Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Prefiled testimony

Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO

Files6

Search terms highlighted
Eversource rate increase is on 8 pages across 4 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
Words on different pages

Text of Exhibit CLP-ADDITIONS-REBUTTAL-3.pdf

Extracted from the file · 73 pages · 332,525 characters

Text of Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf

Extracted from the file · 8 pages · 21,808 characters

1 page match
  1. Page 366 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 366 of 502
  2. Page 367 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 367 of 502
  3. Page 368 of 502

    The Connecticut Light and Power Company REDACTED EST I MAT E Project Title Project Mgr/Lead SU MMAR Y - Repl 3X Relays PTs and SS Transformers d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 368 of 502 Alt Estimate Summary for PP4 Calc ( escalation separate) Estimate #: Date of Estimate:09/16/2021 Estimate #: Date of Estimate 09/16/2021 Project Number: WO & Task #: Estimate revision #: 01 Estimate Type - Station work Estimate done by In Service date (ISD):05/31/2022 Template Revision # 01.66d Project Number: WO & Task #: ESTIMATE SUMMARY Estimate Type: Planning WBS Description % of Directs % of Total $7 000 $7,100 $15,200 $9,100 $109,300 $1 734 900 $148,500 0.3% 0.3% 0.7% 0.4% 5.3% 83.7% 7.2% 0.2% 0.2% 0.5% 0.3% 3.8% 60.9% 5.2% $5 000 $5,000 $10,000 $5,000 $100 $24 000 $41,700 $200 2.0% 0.0% 1.5% 0.0% $20,000 $21,700 $200 $2,073,000 100.0% 72.8% $69,100 $2,003,900 TOTAL 1 ROW / Easements / Land purchases 2 Environmental Approvals / Permits 3 Outreach 4 Siting Approvals / Permits 5 Engineering / Design 6 Materials ( Eversource purchased) 7 Construction ( incl matl's by contractors) 8 Testing / Commissioning 9 PMT Project Mgmt Team 10 Removals 11 Other 12 Risks Priors 2021 2022 2023 2024 2025 2026 2027 2028 2029 TOTAL w/ escal broken out 2030 $2 000 $2,100 $5,200 $4,100 $109,200 $1 710 900 ROW / Easements / Land purchas Environmental Approvals / Permit Outreach Siting Approvals / Permits Engineering / Design Materials ( Eversource purchased $ $ $ $ $ $ 7,000 7,000 15,000 9,000 106,200 1,734,600 $148,500 Construction ( incl matl's by cont Testing / Commissioning PMT Project Mgmt Team Removals Other Risks $ $ $ $ $ $ 144,100 41,100 - Indirects/Overhead AFUDC $ $ 125 Project Directs Total w/Risks 13 Indirects/Overhead 14 AFUDC 125 Project Total - Baseline Budget 15 25 26.4% 0.8% $2,847,000 100.0% $69,100 $2,064,000 $ $2,777,900 $ $ Contingency $2,847,000 100.0% $69,100 $2,777,900 $69,100 $2,777,900 $ $ $ $ Project Total (less reimbursables) $2,847,000 - $30 900 $1,734,900 $24,000 $30 900 $1,710,900 Total materials $1 734 900 $24 000 $1 710 900 -25% 25% $2,135,000 $3,559,000 $ Assumptions/Clarifications; Indirect rates based on; - EA 11 - CT Station work RISKS Copy of Copy o - Partial FundingCover $ $ $ 30 900 $200 Engineering and Design completede with in-house resources. Construction and Test completed with contractors. Potential UG Obstructions Severe Weather Delays OT Design development - $2,847,200 Check total COMMENTS Project Scope: - - $2,816,300 Escal total NOTE: Risk / Contingency is 0% of Project Total Costs (incl escal/indirects/AFUDC but excl reimb.) Key qty's and UOM ( tie to inputs on est sheets) - $'s / EA Amount of Escalation included above Total materials - Eversource Total materials - Contractor Estimate Range 730 400 21,900 $2,816,300 $2,816,300 Reimbursables/Customer Contribution Cost per key qty (if appl) 6 $752 200 $21,800 Contingency Project Total - Funding Approval Level 16 $752 200 $21,800 10 000 5/16/2022
  4. Page 369 of 502

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 369 of 502
  5. Page 370 of 502

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 370 of 502
  6. Page 371 of 502

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 371 of 502
  7. Page 372 of 502

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 372 of 502
  8. Page 373 of 502

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 373 of 502
  9. Page 374 of 502

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 374 of 502
  10. Page 375 of 502

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 375 of 502

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO [26-05-10]

This filing on the current system (opens in a new tab)