Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Prefiled testimony

Witness: DONALD J. SCACCO, JR., DIGAUNTO CHATTERJEE AND DOUGLAS P. HORTON

Files2

Search terms highlighted
Eversource rate increase is on 7 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
7 pages match
  1. Page 11 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 9 of 98 1 methodological choices and the inclusion of the outlier year 2019–2020 (RMI 2 Testimony at 37, 41-42; Taylor Testimony at 24, 31-34). 3 The OCC witnesses also object to several other aspects of the Company’s proposal, 4 including the 0.5 percent Z-Factor threshold, which is lower than the 0.75 percent 5 established in RE01; limiting the S-Factor to O&M expenses; setting a 0 percent floor 6 on the I-Factor; and not including off-ramps from the multi-year plan (RMI Testimony 7 at 11, 14, 43-44, 44-45, 45-46, 46-47). 8 v. Summary of Recommendations 9 The OCC witnesses and Ms. Griffin recommend that PURA reject the Company’s 10 proposed PBMRP (RMI Testimony at 6, 9-10, 49; Griffin Testimony at 75-76). The 11 OCC witnesses further recommend approval of only a one-year rate plan (RMI 12 Testimony at 6-7, 10, 49). Alternatively, if PURA approves a multi-year plan, the 13 OCC’s witnesses recommend using a 2025 test year, reopening the proceeding to 14 implement a single indexed revenue cap covering both O&M and capital costs, and 15 setting the X-Factor at zero (RMI Testimony at 42-43, 49-50). 16 Dr. Taylor’s testimony focuses more narrowly on the technical aspects of the 17 productivity factor. He recommends a TFP of 0.457% if the cap covers both capital 18 and O&M expenses, or an OM&A X-Factor of at least 0.675% if the cap applies only 19 to O&M (Taylor Testimony at 9-10, 35, 37-38, 44-45). 20 independent third-party sensitivity and frontier analyses and proposes alternative TFP He also recommends
  2. Page 12 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 10 of 98 1 floors of 0% or -1.04 if PURA declines to adopt his recommended values Taylor 2 Testimony at 6, 10, 39-41, 46). 3 Both the witnesses for OCC, Acadia Center and CLF also argue that the level and 4 design of the PIMs penalty and incentive pools should be modified (RMI Testimony at 5 52-56; Griffin Testimony at 65-66, 80, 87). 6 7 Q. How is your rebuttal testimony on the PBMRP organized to respond to these issues? 8 A. Our rebuttal follows the four categories of issues described in the summary above and 9 responds, from a senior executive-level perspective, to the arguments raised by the 10 OCC’s RMI witnesses, Ms. Griffin, and Dr. Taylor. 11 (1) consistency with PURA’s proposed PBR framework, where we address the 12 contention that the Company’s proposal departs from the framework developed in 13 Docket No. 21-05-15 and its subsequent reopeners; (2) the merits of the capital support 14 mechanism and the associated revenue cap, where we explain why the Company’s 15 proposed F-Factor and application of the revenue cap to only O&M expenses are a 16 reasonable and balanced ratemaking approach and do not create the capex bias that the 17 witnesses allege; (3) distribution system planning, where we address the criticisms of 18 the Company’s proposed TSP; and (4) the productivity factor and PBRMP design 19 elements, where we respond to the challenges to the proposed X-Factor, Z-Factor 20 threshold, S-Factor, I-Factor floor, and the absence of off-ramps. Specifically, we address:
  3. Page 13 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 11 of 98 1 1. Consistency with PURA Proposed PBR Framework 2 3 Q. How do you address the witnesses’ general criticism that the Company’s proposal does not align with the PBR framework developed in Docket No. 21-05-15? 4 A. The Company’s proposed PBMRP builds upon the policy objectives and regulatory 5 principles developed in Docket No. 21-05-15 and subsequent proceedings. However, 6 those proceedings should not be interpreted as mandating a single, prescriptive model 7 of performance-based regulation or as foreclosing the consideration of alternative 8 approaches that align with the broader objectives of PBR. 9 The Company has both the right and the responsibility to propose a regulatory 10 framework tailored to its operating conditions, investment needs and customer 11 requirements. PURA expressly recognized this, finding that nothing in the prior PBR 12 proceedings precludes CL&P from proposing a PBR plan, nor prevents PURA from 13 considering such a proposal (Ruling on Motion No. 43, at 2). Further, PURA noted 14 that it is required, in any rate hearing under General Statutes § 16-19, to “consider the 15 implementation of financial performance-based incentives and penalties and 16 performance-based metrics.” (id. at 2 quoting Conn. Gen. Stat. § 16-19a(b)). 17 Performance-based regulation is an evolving framework that should remain flexible to 18 meet changing industry conditions, utility-specific needs, and insights gained through 19 experience. Consistency with the principles of PBR does not require strict adherence 20 to every design element considered or adopted in a prior proceeding. Instead, the 21 central focus should be whether the proposed approach advances the underlying policy
  4. Page 14 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 12 of 98 1 objectives of PBR and effectively aligns utility performance with customer interests 2 and regulatory outcomes. 3 In addition, shortly after the rate case was filed, PURA adjusted its schedules in each 4 of the three PBR reopened proceedings and declined to issue updated Proposed Final 5 Decisions or Final Decisions. Even if PURA had issued Final Decisions in each of the 6 PBR dockets, those proceedings were uncontested. As a result, any outcomes would 7 require adjudication in a contested proceeding before taking effect. This process allows 8 the Company to propose a framework and submit supporting record evidence for 9 PURA’s consideration, even if elements of the proposed framework differ from what 10 was outlined in the uncontested proceeding. 11 Thus, the Company’s proposed PBMRP does not need to replicate every element 12 discussed or developed in Docket No. 21-05-15, or its subsequent uncontested 13 reopeners to align with that proceeding’s objectives. The Company’s proposal must be 14 evaluated on its own merits, including whether its specific design appropriately 15 advances the objectives of performance-based regulation in light of CL&P’s unique 16 circumstances. 17 2. Capital Support Mechanism and the Revenue Cap 18 19 Q. How do you respond to the witnesses’ claim that the Company’s proposed FFactor would encourage a capital investment bias? 20 A. The witnesses rely on the frequently repeated, but unvalidated, assertion that rate-of- 21 return regulation creates an incentive for utilities to over-invest in capital. However,
  5. Page 15 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 13 of 98 1 like others who have advanced this theoretical argument, they offer no empirical 2 evidence demonstrating that this thesis is true, nor that such alleged over-investment 3 actually exists. In this case, the available evidence points in the opposite direction. 4 Specifically, the record demonstrates that “CL&P has historically relied more heavily 5 on [O&M] expenditures than capital-related expenditures in providing electric 6 distribution service.” (Exh. CLP-PBR-1, at 58). 7 prudence reviews of the Electric System Improvements (“ESI”) recovery mechanism 8 in the Rate Adjustment Mechanism (“RAM”) process has shown that the Company is 9 routinely imprudent or unable to defend its capital additions, nor has there been an 10 indication of that the Company is over-investing in the electric distribution system, and 11 it is not. Furthermore, during a stay-out period, such as the one proposed under the 12 Company’s PBMRP, the Company is incentivized to incur only those costs (capital or 13 O&M) necessary to operate the business and fulfill its obligations. Thus, the proposed 14 mechanism does not introduce an incentive to favor capital investment over O&M 15 expenditures. Instead, the Company must continue to determine, based on what is most 16 appropriate and cost-effective, whether a particular business or system need is best 17 addressed through capital investment or an O&M expenditure. 18 Contrary to OCC witnesses’ assertion, the decision to make a capital investment or 19 incur an O&M expense is not an either-or proposition. In reality, it is uncommon for a 20 particular system need to be addressed by either a capital investment or an O&M 21 solution. Typically, the nature and scope of the required work, as well as the specific Additionally, PURA’s annual
  6. Page 16 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 14 of 98 1 system needs involved, determine whether a capital investment or an O&M expenditure 2 is the appropriate approach. Therefore, the claim of capital bias is largely theoretical 3 and unsupported by the Company’s historical spending or the practical requirements of 4 operating the electric distribution system during the proposed PBMRP term. 5 6 Q. Do you have any more specific information to show that the witnesses asserting this claim of capital bias are wrong on the facts? 7 A. Yes. To show that these claims are fully misguided, we have analyzed CL&P’s 8 investment track record over a multi-year historical period. When evaluated on a 9 consistent, inflation-adjusted basis, the Company's overall level of capital investment 10 has remained essentially flat. Specifically, the Company adjusted historical 2016- 11 2025 expenditures using the Handy-Whitman Index to reflect current-dollar 12 equivalents, allowing for a direct comparison with the proposed 2027-2031 investment 13 plan, presented in this case. 14 increased from approximately $690 million during 2016-2025 to approximately $706 15 million during 2027-2031, representing an increase of only about 2%. Accordingly, 16 the Company’s proposed TSP cannot be plausibly viewed as a broad increase in capital 17 spending, but rather as a targeted reallocation of resources toward the highest-priority 18 reliability, asset health, capacity, and resiliency needs of the distribution system. 19 At the same time, while overall capital spending remained relatively flat in real terms, 20 the Company has strategically redirected investment toward a limited number of high- 21 priority programs. In particular, targeted investments in Lines and Stations asset health, On this basis, average annual capital expenditures
  7. Page 17 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 15 of 98 1 capacity, and resiliency programs increased by approximately $126 million annually 2 relative to historical spending levels. However, more than $110 million of this increase 3 is offset by reductions or slower growth in other areas of the capital portfolio. As a 4 result, the proposed TSP achieves substantial investment in critical infrastructure, while 5 increasing the average total capital spending by only approximately $16 million 6 annually, demonstrating that the Company is prioritizing investment rather than 7 materially expanding its overall capital program. 8 Moreover, these targeted investments are necessary to address aging infrastructure, 9 increasing system constraints, and evolving reliability and resiliency challenges. For 10 example, the Company continues to operate approximately 3,700 miles of bare copper 11 conductor, much of which is beyond its expected service life, and approximately 42% 12 of bulk transformers are projected to exceed 50 years of age by the end of the planning 13 period. 14 expected to create firm-capacity constraints at multiple substations across the system. 15 Within the ten-year planning horizon, 25% of all bulk distribution substations are 16 projected to exceed their emergency or operational thermal limits, reducing operational 17 flexibility in large areas of the system, and significantly increasing the risk of prolonged 18 outages for customers. At the same time, increasingly frequent and severe weather 19 events continue to be a significant driver of customer interruptions and place additional 20 stress on distribution infrastructure. 21 Q. In addition, load growth, economic development, and electrification are Are you able to explain this description in a table form?
  8. Page 18 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 16 of 98 1 A. Yes. In terms of the evaluation of the total capital program and inflation-adjusted 2 averages, as well as the specific areas of increased capital investment on the system, 3 the Company’s analysis shows the following: 4 Table 1: Historical Capital Program Compared to Inflation Adjusted Averages Organization 1-Electric Distribution 1-Electric Distribution Total 5-Facilities 6-Information Technology Grand Total 5 6 Focus Area Basic Business-ED New Customer-ED Peak Load / Capacity-ED Regulatory CommitmentsED Reliability-ED 2016-2025 Avg $248,064 $64,051 $45,330 2027-2031 Avg $221,493 $70,994 $69,245 $15,340 $292,171 $664,956 $21,426 $3,591 $689,973 $31,106 $279,552 $672,391 $27,308 $6,452 $706,150 Variance ($26,570) -11% $6,944 11% $23,915 53% $15,766 ($12,620) $7,434 $5,881 $2,861 $16,177 103% -4% 1% 27% 80% 2%
  9. Page 19 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 17 of 98 1 2 Source Lines Table 2: Historical Capital Program – Areas of Increase SUBCATEGORY Asset Health Level_2 Overhead Aging Infrastructure Overhead Aging Infrastructure-Incremental UNDERGROUND STRUCTURE ISSUE Asset Health Total Resiliency Lines Total Stations Asset Health SS AGING INFRASTRUCTURE SS AGING INFRASTRUCTURE-Incremental S/S TRANSFORMER RELIABILITY SS TRANSFORMER ASSET HEALTH SS TRANSFORMER ASSET HEALTHIncremental 2016-25 Avg $0 $0 $3,517 2027-31 Avg $14,532 $3,590 $15,341 $3,517 $10,742 $14,259 $0 $0 $14,155 $0 $33,464 $29,947 $26,961 $16,218 $60,425 $46,166 $20,028 $20,028 $3,400 $3,400 $0 ($14,155) $42,630 $42,630 Variance $14,532 $3,590 $11,824 851% 851% 324% $0 $5,100 $5,100 $14,155 $22,284 $71,158 $45,552 $57,004 $23,268 403% 104% Stations Total $36,439 $116,711 $80,272 220% Grand Total $50,698 $177,135 $126,437 249% Asset Health Total Capacity 3 4 Accordingly, the information presented in Table 1 and Table 2 show that the proposed 5 plan does not represent a broad-based increase in capital spending. Rather, it reflects 6 the Company's deliberate prioritization of investments needed to replace aging 7 infrastructure, 8 performance, and strengthen system resiliency. 9 necessary to maintain the safety, reliability, capacity and resilience of the electric 10 distribution system while keeping overall capital expenditures largely consistent with 11 historical, inflation-adjusted levels. address projected capacity deficiencies, improve equipment These targeted investments are
  10. Page 20 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 18 of 98 1 2 Q. How do you respond to the OCC witnesses’ claim that the Company’s proposed F-Factor encourages inflation of its capital forecast? 3 A. As an initial matter, the witnesses’ assertion that the Company’s forecast may be 4 inflated rings hollow given that OCC’s consultants from RMI make no effort to 5 meaningfully examine or evaluate the details of the Company’s capital forecast. 6 Moreover, the OCC witnesses’ assertion completely ignores the financial and 7 regulatory safeguards built into the Company’s proposal. 8 Under the proposed F-Factor, as part of each annual RAM compliance filing, the 9 Company’s actual capital additions placed in service during the applicable plan year 10 would be subject to a prudence review and reconciled against the approved forecast. 11 The resulting revenue requirement recovered from customers would be limited to the 12 lower of: (1) the revenue requirement associated with the forecasted capital approved 13 in this proceeding; or (2) the revenue requirement associated with actual capital 14 additions determined to be prudent, used and useful. As a result, the F-Factor does not 15 guarantee recovery of capital spending, nor does it allow immediate recovery beyond 16 the established forecast. Instead, only qualifying plant additions up to the approved 17 forecast are eligible for recovery during the PBMRP term, and any additions that are 18 disallowed for imprudence would result in an immediate financial consequence to the 19 Company (in the form of a plant write-down of the asset) and a credit to customers, to 20 the extent the addition was included in the F-Factor in the first place. For capital 21 expenditures exceeding the forecast cap during the pendency of the PBMRP, the 22 Company must await a subsequent base rate proceeding or successor PBMRP term to

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DONALD J. SCACCO, JR., DIGAUNTO CHATTERJEE AND DOUGLAS P. HORTON [26-05-10]

This filing on the current system (opens in a new tab)