of 502
The Connecticut Light and Power Company REDACTED EST I MAT E SU MMAR Y d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 296 of 502 Alt Estimate Summary for PP4 Calc ( escalation separate) Estimate #: C-21-844T Date of Estimate:03/24/2022 Project Title: Project Mgr/Lead Estimate #: C-21-844T Date of Estimate 03/24/2022 Project Number 404953 WO & Task #: 40495301 Estimate revision #: 01b Estimate Type - Station work Estimate done by PAG In Service date (ISD):06/01/2023 Template Revision # 01.66e Project Number: 404953 WO & Task #: 40495301 ESTIMATE SUMMARY Estimate Type: Planning WBS Description 1 ROW / Easements / Land purchases 2 Environmental Approvals / Permits 3 Outreach 4 Siting Approvals / Permits 5 Engineering / Design 6 Materials ( Eversource purchased) 7 Construction ( incl matl's by contractors) 8 Testing / Commissioning 9 PMT Project Mgmt Team 10 Removals 11 Other 12 Risks % of Directs % of Total $4,400 $100 $4,400 $370,600 $881,700 $1,303,600 0.1% 0.0% 0.1% 10.7% 25.4% 37 6% 0.1% 0.0% 0.1% 6.5% 15.6% 23.0% $247,800 $224,100 $36 600 $9,300 $385,000 7.1% 6.5% 1.1% 0.3% 11.1% 4.4% 4.0% 0.6% 0.2% 6.8% $195,000 $190,000 $3,467,600 100 0% 61.2% $182,000 $875,000 $2,410,600 $1 825 000 $202,900 32.2% 3.6% $144 900 $21,900 $583 500 $75,500 $1 096 600 $105,500 $5,495,500 97.0% TOTAL 125 Project Directs Total w/Risks 13 Indirects/Overhead 14 AFUDC 125 Project Total - Baseline Budget 15 16 125 $170,300 3.0% $5,665,800 100.0% 2023 $310,600 $1,600 $2,300 $866,600 $2 600 $300 $89,700 $207 000 $81,600 $79,200 $1 094 000 $165,900 $55,200 $36 600 $9,300 $348,800 $1,534,000 2024 2025 2026 2027 2028 2029 2030 TOTAL w/ escal broken out 2031 ROW / Easements / Land purchas $ Environmental Approvals / Permi $ Outreach $ Siting Approvals / Permits $ Engineering / Design $ Materials ( Eversource purchased $ 4,400 100 4,400 370,500 868,700 Construction ( incl matl's by cont $ Testing / Commissioning $ PMT Project Mgmt Team $ Removals $ Other $ Risks $ 1,273,400 243,000 222,500 35 600 9,300 385,000 $3,416,900 Indirects/Overhead AFUDC Project Total (less reimbursables) Amount of Escalation included above Total materials - Eversource Total materials - Contractor Total materials $3,612,700 $20,800 $149,500 $348,800 $1,554,800 $3,762,200 $348,800 $1,554,800 $3,762,200 Contingency $ - $13 500 -$40 $13 460 -25% 25% $4,249,000 $7,082,000 - Eqiv. SF 115kV Transformer, breaker, and switchgear installation, Instal SF-6 Circuit breakers. Instal 115kV Wave Traps Replace 3 phase manually operated disconnects Installation of bus to accept new equipment. Install cable jumpers between bussing and new equipment. Relocate CCVT tap/connection points Install Conduit and trenwa from circuit breakers to control house. repair/connect grounding to existing ground grid Instal SEL-351 relays for breaker failure. Install SEL line relays for system 1 and system 2 protection. Instal electro-mechanical breaker failure lock-out relays $1 600 $1 600 $82,600 $866 $120,500 $987 100 $ Check total Substation expansion 11S expansion, Woodbury Ct. 1T - CT Station work ISD of 6/1/2023 from schedule provided. PP4 Dates from project schedule, dated 2/4/2022. All work to take place within the existing footprint of the substation, no expansion of fenceline is expected. 50% rock excavation based on SOW and existing grading issues and surface rock in area of excavation. All construction to be internal, non internal support. Engineering to be external with internal review. P&C panels and pathway installation is in estimate C-21-844D Distribution. Not IEC61850 standard installation. Prior costs as of 3/24/2022. RISKS Potential UG Obstructions Severe Weather, Delays, OT Design development Additional pathways for P&C wiring External crews for installation Attachment A1 C-21-844T Subsation Expansion Carmel Hill 11S Est Rev 01b EXTCover - $ $ $ $ $ 82,600 $5,665,800 Escal total Cont. Cover page 2. Assumptions/Clarifications; Indirect rates based on; - 170,300 $5,583,200 COMMENTS Project Scope: - $5,412,900 $'s / Eqiv. SF Substation expansion $82,600 $881 700 $120,460 $1 002 160 Key qty's and UOM ( tie to inputs on est sheets) 1 793 100 202,900 $5,583,200 $ $ $ $ $5,665,800 NOTE: Risk / Contingency is 10 9% of Project Total Costs (incl escal/indirects/AFUDC but excl reimb.) Estimate Range $ $ $ Reimbursables/Customer Contribution Cost per key qty (if appl) 6 2022 $4,400 $100 $4,400 $57,700 $13,500 $ Contingency Project Total - Funding Approval Level Priors 40 100,000 30,000 15 200 000 3/30/2022Page 297 of 502
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 297 of 502Page 298 of 502
The Connecticut Light and Power Company REDACTED ESTIMATE SUMMARY d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 298 of 502 Alt Estimate Summary for PP4 Calc ( escalation separate) Estimate #: C-21-844D Date of Estimate:03/24/2022 Project Title Project Mgr/Lead Estimate #: C-21-844D Date of Estimate 03/24/2022 Project Number: CS00284 WO & Task #: CS002841 Estimate revision #: 01c Estimate Type - Station work Estimate done by: PAG In Service date (ISD):06/01/2023 Template Revision # 01.66e Project Number: CS00284 WO & Task #: CS002841 ESTIMATE SUMMARY Estimate Type: Planning WBS Description 1 ROW / Easements / Land purchases 2 Environmental Approvals / Permits 3 Outreach 4 Siting Approvals / Permits 5 Engineering / Design 6 Materials ( Eversource purchased) 7 Construction ( incl matl's by contractors) 8 Testing / Commissioning 9 PMT Project Mgmt Team 10 Removals 11 Other 12 Risks 125 Project Directs Total w /Risks 13 Indirects/Overhead 14 AFUDC 125 Project Total - Baseline Budget 15 25 % of Total 0 0% 0.0% $200 $100 $373,000 $4 003 200 $3,774,000 0 0% 3 8% 40 6% 38 3% 0.0% 2.1% 22.8% 21.5% $100 $50,700 $19 700 $249,500 $207,200 $89 900 $9,300 $1,145,000 2 5% 2.1% 0 9% 0.1% 11 6% 1.4% 1.2% 0.5% 0.1% 6.5% $890,000 $255,000 $9,851,400 100 0% 56.1% $323,400 $7,809,500 $1,718,500 $6,308,100 $917,400 35.9% 5.2% $471,100 $66,600 $3,955,700 $438,400 $1,881,300 $412,400 $17,076,900 97.2% $861,100 $12,203,600 $4,012,200 $494,000 2.8% $412,000 $82,000 $17,570,900 100.0% $861,100 $12,615,600 $4,094,200 $861,100 $12,615,600 $4,094,200 $106,200 $45,600 $91,600 $9,300 2022 2023 $316,800 $3 970 400 $5,500 $13 100 $2,275,800 $203,900 $62,700 $89 900 $1,392,000 $52,900 2024 2025 2026 2027 2028 2029 2030 2031 TOTAL w/ escal broken out ROW / Easements / Land purchase $ Environmental Approvals / Permit $ Outreach $ Siting Approvals / Permits $ Engineering / Design $ Materials ( Eversource purchased $ 200 100 372,800 4,002,900 Construction ( incl matl's by cont Testing / Commissioning PMT Project Mgmt Team Removals Other Risks $ $ $ $ $ $ 3,733,600 249,600 205,700 89 900 ,300 1,145,000 Indirects/Overhead AFUDC $ $ $9,809,100 $ Contingency 6,253,300 917,400 - $16,979,800 - $ 494,000 $17,473,800 $ $ $ $ Reimbursables/Customer Contribution $17,570,900 Project Total (less reimbursables) - $17,473,800 1,597 $'s / Eqiv. SF Substation expansion Cost per key qty (if appl) 6 Priors $ Contingency Project Total - Funding Approval Level 16 % of Directs $200 TOTAL Amount of Escalation included above Total materials - Eversource $97 400 $4 003 200 $298,541 $4 301 741 Total materials - Contractor Total materials NOTE: Risk / Contingency is 10.3% of Project Total Costs (incl escal/indirects/AFUDC but excl reimb.) Estimate Range $19 700 $41 $19 741 -25% 25% $13,178,000 $21,964,000 $3 970 400 $298,500 $4 268 900 $97 400 $13 100 $ Escal total $13 100 Check total 97,400 $17,571,200 $300 COMMENTS: Project Scope: Key qty's and UOM ( tie to inputs on est sheets) 11,000 Eqiv. SF 115kV Transformer, breaker, and switchgear installation Replace 3 phase motorized disconnects Replace Mobile transformer connection point Remove associated bussing on 3X and install new associated bus for both 2X and 3X. Instal 3 phase circuit switchers Instal 115kV ~23kV 62.5 MVA Transformer. Instal SSVT, one on 2X and one 3X Instal 3 phase disconnect for distribution tie Instal set of slip over CT's on 3X. Installation of (1) Primary and (1) backup relay for slip on CT's on 3X Instal PT on 2X Install Distribution 23kV Switchgear enclosure 42' X 27' Install (150 ft) Conduit and (165 ft)trenwa to control house Instal lightning protection masts. Assumptions/Clarifications; Indirect rates based on; Substation expansion expansion, Woodbury Ct. 11 - CT Station work Relays for P&C are located in Transmission Estimate C-21-844T Remote end relay work are in separate Estimates. ISD of 6/1/2023 from schedule provided. All work to take place within the existing footprint of the substation, no expansion of fenceline is expected. 50% rock excavation based on SOW and existing grading issues and surface rock in area of excavation Electrical construction to be internal. Engineering to be external, with internal review. Existing cabinets, pathways and wireways is for new relays is adequate. Not IEC61850 standard installation. Prior costs as of 3/24/2022 included in estimate. RISKS Potential UG Obstructions Severe Weather, Delays, OT Design development External construction work crews Upgrade grounding and lightning Post study upgrades $ $ $ $ $ $ 250 000 200 000 50 000 525 000 50 000 70 000 Attachment A2 C-21-844D Substation Dist Expansion Carmel Hill 11S Est Rev 01c EXTCover 3/30/2022Page 299 of 502
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 299 of 502Page 300 of 502
The Connecticut Light and Power Company REDACTED EST I MAT E SU MMAR Y d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 300 of 502 Alt Estimate Summary for PP4 Calc ( escalation separate) Estimate #: C-21-844 Date of Estimate:02/17/2022 Project Title: Substation Project Mgr/Lead Estimate #: C-21-844 Date of Estimate 02/17/2022 Project Number: 404953 WO & Task #: 80090988 Estimate revision #: 00 Estimate Type - Station work Estimate done by: PAG In Service date (ISD):06/01/2023 Template Revision # 01.66d Project Number: 404953 WO & Task #: 40495301 ESTIMATE SUMMARY Estimate Type: Planning WBS Description 1 ROW / Easements / Land purchases 2 Environmental Approvals / Permits 3 Outreach 4 Siting Approvals / Permits 5 Engineering / Design 6 Materials ( Eversource purchased) 7 Construction ( incl matl's by contractors) 8 Testing / Commissioning 9 PMT Project Mgmt Team 10 Removals 11 Other 12 Risks 125 Project Directs Total w/Risks 13 Indirects/Overhead 14 AFUDC 125 Project Total - Baseline Budget 15 Contingency Project Total - Funding Approval Level 16 25 % of Total Priors 2022 2023 $6,600 $2,200 $99,600 $12 900 $33,200 2.0% 0.7% 30.7% 4.0% 10 2% 1.1% 0.4% 17.3% 2.2% 5.8% $87 800 $24,200 $23,400 27 0% 7.4% 7.2% 15.2% 4.2% 4.1% $35,000 10 8% 6.1% $324,900 100 0% 56.4% $1,800 $323,100 $226,200 $8 100 39.3% 1.4% $3,400 $200 $222,800 $7 900 $559,200 97.0% $5,400 $553,800 $6,600 $2,200 $99,600 $12 900 $1,800 $33,200 $87 800 $22,400 $23,400 $35,000 2024 2025 2026 2027 2028 2029 2030 TOTAL w/ escal broken out 2031 ROW / Easements / Land purchas Environmental Approvals / Permi Outreach Siting Approvals / Permits Engineering / Design Materials ( Eversource purchased $ $ $ $ $ $ 6,400 2,100 96,700 12,700 Construction ( incl matl's by cont Testing / Commissioning PMT Project Mgmt Team Removals Other Risks $ $ $ $ $ $ 32,200 85 200 23,600 22,700 35,000 Indirects/Overhead AFUDC $ $ $316,600 $ $ $17 000 3.0% $200 $16 800 $576,200 100.0% $5,600 $570,600 Project Total (less reimbursables) $5,600 $570,600 - $14 700 $12 900 Total materials $12,900 $12,900 -25% 25% $432,000 $720,000 $ , New Milford, CT. 1T - CT Station work ISD of 6/1/2023 from schedule provided. All work to take place within the existing footprint of the substation, no expansion of fenceline is expected. All Construction to be internal. Engineering to be external. Existing communication panels have adequate space for new equipment RISKS additional communication panel required Severe Weather Delays OT Design development Attachment A3 C-21-844 Substation Dist Expansion Rocky River 12Y Est Rev 01a EXTCover $ $ $ 14,700 -$100 Ckt. Ft expansion remote end line relay work and settings changes Remove SEL-321 line relay Remove TC-10B PLC device Remove TCF-10B PLC devices Remove Wave Trap Remove line tuning unit Install SEL-311C line relay and auxillary back up Install associated test switches. Testing and commisioning. update as-built drawings and schematics. Assumptions/Clarifications; Indirect rates based on; - $576,100 Check total COMMENTS - - 17 000 $561,400 Escal total NOTE: Risk / Contingency is 9 9% of Project Total Costs (incl escal/indirects/AFUDC but excl reimb.) Project Scope: - $'s / Ckt. Ft $14 700 $12 900 Key qty's and UOM ( tie to inputs on est sheets) 219,700 8 100 $544,400 $561,400 $ $ $ $ $576,200 Amount of Escalation included above Total materials - Eversource Total materials - Contractor Estimate Range $ Contingency Reimbursables/Customer Contribution Cost per key qty (if appl) 6 % of Directs TOTAL 25,000 5 000 5 000 3/30/2022Page 301 of 502
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 301 of 502Page 302 of 502
The Connecticut Light and Power Company REDACTED EST I MAT E SU MMAR Y d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 302 of 502 Alt Estimate Summary for PP4 Calc ( escalation separate) Estimate #: C-21-844 Date of Estimate:02/17/2022 Project Title: Substation Dis Project Mgr/Lead Estimate #: C-21-844 Date of Estimate 02/17/2022 Project Number: 404953 WO & Task #: 80090791 Estimate revision #: 00 Estimate Type - Station work Estimate done by: PAG In Service date (ISD):06/01/2023 Template Revision # 01.66d Project Number: 404953 WO & Task #: 40495301 ESTIMATE SUMMARY Estimate Type: Planning WBS Description 1 ROW / Easements / Land purchases 2 Environmental Approvals / Permits 3 Outreach 4 Siting Approvals / Permits 5 Engineering / Design 6 Materials ( Eversource purchased) 7 Construction ( incl matl's by contractors) 8 Testing / Commissioning 9 PMT Project Mgmt Team 10 Removals 11 Other 12 Risks 125 Project Directs Total w/Risks 13 Indirects/Overhead 14 AFUDC 125 Project Total - Baseline Budget 15 Contingency Project Total - Funding Approval Level 16 25 % of Total Priors 2022 2023 $6,600 $2,200 $99,600 $12 900 $33,200 2.0% 0.7% 30.7% 4.0% 10 2% 1.1% 0.4% 17.3% 2.2% 5.8% $87 800 $23,700 $23,400 27.1% 7.3% 7.2% 15.3% 4.1% 4.1% $35,000 10 8% 6.1% $324,400 100 0% 56.5% $1,300 $323,100 $225,300 $8 000 39.2% 1.4% $2,500 $100 $222,800 $7 900 $557,700 97.1% $3,900 $553,800 $6,600 $2,200 $99,600 $12 900 $1,300 $33,200 $87 800 $22,400 $23,400 $35,000 2024 2025 2026 2027 2028 2029 2030 TOTAL w/ escal broken out 2031 ROW / Easements / Land purchas Environmental Approvals / Permi Outreach Siting Approvals / Permits Engineering / Design Materials ( Eversource purchased $ $ $ $ $ $ 6,400 2,100 96,700 12,700 Construction ( incl matl's by cont Testing / Commissioning PMT Project Mgmt Team Removals Other Risks $ $ $ $ $ $ 32,200 85 200 23,100 22,700 35,000 Indirects/Overhead AFUDC $ $ $316,100 $ $ $16 900 2.9% $100 $16 800 $574,600 100.0% $4,000 $570,600 Project Total (less reimbursables) $4,000 $570,600 - $14 700 $12 900 Total materials $12,900 $12,900 -25% 25% $431,000 $718,000 $ , Watertown, CT. 1T - CT Station work ISD of 6/1/2023 from schedule provided. All work to take place within the existing footprint of the substation, no expansion of fenceline is expected. All Construction to be internal. Engineering to be external. Existing communication panels have adequate space for new equipment RISKS additional communication panel required Severe Weather Delays OT Design development Attachment A4 C-21-844 Substation Dist Expansion Frost Bridge 8R Est Rev 01c EXTCover $ $ $ 14,700 -$100 Ckt. Ft expansion remote end line relay work and settings changes Remove EL-321 line relay Remove TC-10B PLC device Remove TCF-10B PLC devices Remove Wave Trap Remove line tuning unit Install SEL-311C line relay and auxillary back up Install associated test switches. Testing and commisioning. update as-built drawings and schematics. Assumptions/Clarifications; Indirect rates based on; - $574,500 Check total COMMENTS - - 16 900 $559,800 Escal total NOTE: Risk / Contingency is 9 9% of Project Total Costs (incl escal/indirects/AFUDC but excl reimb.) Project Scope: - $'s / Ckt. Ft $14 700 $12 900 Key qty's and UOM ( tie to inputs on est sheets) 218,800 8 000 $542,900 $559,800 $ $ $ $ $574,600 Amount of Escalation included above Total materials - Eversource Total materials - Contractor Estimate Range $ Contingency Reimbursables/Customer Contribution Cost per key qty (if appl) 6 % of Directs TOTAL 25,000 5 000 5 000 3/30/2022Page 303 of 502
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 303 of 502Page 304 of 502
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 304 of 502Page 305 of 502
REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 305 of 502
As listed on the current system
Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO [26-05-10]