Words on different pages
7 pages match
  1. Page 63 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 61 of 98 1 customers interrupted may decrease without a corresponding reduction in restoration 2 costs (id.). Similarly, significant storm response expenditures, such as clearing blocked 3 roads, removing debris, and addressing other public-safety needs, are not reflected in 4 customer outage counts (id.). 5 Conversely, the loss of a single transmission line could interrupt service to a large 6 number of customers while requiring relatively limited repair work and restoration 7 expenditures. 8 Accordingly, customer interruption counts are not a reliable measure of the magnitude 9 or cost of a storm event. The Company’s eligibility to access reserve funding should 10 instead be based on whether the Company has incurred incremental, prudently incurred 11 restoration costs, rather than whether an arbitrary customer outage threshold has been 12 met. 13 IEEE Major Event Day 14 The Company’s initial reaction to this proposal is that MED designations should not be used 15 as a criterion for determining eligibility to access reserve funding under the SCRAF, 16 because MEDs reflect system reliability performance rather than storm severity, 17 customer impacts, or restoration costs. IEEE 1366 is designed to identify days with 18 exceptionally high SAIDI values, enabling utilities to more accurately assess reliability 19 under normal conditions and to shape investment plans that target those areas of the 20 system requiring more reliability spending, rather than storm restoration spending
  2. Page 64 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 62 of 98 1 (Exhs. OCC-852; OCC-902). The IEEE 2.5 Beta methodology highlights statistically 2 unusual outage durations based on historical system performance, but it does not define 3 what constitutes a major or catastrophic storm from an operational or ratemaking 4 perspective (Exhs. OCC-852; OCC-902). Moreover, further review of historical storm 5 data confirms that the IEEE 2.5 Beta methodology may exclude events that required 6 substantial operational response and incurred significant restoration costs. 7 reinforces the Company's position that storm qualification should consider operational 8 impacts and resource requirements in addition to any statistical reliability metric. 9 To that end, the IEEE methodology will fundamentally view storm events that have 10 relatively lower SAIDI values as “normal operations,” although the Company may 11 have had to bring a relatively material complement of external crews to address the 12 damage and impacts of that weather event, thereby “limiting” the SAIDI impact below 13 the level that would have been achievable had the Company’s relied exclusively on its 14 own crews. Moreover, it is the cost of those external crews that the “threshold” is 15 looking to identify because the costs of those external crews will not be included in the 16 Company’s base revenue requirement unless PURA makes an express allowance to 17 identify and provide for that cost recovery. 18 This is a consideration that PURA cannot overlook. There is no correlation between 19 an MED designation and the costs or resources required to respond to a storm (Exhs. 20 OCC-852; OCC-902). In addition, the MED threshold shifts over time with historical 21 reliability performance, so improvements in system reliability, such as investments in This
  3. Page 65 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 63 of 98 1 automation and sectionalizing, may reduce measured outage durations even when a 2 storm causes substantial damage and demands significant restoration resources (id.). 3 As a result, a storm could require extensive efforts and incur substantial costs but still 4 fail to meet the MED threshold because earlier investments have minimized customer 5 outage impacts (id.). Likewise, since MEDs are determined on a daily basis, a storm 6 may be classified as an MED on its initial day, while subsequent days of substantial 7 restoration and associated costs are not (id.). Neither scenario provides a reasonable 8 basis for determining cost recovery eligibility. 9 Furthermore, relying on MEDs as an eligibility threshold, risks creating perverse 10 incentives that penalize utilities for effective restoration efforts (Exh. OCC-852). 11 Utilities that quickly deploy resources and restore service may be less likely to meet 12 the MED criteria than those that allow outages to continue beyond typical durations 13 (id.). Over time, extended restoration periods could become embedded in historical 14 data, further reducing the methodology’s value as an indicator of truly extraordinary 15 storm events (id.). These effects are antithetical Company’s ERP obligations and the 16 best interest of customers (id.). 17 Additionally, weather events are inherently uncertain and may weaken, change course, 18 or otherwise fail to materialize with the severity originally anticipated. In such 19 circumstances, the Company may have appropriately incurred extraordinary costs to 20 prepare for the event, even though the event ultimately does not result in an MED. It 21 would be inappropriate to conclude that these expenditures are ineligible for storm
  4. Page 66 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 64 of 98 1 reserve funding solely because the storm did not ultimately satisfy the IEEE MED 2 criteria. This approach would unfairly judge operational decisions using hindsight, 3 even though those decisions were made with the best information available at the time. 4 Lastly, the IEEE MED is not an appropriate threshold because it is designed to identify 5 the most statistically extreme events—essentially, outliers among outliers. As a result, 6 the methodology excludes certain events that, while not meeting the statistical 7 threshold for classification as an MED, are nevertheless catastrophic in nature due to 8 the level of system disruption, as well as the level of resources necessary to restore 9 service and the associated costs. In other words, the fact that an event does not qualify 10 as an MED under the IEEE methodology does not mean that it was routine, ordinary, 11 or operationally insignificant. 12 The Company has demonstrated this in response to a discovery request asking it to 13 identify the catastrophic storms that would have been classified as MEDs under the 14 IEEE methodology. As shown in the table below (reproduced from the Company’s 15 response to OCC-904), there are five storms that would not have been classified as 16 MED under the IEEE methodology but the record evidence in this proceeding plainly 17 demonstrates that these were catastrophic events in their magnitude and impact when 18 viewed in the context of the resources procured based on the information available at 19 the time those procurement decisions were made. 20
  5. Page 67 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 65 of 98 1 Storm Work Order IEEE MED? MS24E011 Y MS24F011 Y MS24G011 Y MS24J011 Y MS24K011 Y MN25K011 Y MN25M011 Y MN24Q011 Y MN24X011 Y a. Average Cost for MEDs MS24A011 N MS24B011 N MS24C011 N MS24D011 N MS24H011 N b. Average Cost for non-MEDs Incremental Cost $5,346,370 $9,962,874 $24,427,262 $8,645,547 $5,290,522 $23,238,528 $9,288,108 $9,003,603 $5,354,923 $11,173,082 $20,328,260 $8,734,920 $8,667,329 $12,373,421 $6,608,771 $11,342,540 2 The bottom line is that IEEE MEDs were developed to measure system reliability, not 3 storm severity or restoration costs, and should not be used (absent modification) to 4 restrict access to reserve funding for incremental storm costs subject to prudence 5 review. 6 All that said, the Company is looking at the IEEE MED to determine whether it could 7 be utilized, in combination with other criteria, to serve as a basis for a technical 8 threshold, which would be a positive step for the overall storm-cost framework. The 9 Company expects that more dialogue on this point will occur in this docket as a result 10 of PURA’s technical session on the same issue. 11 PURA Major Storm Definition
  6. Page 68 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 66 of 98 1 PURA defines a Major Storm as any event where the frequency of restoration work 2 locations exceeds the 98.5th percentile, by company or region. Decision, Aug. 31, 3 2022, Docket No. 17-12-03RE08, PURA Investigation into Distribution System 4 Planning of the Electric Distribution Companies – Resilience and Reliability Standards 5 and Programs at 36. This definition was created in 1995 to help PURA evaluate 6 reliability performance during blue-sky conditions, because Conn. Gen. Stat. § 16- 7 245y(a) requires PURA to exclude the effects of major storms from reliability-based 8 evaluations in certain periodic reports to the Connecticut General Assembly. 9 The Major Storm definition is not a suitable criterion for determining reserve funding 10 eligibility. Like the MEDs discussed above, the Major Storm definition was created to 11 measure reliability performance—not storm severity, customer impacts, or restoration 12 costs. Thus, applying this definition to reserve funding eligibility would improperly 13 exclude events that generate extraordinary storm-related costs simply because they do 14 not meet an incompatible, reliability-based statistical threshold. 15 16 Q. What is the Company’s recommendation for the criterion that should be used to determine whether an event is eligible for recovery under the SCRAF? 17 A. The clearest sign that an event exceeds normal operating conditions is when internal 18 resources are insufficient to restore service and Eversource must engage external 19 mutual assistance or contract crews. The need to engage outside resources reflects the 20 event’s scale and complexity and the incremental costs incurred to respond to the event. 21 Unlike MED designations, customer outage, or trouble spot thresholds that measure
  7. Page 69 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 67 of 98 1 outage outcomes that may not accurately represent restoration efforts or the related 2 costs, the need for external resources directly aligns with the actual resources required 3 for restoration and the associated costs. 4 The magnitude of incremental restoration costs, driven in significant part by the use of 5 external crews, has to remain a factor in the determination of whether an event 6 surpasses “normal” operating conditions and qualifies for catastrophic storm cost 7 recovery under the SCRAF, although the Company is evaluating whether the IEEE 8 methodology could factor into this analysis. Because catastrophic storms and the 9 associated costs are inherently unpredictable, it is impractical to establish a 10 representative amount of costs for these events in base rates. In addition, incremental 11 storm costs may be prudently incurred in accordance with the ERP, even when the 12 proposed impact-based thresholds discussed above are not met. For example, the 13 Company may prudently prepare for a catastrophic storm event by securing additional 14 resources in advance, even if the storm ultimately does not materialize as forecast. 15 Therefore, eligibility for SCRAF cost recovery should be based on the costs incurred, 16 as measured relative to a monetary threshold, rather than strictly on impact-based 17 measures. 18 The number of crews required, the duration of their deployment, and the resources 19 needed to support them are driven by the scope of storm damage and the Company’s 20 obligation to restore service as quickly and safely as reasonably possible. Fulfilling 21 that obligation means responding not only to the physical damage caused by a storm,
  8. Page 70 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 68 of 98 1 but also to the expectations of customers, local and state officials, and regulators. These 2 expectations directly shape the scale, speed, and intensity of restoration efforts, as well 3 as the workforce and resources required to carry them out. As a result, the Company 4 must ensure it can deploy sufficient personnel and resources to meet these operational 5 demands. 6 The storm cost recovery mechanism must reflect these operational realities. It should 7 recognize that restoration costs are primarily determined by the resources necessary to 8 fulfill the Company’s service restoration obligations. At the same time, it should 9 provide a reasonable and predictable process for recovering prudently incurred costs 10 and ensure robust regulatory oversight and accountability. 11 monetary threshold should continue to be used as the primary criterion for determining 12 whether a storm qualifies for reserve funding because that criterion is consistent with 13 the purpose of the reserve itself. The reserve is intended to provide funding for 14 extraordinary storm restoration expenditures, including the incremental costs necessary 15 to procure additional crews and other resources to assist with restoration. Accordingly, 16 the threshold for accessing those funds should be tied primarily to the extraordinary 17 costs incurred in responding to the storm event. 18 Nevertheless, the Company agrees that the recovery mechanism could benefit from an 19 additional, objective criterion reflecting impact-based criteria. As discussed above, the 20 impact-based criteria proposed by the OCC’s witnesses, if used alone and without 21 adjustment, do not sufficiently capture the actual damage from a storm event or the For these reasons, a
  9. Page 71 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 69 of 98 1 circumstances in which the Company prudently prepares for a catastrophic storm that 2 ultimately does not materialize as anticipated. Therefore, any impact-based criteria 3 incorporated into the SCRAF must be refined to address these shortcomings and used 4 in conjunction with a monetary threshold to ensure the mechanism continues to fulfill 5 its primary purpose, i.e., providing funding for extraordinary storm restoration costs. 6 As discussed at the November 2, 2026 Technical Session, any adjustment to the storm 7 threshold requires additional analysis and adjustment to base distribution rates to ensure 8 the level of storm costs included in base distribution rates is set at the appropriate level, 9 ensuring that costs are not ‘trapped’ with no opportunity for recovery, either through 10 base rates, the SCRAF, or a combination thereof. 11 Q. Please describe the alternative threshold that the Company is working to develop. 12 A. In light of the expressed interest during the technical session in developing an 13 alternative methodology for determining when a storm event qualifies as catastrophic 14 for purposes of accessing reserve funding, the Company is actively and diligently 15 developing a hybrid approach that it believes will provide an appropriate and objective 16 basis for making that determination. Consistent with this objective, the Company 17 supports the use of an objective threshold measure based, in part, on SAIDI, as part of 18 the proposed methodology. The Company only recently received the transcript of the 19 technical session and requires a small amount of additional time to consider the 20 discussion and further develop its proposal. Although work remains ongoing, the 21 Company is committed to advancing this effort and will present its proposed
  10. Page 72 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 70 of 98 1 methodology to PURA and the parties once the approach has been sufficiently 2 developed to permit a complete and fully supported presentation, and as soon as 3 possible. 4 2. Carrying Cost Recovery and Regulatory Lag 5 6 7 8 9 Q. The RMI witnesses challenge the Company’s proposal to accrue carrying charges from the date costs are incurred. They argue that carrying charges should only begin accruing after a prudence review and maintain that annual prudence reviews would reduce regulatory lag, thereby encouraging more efficient spending. How do you respond to these assertions? 10 A. The OCC witnesses’ positions are internally inconsistent. On one hand, they argue that 11 regulatory lag should be reduced to minimize the carrying costs customers pay. On the 12 other, they characterize regulatory lag as an important mechanism for promoting cost 13 discipline and efficient spending. These positions are difficult, if not impossible, to 14 reconcile. Moreover, the OCC witnesses’ assertion that regulatory lag incentivizes cost 15 discipline is misplaced in this context. 16 discretionary, nor does the Company have meaningful discretion over when they must 17 be incurred. Instead, they result from catastrophic storms that demand immediate 18 action to restore electric service and protect public safety. For example, when a storm 19 destroys a utility pole, the Company cannot defer its replacement to reduce costs—the 20 pole must be replaced promptly to restore power and ensure safe and reliable service. 21 When the power goes out following a catastrophic storm, municipal officials are not 22 calling the Company to engage in an academic debate about the theoretical merits or 23 shortcomings of regulatory lag. They are calling because their communities are in the The expenditures at issue here are not

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DONALD J. SCACCO, JR., DIGAUNTO CHATTERJEE AND DOUGLAS P. HORTON [26-05-10]

This filing on the current system (opens in a new tab)