Prefiled testimony
Witness: DONALD J. SCACCO, JR., DIGAUNTO CHATTERJEE AND DOUGLAS P. HORTON
Files2
Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
PDF · 152 KB · 3 pagesText searchable
Download Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdfRead the text of Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
Exhibit CLP-LEADERSHIP-REBUTTAL-1.pdf
PDF · 712 KB · 100 pagesText searchable
Download Exhibit CLP-LEADERSHIP-REBUTTAL-1.pdfRead the text of Exhibit CLP-LEADERSHIP-REBUTTAL-1.pdf
Page 81 of 100
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 79 of 98 1 operational review and continuous improvement, they cannot be substituted for the 2 governing prudence standard. If differences between forecasts and actual outcomes 3 could be treated as evidence of imprudence, as the OCC’s witnesses suggest, it would 4 unfairly penalize the Company for taking reasonable, precautionary measures in 5 response to the risks and uncertainties of an impending storm. 6 7 Q. Are there other potential issues with the reporting requirements and benchmarks proposed by OCC’s witnesses? 8 A. Yes. Although Mr. Balakumar acknowledges that the ERP and Event Level Matrix 9 (“ELM”) do not prescribe a fixed resource plan for each emergency event, he 10 nevertheless recommends requiring the Company to justify crew levels at each decision 11 point against a benchmark tied to the declared event level and forecasted trouble spots 12 (Balakumar Testimony at 99). 13 transforming a flexible planning tool into a rigid staffing mandate. 14 The ELM is a framework for classifying events and planning resources based on a 15 range of factors, such as weather forecasts and anticipated trouble spots. Its purpose is 16 to guide advance preparation—not to prescribe fixed resource levels or impose strict 17 limits on deployment. Since emergencies rarely follow a predictable script, resource 18 needs must be reassessed continually as actual storm impacts, damage, and evolving 19 conditions become clear. This approach misconstrues the ELM’s purpose, The ELM’s overlapping resource ranges are thereforePage 82 of 100
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 80 of 98 1 intentional, underscoring the uncertainty of storm response and the necessity of 2 adaptive decision-making. 3 Moreover, the ELM is just one of several factors the Company weighs when 4 determining resource needs. In addition to the ELM, the Company assesses weather 5 forecasts, outage prediction models, resource availability, and environmental variables, 6 such as tree conditions, foliage, and soil saturation, that can influence storm damage. 7 Taken together, these variables yield a wide range of possible outcomes, a wide bell 8 curve, rather than a precise forecast of storm impacts and resource requirements. 9 Accordingly, deploying crews above the range associated with a given event level does 10 not mean the Company has used excessive resources. The ELM is a planning guide, 11 not a resource cap, and the declared event level does not dictate the precise number of 12 crews needed for an effective response. Mr. Balakumar’s proposed benchmark would 13 discourage deploying additional resources when justified or could potentially prompt 14 unnecessary escalation of event levels to satisfy staffing requirements. Thus, Mr. 15 Balakumar’s proposal would undermine effective storm response by replacing 16 operational flexibility with predetermined staffing mandates. 17 18 Q. Do you have any other comments regarding the reporting and benchmarking proposals offered by OCC’s witnesses? 19 A. Yes. All three OCC witnesses recommend that the Company report contractor time 20 spent on standby, travel, lodging, and meals separately. While such granular reporting 21 may be feasible and potentially useful, this recommendation appears to be based on aPage 83 of 100
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 81 of 98 1 fundamental misconception: that time not spent turning a wrench or physically 2 restoring power is unproductive time and an unwarranted cost. This premise is 3 incorrect and does not reflect the realities of storm restoration. 4 The use of external crews necessarily requires travel to Connecticut. Additionally, 5 restoration efforts demand that the Company mobilize resources across its system to 6 address numerous issues occurring simultaneously. OCC cannot reasonably argue that 7 the time external crews spend traveling to and within the Company’s service territory 8 is unproductive or is not essential to storm restoration. 9 As conditions evolve during an event, crews may need to remain on standby to respond 10 to anticipated developments or coordinate work in specific areas. Demobilizing and 11 remobilizing crews would cause unnecessary delays, inefficiencies, and significant 12 added costs. Standby time is not unproductive; it is a purposeful and cost-effective 13 resource management strategy that preserves the Company’s ability to respond rapidly 14 as restoration needs change. 15 OCC also cannot reasonably discount the time needed to provide crews with lodging, 16 meals, and rest between extended shifts. Crews perform physically demanding work 17 under challenging conditions. Proper nutrition and rest are not optional perks or signsPage 84 of 100
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 82 of 98 1 of inefficiency; they are essential for maintaining workforce readiness, ensuring safety, 2 and sustaining restoration operations over long durations. 3 Ultimately, effective storm restoration encompasses far more than the hours crews 4 spend performing hands-on repairs. Travel is necessary to deploy crews to the affected 5 system; standby ensures qualified personnel remain available when and where they are 6 needed; and adequate lodging, meals, and rest enable crews to work safely and 7 effectively. 8 ignores their essential role in the safe and effective restoration of service following a 9 catastrophic storm event. 10 3. Recovery of 2024-2024 Storm Costs Any characterization of these activities as unproductive improperly 11 12 Q. Please explain why Mr. Balakumar’s recommendation to disallow costs incurred for six storm events is inconsistent with the governing prudence standard. 13 A. Mr. Balakumar recommends that PURA disallow any portion of the $62 million 14 requested for six storms (MS24A, MS24B, MS24C, MS24D, MS24H, and MS24K) 15 that exceeds “established spending benchmarks,” 6 unless the Company provides 16 evidence justifying the variances (Balakumar Testimony at 101). 17 testimony is not clear on this point, his recommendation appears to be based on his 18 assertion that these six storms were less severe than forecast, and that their cost per 19 trouble spot was higher than the average. However, those facts do not establish that Although his In response to discovery, Mr. Balakumar explains that “established,” in this context, means established by the Company based on its own examination of the interaction of its past staffing and its responses to past storms, rather than approved by PURA as a spending cap or drawn from industry practice or published research (Exh. CLP-OCC-09). 6Page 85 of 100
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 83 of 98 1 the Company’s decisions were unreasonable when they were made. Mr. Balakumar’s 2 own testimony acknowledges the governing prudence standard, stating that “PURA 3 asks whether the Company’s decision-making process was in good faith and reasonable 4 under the circumstances at the time the costs were incurred.” (id. at 94). Yet, his central 5 argument, and ultimate recommendation, relies exclusively on a post-hoc, hindsight 6 analysis. 7 8 Q. Has the Company provided evidence to demonstrate that its decisions were reasonable and prudent at the time they were made? 9 A. Yes. In Exhibits CLP-STORM-IMT-1 and CLP-STORM-IMT-3, and in response to 10 numerous discovery requests, the Company has provided substantial evidence detailing 11 its preparation for and response to each storm event. This evidence encompasses 12 weather forecasts, anticipated damage and outage projections, resource assessments 13 throughout the events, and restoration status updates. This information is essential for 14 evaluating the reasonableness and prudence of the Company’s storm-related 15 expenditures. However, Mr. Balakumar's testimony neither discusses nor analyzes any 16 of this evidence. 17 For each of the six storm events for which Mr. Balakumar challenges cost recovery, 18 the Company submitted evidence from professional weather forecasters indicating a 19 high likelihood of significant weather events affecting the Company’s electric 20 distribution system. The table below summarizes the forecasted conditions for each 21 event:Page 86 of 100
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 84 of 98 Event Forecasted Conditions MS24A (1/9/24) Forecasts called for a powerful, winter storm with moderate to heavy rainfall with snow in the northwest hills, and strong damaging winds expected to impact Connecticut beginning on or around January 9th and continuing into January 10th. Peak wind gusts were predicted to range from 45-50 mph, with higher gusts of up to 57 mph in the southeast coastal areas. MS24B (1/13/24) Forecasts called for a storm system with 1.5 to 2.5 inches of rain, strong wind gusts, with peak winds predicted from 50-55 mph, a chance for isolated thunderstorms, and flooding. MS24C (2/13/24) Forecasts called for a strong, fast-moving lowpressure system with strong winds, with peak gusts up to 45 mph, and heavy wet snow with totals ranging from 3 to 14 inches across Connecticut. MC24D (2/28/24) Forecasts called for a very strong cold front to move across Connecticut, bringing continuous widespread rainfall, rapidly falling temperatures, elevated sustained winds and hazardous wind gusts in the range of 40-55 mph. MS24H (6/30/24) Forecasts called for two rounds of strong-tosevere thunderstorms, predicted to form on the afternoon of June 30th and later that evening. Both events were predicted to bring high winds of up to 65 mph. MS24K (12/10/24) Forecasts called for a strong cold front to move across Connecticut on the evening of December 11th, with heavy, widespread rain and strong winds, with gusts up to 60 mph, ahead of that cold front. Record Citations Exhibits CLPSTORM-IMT-1, at 1; Exhibit CLP-STORMIMT-3 (Event 1MS24A), at 7-99 Exhibits CLPSTORM-IMT-1, at 45; Exhibit CLPSTORM-IMT-3 (Event 1-MS24B), at 8-40 Exhibits CLPSTORM-IMT-1, at 89; Exhibit CLPSTORM-IMT-3 (Event 1-MS24C), at 7-136 Exhibits CLPSTORM-IMT-1, at 10-11; Exhibit CLPSTORM-IMT-3 (Event 1-MS24D), at 7-65 Exhibits CLPSTORM-IMT-1, at 22; Exhibit CLP-STORMIMT-3 (Event 1MS24H), at 9-22 Exhibits CLPSTORM-IMT-1, at 27-29; Exhibit CLPSTORM-IMT-3 (Event 1-MS24K), at 4-88 1 Even this high-level summary plainly shows that each event posed a substantial risk of 2 damage to the Company’s electric distribution system. In particular, the forecasts for 3 all six events predicted hazardous wind conditions, with gusts expected between 40 and 4 65 mph. These conditions are a serious threat to the Company’s overheadPage 87 of 100
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 85 of 98 1 infrastructure, which is directly exposed to the elements. High winds can bring down 2 trees and large branches onto overhead lines, causing outages, breaking conductors, 3 and damaging or toppling utility poles. These risks increase further when combined 4 with heavy rainfall, which saturates the soil and increases the likelihood of trees 5 uprooting and falling onto electric distribution equipment. 6 The Company’s prudence must be evaluated based on the information available when 7 it made the decisions, rather than with the benefit of hindsight. The forecasts for these 8 six events provided advance notice of potentially severe weather, giving the Company 9 ample justification to anticipate significant impacts to its distribution system and to 10 prepare accordingly. The Company’s resource assessments, restoration records, and 11 contemporaneous communications document the reasonableness of its response as 12 conditions evolved and restoration needs emerged. 13 14 Q. Please explain why Mr. Balakumar’s use of cost-per-trouble spot as evidence of imprudence is flawed. 15 A. A comparison of cost per trouble spot does not establish whether the underlying costs 16 were imprudent or unreasonable. As explained above, every single storm is unique and 17 the factors affecting each particular trouble spot can differ greatly depending on the 18 equipment involved, the extent of damage, and the complexity of restoration required. 19 Additionally, the cost-per-trouble-spot ratio does not account for storm-specific factors 20 such as resource availability, storm geography, damage distribution and severity, 21 mobilization distances, and storm duration. It also fails to reflect the varying amountsPage 88 of 100
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 86 of 98 1 of labor, equipment, and time needed for different types of repairs. Without 2 considering the specific facts and circumstances that drive these costs, the cost-per- 3 trouble spot ratio does not, by itself, demonstrate that expenditures were excessive, 4 unreasonable, or imprudent. 5 4. Calculation of Annual Allowances 6 Q. Is inflation a known and measurable cost that should be applied to rate setting? 7 A. Yes. As the Connecticut Supreme Court has explained, ratemaking is a prospective 8 endeavor. PURA must make reasoned estimates to establish rates that will adequately 9 compensate the utility during the period those rates are in effect. Aquarion Water Co. 10 of Connecticut v. Pub. Utilities Regul. Auth., 352 Conn. 381, 390 (2025). The Court 11 further recognized that the test year may be adjusted to permit recovery of “definite, 12 ascertainable expenses maturing or certain to materialize” during the relevant period. 13 Id. at 391 (citing Connecticut Natural Gas Corp. v. Public Utilities Commission, 29 14 Conn. Supp. 379, 390–91 (1971)). An inflation adjustment is fully consistent with 15 these principles. 16 Inflation is objectively measurable through established government indices. When 17 applied to identifiable expense categories and supported by verifiable calculations, 18 these indices provide a sound basis for determining known and measurable cost 19 adjustments. 20 reasonable and broad-based measure of changes in prices across the economy and, The Gross Domestic Product Price Index ("GDP-PI") provides aPage 89 of 100
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 87 of 98 1 accordingly, serves as an objective basis for escalating historical O&M expenses to the 2 Rate Year. 3 Because ratemaking is inherently forward-looking, the revenue requirement must 4 reflect reasonable estimates of revenues and expenses during the rate-effective period. 5 Accordingly, relying solely on historical expenses, without accounting for reasonably 6 ascertainable and measurable cost increases, would understate the revenue requirement 7 necessary to provide service during that future period. This problem is magnified under 8 a multi-year rate plan with a stay-out commitment, such as the one proposed in this 9 proceeding. In a single-year rate plan, a utility can seek a new rate adjustment if its 10 authorized revenue requirement no longer covers the actual costs of providing service. 11 By contrast, a multi-year rate plan locks in rates for a longer period, increasing the risk 12 that rates will become misaligned with the actual costs of service over time. The further 13 these rates extend into the future, the more pronounced the gap can become between 14 historical expenditures and the actual costs of providing service. To address this, an 15 inflation adjustment is necessary to set a revenue requirement that reasonably reflects 16 the costs of providing service throughout the authorized rate-effective period. The 17 principle is perhaps best summed up by the Virginia Supreme Court: “in exercising its 18 legislative function of fixing utility rates for the future, [a public utilities commission]Page 90 of 100
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 88 of 98 1 should not be blind to the future.” Commonwealth v. Virginia Elec. & Power Co., 211 2 Va. 758, 771 (1971). 3 4 5 Q. How do you respond to Mr. Defever’s argument that the Company should not have made an inflation adjustment when calculating the five-year average used to derive the Rate Year funding for non-catastrophic and prestaging expenses? 6 A. Mr. Defever’s recommendation to use an unadjusted average of the Company’s 2021 7 to 2025 non-catastrophic storm costs does appropriately account for inflation in labor, 8 contractor services, materials, equipment, and fuel. Eversource will incur these costs 9 for storm restoration at prevailing 2028 prices, not at the historical prices in the five- 10 year average (2021 – 2025). Accordingly, the Company adjusted its historical storm 11 costs for inflation to more accurately reflect expected costs during the rate-effective 12 period. While a five-year average without an inflation adjustment may smooth annual 13 fluctuations, it understates the cost of service for the rate-effective period. The 14 Company’s proposed adjustment, on the other hand, aligns historical cost data with 15 expected costs during the period in which rates will apply. 16 17 Q. Did the Company apply an inflation adjustment to any other components of its storm cost recovery proposal? 18 A. The Company seeks to establish a fair, balanced, and stable storm cost recovery 19 framework for catastrophic and non-catastrophic storms that reflects the costs 20 reasonably incurred to restore service to customers—an objective it believes all the 21 parties in this proceeding share. To that end, CL&P adjusted not only the proposed 22 base-rate funding but also the threshold for accessing the catastrophic storm reserve for 23 inflation. As explained in its revenue requirement testimony, the Company derived the