Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Prefiled testimony

Witness: DONALD J. SCACCO, JR., DIGAUNTO CHATTERJEE AND DOUGLAS P. HORTON

Files2

Search terms highlighted
Eversource rate increase is on 7 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
7 pages match
  1. Page 51 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 49 of 98 1 total return on equity achieved should be no greater than the level PURA would 2 otherwise find just and reasonable (Griffin Testimony at 65). 4 3 4 Q. How does the Company respond to the Acadia Center and CLF’s recommendation regarding the scale of the penalty pool for PIMs? 5 A. As discussed above, the Company established the potential penalty pool by 6 benchmarking the pool against the exogenous cost threshold. Since the purpose of a 7 penalty metric is to provide sufficient financial motivation to achieve the PIM’s 8 objectives, the exogenous cost threshold is a good measure of the costs that constitute 9 a significant expense for the Company. While a penalty should be significant enough 10 to incentivize a particular action, the penalty level should not be set so high that it could 11 cause financial instability. Assessing a high penalty could impact the Company’s 12 creditworthiness and borrowing costs, which ultimately will negatively impact 13 customers. Accordingly, the penalty level should seek to balance these factors. Using 14 the exogenous threshold, as discussed above, achieves this objective. 15 16 Q. How does the Company respond to the Acadia Center and CLF’s recommendation regarding using a fixed penalty level for PIMs? 17 A. As discussed above and in the Company’s Performance-Based Ratemaking Metrics 18 Panel testimony, the Company’s proposed sliding scale PIM design provides additional 19 benefits compared to a fixed penalty. Under the sliding scale approach, the Company 20 will receive a meaningful penalty or incentive if the respective PIM threshold is AC-CLF’s witness made additional recommendations regarding the design of specific PIMs and metrics which are addressed in the Company’s Performance-Based Ratemaking Metrics Panel testimony. 4
  2. Page 52 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 50 of 98 1 triggered but the Company is encouraged to continue pursuing the PIM objectives to 2 obtain additional incentives or mitigate potential penalties. This mechanism ensures 3 that the objectives of the PIM are pursued even if the PIM threshold is achieved, while 4 also establishing a maximum penalty or incentive to limit potential financial exposure 5 for the Company and its customers. 6 7 8 Q. How does the Company respond to the Acadia Center and CLF’s recommendation regarding limiting the total return the Company can achieve under the PBMRP and PIMs? 9 A. The Company’s proposed Earnings Sharing Mechanism provides a means for 10 customers to share in savings obtained during the PBMRP term. If the Company 11 achieves cost efficiencies during the PBMRP term that result in earnings above the 12 Company’s authorized return on equity, the Company would share the additional 13 earnings 50/50 with customers (Exh. CLP-ELP-1, at 98). This mechanism provides a 14 safeguard for customers and addresses the concern Acadia Center and CLF raise, while 15 also incentivizing the Company to pursue cost-efficiency opportunities during the 16 PBMRP term. 17 III. RESPONSE TO TESTIMONY REGARDING STORM COST RECOVERY 18 19 Q. Please summarize the testimony submitted by parties and intervenors regarding the Company’s storm cost recovery proposals. 20 A. Nikhil Balakumar 5 of Eclipse Energy Partners and Gennelle Wilson and Oliver Tully On page 94 of his testimony, Mr. Balakumar quotes the Company’s testimony as including costs associated with “eight pre-staging events” (Balakumar Testimony at 94 quoting Exh. CLP-STORM-1 at 80). The reference to eight pre-staging events originated in prior testimony and was inadvertently included on page 80 of Exhibit CLP-STORM-1. The Company’s filing includes 14 weather events, each of which exceeded the $4 million threshold for catastrophic storm recovery. 5
  3. Page 53 of 100Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 51 of 98 1 of RMI filed two separate testimonies on behalf of OCC concerning the Company’s 2 proposed storm cost recovery and its new cost recovery framework. 3 The Balakumar and RMI testimonies are predicated on a common, but erroneous, 4 premise, which is that CL&P’s proposed storm cost recovery framework provides 5 insufficient incentives to control costs and inadequate protection for customers against 6 forecast and spending risk (Balakumar Testimony at 95-96; RMI Testimony at 78-81). 7 Specifically, the witnesses criticize the use of a monetary threshold as the primary 8 criterion for classifying a storm as “catastrophic” (Balakumar Testimony at 95-96; RMI 9 Testimony at 80-81). They contend that a cost-only threshold could incentivize the 10 Company to increase storm-response spending to qualify for catastrophic-storm cost 11 recovery. Frankly, this contention in mind-boggling to the Company as the Company 12 would prefer that catastrophic storms never occurred to begin with and the Company 13 is not certainly driving to a catastrophic storm event, whereas its sole focus in storm 14 restoration is the safe and expeditious restoration of power to customers – without harm 15 to employees – restoration of the system to its steady state operation. Where the 16 ratemaking framework supports restoration, through a combination of base rates and 17 incremental cost recovery, the Company is entirely neutral as to how that recovery 18 occurs. The Company simply seeks an opportunity to prove prudence before cost 19 recovery is denied for storm restoration, whether that is through one rate or the other. 20 The witnesses’ overlapping recommendations ask PURA to: (1) retain a monetary 21 threshold only if paired with objective, impact-based criteria, such as the Major Storm
  4. Page 54 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 52 of 98 1 criterion established in Docket No. 86-12-03, the IEEE 1366 Major Event Day 2 (“MED”) methodology, the number of customers interrupted, or the number of trouble 3 spots; (2) require standardized event-level reporting comparing forecasts, declared 4 event levels, crew plans, actual crew utilization, outages, trouble spots, restoration 5 performance, standby time, travel, lodging, meals, SAIDI/SAIFI/CAIDI/CMI, storm- 6 hardening and vegetation-management spending, and total costs; (3) establish clearer 7 benchmarks for storm staffing and related costs, including comparisons with other 8 utilities; (4) require the Company to explain material forecast-to-actual and staffing 9 variances, and deny recovery of unjustified overspending; and/or (5) evaluate storm- 10 hardening, vegetation-management, analytics, automation, and AMI investments based 11 on measurable reductions in outages, restoration time, and storm costs (see Balakumar 12 Testimony at 97-101; RMI Testimony at 82-89). 13 Mr. Balakumar also briefly addresses the Company’s request to recover approximately 14 $157.3 million for 14 catastrophic storm events in 2024 and 2025. He recommends 15 that PURA disallow any portion of the $62 million requested for storms MS24A, 16 MS24B, MS24C, MS24D, MS24H, and MS24K that exceeds “established spending 17 benchmarks[,]” unless the Company provides evidence justifying the “variances” 18 (Balakumar Testimony at 101). In support of his recommendation, he argues that the 19 six storms were less severe than forecast and their cost per trouble spot was roughly 20 twice that of the other eight events (id. at 97-98).
  5. Page 55 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 53 of 98 1 Mr. Balakumar further recommends using the storm costs presented in this filing as the 2 baseline for evaluating the Company’s claimed savings for AMI and storm hardening 3 investments (id. at 100). In support of that recommendation, he asserts that the 4 Company relies on anticipated storm-cost savings when seeking funding, yet states in 5 this proceeding that cost-effectiveness “is not a concept generally applicable to storm 6 response” (id. citing OCC-557 at 1). 7 OCC witnesses Wilson and Tully separately object to three elements of the Company’s 8 proposal: the higher monetary storm-eligibility threshold of $5.4 million, annual 9 SCRAF proceedings, and the accrual of carrying charges before a prudence 10 determination (RMI Testimony at 79-80, 81). They argue that these features reduce 11 regulatory lag and weaken incentives for efficient storm-cost management (id. at 81). 12 Instead, they recommend that PURA consider an annual review process, potentially 13 through the RAM proceeding, with recovery permitted only after a prudence 14 determination (id. at 82). They also briefly consider alternative reserve structures, 15 including a reserve for all storm and prestaging costs, but make no final 16 recommendations on those design choices pending further analysis and stakeholder 17 input (id. at 86-89). 18 19 Q. Did any other witnesses file testimony on the Company’s storm cost recovery proposals? 20 A. Yes. OCC’s consultant, John Defever, filed testimony asserting that the Company’s 21 proposed annual Rate Year allowance of $38 million for non-catastrophic storm and
  6. Page 56 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 54 of 98 1 prestaging expenses is overstated (Defever Testimony at 40). According to Mr. 2 Defever, the Company should not have adjusted historical costs to 2028 dollars when 3 calculating the five-year average used to derive the $38 million Rate Year allowance 4 for non-catastrophic storms (id. at 39). He argues that a five-year average of unadjusted 5 historical costs would smooth out annual fluctuations and yield an allowance of 6 approximately $32 million (id.). 7 Mr. Defever raises a similar objection to the proposed $4 million in annual funding for 8 the prestaging reserve. He recommends removing the inflation adjustment from the 9 five-year average of historical costs (id. at 40–41). He calculates an unadjusted average 10 of annual funding at approximately $3.4 million (id. at 41–42). 11 12 13 Q. In addition to the testimony described above addressing storm cost recovery, has PURA undertaken any other efforts to examine storm cost recovery frameworks in this proceeding? 14 A. Yes. On November 2, 2026, PURA held a technical session to facilitate discussion of 15 storm cost recovery frameworks. The session addressed, among other things, the 16 definition of catastrophic storms and pre-staging events, funding mechanisms for the 17 reserve funds, and carrying costs on regulatory assets. 18 19 Q. How is the Company’s rebuttal testimony organized to address the issues raised by the OCC witnesses regarding the Company’s storm cost recovery proposals? 20 A. The Company’s rebuttal testimony addresses the issues raised by the OCC witnesses 21 in five principal categories: (1) the design and operation of the Company’s proposed 22 storm cost recovery framework, including the criteria for catastrophic storm eligibility
  7. Page 57 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 55 of 98 1 and the process for cost recovery; (2) the treatment of carrying costs on storm costs, 2 including the timing at which such charges begin to accrue; (3) the review of storm 3 costs, including cost management incentives, cost benchmarks, reporting requirements, 4 and the evaluation of storm-related investments; (4) the reasonableness of the 5 Company’s requested recovery of costs associated with the 14 catastrophic storm 6 events in 2024 and 2025; and (5) the calculation of the proposed annual allowances for 7 non-catastrophic storm and prestaging expenses. These categories are addressed in the 8 following subsections. 9 1. Design and Operation of Proposed Storm Cost Recovery Framework 10 11 12 Q. The OCC’s witnesses argue that a monetary threshold for accessing the storm reserve creates an incentive to spend more to push events over the threshold. What is your response to that argument? 13 A. From the Company’s perspective, there are a few disconnects in this thinking. First 14 and foremost, this allegation ignores the circumstances under which storm response 15 expenditures are incurred. Before and after a storm event, the Company’s attention is 16 directed toward preparing for the event, protecting public safety, assessing damage, 17 deploying personnel and resources, and restoring service as safely and efficiently as 18 possible. The Company’s operational decisions are driven by the conditions on the 19 ground and the resources necessary to address them—not by how close the Company 20 may be to reaching a predetermined monetary threshold. Indeed, the Company does 21 not have visibility into the full storm costs as those costs are being incurred. Rather,
  8. Page 58 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 56 of 98 1 the total costs become known only after the event, as contractors and other service 2 providers submit invoices, and the associated costs are reviewed and processed. 3 Second, this argument also presumes (incorrectly) that the Company has confidence 4 that, when it expends dollars on storm restoration, and allegedly does so in a way that 5 pushes a particular storm event into the category of incremental, catastrophic recovery, 6 there is no increase in risk in recovering those dollars, which is 100% not the case. The 7 Company has no objective whatsoever to expend dollars and to place those dollars at 8 greater risk of recovery – both in terms of the timeliness and adequacy of such 9 recovery. The incremental storm costs incurred by the Company are recoverable only 10 if PURA finds them to be prudent and storm costs incurred in relation to storms that 11 are directly on that margin of being catastrophic or non-catastrophic are the events most 12 susceptible to disallowance in the long run, as recently occurred in Docket No. 25-12- 13 13. There is no incentive for the Company to place greater dollars at risk. 14 For example, a monetary threshold does not incentivize the Company to incur 15 unnecessary expenses that are going to be totally exposed in a prudence review, 16 particularly where the storm conditions place the event on the margin. The Company 17 is always responsible for efficiently managing its resources and making prudent 18 decisions when responding to storm events. All costs incurred, regardless of whether 19 they fall above or below the threshold, must be reasonable and necessary to respond to 20 the storm and restore service. Contrary to the characterization advanced by the OCC’s 21 witnesses, the threshold is not a spending target. Rather, it is a ratemaking construct
  9. Page 59 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 57 of 98 1 that establishes the point at which storm-related costs become extraordinary enough to 2 justify cost recovery through the reserve mechanism. 3 The OCC witnesses’ assertion also ignores the circumstances under which 4 storm response expenditures are incurred. Before and after a storm event, the 5 Company’s attention is directed toward preparing for the event, protecting public 6 safety, assessing damage, deploying personnel and resources, and restoring service as 7 safely and efficiently as possible. The Company’s operational decisions are driven by 8 the conditions on the ground and the resources necessary to address them—not by how 9 close the Company may be to reaching a predetermined monetary threshold. Indeed, 10 the Company does not have visibility into the full storm costs as those costs are being 11 incurred. Rather, the total costs become known only after the event, as contractors and 12 other service providers submit invoices, and the associated costs are reviewed and 13 processed. 14 Ultimately, the Company’s operational interests and financial interests are aligned. The 15 best decisions from an operational standpoint, including deploying the appropriate 16 resources and restoring service efficiently, are also the best decisions from a financial 17 standpoint. Conversely, unnecessary spending does not improve storm response, it 18 simply increases costs. In fact, expenditures incurred without reasonable justification 19 would only expose the Company to a finding of imprudence and the disallowance of 20 those costs from recovery. In other words, the Company has no reasonable economic 21 incentive to incur unnecessary costs merely to access reserve funding.
  10. Page 60 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 58 of 98 1 That said, like other parties and PURA, the Company would prefer a non-monetary 2 metric as a way to measure qualifying events in order to reduce controversy around the 3 point of whether an event has met a threshold that signals whether the storm is a 4 “normally recurring” minor weather event contemplated in base rates, or a randomly 5 occurring, major event that requires the use of outside crews and cost incurrence not 6 intended to be recovered through base rates. To that end, the Company is evaluating 7 alternative criteria and intends to submit written comments addressing this more fully, 8 along with other proposals discussed during the November 2, 2026 technical session, 9 as described below. 10 11 12 13 Q. What is your assessment of using impact-based criteria, such as the number of trouble spots, the number of customer outages or an IEEE Major Event Day designation, to establish eligibility for accessing reserve funding for storm-related costs? 14 A. Generally speaking, the impact-based criteria, as proposed by the OCC’s witnesses, are 15 not an appropriate basis for determining eligibility to access reserve funding because 16 these types of criteria do not consistently or adequately capture the impact of the effort 17 required to restore service from a qualitative perspective, nor have any correlation to 18 the actual storm costs incurred, which would tend to consistently overstate or understate 19 the financial significance of a particular storm. Using these criteria as eligibility 20 thresholds could allow or deny access to reserve funding in circumstances that do not 21 reflect CL&P’s actual circumstances, creating a disconnect between reliability 22 objectives and cost recovery.

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DONALD J. SCACCO, JR., DIGAUNTO CHATTERJEE AND DOUGLAS P. HORTON [26-05-10]

This filing on the current system (opens in a new tab)