Prefiled testimony
Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO
Files6
Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
PDF · 152 KB · 3 pagesText searchable
Download Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdfRead the text of Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
Exhibit CLP-ADDITIONS-REBUTTAL-1.pdf
PDF · 361 KB · 34 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-1.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-1.pdf
Exhibit CLP-ADDITIONS-REBUTTAL-2.pdf
PDF · 872 KB · 6 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-2.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-2.pdf
Exhibit CLP-ADDITIONS-REBUTTAL-3.pdf
PDF · 6.7 MB · 73 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-3.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-3.pdf
Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf
PDF · 1.1 MB · 8 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-4.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf
Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED.pdf
PDF · 52 MB · 502 pagesText searchable
Download Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED.pdfRead the text of Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED.pdf
Text of Exhibit CLP-ADDITIONS-REBUTTAL-3.pdf
Extracted from the file · 73 pages · 332,525 characters
Text of Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf
Extracted from the file · 8 pages · 21,808 characters
Page 336 of 502
REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 336 of 502Page 337 of 502
REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 337 of 502Page 338 of 502
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 338 of 502 Constructability Review Form: Substation Project Title: 2TXf and Switchgear Project Project Numbers(s): CS00284 / 404953 ☐ ☐ Prior Constructability Review Performed? Program Related Site Specific Review? Project Constructability Phase: ☐ Conceptual Engineering Design ☒ Preliminary Engineering Design ☐ Detailed Engineering Design Date(s) of Constructability Review: 12/08/2021 12/08/2021 Project Scope Statement: Distribution: Transmission: A Type of equipment Circuit switcher Manufacturer Information Switzer & Conrad (S&C), series 2000 Location Quantity Scope of work Between the new 11S2X and 11S-2X1-4 New installation Circuit switcher Switzer & Conrad (S&C), series 2000 Between 11S-3X and 11S-3X1-4 and 115/23kV, 62.5 MVA transformer 11S-2X Switchgear TBD* 11S-2X 1 set (all three phase) 1 set (all three phase) 1 PowerCon/AZZ Switchgear with relays 1 New Installation New installation New installationPage 339 of 502
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 339 of 502 Constructability Review Form: Substation Type of equipment Wave Trap, 2000A Wave Trap Manufacturer Information GE, LTO 0.265-300040-2 GE, LTO 0.265-300040-2 N/A Wave Trap N/A Retired/Decommissioned 115kV series, circuit breaker Manually Operated Disconnect Switches CCVTs ABB, 3000A, 40 New installation Southern States, 2000A, EV-2-1152000 Trench Electric, TEMF-123 Trench Electric, TEMF-123 Various Retired/Decommissioned Wave Trap, 2000A CCVTs Protection Relays and Equipment Location Quantity Scope of work New installation New installation Retired/Decommissioned Tap/connection relocation. CCVTs remained in the same location/position. Tap/connection relocation. CCVTs remained in the same location/position. See next section for detailed Protection & Control Scope of WorkPage 340 of 502
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 340 of 502Page 341 of 502
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 341 of 502Page 342 of 502
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 342 of 502Page 343 of 502
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 343 of 502Page 344 of 502
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 344 of 502Page 345 of 502
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 345 of 502
As listed on the current system
Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO [26-05-10]