    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 64 of 98 1 reserve funding solely because the storm did not ultimately satisfy the IEEE MED 2 criteria. This approach would unfairly judge operational decisions using hindsight, 3 even though those decisions were made with the best information available at the time. 4 Lastly, the IEEE MED is not an appropriate threshold because it is designed to identify 5 the most statistically extreme events—essentially, outliers among outliers. As a result, 6 the methodology excludes certain events that, while not meeting the statistical 7 threshold for classification as an MED, are nevertheless catastrophic in nature due to 8 the level of system disruption, as well as the level of resources necessary to restore 9 service and the associated costs. In other words, the fact that an event does not qualify 10 as an MED under the IEEE methodology does not mean that it was routine, ordinary, 11 or operationally insignificant. 12 The Company has demonstrated this in response to a discovery request asking it to 13 identify the catastrophic storms that would have been classified as MEDs under the 14 IEEE methodology. As shown in the table below (reproduced from the Company’s 15 response to OCC-904), there are five storms that would not have been classified as 16 MED under the IEEE methodology but the record evidence in this proceeding plainly 17 demonstrates that these were catastrophic events in their magnitude and impact when 18 viewed in the context of the resources procured based on the information available at 19 the time those procurement decisions were made. 20
  2. Page 67 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 65 of 98 1 Storm Work Order IEEE MED? MS24E011 Y MS24F011 Y MS24G011 Y MS24J011 Y MS24K011 Y MN25K011 Y MN25M011 Y MN24Q011 Y MN24X011 Y a. Average Cost for MEDs MS24A011 N MS24B011 N MS24C011 N MS24D011 N MS24H011 N b. Average Cost for non-MEDs Incremental Cost $5,346,370 $9,962,874 $24,427,262 $8,645,547 $5,290,522 $23,238,528 $9,288,108 $9,003,603 $5,354,923 $11,173,082 $20,328,260 $8,734,920 $8,667,329 $12,373,421 $6,608,771 $11,342,540 2 The bottom line is that IEEE MEDs were developed to measure system reliability, not 3 storm severity or restoration costs, and should not be used (absent modification) to 4 restrict access to reserve funding for incremental storm costs subject to prudence 5 review. 6 All that said, the Company is looking at the IEEE MED to determine whether it could 7 be utilized, in combination with other criteria, to serve as a basis for a technical 8 threshold, which would be a positive step for the overall storm-cost framework. The 9 Company expects that more dialogue on this point will occur in this docket as a result 10 of PURA’s technical session on the same issue. 11 PURA Major Storm Definition
  3. Page 68 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 66 of 98 1 PURA defines a Major Storm as any event where the frequency of restoration work 2 locations exceeds the 98.5th percentile, by company or region. Decision, Aug. 31, 3 2022, Docket No. 17-12-03RE08, PURA Investigation into Distribution System 4 Planning of the Electric Distribution Companies – Resilience and Reliability Standards 5 and Programs at 36. This definition was created in 1995 to help PURA evaluate 6 reliability performance during blue-sky conditions, because Conn. Gen. Stat. § 16- 7 245y(a) requires PURA to exclude the effects of major storms from reliability-based 8 evaluations in certain periodic reports to the Connecticut General Assembly. 9 The Major Storm definition is not a suitable criterion for determining reserve funding 10 eligibility. Like the MEDs discussed above, the Major Storm definition was created to 11 measure reliability performance—not storm severity, customer impacts, or restoration 12 costs. Thus, applying this definition to reserve funding eligibility would improperly 13 exclude events that generate extraordinary storm-related costs simply because they do 14 not meet an incompatible, reliability-based statistical threshold. 15 16 Q. What is the Company’s recommendation for the criterion that should be used to determine whether an event is eligible for recovery under the SCRAF? 17 A. The clearest sign that an event exceeds normal operating conditions is when internal 18 resources are insufficient to restore service and Eversource must engage external 19 mutual assistance or contract crews. The need to engage outside resources reflects the 20 event’s scale and complexity and the incremental costs incurred to respond to the event. 21 Unlike MED designations, customer outage, or trouble spot thresholds that measure
  4. Page 69 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 67 of 98 1 outage outcomes that may not accurately represent restoration efforts or the related 2 costs, the need for external resources directly aligns with the actual resources required 3 for restoration and the associated costs. 4 The magnitude of incremental restoration costs, driven in significant part by the use of 5 external crews, has to remain a factor in the determination of whether an event 6 surpasses “normal” operating conditions and qualifies for catastrophic storm cost 7 recovery under the SCRAF, although the Company is evaluating whether the IEEE 8 methodology could factor into this analysis. Because catastrophic storms and the 9 associated costs are inherently unpredictable, it is impractical to establish a 10 representative amount of costs for these events in base rates. In addition, incremental 11 storm costs may be prudently incurred in accordance with the ERP, even when the 12 proposed impact-based thresholds discussed above are not met. For example, the 13 Company may prudently prepare for a catastrophic storm event by securing additional 14 resources in advance, even if the storm ultimately does not materialize as forecast. 15 Therefore, eligibility for SCRAF cost recovery should be based on the costs incurred, 16 as measured relative to a monetary threshold, rather than strictly on impact-based 17 measures. 18 The number of crews required, the duration of their deployment, and the resources 19 needed to support them are driven by the scope of storm damage and the Company’s 20 obligation to restore service as quickly and safely as reasonably possible. Fulfilling 21 that obligation means responding not only to the physical damage caused by a storm,
  5. Page 70 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 68 of 98 1 but also to the expectations of customers, local and state officials, and regulators. These 2 expectations directly shape the scale, speed, and intensity of restoration efforts, as well 3 as the workforce and resources required to carry them out. As a result, the Company 4 must ensure it can deploy sufficient personnel and resources to meet these operational 5 demands. 6 The storm cost recovery mechanism must reflect these operational realities. It should 7 recognize that restoration costs are primarily determined by the resources necessary to 8 fulfill the Company’s service restoration obligations. At the same time, it should 9 provide a reasonable and predictable process for recovering prudently incurred costs 10 and ensure robust regulatory oversight and accountability. 11 monetary threshold should continue to be used as the primary criterion for determining 12 whether a storm qualifies for reserve funding because that criterion is consistent with 13 the purpose of the reserve itself. The reserve is intended to provide funding for 14 extraordinary storm restoration expenditures, including the incremental costs necessary 15 to procure additional crews and other resources to assist with restoration. Accordingly, 16 the threshold for accessing those funds should be tied primarily to the extraordinary 17 costs incurred in responding to the storm event. 18 Nevertheless, the Company agrees that the recovery mechanism could benefit from an 19 additional, objective criterion reflecting impact-based criteria. As discussed above, the 20 impact-based criteria proposed by the OCC’s witnesses, if used alone and without 21 adjustment, do not sufficiently capture the actual damage from a storm event or the For these reasons, a
  6. Page 71 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 69 of 98 1 circumstances in which the Company prudently prepares for a catastrophic storm that 2 ultimately does not materialize as anticipated. Therefore, any impact-based criteria 3 incorporated into the SCRAF must be refined to address these shortcomings and used 4 in conjunction with a monetary threshold to ensure the mechanism continues to fulfill 5 its primary purpose, i.e., providing funding for extraordinary storm restoration costs. 6 As discussed at the November 2, 2026 Technical Session, any adjustment to the storm 7 threshold requires additional analysis and adjustment to base distribution rates to ensure 8 the level of storm costs included in base distribution rates is set at the appropriate level, 9 ensuring that costs are not ‘trapped’ with no opportunity for recovery, either through 10 base rates, the SCRAF, or a combination thereof. 11 Q. Please describe the alternative threshold that the Company is working to develop. 12 A. In light of the expressed interest during the technical session in developing an 13 alternative methodology for determining when a storm event qualifies as catastrophic 14 for purposes of accessing reserve funding, the Company is actively and diligently 15 developing a hybrid approach that it believes will provide an appropriate and objective 16 basis for making that determination. Consistent with this objective, the Company 17 supports the use of an objective threshold measure based, in part, on SAIDI, as part of 18 the proposed methodology. The Company only recently received the transcript of the 19 technical session and requires a small amount of additional time to consider the 20 discussion and further develop its proposal. Although work remains ongoing, the 21 Company is committed to advancing this effort and will present its proposed
  7. Page 72 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 70 of 98 1 methodology to PURA and the parties once the approach has been sufficiently 2 developed to permit a complete and fully supported presentation, and as soon as 3 possible. 4 2. Carrying Cost Recovery and Regulatory Lag 5 6 7 8 9 Q. The RMI witnesses challenge the Company’s proposal to accrue carrying charges from the date costs are incurred. They argue that carrying charges should only begin accruing after a prudence review and maintain that annual prudence reviews would reduce regulatory lag, thereby encouraging more efficient spending. How do you respond to these assertions? 10 A. The OCC witnesses’ positions are internally inconsistent. On one hand, they argue that 11 regulatory lag should be reduced to minimize the carrying costs customers pay. On the 12 other, they characterize regulatory lag as an important mechanism for promoting cost 13 discipline and efficient spending. These positions are difficult, if not impossible, to 14 reconcile. Moreover, the OCC witnesses’ assertion that regulatory lag incentivizes cost 15 discipline is misplaced in this context. 16 discretionary, nor does the Company have meaningful discretion over when they must 17 be incurred. Instead, they result from catastrophic storms that demand immediate 18 action to restore electric service and protect public safety. For example, when a storm 19 destroys a utility pole, the Company cannot defer its replacement to reduce costs—the 20 pole must be replaced promptly to restore power and ensure safe and reliable service. 21 When the power goes out following a catastrophic storm, municipal officials are not 22 calling the Company to engage in an academic debate about the theoretical merits or 23 shortcomings of regulatory lag. They are calling because their communities are in the The expenditures at issue here are not
  8. Page 73 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 71 of 98 1 dark, critical services are disrupted, and they need to know one thing: When is the 2 power coming back on? 3 recognizes that storm restoration is not simply a matter of discretionary spending or 4 cost management. Connecticut Gen. Stat. §§ 16-32h and 16-32i establish specific 5 emergency preparedness and restoration performance standards for electric distribution 6 companies, with the potential for substantial civil penalties when those standards are 7 not met. 8 Electricity is a critical service and the restoration of that service cannot reasonably be 9 delayed, postponed, or deferred. At the same time, the Company is required to make 10 staffing and resource decisions in advance of upcoming weather events, based on 11 forecasts that are far from perfect. The Company firmly agrees it should have (and 12 does have) strong incentives to control expenditures to the greatest extent possible, 13 because the Company perceives that it is better off where it can demonstrate that cost 14 efficiency is incorporated into the costs incurred and subject to the prudence review. 15 However, the regulatory framework needs to recognize that there is a constant and 16 persistent requirement for the Company to prepare adequately in advance for weather 17 events that, in the end, may not materialize. Regulatory lag as a concept is inapplicable, 18 certainly not in the traditional sense of the phrase, when the Company may need to 19 respond to multiple successive weather events in a condensed period, each requiring 20 their own unique response and expenditures. 21 expenditures immediately and as they are incurring. That urgency is reflected in Connecticut law, which The Company must finance those Therefore, imposing
  9. Page 74 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 72 of 98 1 uncompensated financing costs on the Company as suggested by the OCC does not 2 encourage greater efficiency; it merely shifts the entire financial burden of emergency 3 restoration onto the Company without recognizing the real cost of that emergency 4 restoration. 5 The Company’s proposed annual prudence reviews and carrying-charge treatment are 6 not competing approaches—they are complementary components of a balanced 7 recovery framework. The annual reviews provide a predictable process for timely 8 regulatory oversight of storm-related expenditures and carrying costs recognize the 9 financing costs the Company incurs between the time those expenditures are made and 10 the time recovery begins. 11 accountability while ensuring the Company is appropriately compensated for the cost 12 of financing storm restoration. OCC’s regulatory lag discussion is not the appropriate 13 focus in this context, and it adds little, if anything to the evaluation of the Company’s 14 proposal. Together, these mechanisms promote regulatory 15 16 17 Q. Why is it appropriate to accrue carrying costs from the date those expenditures are incurred, rather than from the point at which PURA issues a prudence determination? 18 A. The Company has already explained in testimony and discovery responses why the 19 Company incurs carrying charges from the date storm-related expenditures are 20 incurred, and why a storm framework should recognize the costs incurred by the 21 Company, inclusive of the carrying costs of capital, so it will not repeat all of that 22 information here. In short, the Company faces substantial costs when responding to
  10. Page 75 of 100

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 73 of 98 1 storm events, and it must finance these expenditures as they occur, regardless of when 2 PURA completes its prudence review. 3 Just as the timing of the expenditure reflects when the Company begins financing these 4 expenditures, the applicable carrying charge should reflect the actual cost of that 5 financing. When substantial balances remain outstanding for extended periods, the 6 Company’s weighted average cost of capital (“WACC”) accurately represents the mix 7 of debt and equity financing required to support these obligations. This approach aligns 8 with the ratemaking treatment of long-term utility assets, which earn a return based on 9 the Company's authorized WACC. This is true for long-term utility assets in the same 10 way it is true for long-term regulatory assets, such as storm costs. 11 Utilities earn their WACC on rate base (long-term utility assets) because the utility 12 must finance assets recovered over an extended period with an appropriate mix of debt 13 and equity, each of which comes with its own unique set of risks and costs. Although 14 the cost of debt is generally lower than the cost of equity of the same firm due to the 15 different financial risk parameters associated with each financing option, utilities are 16 not able to finance any single long-term asset (be it a physical asset like a pole or 17 substation, or a regulatory asset like a storm cost expenditure, required to be financed 18 and recovered over an extended period) with any single, dedicated source of funding. 19 Credit rating agencies, as well as debt and equity investors, evaluate companies as a 20 whole, taking into consideration all sources and uses of cash, and all financing 21 arrangements supporting the firm’s balance sheet. It is not possible for the Company

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DONALD J. SCACCO, JR., DIGAUNTO CHATTERJEE AND DOUGLAS P. HORTON [26-05-10]

This filing on the current system (opens in a new tab)