Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Prefiled testimony

Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO

Files6

Search terms highlighted
Eversource rate increase is on 8 pages across 4 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
Words on different pages

Text of Exhibit CLP-ADDITIONS-REBUTTAL-3.pdf

Extracted from the file · 73 pages · 332,525 characters

Text of Exhibit CLP-ADDITIONS-REBUTTAL-4.pdf

Extracted from the file · 8 pages · 21,808 characters

1 page match
  1. Page 393 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 393 of 502
  2. Page 394 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 394 of 502
  3. Page 395 of 502

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 395 of 502
  4. Page 396 of 502Match

    The Connecticut Light and Power Company REDACTED ESTIMATE Project Title Project Mgr/Lead SUMMARY - Replace 2X & 3X Transformers d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 396 of 502 Alt Estimate Summary for PP4 Calc ( escalation separate) Estimate #: C-22-312 Date of Estimate:06/24/2022 Estimate #: C-22-312 Date of Estimate:06/24/2022 Project Number: CS00516 WO & Task #: 80121160 & 80121158 Estimate revision #: 01 Estimate Type - Station work Estimate done by In Service date (ISD):12/31/2023 Template Revision # 01.70c1 Project Number: CS00516 WO & Task #: 80121160 & 80121158 ESTIMATE SUMMARY Estimate Type: Planning WBS Description 1 ROW / Easements / Land purchases 2 Environmental Approvals / Permits 3 Outreach 4 Siting Approvals / Permits 5 Engineering / Design 6 Materials ( Eversource purchased) 7 Construction ( incl matl's by contractors) 8 Testing / Commissioning 9 PMT Project Mgmt Team 10 Removals 11 Other 12 Risks % of Directs TOTAL % of Total Priors 2022 13 Indirects/Overhead 14 AFUDC $12,200 $64,300 $1,208,300 $3,408,400 $1,811,800 0.2% 0.8% 15.0% 42.3% 22.5% 0.1% 0.6% 10.5% 29.7% 15.8% $474,200 $189,700 $96,300 5.9% 2.4% 1.2% 4.1% 1.7% 0.8% $800,000 9.9% 7.0% $8,065,200 100.0% 70.3% $907,300 $4,500 $23,700 $173,800 $1 348 800 $7,700 $40,600 $127,200 $2 059 600 $470 600 $233,600 $94,700 $28 300 $1 341 200 $240,600 $95,000 $68 000 $2,601,500 $451,100 22.7% 3.9% $11,117,800 97.0% $907,300 $400,000 $400,000 $2,778,000 $4,379,900 $998 900 $181,700 $1 602 600 $269,400 $3,958,600 $6,251,900 125 Project Total - Baseline Budget 15 Contingency Project Total - Funding Approval Level 16 25 2025 2026 2027 2028 2029 2030 2031 TOTAL w/ escal broken out $907,300 Environmental Approvals / Permit $ Outreach $ Siting Approvals / Permits $ Engineering / Design $ Materials ( Eversource purchased $ Construction ( incl matl's by cont $ Other Risks $ $ $ $ $ Indirects/Overhead AFUDC $ $ Testing / Commissioning PMT Project Mgmt Team Removals Project Total (less reimbursables) Cost per key qty (if appl) Total materials - Eversource Total materials - Contractor Total materials 1,772,700 467,200 187,000 94 300 800,000 $ 2 554 800 451,100 - $10,984,700 $ $347,100 3.0% $11,464,900 100.0% $130,000 $217,100 $907,300 $4,088,600 $6,469,000 $907,300 $4,088,600 $6,469,000 Contingency $ - 347,100 $11,331,800 $ $ $ $ $11,464,900 - $11,331,800 5,732,450 $'s / EA 115/13.8kV 37.5/48/62.5 MVA Delta-Wye $133,200 $3,408,400 $1,348,800 $133,200 $2,059,600 $3,408,400 $1,348,800 $2,059,600 $ Escal total NOTE: Risk / Contingency is 11.1% of Project Total Costs (incl escal/indirects/AFUDC but excl reimb.) Estimate Range 12,000 63,100 1,204,700 3,377,800 move contractor mat $7,978,800 Reimbursables/Customer Contribution Amount of Escalation included above 6 2024 ROW / Easements / Land purchase $ 125 Project Directs Total w /Risks 2023 -25% 25% $8,599,000 $14,331,000 Check total 133,200 $11,465,000 $100 COMMENTS: Project Scope: Key qty's and UOM ( tie to inputs on est sheets) 2 EA 115/13.8kV 37.5/48/62.5 MVA Delta-Wye Substation engineering scope of work for the Replacement of two existing 115kV/13.8kV (47MVA) power transformers to 62.5MVA. In addition to replacing the failed 3X transformer this project will replace the 22N-2X due to both asset condition and the station load. The 22N-2X is similar age and condition as the 22N-3X that failed last summer. Replacing both transformers with 62.5MVA 115/13.8KV transformers will increase the station s LCC from 59MVA to 81MVA and facilitate offloading the adjacent station Peaceable 12N. Included with this alternative are the following: Equipment removals include the following: Two (02), 115kV motor operated Disconnects (MODs) i.e., 2X1-4 and 3X1-4 with associated foundations. Two (02), 115kV Candle stick Circuit switchers i.e., 2X1-2 and 3X1-2 with associated foundations. Two (02), 115/13.8kV Transformers with associated foundations and rerouting of conduits. Equipment additions include the following: Two (02), 115kV Combination unit Circuit switchers. Two (02) three phase bus support structures supporting rigid bus connection to circuit switcher. Install new foundation and control conduits for both 115kV Circuit Switchers – Disconnect Switch Combination Unit. Two (02), 115/13.8kV HICO Transformers with associated foundations, rerouting of conduits with no new containments. Two (2), 13.8kV, 600A, 0.4ohm Neutral Grounding Reactors. Additional conduits re-routed to the new transformers location. Extension of control conduits to new transformer control cabinet. Replacement of the existing 2X only transformer electromechanical relays with new microprocessor-based relays. For 3X transformer electromechanical & DSCADA realys were repalced previously under CS00581. further, add DSCADA LTC capability to 2X transformer. Replace existing Six (06) 25kVA SSVTs and asscoaited PTs for both 2X & 3X transformers. Install higher capacity battery (320AH) in control house tro bring the existign 200Ah battery to SUB 38 and to supply added DSCADA communication load. Replace current EPAQ9100 RTU with SEL-3530 RTAC. for both 2X and 3X, Over-current, Differential & Lock-out relays. Electroswitch LOR, PML 8650 Meter; PM2000 Meter; Test Switches type FT-19R, as required; Test Switches type FT-1, as required. Assumptions/Clarifications; Indirect rates based on; 11 - CT Station work Engineering, Construction, testing and commissioning to be outsourced. Risks for soil contamination is anticipated. Transformer foundation soil pre-characterization will be performed. EOC vendor's Civil, Electrical and P&C Engineering teams would be involved during the course of this project. Eversource Material estimates are based on previous work and vendor quotes. Risk allocation is included to account for unforeseen conditions during civil construction and complications of installing the mobile. contingency is included for unforeseen conditions and situations. All new equipment will be installed within the confines of the existing fenced yard. No additional allowances have been added for aggressive outage recall times. RISKS Potential UG Obstructions Severe Weather, Delays, OT Design development Complications of mobile installation PCB Contaminated soil dispose off and repalcement with new soil Price Inflation Risk Material Delays Attachment A - Cost EstimateCover $ $ $ $ $ $ $ 80 000 120 000 120,000 100,000 160 90 000 130 000 8/3/2022 $ -
  5. Page 397 of 502

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 397 of 502 UNESCALATED LINE ITEM DOLLARS Project Number CS00516 Date of Estimate 06/24/2022 Estimate revision # 01 Escalation Rate E Rate CSTXX-CONSTRUCTION R Electrical Construction General Construction SCADA / Automation Telecom - Field Construction Reps ( internal) Support Switch/Tag Other ( specify) LT LT LT LT LT LT LT LT LT Other ( specify) LT Total Employee Expenses Construction Purchased Material Outside Construction Vendor Sales tax on Constr. Vendor Vehicles ( now in indirects section) $ Prior DOLLARS 1 Mhrs 2022 DOLLARS Mhrs 2023 DOLLARS 2 Mhrs 2024 DOLLARS Mhrs TOTAL DOLLARS AE AM AQ AV AQ AQ BR Inspection services ( Outside Vendor) Construction Rep (Outside vendor) Rents and Leases Escalation Mhrs CSTXX Subtotal CSTXX Total ENRXX-TG ENGINEERING/DESIGN Project Services/Drafting T- Line Engineering/Design D- Street Engineering/Design Civil Engineering/Design Substation (T) Engineering/Design Substation (D) Engineering/Design Protection & Controls Engineering Survey Engineering SCADA / Automation Engineering Telecom Engineering Prior Authorized (Partial Funding) Other - specify LT LT LT LT LT LT LT LT LT LT LT LT Employee Expenses Contractor Engineering - T-Lines Contractor Engineering - D-Street Contractor Engineering - T -Station Contractor Engineering - D-Station Contractor Engineering - P&C Contractor Engineering - Survey Contractor Engineering - SCADA / Automation Contractor Engineering - Telecom Contractor Engineering - Civil Contractor Engineering - Specify Contractor Engineering - Specify Vehicles ( now in indirects section) ENRXX Subtotal Escalation LT Total AE AQ AQ AQ AQ AQ AQ AQ AQ AQ AQ AQ AV ENRXX Total LNDXX-TG LAND Real Estate Employee Expenses Purchase Land Vehicles ( now in indirects section) Fees and Payments LNDXX Subtotal Escalation LT AE AM AV BF LNDXX Total MATXX-TG MATERIAL Eversource Outside Services AM AM AM Freight Sales Tax Eversouce/outside services Other MATXX Subtotal Escalation 3.9% MATXX Total PSMXX-PROJECT MANAGER & SUPPORT Project Management (PM) Project Planning/Cost (IP) Contracts/Purchasing (C/P) System Planning Environmental SCS - Notification Legal Estimating Siting - Exempt Modification Asset Management Other - Material Corodinators Other Other Other LT Total Employee Expenses Project Support Vendor - PM Project Support Vendor - IP Project Support Vendor - C/P Project Support Vendor - System Planning Project Support Vendor - Enviromental Project Support Vendor - SCS - Notification Project Support Vendor - Legal Project Support Vendor - Estimating Project Support Vendor - Siting - Exempt Modification Project Support Vendor - Asset Management Project Support Vendor - Other Project Support Vendor - Other Project Support Vendor - Other Project Support Vendor - Other Vehicles ( now in indirects section) Property or CWIP tax large proj. allowance Builder All risk insurance excluding deductables( if project is over $50m) Fees and Payments - Enviromental Fees and Payments - Siting Fees and Payments - Other PSMXX Subtotal Escalation LT LT LT LT LT LT LT LT LT LT LT LT LT LT AE AQ AQ AQ AQ AQ AQ AQ AQ AQ AQ AQ AQ AQ AQ AV BR BR BF BF BF PSMXX Total REMXX-TG REMOVAL Engineering/Design Internal Construction LT LT LT Total Employee Expenses Outside Services Contractor Labor Vehicles ( now in indirects section) Rents and Leases REMXX Subtotal Escalation REMXX Total TSTXX-TG TEST Test / Field Engr. Labor (In House) Lead Commissioning Engr. (LCE) ( internal) Employee Expense Test / Field Engr. Labor (contractor) Lead Commissioning Engr. (LCE) (contactor) Vehicles ( now in indirects section) TSTXX Subtotal Escalation AE AO AQ AV BR LT LT AE AQ AQ AV TSTXX Total SUBTOTAL PROJECT DIRECT COST Risk Risk Risk Total TOTAL PROJECT DIRECT COST (w risk) INDIRECTS Non-Productive Time Allocation (ZNP) Payroll Benefits Allocation (ZPB) incl NPT Gen SVC CO Overhead (ZGS) incl NPT E&S Allocations (ZEB,ZEL,ZES) AS&E A locations (ZAS) Stores Expense Allocation (ZST) Lobby Stock MDEC (ZMI) Vehicles (ZVE) Indirects Subtotal TOTAL PROJECT COST - Direct & Indirect ( excl AFUDC ) AFUDC AFUDC (ZK) In Service Dollars Cumulative IS$ AFUDC Subtotal TOTAL PROJECT COST - Baseline Budget Contingecy Contingency Other Contingency SubTotal TOTAL PROJECT COST - Approved Funding Reimbursables / Customer Contribution Reimbursables / Customer Contribution ( enter as negative) 8/3/20226:20 PM
  6. Page 398 of 502

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 398 of 502
  7. Page 399 of 502

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 399 of 502
  8. Page 400 of 502

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 400 of 502
  9. Page 401 of 502

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 401 of 502
  10. Page 402 of 502

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-REBUTTAL-8 REDACTED Page 402 of 502

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DAVID L. GLADEY, JOHN P. DIPAOLA-TROMBA, LEANNE M. LANDRY, AND JEFFREY D. TURANO [26-05-10]