Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Prefiled testimony

Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO

Files6

Search terms highlighted
Eversource rate increase is on 8 pages across 4 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
Words on different pages

Text of Exhibit CLP-ADDITIONS-REBUTTAL-3.pdf

Extracted from the file · 73 pages · 332,525 characters

Text of Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf

Extracted from the file · 8 pages · 21,808 characters

1 page match
  1. Page 376 of 502

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 376 of 502
  2. Page 377 of 502

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 377 of 502
  3. Page 378 of 502

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 378 of 502
  4. Page 379 of 502

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 379 of 502
  5. Page 380 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 380 of 502
  6. Page 381 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 381 of 502 On June 30, 2021, the 49-year-old 22N-3X transformer (manufactured in 1972) tripped and locked out. Oil results from a sample taken on 7/1/22 showed a ~50% increase in acetylene from 8ppm – 13ppm which suggested an internal fault occurred. Testing could not confirm the internal fault so the unit was placed back in service on August 16, 2021 and has been holding in, but due to the age and high gas levels , it should be replaced. In addition to replacing the failed -3X transformer this project will replace the 22N-2X transformer due to both asset condition and the station load. The 22N-2X is similar age (49 years old) and condition as the 22N-3X that failed in 2021. Prior to the failure of the 22N-3X transformer, station peaked at 61MVA which is 103% of its LCC. This project is also replacing the obsolete transformer protection relays for the 22N-2X transformers and circuit switchers. JA-AM-2001-A Rev. 6 Page 2
  7. Page 382 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 382 of 502
  8. Page 383 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 383 of 502
  9. Page 384 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 384 of 502
  10. Page 385 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 385 of 502

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO [26-05-10]

This filing on the current system (opens in a new tab)