  1. Page 33 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 31 of 98 1 2 The Tiering Framework Is “Artificial” and “Business-as-Usual” and Lacks Urgency 3 Mr. Balakumar claims that the Company’s TSP proposal is “business-as-usual,” lacks 4 urgency on grid modernization, and uses “artificial” tiers. He recommends that PURA 5 reject the tiering framework (Balakumar Testimony at 15, 16). 6 Contrary to Mr. Balakumar’s claim, each tier is grounded in specific performance 7 objectives and quantified system impacts. The Sustained Performance Tier ($3.611B) 8 maintains reliability, with a SAIDI impact of -0.7 minutes. The Targeted System 9 Performance Tier ($3.985B) hardens the system, with a SAIDI impact of -6.1 minutes. 10 The Advancing the Grid Tier ($4.381B) modernizes the grid, with a SAIDI impact of 11 -10.3 minutes. 12 As documented in Exhibit CLP-TSP-3, at pages 7, 11, and 39-49, each tier is defined 13 by a distinct set of characteristics spanning multiple dimensions, including primary 14 objectives, operational approach, reliability performance, resiliency investment, cost 15 trajectory, and alignment with regulatory requirements, including RE08. 16 Mr. Balakumar’s criticism that the Company is improperly treating grid modernization 17 as a “long-term” objective and lack urgency reflects a fundamental misunderstanding 18 of prudent infrastructure planning and the foundational investments required to support 19 advanced grid capabilities. 20 successful DER integration and the development of dynamic grid capabilities depend 21 on first ensuring sufficient baseline resiliency. The Company’s approach correctly recognizes that To proceed otherwise would be
  2. Page 34 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 32 of 98 1 imprudent and could jeopardize both system reliability and the effectiveness of 2 subsequent investments. 3 Limited Reliability Benefit of the Sustained Performance Tier 4 Mr. Balakumar argues that the Sustained Performance Tier’s projected net SAIDI 5 improvement of only 0.7 minutes shows that it provides limited reliability benefits 6 (Balakumar Testimony at 17, 21). 7 However, the Sustained Performance Tier is intended to preserve existing reliability 8 levels rather than deliver significant incremental improvements in SAIDI. 9 Company’s distribution system faces ongoing asset deterioration, rising capacity 10 demands, and emerging reliability challenges that require continued investment. 11 Additionally, SAIDI does not fully reflect the benefits of preventive investments, such 12 as reduced equipment failure risk, improved asset health, expanded system capacity, 13 and greater operational flexibility. 14 evaluated by its effectiveness in mitigating system degradation and maintaining the 15 reliability and quality of service customers expect, rather than solely by its projected 16 SAIDI improvement. 17 O&M Costs and Advancing the Grid Investments 18 Mr. Balakumar argues that the $71 million in O&M proposed for the Targeted System 19 Performance Tier, including the $38 million Grid Services Compensation Fund, is not 20 adequately supported (Balakumar Testimony at 14, 37-38). He also argues that the The The Sustained Performance Tier should be
  3. Page 35 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 33 of 98 1 Company has not quantified the incremental benefits of the $770 million Advancing 2 the Grid Tier (id. at 5-6). Mr. Balakumar further argues that DERMS and the Grid 3 Services Compensation Fund should be approved only if they are subject to conditions, 4 such as an iterative roadmap with annual updates, testing a flexibility market platform, 5 and targeted deployment at constrained locations (id. at 63). 6 The Company disagrees with Mr. Balakumar’s assertion that the proposed O&M costs 7 are insufficiently supported. The $71 million in incremental O&M costs for the 8 Targeted System Performance Tier reflects specific, well-defined investments in 9 personnel, programs, and resources essential to achieving the Company’s system 10 performance objectives. The principal components of these investments are as follows: 11 • Grid Services Compensation Fund: $38 million 12 • Control Room Labor: 7 new FTEs 13 • Field Communications Labor and Cellular: 2 new FTEs 14 • Data Innovation: 3 new FTEs 15 • Distribution Substation Asset Management: 1 new FTE 16 • Vegetation Management: 21 new FTEs to bring certain work in-house 17 • Power Quality: 5 new FTEs to investigate and resolve power quality issues 18 (Exh. CLP-TSP-3, at 43). 19 These targeted investments provide the staffing and programmatic resources needed to 20 enhance system performance, advance grid modernization, and address emerging 21 distribution system needs. 22 increases in O&M spending, they are tailored to specific operational requirements Rather than representing unsupported or generalized
  4. Page 36 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 34 of 98 1 identified by the Company. 2 objectives of the Company’s proposed grid investment strategy, including the 3 deployment of customer DERs and the development of a more flexible and resilient 4 distribution system. It is within PURA’s authority to establish the funding for these 5 items as adjustments to the PBMRP over its term and the Company has provided the 6 information to support these adjustments in this filing. 7 Regarding the $38 million Grid Services Compensation Fund, Eversource appreciates 8 Mr. Balakumar’s recognition that this is “a good starting point” for compensating 9 customer DER and flexible loads for local grid services. However, the Company 10 respectfully disagrees with Mr. Balakumar’s recommendation to restrict funding solely 11 to specific capacity constrained locations or deferred infrastructure investments 2. 12 The proposed Fund is a policy-driven mechanism intended to capture local grid benefits 13 from customer-owned DERs, while also facilitating the deferral or avoidance of 14 traditional infrastructure investments and ensuring customers receive their fair share of 15 resulting economic benefits. Notably, this approach is not without precedent. In 2024, 16 Eversource received approval to implement a Grid Services Compensation Fund in its 17 Massachusetts service territory, laying the foundation for procuring local grid services 18 from customer-owned DERs. As emphasized in the Massachusetts proceeding, the 2 Moreover, these investments support the broader The Company clarifies that, should PURA authorize the Company to proceed with the Grid Services Compensation Fund as described in the TSP, funding would be provided for through the RAM proceeding, subject to the 4 year program budget cap of $38 million outlined therein.
  5. Page 37 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 35 of 98 1 Fund should be supported by a long-term, sustainable funding mechanism, a 2 transparent compensation methodology, and clearly defined program rules. These 3 components help ensure that participating customers are fairly compensated, reflecting 4 the shared savings realized by deferring or avoiding traditional infrastructure 5 investments. 6 In addition to supporting these targeted O&M investments, the Company has also 7 demonstrated the measurable reliability benefits associated with its broader grid 8 investment strategy. Contrary to Mr. Balakumar’s claim, the Company has clearly 9 articulated and quantified the incremental benefits of the Advancing the Grid Tier. As 10 detailed in Exhibit CLP-TSP-3, the Advancing the Grid Tier is projected to deliver a 11 10.3-minute improvement in SAIDI over five years, compared to a 0.7-minute 12 improvement under the Sustained Performance Tier—resulting in a 9.6-minute 13 incremental increase in reliability (Exh. CLP-TSP-3, at 7, 11, 40). This measurable 14 benefit directly improves customer service quality and system performance. 15 Importantly, the incremental benefits of the Advancing the Grid Tier go beyond the 16 projected SAIDI improvement. The additional investments proposed by the Company 17 are designed to modernize the electric distribution system, increase system resiliency, 18 strengthen operational capabilities, and better equip the grid to address evolving 19 customer needs. The resulting benefits will extend well beyond the initial five-year 20 planning period, supporting a more reliable and resilient electric system for the long 21 term.
  6. Page 38 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 36 of 98 1 Turning to the specific conditions proposed by Mr. Balakumar, Eversource agrees that 2 ongoing evaluation, robust framework development, and regular regulatory oversight 3 are necessary to ensure the successful implementation of a Grid Services Compensation 4 Fund. While these objectives align with the Company’s priorities, Eversource does not 5 agree that approval of the Fund should be contingent upon the additional requirements 6 suggested by Mr. Balakumar. The Company has already gained valuable experience 7 with flexibility market platforms and maintains that its proposed approach offers a 8 practical, cost-effective, and adaptable solution. 9 For example, Eversource has already tested the Piclo flexibility market platform in 10 Connecticut as part of PURA’s Innovative Energy Solutions (IES) Program, and so a 11 new pilot should not be a condition of approval. This initiative identified challenges 12 with stand-alone market platforms implemented with no direct integration to the 13 Company’s control room systems used by its system operators to ensure safe, reliable 14 grid operations. 15 Building on its experience with the Piclo IES demonstration, Eversource acknowledges 16 that flexibility marketplaces are a viable option for procuring cost-effective flexibility 17 resources. Nevertheless, the Company maintains that a range of fit-for-purpose 18 solutions should be considered. For instance, expanding Eversource’s industry-leading 19 ConnectedSolutions programs to compensate customers for providing local grid 20 services could prove more effective for accessing behind-the-meter (BTM) resources 21 than relying solely on a flexibility marketplace. Therefore, Eversource does not
  7. Page 39 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 37 of 98 1 consider funding and testing an additional flexibility market platform to be a necessary 2 condition for approving the proposed Fund. 3 Similarly, the Company’s proposed DERMS investment reflects a deliberate, phased 4 approach to grid modernization, rather than the need for additional prescriptive 5 approval 6 recommendation to make DERMS approval contingent on an iterative roadmap with 7 annual updates and specific MW targets. The Company’s proposed $24.7 million 8 DERMS investment—$10.7 million for the core Grid DERMS (within the Targeted 9 System Performance Tier) and $14 million for a targeted demonstration project (in the 10 Advancing the Grid Tier)—reflects a prudent, phased strategy tailored to Connecticut’s 11 unique grid needs and regulatory environment. 12 The core Grid DERMS implementation ($10.7M) establishes the foundational platform 13 that will transform real-time operations across Connecticut’s entire distribution system. 14 As detailed in Exhibit CLP-ELP-1, Grid DERMS “represents a significant 15 advancement as EDCs transition toward the Control Room of the future—leveraging 16 Advanced Distribution Management Systems not only to pinpoint fault locations and 17 reconfigure the distribution system to isolate faults, but also to utilize DERs to 18 maximize customer restoration and grid resilience.” (Exh. CLP-ELP-1, at 72). 19 Building on this foundational investment, the DERMS architecture, detailed in Exhibit 20 CLP-TSP-3, will give control room operators visibility and control over both utility- conditions. Eversource also disagrees with Mr. Balakumar’s
  8. Page 40 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 38 of 98 1 scale and behind-the-meter DERs. It will enable dynamic, flexible interconnections that 2 lower DER integration costs, provide advanced decision-support tools for optimal DER 3 control, orchestrate behind-the-meter (“BTM”) and front-of-meter (“FTM”) DERs to 4 deliver grid services, and facilitate compliance with FERC Order 2222 by supporting 5 DER Aggregators. 6 Connecticut’s increasing DER penetration and meeting the state’s clean energy 7 objectives. 8 The $14 million DERMS demonstration is not indicative of limited ambition on the 9 part of the Company, as Mr. Balakumar suggests. Instead, it exemplifies prudent utility 10 practice. The proposed demonstration will validate three essential use cases before 11 pursuing system-wide deployment: (1) DER communications and control technology 12 to evaluate new protocols that reduce integration costs compared to current DER 13 Gateway systems; (2) centralized voltage management leveraging DERMS control of 14 advanced inverters, coordinated with grid devices, to improve power delivery 15 efficiency; and (3) cost-effective, DER-enabled microgrids through integration of 16 third-party DERs. 17 “demonstrate the use of centralized DERMS advanced capabilities to integrate third- 18 party DERs, [delivering] grid benefits in a select location in support of future programs 19 at scale.” (Exh. CLP-TSP-3, at 134). 20 Conditioning approval on an iterative roadmap with annual updates, as Mr. Balakumar 21 suggests, would delay essential grid modernization, and risk stranding investments if These capabilities are critical for effectively managing As described in the Company’s filing, this initiative will
  9. Page 41 of 100Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 39 of 98 1 requirements change each year. Accordingly, the Company respectfully requests 2 approval of the DERMS investment as proposed, with the expectation that future rate 3 cases will offer opportunities to assess progress, confirm realized benefits, and consider 4 subsequent deployment phases based on proven outcomes. 5 4. Productivity Factor and Other PBMRP Design Elements 6 7 8 Q. How do you respond to the OCC witnesses’ criticisms regarding the Company’s proposed Z-Factor, S-Factor, I-Factor, and the absence of off-ramps in the PBMRP design? 9 Z-Factor Threshold 10 Ms. Wilson and Mr. Tully’s recommendation to increase the Z-Factor threshold from 11 0.5 percent to 0.75 percent is not supported by evidence that the Company’s proposed 12 threshold would capture ordinary cost fluctuations. 13 materiality threshold, as suggested by the OCC’s witnesses, could weaken the Z-Factor 14 mechanism and the overall PBR framework by preventing CL&P from recovering 15 legitimate exogenous costs. This could undermine the Company’s financial stability 16 and creditworthiness, and increase borrowing costs, ultimately resulting in higher rates 17 for customers. In addition, if the threshold is set too high, customers may not benefit 18 from cost reductions (such as those resulting from lower federal or state income tax 19 rates) if the savings do not exceed the materiality requirement. 20 S-Factor 21 The OCC witnesses’ recommendation to extend the S-Factor to capital expenditures 22 overlooks the fundamental differences between capital investments and O&M Setting an excessively high
  10. Page 42 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 40 of 98 1 expenses. While reductions in O&M expenses can indicate improved efficiency, 2 similar reductions in capital expenditures cannot reasonably be viewed in the same light 3 during a period of increasing capital investment needs, as has been extensively 4 documented in this proceeding. 5 I-Factor 6 Apart from the fact that it applies only to O&M, Ms. Wilson and Mr. Tully’s main 7 concern with the I-Factor is that it includes a floor of zero and cannot go negative. 8 They offer no rationale for this criticism other than that the Docket No. 21-05-15RE01 9 Proposed Final Decision does not specify that the I-Factor “must be non-negative” 10 (RMI Testimony at 46). The OCC witnesses’ criticism is inconsistent with the purpose 11 of the I-Factor and, more broadly, the purpose of the PBMRP. 12 The purpose of the I-Factor is to recognize that the costs of providing utility service 13 change over time due to inflation. A negative I-Factor would convert that adjustment 14 into a reduction even though the Company’s underlying costs to operate and maintain 15 the system have not declined. For example, a portion of the Company’s labor costs is 16 fixed by contract and does not decrease when inflation declines. 17 The purpose of the PBMRP is to provide a predictable framework for adjusting O&M 18 revenues during the term while creating incentives for the Company to improve 19 efficiency and manage costs. Allowing the I-Factor to go negative would impose an 20 automatic downward adjustment unrelated to the Company’s efficiency or performance