  1. Page 36 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 34 of 98 1 identified by the Company. 2 objectives of the Company’s proposed grid investment strategy, including the 3 deployment of customer DERs and the development of a more flexible and resilient 4 distribution system. It is within PURA’s authority to establish the funding for these 5 items as adjustments to the PBMRP over its term and the Company has provided the 6 information to support these adjustments in this filing. 7 Regarding the $38 million Grid Services Compensation Fund, Eversource appreciates 8 Mr. Balakumar’s recognition that this is “a good starting point” for compensating 9 customer DER and flexible loads for local grid services. However, the Company 10 respectfully disagrees with Mr. Balakumar’s recommendation to restrict funding solely 11 to specific capacity constrained locations or deferred infrastructure investments 2. 12 The proposed Fund is a policy-driven mechanism intended to capture local grid benefits 13 from customer-owned DERs, while also facilitating the deferral or avoidance of 14 traditional infrastructure investments and ensuring customers receive their fair share of 15 resulting economic benefits. Notably, this approach is not without precedent. In 2024, 16 Eversource received approval to implement a Grid Services Compensation Fund in its 17 Massachusetts service territory, laying the foundation for procuring local grid services 18 from customer-owned DERs. As emphasized in the Massachusetts proceeding, the 2 Moreover, these investments support the broader The Company clarifies that, should PURA authorize the Company to proceed with the Grid Services Compensation Fund as described in the TSP, funding would be provided for through the RAM proceeding, subject to the 4 year program budget cap of $38 million outlined therein.
  2. Page 37 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 35 of 98 1 Fund should be supported by a long-term, sustainable funding mechanism, a 2 transparent compensation methodology, and clearly defined program rules. These 3 components help ensure that participating customers are fairly compensated, reflecting 4 the shared savings realized by deferring or avoiding traditional infrastructure 5 investments. 6 In addition to supporting these targeted O&M investments, the Company has also 7 demonstrated the measurable reliability benefits associated with its broader grid 8 investment strategy. Contrary to Mr. Balakumar’s claim, the Company has clearly 9 articulated and quantified the incremental benefits of the Advancing the Grid Tier. As 10 detailed in Exhibit CLP-TSP-3, the Advancing the Grid Tier is projected to deliver a 11 10.3-minute improvement in SAIDI over five years, compared to a 0.7-minute 12 improvement under the Sustained Performance Tier—resulting in a 9.6-minute 13 incremental increase in reliability (Exh. CLP-TSP-3, at 7, 11, 40). This measurable 14 benefit directly improves customer service quality and system performance. 15 Importantly, the incremental benefits of the Advancing the Grid Tier go beyond the 16 projected SAIDI improvement. The additional investments proposed by the Company 17 are designed to modernize the electric distribution system, increase system resiliency, 18 strengthen operational capabilities, and better equip the grid to address evolving 19 customer needs. The resulting benefits will extend well beyond the initial five-year 20 planning period, supporting a more reliable and resilient electric system for the long 21 term.
  3. Page 38 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 36 of 98 1 Turning to the specific conditions proposed by Mr. Balakumar, Eversource agrees that 2 ongoing evaluation, robust framework development, and regular regulatory oversight 3 are necessary to ensure the successful implementation of a Grid Services Compensation 4 Fund. While these objectives align with the Company’s priorities, Eversource does not 5 agree that approval of the Fund should be contingent upon the additional requirements 6 suggested by Mr. Balakumar. The Company has already gained valuable experience 7 with flexibility market platforms and maintains that its proposed approach offers a 8 practical, cost-effective, and adaptable solution. 9 For example, Eversource has already tested the Piclo flexibility market platform in 10 Connecticut as part of PURA’s Innovative Energy Solutions (IES) Program, and so a 11 new pilot should not be a condition of approval. This initiative identified challenges 12 with stand-alone market platforms implemented with no direct integration to the 13 Company’s control room systems used by its system operators to ensure safe, reliable 14 grid operations. 15 Building on its experience with the Piclo IES demonstration, Eversource acknowledges 16 that flexibility marketplaces are a viable option for procuring cost-effective flexibility 17 resources. Nevertheless, the Company maintains that a range of fit-for-purpose 18 solutions should be considered. For instance, expanding Eversource’s industry-leading 19 ConnectedSolutions programs to compensate customers for providing local grid 20 services could prove more effective for accessing behind-the-meter (BTM) resources 21 than relying solely on a flexibility marketplace. Therefore, Eversource does not
  4. Page 39 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 37 of 98 1 consider funding and testing an additional flexibility market platform to be a necessary 2 condition for approving the proposed Fund. 3 Similarly, the Company’s proposed DERMS investment reflects a deliberate, phased 4 approach to grid modernization, rather than the need for additional prescriptive 5 approval 6 recommendation to make DERMS approval contingent on an iterative roadmap with 7 annual updates and specific MW targets. The Company’s proposed $24.7 million 8 DERMS investment—$10.7 million for the core Grid DERMS (within the Targeted 9 System Performance Tier) and $14 million for a targeted demonstration project (in the 10 Advancing the Grid Tier)—reflects a prudent, phased strategy tailored to Connecticut’s 11 unique grid needs and regulatory environment. 12 The core Grid DERMS implementation ($10.7M) establishes the foundational platform 13 that will transform real-time operations across Connecticut’s entire distribution system. 14 As detailed in Exhibit CLP-ELP-1, Grid DERMS “represents a significant 15 advancement as EDCs transition toward the Control Room of the future—leveraging 16 Advanced Distribution Management Systems not only to pinpoint fault locations and 17 reconfigure the distribution system to isolate faults, but also to utilize DERs to 18 maximize customer restoration and grid resilience.” (Exh. CLP-ELP-1, at 72). 19 Building on this foundational investment, the DERMS architecture, detailed in Exhibit 20 CLP-TSP-3, will give control room operators visibility and control over both utility- conditions. Eversource also disagrees with Mr. Balakumar’s
  5. Page 40 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 38 of 98 1 scale and behind-the-meter DERs. It will enable dynamic, flexible interconnections that 2 lower DER integration costs, provide advanced decision-support tools for optimal DER 3 control, orchestrate behind-the-meter (“BTM”) and front-of-meter (“FTM”) DERs to 4 deliver grid services, and facilitate compliance with FERC Order 2222 by supporting 5 DER Aggregators. 6 Connecticut’s increasing DER penetration and meeting the state’s clean energy 7 objectives. 8 The $14 million DERMS demonstration is not indicative of limited ambition on the 9 part of the Company, as Mr. Balakumar suggests. Instead, it exemplifies prudent utility 10 practice. The proposed demonstration will validate three essential use cases before 11 pursuing system-wide deployment: (1) DER communications and control technology 12 to evaluate new protocols that reduce integration costs compared to current DER 13 Gateway systems; (2) centralized voltage management leveraging DERMS control of 14 advanced inverters, coordinated with grid devices, to improve power delivery 15 efficiency; and (3) cost-effective, DER-enabled microgrids through integration of 16 third-party DERs. 17 “demonstrate the use of centralized DERMS advanced capabilities to integrate third- 18 party DERs, [delivering] grid benefits in a select location in support of future programs 19 at scale.” (Exh. CLP-TSP-3, at 134). 20 Conditioning approval on an iterative roadmap with annual updates, as Mr. Balakumar 21 suggests, would delay essential grid modernization, and risk stranding investments if These capabilities are critical for effectively managing As described in the Company’s filing, this initiative will
  6. Page 41 of 100Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 39 of 98 1 requirements change each year. Accordingly, the Company respectfully requests 2 approval of the DERMS investment as proposed, with the expectation that future rate 3 cases will offer opportunities to assess progress, confirm realized benefits, and consider 4 subsequent deployment phases based on proven outcomes. 5 4. Productivity Factor and Other PBMRP Design Elements 6 7 8 Q. How do you respond to the OCC witnesses’ criticisms regarding the Company’s proposed Z-Factor, S-Factor, I-Factor, and the absence of off-ramps in the PBMRP design? 9 Z-Factor Threshold 10 Ms. Wilson and Mr. Tully’s recommendation to increase the Z-Factor threshold from 11 0.5 percent to 0.75 percent is not supported by evidence that the Company’s proposed 12 threshold would capture ordinary cost fluctuations. 13 materiality threshold, as suggested by the OCC’s witnesses, could weaken the Z-Factor 14 mechanism and the overall PBR framework by preventing CL&P from recovering 15 legitimate exogenous costs. This could undermine the Company’s financial stability 16 and creditworthiness, and increase borrowing costs, ultimately resulting in higher rates 17 for customers. In addition, if the threshold is set too high, customers may not benefit 18 from cost reductions (such as those resulting from lower federal or state income tax 19 rates) if the savings do not exceed the materiality requirement. 20 S-Factor 21 The OCC witnesses’ recommendation to extend the S-Factor to capital expenditures 22 overlooks the fundamental differences between capital investments and O&M Setting an excessively high
  7. Page 42 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 40 of 98 1 expenses. While reductions in O&M expenses can indicate improved efficiency, 2 similar reductions in capital expenditures cannot reasonably be viewed in the same light 3 during a period of increasing capital investment needs, as has been extensively 4 documented in this proceeding. 5 I-Factor 6 Apart from the fact that it applies only to O&M, Ms. Wilson and Mr. Tully’s main 7 concern with the I-Factor is that it includes a floor of zero and cannot go negative. 8 They offer no rationale for this criticism other than that the Docket No. 21-05-15RE01 9 Proposed Final Decision does not specify that the I-Factor “must be non-negative” 10 (RMI Testimony at 46). The OCC witnesses’ criticism is inconsistent with the purpose 11 of the I-Factor and, more broadly, the purpose of the PBMRP. 12 The purpose of the I-Factor is to recognize that the costs of providing utility service 13 change over time due to inflation. A negative I-Factor would convert that adjustment 14 into a reduction even though the Company’s underlying costs to operate and maintain 15 the system have not declined. For example, a portion of the Company’s labor costs is 16 fixed by contract and does not decrease when inflation declines. 17 The purpose of the PBMRP is to provide a predictable framework for adjusting O&M 18 revenues during the term while creating incentives for the Company to improve 19 efficiency and manage costs. Allowing the I-Factor to go negative would impose an 20 automatic downward adjustment unrelated to the Company’s efficiency or performance
  8. Page 43 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 41 of 98 1 and impair the Company’s ability to operate the system safely and reliably for the full 2 PBMRP term. 3 Off-Ramps 4 Ms. Wilson and Mr. Tully’s recommendation to incorporate off-ramps overlooks or 5 ignores the potential for such mechanisms to weaken the cost-containment incentives 6 central to a multi-year rate plan. The Company’s proposal already incorporates robust 7 customer protections, including the Consumer Dividend, the I-Factor cap, the Earnings 8 Sharing Mechanism, and capped capital expenditures. These mechanisms provide 9 appropriate safeguards while preserving CL&P’s incentive to manage costs within the 10 established PBMRP framework. Furthermore, the lack of predefined off-ramps does 11 not limit PURA’s authority to address extraordinary circumstances as needed. 12 Q. How do you respond to Dr. Taylor’s criticisms of the TFP study and its results? 13 A. Dr. Taylor’s criticisms of the productivity study center mainly on differing opinions 14 regarding specific methodological choices. However, alternative methodological 15 choices do not establish that LEI’s analysis is flawed or unreliable, nor do they 16 undermine the reasonableness of the proposed X-Factor. As with any productivity 17 study, selecting inputs, outputs, and study periods requires informed judgment. LEI’s 18 methodological choices are well supported and reasonable, and Dr. Taylor’s specific 19 technical criticisms are addressed in Ms. Frayer’s rebuttal testimony.
  9. Page 44 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 42 of 98 1 5. PIM Design Elements 2 3 Q. What conclusions and recommendations do the OCC’s witnesses make with respect to the Company’s proposed PIM incentive and penalty design and pool? 4 A. The OCC witnesses contend that they are not certain that the Company has proposed 5 an appropriate size of the incentive and penalty pool, as well as the allocation of the 6 pool (RMI Testimony at 52). The OCC witnesses do not have a concern with the 7 asymmetrical structure of the PIMs, where the potential penalties are double the 8 potential incentives (RMI Testimony at 54). The witnesses raise only a general 9 question about whether the proposed penalty and incentive pool is right-sized and 10 whether the incentive amount is appropriate to encourage incremental performance that 11 provides incremental benefits to customers to justify the potential costs (RMI 12 Testimony at 55). The OCC witnesses, however, do not propose an alternative pool or 13 allocation methodology. Instead, OCC recommends that PURA approve financial 14 incentives only when the Company has demonstrated that the PIM targets exemplary 15 performance or discourages substandard performance, that a financial incentive or 16 penalty is appropriate to influence that performance, and that the financial exposure is 17 calibrated to the outcome (RMI Testimony at 56). 3 18 19 Q. How does the Company respond to the OCC’s conclusions and recommendations regarding the determination to include an incentive or penalty for a PIM? 20 A. As a general matter, the Company agrees with the principles that OCC’s witnesses 21 identify for evaluating whether to include a penalty or incentive for a proposed PIM. OCC’s witnesses made additional recommendations regarding the design of specific PIMs and metrics which are addressed in the Company’s Performance-Based Ratemaking Metrics Panel testimony. 3
  10. Page 45 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 43 of 98 1 In the Company’s initial filing, the Company similarly explained that a “well-designed 2 performance metric encourages improvements in areas that the Company may not 3 otherwise directly pursue unless necessary to fulfill its basic obligation of safe and 4 reliable services” (Exh. CLP-ELP-1, at 105). The Company specifically designed the 5 PBMRP PIMs to incentivize it to achieve specific goals that go above and beyond the 6 efficient delivery of core business operations. Out of the array of performance metrics, 7 the Company has proposed four PIMS: two System Reliability PIMs - Blue Sky SAIDI 8 and Blue Sky SAIFI; a Customer Reliability PIM - Count of Repeat CEMI-5/CELID- 9 6; and a Customer PIM Suite consisting of five components representing a holistic 10 assessment of overall customer service. Although the overall performance metric 11 portfolio provides transparency into multiple aspects of the Company’s operations, the 12 PIMs are targeted at reliability and improving customer service in order to provide 13 significant and direct benefits to customers. 14 The System Reliability PIMs are downside-only PIMs and subject the Company to 15 penalties for substandard performance. These PIMs, which are aligned with RE02’s 16 penalty structure proposal, provide a financial incentive for the Company to maintain 17 system reliability during the PBMRP term and not allow system reliability to degrade 18 by deferring system investments while the Company pursues cost efficiencies. The 19 PIMs set a floor for system reliability and holds the Company accountable for failing 20 to achieve the minimum level of reliability. Given that degradation in system reliability 21 substantially impacts all customers and can have ramifications for businesses and