  1. Page 3 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 1 of 98 STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY JOINT REBUTTAL TESTIMONY OF DONALD J. SCACCO, JR., DIGAUNTO CHATTERJEE AND DOUGLAS P. HORTON 1 I. INTRODUCTION 2 Q. Please state the names of the witnesses on the Leadership Rebuttal Panel. 3 A. The Leadership Rebuttal Panel is comprised of Donald J. Scacco, Jr., Digaunto 4 Chatterjee and Douglas P. Horton. We are providing this rebuttal testimony on behalf 5 of The Connecticut Power and Light Company d/b/a Eversource Energy 6 (“Eversource,” “CL&P,” or the “Company”). 7 8 Q. Have the members of the Leadership Rebuttal Panel previously submitted testimony in this proceeding? 9 A. Yes. On July 14, 2026, we submitted direct, pre-filed testimony to the Public Utilities 10 Regulatory Authority (“PURA”) on behalf of CL&P in support of its application for 11 approval of amended rate schedules. Company Witnesses Scacco, Chatterjee and 12 Horton co-sponsored Exhibit CLP-ELP-1 and the related attachments. In addition, Mr. 13 Horton co-sponsored Exhibit CLP-AMI-1 and the related attachments. 14 Q. What is the purpose of this panel’s joint rebuttal testimony? 15 A. On October 21, 2026, the parties and intervenors in this proceeding filed testimony in 16 accordance with the procedural schedule. Our joint rebuttal testimony addresses the
  2. Page 4 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 2 of 98 1 issues and recommendations raised regarding the Company’s proposed Performance- 2 Based Multi-Year Rate Plan (“PBMRP”), storm cost recovery and advanced metering 3 infrastructure (“AMI”) deployment. 1 We offer a senior executive-level perspective on 4 the policy, business and operational considerations underlying these proposals, 5 complementing the more detailed technical testimony provided by the Company’s 6 other rebuttal witnesses. 7 Q. How is your testimony organized? 8 A. Our testimony is organized into the following sections: 9 • Section I is the introduction; 10 11 • Section II responds to the claims and recommendations of the parties and intervenors regarding the Company’s proposed PBMRP; 12 13 • Section III responds to claims and recommendations on the Company’s proposed storm recovery framework; 14 • Section IV responds to testimony regarding the Company’s AMI proposal; and 15 • Section V is the conclusion. 16 17 II. RESPONSE ON ISSUES AND RECOMMENDATIONS PERTAINING TO THE PROPOSED PBMRP. 18 19 Q. Please describe the scope of your joint rebuttal testimony regarding the Company’s proposed PBMRP. 20 A. Our testimony is intended to present a senior executive-level perspective, focusing on 21 key issues with significant policy, business or strategic implications, rather than delving 22 into the detailed technical aspects of the PBMRP proposal. The more technical aspects 1 The Company does not respond to every issue raised in the intervenor testimonies. Silence on any issue should not be construed as agreement on any issue.
  3. Page 5 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 3 of 98 1 of the PBMRP are presented in the separate rebuttal testimony of Julia Frayer of 2 London Economics International (“LEI”). 3 4 5 Q. Please summarize the issues and positions raised in the testimony submitted by the parties and intervenors that are the subject of your rebuttal testimony on this topic. 6 A. Three separate testimonies address the Company’s proposed PBMRP: (1) Gennelle 7 Wilson and Oliver Tully from the Rocky Mountain Institute (“RMI”) on behalf of the 8 Office of Consumer Counsel (“OCC”); (2) Lindsay J. Griffin from Northeast for Vote 9 Solar on behalf of the Acadia Center and the Conservation Law Foundation (“CLF”); 10 and (3) Dr. William Taylor on behalf of the Acadia Center. 11 Collectively, these testimonies address several key elements of the Company’s 12 PBMRP, including alignment with the performance-based regulation framework 13 developed in Docket No. 21-05-15 and its subsequent reopeners; the Company’s 14 proposed capital support mechanism (F-Factor) and the revenue cap; distribution 15 system planning; the productivity factor and revenue cap design; and the proposed 16 performance incentive mechanisms (“PIMs”). 17 Before summarizing the intervenor and party testimonies and presenting our specific 18 rebuttal points, we would like to take this opportunity to level-set with the Commission 19 on our motivations for the core proposals we have made in this case, including the 20 development of the Targeted System Plan (“TSP”) and the comprehensive PBMRP, 21 which are closely aligned. We genuinely appreciate the diligent engagement by PURA, 22 its staff and each one of the parties and intervenors in this proceeding and we are
  4. Page 6 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 4 of 98 1 striving to present a clear line of sight into what it will take to assure Connecticut’s 2 future in relation to a safe, reliable and modernized electric grid. For the Company, it 3 is refreshing and invigorating to be part of this proceeding, with a high level of 4 collaborative interaction and engagement from all parties to this point. Our customers 5 will benefit from this collective effort, which remains our fundamental priority and 6 focus. We are here to serve our customers and our customers are at the center of every 7 proposal we have put forth in this proceeding. 8 Our proposals in this case are built on the foundation that our customers are heavily 9 reliant on the availability of safe and relative electric service – and meeting those 10 expectations requires us to raise investment levels in Connecticut above historical 11 levels. Simply put, Connecticut is beginning to fall behind because, since 2018, the 12 regulatory construct has not focused on meeting the dual demands of customers, which 13 are reliability and affordability, not just affordability. 14 The required level of infrastructure investment and associated drivers behind the need 15 for it are outlined in our TSP. However, the step-change necessary is influenced by 16 myriad factors that have to be addressed and balanced in order for us to be able to 17 deliver the sustained reliability and resiliency of electric service that customers 18 demand. These factors include the building impacts of climate change and severe 19 weather trends; increased customer expectations of reliability and system performance 20 (and lack of tolerance for outages of any extended duration); increased penetration of 21 DER necessitated by, among other factors, the need for locally sited generation
  5. Page 7 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 5 of 98 1 resources; age and asset condition; regulatory and legislative mandates, and other 2 factors. 3 There is no dispute that the electric grid is the critical backbone necessary to provide 4 essential services to customers to protect their health and welfare and to power 5 Connecticut’s economic viability and sustainability. It is for this reason that we have 6 presented evidence to demonstrate the need to PURA (and to other stakeholders) for a 7 comprehensive PBR framework that balances the Company’s need for financial 8 support for operations with the affordability interests of customers. We recognize that 9 other parties are challenging virtually every aspect of the Company’s PBMRP proposal, 10 and we respect that the burden is ours to convince PURA to adopt our proposal versus 11 an alternative framework, or no framework at all. 12 However, the reality is that the Company cannot make the investments necessary to 13 adequately serve our customers without additional revenue support to sustain the 14 investments over time, which, in the absence of adoption of a well-balanced 15 framework, will inevitably lead to multiple, successive rate cases on a cycle as 16 frequently as legally and logistically as possible. The Company is at a point where it 17 must be in a position to advance the grid and to make investments to that end. Where 18 it makes investment, the Company will need to obtain timely and adequate recovery of 19 those investments, which the Company can accomplish through a rate-case cycle or 20 through a well-constructed PBMRP. The Company’s concern is that, without a 21 constructive ratemaking framework, the situation becomes lose-lose for customers,
  6. Page 8 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 6 of 98 1 causing the Company to scale investment around the rate-case cycle and resulting in 2 choppier and larger bill impacts for customers that are greater overall than they would 3 otherwise be under a properly designed PBR framework that would harness incentive 4 properties for greater cost efficiency. 5 i. Consistency with PURA’s Proposed PBR Framework 6 The OCC witnesses and Ms. Griffin devote considerable attention in their testimony to 7 identifying every perceived difference between the Company’s proposals and the 8 performance-based regulation framework developed in Docket No. 21-05-15. They 9 ultimately claim that the Company’s proposals depart materially from that framework 10 and suggest that such departures are grounds for rejecting the Company’s proposals 11 because the Docket No. 21-05-15 framework reflects years of regulatory proceedings 12 and stakeholder input (RMI Testimony at 5–6, 10–14, et passim; Griffin Testimony at 13 76–85, et passim). 14 Here, the Company would like to note that, without a final decision in those dockets, 15 the Company’s proposed PBMRP stands as a reasonable outcome that could have been 16 achieved in those dockets had the full process been completed with the fair and 17 balanced consideration of all parties, including the Company, in the final result. 18 Meaning that – there is no reason to conclude that the final performance-based 19 regulation framework in that docket would mimic the proposed final decisions entirely. 20 Nor would such an outcome have precluded the Company’s legal opportunity to 21 challenge such a result, given that the final decision(s) would have emerged from an
  7. Page 9 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 7 of 98 1 uncontested proceeding that does not have preclusive effect on the Company. As a 2 result, the Company has properly presented its proposed PBMRP in this docket as a 3 viable outcome to PURA’s PBR process and PURA is properly considering the merits 4 of the Company’s proposal on its merits. 5 ii. Capital Support Mechanism and the Revenue Cap 6 All three testimonies oppose the Company’s proposal to apply the revenue cap solely 7 to operations and maintenance (“O&M”) expenses. The witnesses argue that by 8 omitting capital costs from the formula, the Company’s proposal fails to mitigate the 9 financial incentive for investor-owned utilities to favor capital investment over 10 potentially less costly or more flexible operational solutions (RMI Testimony at 11, 11 15–17, 20–24; Griffin Testimony at 22–26; see Taylor Testimony at 28–31). 12 The OCC witnesses specifically argue that the proposed F-Factor, which establishes 13 annual capital investment allowances based on the Company’s forecast and is subject 14 to annual reconciliation through the Rate Adjustment Mechanism (“RAM”), could 15 incentivize shifting O&M expenses into capital (RMI Testimony at 17, 25-26). Ms. 16 Griffin similarly argues that a revenue cap constrains costs only if it includes the 17 Company’s entire revenue requirement (Griffin Testimony at 36-37). 18 The OCC witnesses and Ms. Griffin also emphasize, at great length, the differences 19 between the proposed F-Factor and the capital recovery mechanism in PURA’s RE01 20 decision (i.e., the “CT-Bar”). The witnesses assert that the CT-Bar allows recovery of 21 depreciation and taxes on new capital investments but delays any return until a
  8. Page 10 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 8 of 98 1 prudence determination (RMI Testimony, at 18, 19-20; Griffin Testimony at 35, 38, 2 42). In contrast, the proposed F-Factor would allow the Company to earn a return on 3 forecast capital investment upfront, with downward reconciliation later (RMI 4 Testimony, at 18, 19-20; Griffin Testimony at 35, 38, 42-43). According to the OCC 5 witnesses, this incentivizes an inflated capital forecast and necessitates recurring 6 prudence reviews, which erodes the administrative efficiencies that a multi-year rate 7 plan should deliver (RMI Testimony, at 6, 20, 21, 23-24, 32-33). 8 iii. Distribution System Planning 9 The OCC witnesses and Ms. Griffin also challenge the Company’s proposed Targeted 10 System Performance Plan (“TSP”), stating that it omits essential elements of an 11 Integrated Distribution System Plan (“IDSP”), the capital planning process proposed 12 in Docket 21-05-15RE03, such as scenario-based forecasting, “least-regrets” analysis, 13 and meaningful stakeholder engagement (RMI Testimony at 28-32; Griffin Testimony 14 at 44, 47-48, 50-51, 55-59). 15 iv. Productivity Factor and Revenue Cap Design 16 All three testimonies challenge the Company’s proposed -0.03% X-Factor, which is 17 based on a total factor productivity (“TFP”) study performed by LEI. The witnesses 18 assert that LEI’s study diverges from PURA’s guidance in the RE01 decision, relies on 19 customer count as the only output measure while excluding delivered energy and peak 20 demand, and lacks sufficient sensitivity testing (see RMI Testimony at 32, 35-38, 40, 21 41-41; Griffin Testimony at 37, 79; Taylor Testimony at 6-9, 14-15, 23). The OCC 22 witnesses and Dr. Taylor assert that the TFP results are especially sensitive to
  9. Page 11 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 9 of 98 1 methodological choices and the inclusion of the outlier year 2019–2020 (RMI 2 Testimony at 37, 41-42; Taylor Testimony at 24, 31-34). 3 The OCC witnesses also object to several other aspects of the Company’s proposal, 4 including the 0.5 percent Z-Factor threshold, which is lower than the 0.75 percent 5 established in RE01; limiting the S-Factor to O&M expenses; setting a 0 percent floor 6 on the I-Factor; and not including off-ramps from the multi-year plan (RMI Testimony 7 at 11, 14, 43-44, 44-45, 45-46, 46-47). 8 v. Summary of Recommendations 9 The OCC witnesses and Ms. Griffin recommend that PURA reject the Company’s 10 proposed PBMRP (RMI Testimony at 6, 9-10, 49; Griffin Testimony at 75-76). The 11 OCC witnesses further recommend approval of only a one-year rate plan (RMI 12 Testimony at 6-7, 10, 49). Alternatively, if PURA approves a multi-year plan, the 13 OCC’s witnesses recommend using a 2025 test year, reopening the proceeding to 14 implement a single indexed revenue cap covering both O&M and capital costs, and 15 setting the X-Factor at zero (RMI Testimony at 42-43, 49-50). 16 Dr. Taylor’s testimony focuses more narrowly on the technical aspects of the 17 productivity factor. He recommends a TFP of 0.457% if the cap covers both capital 18 and O&M expenses, or an OM&A X-Factor of at least 0.675% if the cap applies only 19 to O&M (Taylor Testimony at 9-10, 35, 37-38, 44-45). 20 independent third-party sensitivity and frontier analyses and proposes alternative TFP He also recommends
  10. Page 12 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 10 of 98 1 floors of 0% or -1.04 if PURA declines to adopt his recommended values Taylor 2 Testimony at 6, 10, 39-41, 46). 3 Both the witnesses for OCC, Acadia Center and CLF also argue that the level and 4 design of the PIMs penalty and incentive pools should be modified (RMI Testimony at 5 52-56; Griffin Testimony at 65-66, 80, 87). 6 7 Q. How is your rebuttal testimony on the PBMRP organized to respond to these issues? 8 A. Our rebuttal follows the four categories of issues described in the summary above and 9 responds, from a senior executive-level perspective, to the arguments raised by the 10 OCC’s RMI witnesses, Ms. Griffin, and Dr. Taylor. 11 (1) consistency with PURA’s proposed PBR framework, where we address the 12 contention that the Company’s proposal departs from the framework developed in 13 Docket No. 21-05-15 and its subsequent reopeners; (2) the merits of the capital support 14 mechanism and the associated revenue cap, where we explain why the Company’s 15 proposed F-Factor and application of the revenue cap to only O&M expenses are a 16 reasonable and balanced ratemaking approach and do not create the capex bias that the 17 witnesses allege; (3) distribution system planning, where we address the criticisms of 18 the Company’s proposed TSP; and (4) the productivity factor and PBRMP design 19 elements, where we respond to the challenges to the proposed X-Factor, Z-Factor 20 threshold, S-Factor, I-Factor floor, and the absence of off-ramps. Specifically, we address: